PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board

page 1

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS A. B. C. D. E. General description of project activity Application of a baseline and monitoring methodology Duration of the project activity / crediting period Environmental impacts Stakeholders comments Annexes Annex 1: Contact information on participants in the project activity Annex 2: Information regarding public funding Annex 3: Baseline information Annex 4: Monitoring plan

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 2

SECTION A. General description of project activity A.1 Title of the project activity: >> Installation of amorphous transformers in Shandong power distribution grid Version 1.0 Date: 23/08/2007

A.2.

Description of the project activity: >> The purpose of this project activity is to accelerate the installation of amorphous transformers in Shandong power distribution grid in China. At present, silicon steel plate transformers are common and amorphous transformers is not commonly installed in China, because the production of amorphous transformers requires a specific and advanced technology and the price of amorphous transformers is about 1.5 times higher than silicon steel plate transformers.
Through this CDM project activity, the project participant will manufacture and sell amorphous transformers for installation in the Shandong power distribution grid as an alternative for low-efficiency silicon steel plate transformers. By installing such efficient transformers in the power distribution grid, the project activity is expected to reduce electricity consumptions which result in reducing CO2 emitted from the power grid. By accelerating the promotion of high energy-efficiency transformer, the CDM project activity will contribute to Chinese sustainable development in the following four aspects. 1) Promote energy-saving economic growth; 2) Lessen energy security concerns; 3) Improve the quality of Chinese transformers; and 4) Expand the market of energy-saving amorphous transformers A.3. Project participants: >> Name of Party Private and/or public entity(ies) involved project participants China (Host) Japan - China special purpose company. (This is to be completed at a later stage.) - Hitachi Industrial Equipment Systems Co., Ltd.

Kindly indicate if the Party involved wishes to be considered as project participant (Yes/No) No No

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 3

A.4.

Technical description of the project activity: A.4.1. Location of the project activity:

A.4.1.1. >> People's Republic of China A.4.1.2. >> Shandong Province A.4.1.3. >> Shandong Power Grid

Host Party(ies):

Region/State/Province etc.:

City/Town/Community etc:

Northeast China Power Grid

Northwest China Power Grid

North China Power Grid Shandong Power Grid

Tibet Power Grid

Central China Power Grid

East China Power Grid

China Southern Power Grid

Map: Location of Shandong Power Grid

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 4

A.4.1.4. Detail of physical location, including information allowing the unique identification of this project activity (maximum one page): >> Amorphous transformers will be equipped at a number of locations in Shandong power distribution grid. The level of voltage is below 10kV.

Generation of Losses Electricity

Power Plants Transformers Transmissionand Distribution Grid

A.4.2. Category(ies) of project activity: >> Supply side energy efficiency improvements transmission and distribution A.4.3. Technology to be employed by the project activity: >> Transformers convert electrical energy from one voltage level to another. They are an essential part of the electricity transmission and distribution network. After generation in power plants, electrical energy needs to be transported to the areas where it is consumed. A large number of transformers of different classes and sizes are needed in the transmission and distribution network, with a wide range of operating voltages. There are two different types of losses that constitute transformer loss: No-load loss (also called iron loss or core loss): Caused by the hysteresis and eddy currents in the core. It is present whenever the transformer is connected, and independent of the load. It represents a constant, and therefore significant, energy drain. Load loss (or copper loss): Caused by the resistive losses in the windings and leads, and by eddy currents in the structural steelwork and the windings. It varies with the square of the load current. No-load loss can be reduced by selecting a high performance steel for the core. Recent development of amorphous iron introduced a significant new evolution for reducing the no-load loss. These transformers have cores wound with amorphous ribbon made from a ferric metal alloy produced by very rapid quenching to avoid crystallisation.

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 5

The project activity will manufacture distribution transformers built with amorphous iron cores. Since amorphous transformers have significantly lower no-load losses, the installation of this type of transformers can contribute to great reduction of energy losses in the power distribution grid. A.4.4 Estimated amount of emission reductions over the chosen crediting period:

>> About 20,086 tCO2-equivalent/year Up to a period of 10 years: about 200,864 tCO2-equivalent (See Section B for detail) Years 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Total estimated reductions (tonnes of CO2e) Total number of crediting years Annual average over the crediting period of estimated reductions (tonnes of CO2e) Annual estimation of emission reductions in tonnes of CO2e 3,652 7,304 10,956 14,608 18,260 21,912 25,565 29,217 32,869 36,521 200,864 10 years 20,086

A.4.5. Public funding of the project activity: >> No public funding is used for this project activity.

