Projs/Research Which Can Be Undertaken As Medium/Long Term Projs by Dept

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

Annex A

Projs/Research Which Can be Undertaken As Medium/Long Term Projs by Dept


Ser Unit/Fmn Proj Theme Brief feasibility/Description of how to take undertake research/project Anticipated time for completion Remarks

HQ SC Qta

A lot of exp is done on surv msns of hel/ ac at sta like Qta. An economic and more eff altn could be dev a Helium filled or Hot Air Balloon having high quality day/ni camera assys with zoom and single axis mov cap. This sys may be able to provide 360 degree vis. MLRS A100 has been recently inducted in Pak Army. The sys is primarily designed to del a large vol of fire in a short span of time against critical and time sensitive tgts. In order to streamline drills and procedures, the process of trg on the sys is in progress. Eco of effort alongwith safety of the sys, demands dev of sml / other allied facilities for the trg /ops purpose. Consequently, fol is suggested to be dev for:a. Mob Loading Facility for MLRS Rkts.

The project can be given to Timeline will be UG students decided after LE Faseeh Tahir and A/P Saif Ullah Khalid will work on a feasibility of the project during summer Feasibility study would be carried out with UG students during during summer

Latest info. Required

feasibility study

HQ SC Qta / HQ 21 Arty Div

Timeline will be decided after feasibility study

Latest info. Required

Need a study of existing system

Fac. : A/P Dr Abdul Waheed Badar

Annex A

b. LASER Based Alignment Sys for Loading of Rkts in Launch Tube Packs (LTPs) c. Trg Sml of MLRS Eqpt 3 IGT&E Br Pakistan army has suffered from no of cas D&E Dte due to IEDs in FATA and Swat. Most of the cas are attributed to lack of capacity to detect and neut IEDs. There is a need to dev unmanned robotic gr vehs for IED detection and neut. The US dev unmanned gr veh (UGVs) have conducted over 30, 000 msns detecting and neutralizing over 15,000 IEDs in Iraq and Afghanistan. IGT&E Br Since our sldrs are often exposed to IED D&E Dte threat which remains unavoidable in the prevailing envmt, and incur huge life losses without even nctr. There is also need to dev special suit to protect the indls who are emp as scouts to search IEDs. The suit provides full body protection against fragments and explosions. The suit being manufactured by Global Aremour can be eval for indigenous production and subsequently provision to Pakistan Army. Can be assigned to UG students Veh. Design, Fabrication and control

Timeline will be decided after feasibility study

Latest info. Required

Fac. : A/P Raja Amer

The project can be given to 2-3 Years different groups of UG students, subjected to the arrival of Dr Rizwan Saeed Choudhry

Latest info. Required

Annex A

IGT&E Br The imp of surv for both conventional and D&E Dte sub conventional warfare cannot be over emphasized. US Army is using a white 117foot long surv balloon called an aerostat. It is equipped with infrared and colour video cameras and can stand up at more than 1500 feet in the daytime. This balloon can be studied for dev our own indigenous devices to be emp in LIC Z. HQ 11 Coprs Most of the posts being isolated are out of reach of elec, lack NVDs charging facility. Smart low voltage solar charges for such devices should be dev

The project can be given to Timeline will be UG students decided after LE Faseeh Tahir and A/P Saif Ullah Khalid will work on a feasibility of the project during summer

Latest info. Required

feasibility study

The project can be given to UG DE-32-ME: UG students

Start: Sep 2013 End: July 2014

Latest info. Required

Fac.: Lt Col Rashid Ansari 7 HQ 11 Corps Most radio sets work on portable batteries .Units are depl in vast areas & lacks electricity. Portable solar btys chargers should be intro The project can be given to UG DE-32-ME: UG students Fac.: Lt Col Rashid Ansari Latest info. Required

Start: Sep 2013 End: July 2014

HQ 11 Corps

The external body of bino frequently cracks in ops. Outer body of bino should be made robust, water proof and shock proof as these are being used in the most rugged envrnts in ongoing LIC ops

The project can be given to UG DE-32-ME: UG students Fac. : A/P Dr Hasan Aftab / End: July 2014 Lec Mubashir Gulzar

Start: Sep 2013

Latest info. Required

Annex A

HQ 4 AD Div

EO guided smart munitions (Laser guided) are held on the inventory of IAF. In order to evade EO guidance sys, R&D to dev smoke generators, which are able to curtain VP/critical asset at the time of air attack, may be considered. 57 mm AD Gun is a single barrel gun interfaced with 702A radar. This gun is frequently developing problem in azimuth motor. An azimuth motor can be designed that can bear the load of traversing uit smoothly.

