Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 8

DTS TOOLING ABERDEEN TECHNICIAN TRAINING MODULES GL 4 REAGAN LATCH TOOL

GL 4 REAGAN LATCH TOOL

Prepared by: Oceaneering Intervention Engineering Deepwater Technical Solutions Oceaneering House Pitmedden Road, Dyce Aberdeen AB21 0DP
Oceaneering Intervention Engineering is a division of Oceaneering International Services Ltd Registered Office: Royal London House, 22/25 Finsbury Square, London EC2A 1DS (Reg No: 1023217 England)

____________________________________________________________________________________________ Module 37
/var/www/apps/conversion/tmp/scratch_3/172620183.doc

Page 1

Rev A

DTS TOOLING ABERDEEN TECHNICIAN TRAINING MODULES GL 4 REAGAN LATCH TOOL

TABLE OF CONTENTS
1.0 INTRODUCTION.........................................................................................................4 1.1 System Overview...............................................................................................4 2.0 SPECIFICATIONS........................................................................................................5 2.1 Tool....................................................................................................................5 2.2 Performance Data...............................................................................................5 3.0 OPERATIONS GUIDE.................................................................................................6 3.1 Hydraulic Connection and Function Test...........................................................6 3.2 Operation of the tool..........................................................................................6 4.0 MAINTENANCE & STORAGE...................................................................................7 4.1 Maintenance Schedule........................................................................................7 5.0 PREDIVE CHECKLIST...............................................................................................8 This module is based on: GL4 Release Tool Operations and Maintenance Manual Document Number 33443/ ROV-MAN-001

____________________________________________________________________________________________ Module 37
/var/www/apps/conversion/tmp/scratch_3/172620183.doc

Page 2

Rev A

DTS TOOLING ABERDEEN TECHNICIAN TRAINING MODULES GL 4 REAGAN LATCH TOOL

____________________________________________________________________________________________ Module 37
/var/www/apps/conversion/tmp/scratch_3/172620183.doc

Page 3

Rev A

DTS TOOLING ABERDEEN TECHNICIAN TRAINING MODULES GL 4 REAGAN LATCH TOOL

1.0

INTRODUCTION Oceaneering are supplying a GL4 Release Tool, for wellhead intervention works. This system features a tool designed to interface with a ABB Vetco Gray Guideline Connector, GL4, (Regan Profile) complete with Jaw End Swivel Top. This instruction manual contains information required to successfully operate and maintain the tool as supplied to the client. It assumes the system will be operated by trained and experienced ROV Technicians exercising good judgement concerning operating conditions and providing constant inspection and maintenance. It is essential that the systems operators read these instructions and familiarise themselves with the equipment, prior to operation.

1.1

System Overview The tool basically consists of two plates, one to interface with the reaction profile on the connector, and the second to interface with, and function the release mechanism. The tool is functioned by a matched pair of hydraulic cylinders. Note : It is the operators primary responsibility to implement appropriate safety precautions at all times The cylinders are supplied directly with the ROV systems working fluid, at a pressure of 70 bar. This is the maximum pressure required to operate the GL4 connector. It should be noted that incorrect connection of these lines and or excess pressure could result in damage to the tool and connector. A flow divider is incorporated to ensure the cylinders work in tandem, on the operating stroke.

____________________________________________________________________________________________ Module 37
/var/www/apps/conversion/tmp/scratch_3/172620183.doc

Page 4

Rev A

DTS TOOLING ABERDEEN TECHNICIAN TRAINING MODULES GL 4 REAGAN LATCH TOOL

2.0 2.1

SPECIFICATIONS Tool Dimensions (closed) Weight Weight : : : 370mm x 250mm x 340mm 40 lbs (Air) 35 lbs (Water)

2.2

Performance Data Pressure Force Output Flow Requirement Primary Hydraulic Fluid Weight Cleanliness : : : : : : 1500psi (70 bar) 3.02kN 2.5 to 20 Ipm Mineral Oil Shell Tellus 22/37 or equivalent < 10 Micron

____________________________________________________________________________________________ Module 37
/var/www/apps/conversion/tmp/scratch_3/172620183.doc

Page 5

Rev A

DTS TOOLING ABERDEEN TECHNICIAN TRAINING MODULES GL 4 REAGAN LATCH TOOL

3.0 3.1

OPERATIONS GUIDE Hydraulic Connection and Function Test Connect pressure hose from host ROV 3-way valve A to port 3 on flow divider Connect pressure hose from host ROV 3-way valve B to Tee piece on pipe-work. Function - ROV valve and observe tool cylinders extend, smoothly. Function - ROV valve in opposite direction and observe tool cylinders retract in a continuous movement. This is the operating stroke for the GL4 release. Adjust ROV valve flow controllers to desired speed of operation.

Note: The tool should always be retracted when transiting to and from the worksite, to ensure it is best protected from damage. 3.2 The tool is now ready for operation Operation of the tool On reaching the worksite, the orientation of the GL connector shall be observed. The tension on the guideline should be released, but maintain the rigging near vertical. The release tool shall be extended to the fully open position, and aligned along the axis of the pin in the jaw of the jaw end swivel. The lower plate of the tool shall be located in the recess of the GL4 connector body, and pushed fully against the connector. When operating the tool observe the plunger tube on the top plate enter the top of the connector and depress the collar. Extend the tool and remove from the GL4 connector The GL4 and guideline shall be ready to recover.

____________________________________________________________________________________________ Module 37
/var/www/apps/conversion/tmp/scratch_3/172620183.doc

Page 6

Rev A

DTS TOOLING ABERDEEN TECHNICIAN TRAINING MODULES GL 4 REAGAN LATCH TOOL

4.0

MAINTENANCE & STORAGE The following maintenance instructions MUST be followed if the package is to be kept in good mechanical condition and state of readiness.

4.1

Maintenance Schedule TASK a) Fresh water rinse of tool b) Light exterior lubrication of tool c) Inspec tube and fittings for leaks or sign of d) Protect flow divider cartridges with Denso tape e) Function test and inspect cylinders for misalignment or Damage FREQUENCY After every dive After fresh water Prior to every dive rinsing Before use After every dive

____________________________________________________________________________________________ Module 37
/var/www/apps/conversion/tmp/scratch_3/172620183.doc

Page 7

Rev A

DTS TOOLING ABERDEEN TECHNICIAN TRAINING MODULES GL 4 REAGAN LATCH TOOL

5.0

PREDIVE CHECKLIST Check tool is fully assembled, fitted correctly and secured. Check cylinders and hose are purged of air Check Fittings for leaks

____________________________________________________________________________________________ Module 37
/var/www/apps/conversion/tmp/scratch_3/172620183.doc

Page 8

Rev A

You might also like