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 6

SECTION B. Application of a baseline methodology B.1. Title and reference of the approved baseline methodology applied to the project activity: >> Methodology for installation of amorphous transformers in a power grid B.2 Justification of the choice of the methodology and why it is applicable to the project activity: >> The baseline methodology is applicable because the proposed project activity meets all the applicability conditions of the methodology in the following way: Applicability conditions of the methodology
Applicability Condition 1:

How the proposed project activity meets the applicability conditions


In China, the value of load loss and no-load loss for distribution transformers is stipulated in national mandatory standard, which is called GB 2005-2006 / The minimum allowable values of energy efficiency and the evaluating values of energy conservation for three-phase distribution transformers. As stated above, the value of load loss and no-load loss of transformers are given in the Chinese standard GB 20052006.

The efficiency, or the value of load loss and no-load loss, of transformers generally used is guaranteed by standard specifications determined by the national authorities.

Applicability Condition 2:

Load loss of amorphous transformers to be installed by the project activity, which is confirmed by performance test report submitted by manufactures, is equal or smaller than that of transformers generally used at the equivalent capacity.

The current standard is S9 type and a new standard called S11 is expected to be introduced in year 2011. According to GB 2005-2006, the load loss of an amorphous transformer shall be equal to those of silicon steel plate transformers such as S9 and S11 type. The amount of the load loss for a silicon steel plate transformer is shown in the standard, while the amount of the load loss for an amorphous transformer will be tested and assured before installation. The no-load loss of an amorphous transformer is smaller than that of a silicon steel plate transformer. The amount of the no-load loss for a silicon steel plate transformer is shown in the standard, while the amount of the no-load loss for an amorphous transformer will be tested and assured before installation.

Applicability Condition 3:

No-load loss of amorphous transformers to be installed by the project activity, which is confirmed by performance test report submitted by manufactures, is smaller than that of transformers generally used at the equivalent capacity.

B.3.

Description of how the sources and gases included in the project boundary

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 7

>> The project boundary is Shandong power distribution grid where amorphous transformers are installed by the project activity. It also includes fossil fuel power plants which supply electricity to the grid, because this is the base of GHG emissions reductions. Of the two types of losses generated by the amorphous transformer, only the difference between No-load loss is counted, because the amount of Load loss does not differ by type in China. Emissions sources included in or excluded from the project boundary [add/delete gases and sources as needed] Source Baseline Gas CO2 Included?
Included and monitored No No Included and monitored No No

Justification / Explanation
Emissions at the fossil fuel power plants when the energy-efficient transformers introduced by the proposed project activity are used. Excluded for simplification. Emissions at the fossil fuel power plants when the energy-efficient transformers introduced by the proposed project activity are used. Excluded for simplification.

Fossil fuel power plants in the CH4 grid

N2O CO2

Project Activity

Fossil fuel power plants in the grid

CH4 N2O

B.4. Description of how the baseline scenario is identified and description of the identified baseline scenario: >> The baseline methodology requires the following steps to identify the baseline scenario for the project activity. [Step 1] List up all the possible transformers First, project proponents shall identify all the alternative transformers which are currently prevalent in the market or are likely to be developed in the near future. These candidates are S9 type of silicon steel plate transformer S10 type of silicon steel plate transformer S11 type of silicon steel plate transformer Amorphous transformer Sub-step 1b Enforcement of applicable laws and regulations All scenarios will be in compliance with applicable laws and regulations.

[Step 2] Identify the most feasible baseline scenario, using additionality tool

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 8

Project proponents shall identify the most plausible baseline scenario among the aboves, using the latest approved version of the tool for the determination and assessment of additionality. In the absence of the project activity, amorphous transformers will not be produced/installed because of the following barriers; Technological barriers Manufacture of amorphous ribbon is the state-of-the-art technology, and a substantial research effort is required to enable the production. According to the Research report on development in china transformer industry, there is very few materials available in China, which is one of the most critical limiting factor of amorphous transformers. Institutional barriers Ineffectiveness of policies which accelerate promotion of the amorphous transformer. Investment barriers In China, the price data of transformers are taken as confidential business information both by the grid company and manufacturers, therefore those data are not publicly available. However, according to several information sources, it appears that the price of amorphous transformer is approx. 1.5 times higher than that of silicon steel plate transformer. Shandong Electric Power Corporation (SEPCO) has positively considered the possibility of introducing amorphous transformers for many years and has made a trial installation into a part of its power distribution grid, but SEPCO has gave up the installation since it turned out to be not economically feasible due to high cost of amorphous transformers.