The project can be given to UG DE-32-ME: UG students Fac. : Col Dr Syed Waheed Ul haq

Start: Sep 2013 End: July 2014

10 HQ 4 AD Div

The project can be given to Timeline will be UG students decided after Need study of existing system Fac. A/P Raja Amer Azeem

Latest info. Required

feasibility study

Annex A

Ser Unit/Fmn

Proj Theme

Brief feasibility/Description Anticipated time for Remarks of how to take undertake completion research/project The project can be given to PG students

11 HQ 5 Corps Due to high content humidity (Moisture) present in the atmosphere in Kci, B vehs / eqpt are corroded prematurely thus reducing the life. Research work is req devising ways to reduce corrosion to enhance the life and workability of vehs / eqpt.

PG students MS-68/MS-72
Timeline will vary depending upon the student taken

Latest info. Required

Fac. Lt Col Dr Khalid Mahmood

12 TAC HQ 45 Dev of test bench for common rail diesel Engr Div engine

The project can be given to UG students (GC)

UG DE-32-ME: Start: Sep 2013 End: July 2014

Latest info. Required

Fac.: A/P Raja Amer Azeem 13 HQ CEME 12 Div Solar sys for charging of btys is valuable commodity especially in mtn areas. However, difficult access to mtn areas demands portable as well as durable solar sys. Solar sys, presently, in use by inf bns are quite delicate and cumbersome. Keeping this in view, feasibility of portable and durable energy solar sys may be The project can be given to UG students

UG DE-32-ME: Start: Sep 2013 End: July 2014

Latest info. Required

Fac. : A/P Dr Abdul Waheed Badar

Annex A

studied as R&D proj at college of E&ME. Moreover, feasibility for use of solar heaters and cooker at difficult / inaccessible posts be eval at the proj 14 HQ FC KPK Dev of elec from wind energy so that same can be used for providing elec to post/ pqt in ops area The project can be given to UG students Fac. : Lt Col Rashid Ansari

UG DE-32-ME: Start: Sep 2013 End: July 2014

Latest info. Required

Annex A

Ser Unit/Fmn

Proj Theme

Brief feasibility/Description Anticipated time for Remarks of how to take undertake completion research/project

15 Sta Wksp EME, Peshawar

A machine/ test eqpt may be dev to check The project can be given to condition /svc of used transformer oil UG students

UG DE-32-ME: Start: Sep 2013

Latest info. Required

Fac. : Col Dr Syed Waheed Ul End: July 2014 Haq The project can be given to UG students Fac. : Lt Col Rashid Ansari

16 602 Regional Bty op trolley vehs to run inside B wksp Wksp EME /deps for tn of store/ assys

UG DE-32-ME: Start: Sep 2013 End: July 2014

Latest info. Required

17 CEME 18 Div Design & fabrication of desert warfare unmanned ground combat veh

The project can be given to UG students

UG DE-32-ME: Start: Sep 2013 End: July 2014

Latest info. Required

Fac. : Asst Prof Raja Amer Azim 18 Conversion of Land Rover Defender 90 GS veh into hybrid technology The project can be given to UG students

UG DE-32-ME: Start: Sep 2013 End: July 2014

Latest info. Required

Fac. : Asst Prof Raja Amer

Annex A

Azim

19 CEME 4 Corps Advance Manufacturing Systems

The project can be given to UG/PG students

Timeline will be decided after feasibility study Need the exact requirements when the Fac. : Lt Col Dr Aamer Baqai / requirements are A/P Dr Sajid Ullah Butt clear

Requirement not clear. Details Are required please.

20

Alternate fuels

The project can be given to UG students Fac.: Lt Col Rashid Ansari

UG DE-32-ME: Start: Sep 2013 End: July 2014 UG DE-32-ME: Start: Sep 2013 End: July 2014
Latest info. Required

21

Energy efficient buildings

The project can be given to UG students Fac. : Dr Imran Akhtar/ A/P Ahmed Sohail

You might also like