Prevailing practice barriers There is no official statistics for the number of distribution transformers which has been produced and installed, and only very limited information is available. However, according to a news article of the China Electro Mechanics Enterprise Network, the diffusion rate of amorphous transformers is approx. 0.2 %. Moreover, according to the recent survey conducted by the China National Institute of Standardisation, the diffusion rate of amorphous transformer is less than 1 % as shown below. In 1980s, Chinese Government pursued a compulsory policy for installation of high energyefficiency transformers, but amorphous transformers was excluded by market mechanisms. SEPCO has also promoted the use of amorphous transformers to private transformer users and some users have become aware of the cost-saving benefits of amorphous transformers. Nonetheless, they gave up the installation because of the cost increase. According to the Research report on development in china transformer industry, companys awareness on energy saving in rural area of China is lack, which encourages grid companies to purchase cheaper silicon plate transformers. The production of amorphous transformers has been also precluded by cost increase and insufficiency of materials for companies located in urban area. Due to the prohibitive barriers mentioned above, the installation of amorphous transformer is unlikely in the baseline scenario, and the most feasible baseline scenario options would be S9, S10 and S11. [Step 3] Determine the ratio of transformers in the baseline scenario

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 9

From the three options prescribed in the methodology, option 1 is chosen for this project activity. According to Option 1, the project proponent is requested to estimate the ratio of transformer types in the baseline scenario based on the historical installation data. 1) Gather historical installation data of the identified transformer types for the past three (3) years. 2) Estimate the ratio of transformer types that would have been installed in the baseline scenario. Take the average of the three (3) years as the ratio for the first crediting period. Installation of transformers in the Shandong power distribution grid for the past three (3) years is as follows:
Year 2003 0.0% 99.1% 0.9% 0.0% Percentage Year 2004 0.0% 98.4% 1.6% 0.0% Year 2005 0.0% 97.7% 2.3% 0.0% Average 0.0% 98.3% 1.7% 0.0%

S7 S9 S11 Others

Therefore, the most likely baseline scenario is 98.3% of S9-type and 1.7% of S11-type. No-load loss in the baseline scenario is calculated as follows: Calculation of no-load loss in the baseline scenario Capacity No-load loss (kVA) Baseline scenario Project activity 315 666 140 315kVA: No-load loss = 670W x 0.983 + 480W x 0.017 = 666 B.5. Description of how the anthropogenic emissions of GHG by sources are reduced below those that would have occurred in the absence of the registered CDM project activity (assessment and demonstration of additionality): >> As explained in Section B.4., the most plausible baseline scenario is identified as the case where the S9type (98.3%) and S11-type (1.7%) would be newly installed, and amorphous transformers would not be produced/installed in the absence of the CDM project activity. STEP 4 Common Practice Analysis As stated in Step 2 regarding barriers due to prevailing practices, it is not a common practice. There is no activity similar to the proposed project activity in China and there are only few manufacturers of amorphous transformers. STEP 5 Impact of CDM Registration The approval and registration of the project activity as a CDM activity would result inter alia in the following benefits: The CDM project activity will reduce GHG emissions The CDM project activity will trigger the replication of such projects in the power transmission and distribution grid, to promote GHG abatement throughout China.

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 10

The CDM project activity will raise awareness of necessity of energy saving in the industry of power transmission and distribution as they are not well aware of the high emissions associated with electricity loss. The diffusion of amorphous transformers by the CDM project activity will increase the production. The CDM project activity will stimulate further R&D efforts to improve the energy efficiency of amorphous transformers. Emission reductions:

B.6.

B.6.1. Explanation of methodological choices: >> According to the baseline methodology, project proponents shall list up all the possible transformers and determine the ratio of transformers in the baseline scenario. As already mentioned in [Step 3] of B.4., the project activity considered all the options and determined the baseline scenario as the case where S9 type (98.3%) and S11 type (1.7%) of silicon steel plate transformers would be installed. B.6.2. Data and parameters that are available at validation: (Copy this table for each data and parameter) Data / Parameter: Data unit: Description: Source of data used: Value applied:
Justification of the choice of data or description of measurement methods and procedures actually applied :

Historical installation data of transformers % Historical installation data of the transformer types for the past three (3) years in Shandong power distribution grid. Past record of installation of transformers provided by SEPCO. See the table in B.6.3. The installation data was provide by SEPCO.

Any comment: Data / Parameter: Data unit: Description: Source of data used: Value applied:
Justification of the choice of data or description of measurement methods and procedures actually applied :

NLLoss(baseline, i) W No-load loss of each existing silicon steel plate transformer in the baseline scenario. Chinese standard specification called GB 2005-2006 / The minimum allowable values of energy efficiency and the evaluating values of energy conservation for three-phase distribution transformers See the table in B.6.3. Details are shown in GB 2005-2006 / The minimum allowable values of energy efficiency and the evaluating values of energy conservation for three-phase distribution transformers. The standard is authorized by Chinese Government.

Any comment: Data / Parameter: Data unit: Description: LLoss(baseline, i) W Load loss of each existing silicon steel plate transformer in the baseline

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 11

Source of data used: Value applied:


Justification of the choice of data or description of measurement methods and procedures actually applied :

scenario. Chinese standard specification called GB 2005-2006 / The minimum allowable values of energy efficiency and the evaluating values of energy conservation for three-phase distribution transformers See the table in B.6.3. Details are shown in GB 2005-2006 / The minimum allowable values of energy efficiency and the evaluating values of energy conservation for three-phase distribution transformers. The standard is authorized by Chinese Government.

Any comment: Data / Parameter: Data unit: Description: Source of data used: Value applied:
Justification of the choice of data or description of measurement methods and procedures actually applied :

EF t CO2/MWh CO2 emission factor of the North China Power Grid where the project activity is implemented. Official data on CO2 emission factor published by Chinese DNA 0.98255 This is the standardized emission factor officially provided by National Development and Reform Committee in China. Use of the combined margin method specified in ACM0002. The emission factor is fixed over the crediting period. OM = 1.0585 [tCO2/MWh] BM = 0.9066 [tCO2/MWh] k Fraction Transmission loss (e.g. cable loss) for Shandong power Grid. China Electric Power Yearbook 2005 0.0673 6.73 [%] was cited from China Electric Power Yearbook 2005. This yearbook is published annually and can be used as the authoritative and convenient reference for the calculation of power loss for the proposed project activity.
Shandong Electricity Supply (GWh) 131,831 Loss (GWh) 8,877 Loss Rate 6.73%

Any comment: Data / Parameter: Data unit: Description: Source of data used: Value applied:
Justification of the choice of data or description of measurement methods and procedures actually applied :

Any comment:

B.6.3 >>

Ex-ante calculation of emission reductions:

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 12

Since the load loss does not differ between amorphous transformers and silicon steel plate transformers, emission reductions generated by the project activity are calculated only by the difference in no-load loss between them. As shown in the following table, the value of no-load loss for distribution transformers is stipulated in national mandatory standard, which is called GB 2005-2006. No-load loss (W) Load loss Amorphous Silicon steel plate Silicon steel plate (W) transformer transformer transformer S11 type (oil) S9 type (oil) [baseline candidate] [baseline candidate] [project activity] 50 34 130 170 870 100 60 200 290 1500 160 80 280 400 2200 200 100 340 480 2600 250 120 400 560 3050 315 140 480 670 3650 400 170 570 800 4300 500 200 680 960 5150 630 240 810 1200 6200 800 300 980 1400 7500 1000 340 1150 1700 10300 * Data for amorphous transformer is provisional. Data for silicon transformer comes from GB 2005-2006 The minimum allowable values of energy efficiency and the evaluating values of energy conservation for three-phase distribution transformers. The calculation of the emission reductions was made under the assumption that the target capacity of amorphous transformers be 0.237 GVA per year for the project activity. The estimation also suppose that they introduce amorphous transformers with the capacity of 315 kVA only and with oil-filled type only. Since the most likely baseline scenario is 98.3% of S9-type and 1.7% of S11-type, no-load loss in the baseline scenario is calculated as follows: Calculation of no-load loss in the baseline scenario Capacity No-load loss (kVA) Baseline scenario Project activity 315 666 140 315kVA: No-load loss = 670W x 0.983 + 480W x 0.017 = 666 Capacity (kVA)

The target capacity of amorphous transformers is shown below:


Year
New installed capacity

2007
0.237

2008
0.237

2009
0.237

2010
0.237

2011
0.237

2012
0.237

2013
0.237

2014
0.237

2015
0.237

2016
0.237

Total
2.37

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
(GVA) Accumulated installed capacity (GVA) page 13

0.237

0.474

0.711

0.948

1.185

1.422

1.659

1.896

2.133

2.370

However, the scale of the project activity i.e. how much capacity of the amorphous transformer will be installed through the project activity largely varies depending on the demand increase. In addition, the capacity and the type of each amorphous transformer equipped are various. For these reasons, the calculation above for the emission reductions is very preliminary and is subject to change. The total installed capacity and the capacity of each amorphous transformer should be monitored ex-post. Baseline Emission The baseline emissions BEy [t CO2/yr] in a year y is given by: BEy = i { NLLoss(baseline, i) x Hi } x Br x EF / (1 k) x 10-6 where NLLoss(baseline, i) : Hi (=Hj) : No-load loss of the transformer i which would have been installed by the end of the year y in the baseline scenario. [W] Hours since the instalment of the transformer i during the year y. [hour] If installed in the year y, use the hours (0Hi8760) from the installation date until the end of the year y. If installed before the year y, use 8760 hours. Yearly average blackout rate of the grid during the year y. [%] CO2 emission factor of the grid which supplies electricity to the area. [t CO2/MWh] EF is calculated by the combined margin method specified in ACM0002 as a fixed value for whole crediting period calculated before implementation of the project. Transmission loss (e.g. cable loss). [fraction] Index i specifies the corresponding baseline transformer to each amorphous transformer j which will have been installed by the project activity by the end of the year y.

Br EF :

k: i:

Preliminary calculation for the baseline emissions BEy [t CO2/yr] has been made as shown below. Parameter NLLoss(baseline, i) Hi Br EF Value 666 [W] 8760 [hour] 0.99855 0.98255 Comments Based on the assumption that the capacity of all the transformers be 315 kVA. 99.855 [%] was published by China Electricity Council. This is the standardized emission factor officially provided by National Development and Reform Committee in China.

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 14

0.0673

6.73 [%] was calculated based on China Electric Power Yearbook 2005.

Therefore, the estimated BEy [tCO2/yr] for the 1st year is 4,617 [tCO2/yr]. BEy = (0.237 x 106 / 315) x 666 x 8760 x 0.99855 x 0.98255 / (1 0.0673) x 10-6 = 4,617 Project Emission The project emissions PEy [tCO2/yr] in a year y is given by: PEy = j { NLLoss(project, j) x Hj } x Br x EF / (1 k) x 10-6 where NLLoss(project, j) : Hj (=Hi) : Br j: No-load loss of the amorphous transformer j which will have been installed by the end of the year y in the project scenario. [W] Hours since the instalment of the transformer j during the year y. [hour] Yearly average blackout rate of the grid during the year y. [%] Index j specifies each amorphous transformer which will have been installed by the project activity by the end of the year y.

Preliminary calculation for the project emissions PEy [tCO2/yr] has been made as shown below. Parameter NLLoss(project, i) Hi Br EF Value 140 [W] 8760 [hour] 0.99855 0.98255 Comments Based on the assumption that the capacity of all the transformers be 315 kVA. 99.855 [%] was published by China Electricity Council. This is the standardized emission factor officially provided by National Development and Reform Committee in China. 6.73 [%] was calculated based on China Electric Power Yearbook 2005.

0.0673

Therefore, the estimated PEy [tCO2/yr] for the 1st year is 971 [tCO2/yr]. BEy = (0.237 x 106 / 315) x 140 x 8760 x 0.99855 x 0.98255 / (1 0.0673) x 10-6 = 971 Emission Reduction The emission reductions ERy [tCO2/yr] in a year y is given by: ERy = BEy PEy Leakage

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 15

with the notations specified before. Therefore, the estimated ERy [tCO2/yr] for the 1st year is 3,646 [tCO2/yr]. The estimated amount of emission reductions
Year New installed capacity (GVA) Accumulated installed capacity (GVA) Baseline emissions (tCO2) Project emissions (tCO2) Annual emission reductions (tCO2) 2007
0.237 0.237 4,617 971 3,646

2008
0.237 0.474 9,234 1,942 7,292

2009
0.237 0.711 13,851 2,913 10,938

2010
0.237 0.948 18,468 3,884 14,584

2011
0.237 1.185 23,085 4,855 18,230

2012
0.237 1.422 27,702 5,826 21,876

2013
0.237 1.659 32,319 6,797 25,522

2014
0.237 1.896 36,936 7,768 29,168

2015
0.237 2.133 41,553 8,739 32,814

2016
0.237 2.370 46,170 9,710 36,460

Total
2.37 253,935 53,405 200,530

B.6.4 >> Year 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Total (tonnes of CO2e)

Summary of the ex-ante estimation of emission reductions: Estimation of project activity emissions (tonnes of CO2e) 971 1,942 2,913 3,884 4,855 5,826 6,797 7,768 8,739 9,710 53,405 Estimation of baseline emissions (tonnes of CO2e) 4,617 9,234 13,851 18,468 23,085 27,702 32,319 36,936 41,553 46,170 253,935 Estimation of leakage (tonnes of CO2e) 0 0 0 0 0 0 0 0 0 0 0 Estimation of overall emission reductions (tonnes of CO2e) 3,646 7,292 10,938 14,584 18,230 21,876 25,522 29,168 32,814 36,460 200,530

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 16

B.7.

Application of the monitoring methodology and description of the monitoring plan:

B.7.1 Data and parameters monitored: (Copy this table for each data and parameter) Data / Parameter: Data unit: Description: Source of data to be used: Value of data applied for the purpose of calculating expected emission reductions in section B.5 Description of measurement methods and procedures to be applied: QA/QC procedures to be applied: Any comment: Data / Parameter: Data unit: Description: Source of data to be used: Value of data applied for the purpose of calculating expected emission reductions in section B.5 Description of measurement methods and procedures to be applied: QA/QC procedures to be applied: Any comment: Data / Parameter: Data unit: Description: NLLoss(project, j) W No-load loss of amorphous transformers installed by the project activity. Manufacturers specification See the table in B.6.3.

This is reported by power distribution company at the time of each installation

Credibility of manufacturers specification is confirmed by performance test report submitted by the manufacturer.

LLoss(project, j) W Load loss of amorphous transformers installed by the project activity. Manufacturers specification See the table in B.6.3.

This is reported by power distribution company at the time of each installation

Credibility of manufacturers specification is confirmed by performance test report submitted by the manufacturer.

Hj (= Hi) hour Hours since the instalment of the transformer j during the year y. [hour] If installed in the year y, use the hours (0Hi8760) from the installation date until the end of the year y. If installed before the year y, use 8760 hours.

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 17

Source of data to be used: Value of data applied for the purpose of calculating expected emission reductions in section B.5 Description of measurement methods and procedures to be applied: QA/QC procedures to be applied: Any comment: Data / Parameter: Data unit: Description:

Operating hours of the transformer i is the same as those of the transformer j. Record of installation of amorphous transformers provided by power distribution company. 8760 hours

This is reported by power distribution company at the time of each installation into a power distribution grid. The installation data will be collected as part of normal business operations by the SEPCO. The data shall be crosschecked with their internal company reports.

Source of data to be used: Value of data applied for the purpose of calculating expected emission reductions in section B.5 Description of measurement methods and procedures to be applied: QA/QC procedures to be applied: Any comment: Data / Parameter: Data unit: Description:

Br % Yearly average blackout rate of the grid during the year y. [%] Because No-load loss does not occur while a grid is cut off, blackout hours should be considered. If available data were "blackout hours, convert it into "rate" (using 8,760hours a year). official statistics or data obtained from local power company 99.855 [%]

This is determined by public data announced regularly. In the case of its modification, it shall be monitored The statistics data published by China Electricity Council

j and i Number and kVA Index j specifies each amorphous transformer which will have been installed by the project activity by the end of the year y. Total number of amorphous transformers installed, the actual installed capacity (kVA) of each amorphous transformer will be monitored. On the other hand, index i specifies the corresponding baseline transformer to each amorphous transformer j which will have been installed by the project activity by the end of the year y. In addition, the number of amorphous transformers removed since installed shall be monitored.

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 18

Source of data to be used: Value of data applied for the purpose of calculating expected emission reductions in section B.5 Description of measurement methods and procedures to be applied: QA/QC procedures to be applied: Any comment:

Record of installation & removal of amorphous transformers provided by power distribution company. 315 kVA

This is reported by power distribution company at the time of each installation & removal into a power distribution grid. The installation & removal data will be collected as part of normal business operations by the SEPCO. The data shall be crosschecked with their internal company reports.

B.7.2 Description of the monitoring plan: >> The project participant in China will be in charge of collection and compilation of all the monitoring data. Amorphous transformers will be installed by experts of the SEPCO and regularly inspected. In addition to its operation and maintenance, the grid company is responsible for periodical reporting for CDM purpose. The data reported shall include the total number of amorphous transformers installed & removed and the date and the capacity (kVA) of each. B.8 Date of completion of the application of the baseline study and monitoring methodology and the name of the responsible person(s)/entity(ies) <Date of completion of the baseline study and monitoring methodology> The baseline study was completed in 23/08/2007. <Name of person(s)/entity(ies)> Hitachi, Ltd. Mr. Ken Hirata / Ms. Yuka Saito Energy and Environmental Solutions Center Total Solutions Div. Hitachi, Ltd. 18-13, Soto-Kanda 1-chome, Chiyoda-ku, Tokyo 101-8608 Japan Tel: +81-3-4564-5837 Fax: +81-3-4564-3713 Email: ken.hirata.fn@hitachi.com yuka.saito.ec@hitachi.com

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 19

SECTION C. Duration of the project activity / crediting period C.1 Duration of the project activity:

C.1.1. Starting date of the project activity: >> 01/01/2007

C.1.2. Expected operational lifetime of the project activity:


>> 20 years C.2 Choice of the crediting period and related information: C.2.1. Renewable crediting period C.2.1.1. >> Not applicable C.2.1.2. >> Not applicable C.2.2. Fixed crediting period: C.2.2.1. >> 01/01/2007 The expected date of commissioning of the first installation is given as the starting date of the crediting period. Should the installation be delayed, the starting date of the crediting period will be delayed accordingly. C.2.2.2. >> Ten(10) years. Length: Starting date: Length of the first crediting period: Starting date of the first crediting period:

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 20

SECTION D. Environmental impacts >> D.1. Documentation on the analysis of the environmental impacts, including transboundary impacts: >> To be completed before project validation. D.2. If environmental impacts are considered significant by the project participants or the host Party, please provide conclusions and all references to support documentation of an environmental impact assessment undertaken in accordance with the procedures as required by the host Party: >> To be completed before project validation. SECTION E. Stakeholders comments >> E.1. Brief description how comments by local stakeholders have been invited and compiled: >> To be completed before project validation. E.2. Summary of the comments received: >> To be completed before project validation. E.3. Report on how due account was taken of any comments received: >> To be completed before project validation.

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 21

Annex 1 CONTACT INFORMATION ON PARTICIPANTS IN THE PROJECT ACTIVITY Organization: Street/P.O.Box: Building: City: State/Region: Postfix/ZIP: Country: Telephone: FAX: E-Mail: URL: Represented by: Title: Salutation: Last Name: Middle Name: First Name: Department: Mobile: Direct FAX: Direct tel: Personal E-Mail: Organization: Street/P.O.Box: Building: City: State/Region: Postfix/ZIP: Country: Telephone: FAX: E-Mail: URL: Represented by: Title: Salutation: Last Name: Middle Name: First Name: Department: China special purpose company (This is to be completed at a later stage.)

Jinan Shandong China

Hitachi Industrial Equipment Systems Co., Ltd. 3, Kanda Neribei-cho, Chiyoda-ku AKS Building Tokyo
101-0022

Japan

Section Manager Mr. Hayashi Yasumasa Power Distribution & Environmental System Division Buisness Operations Group

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 22

Mobile: Direct FAX: Direct tel: Personal E-Mail:

(81)-3-4345-6076 (81)-3-4345-6913 hayashi-yasumsa@hitachi-ies.co.jp

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 23

Annex 2 INFORMATION REGARDING PUBLIC FUNDING ACM0002 Consolidated methodology for grid-connected electricity generation from renewable sources --- Version 6

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM Executive Board
page 24

Annex 3 BASELINE INFORMATION See Section B. Annex 4 MONITORING INFORMATION See Section B. -----

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.