Shutdown Work Experience
Plant ExxonMobil Duration July 07 - Aug 07 Jobs Completed Furnace C Shutdown Approx. Value In progress
\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : SCP
Page 1 of 16
HCU
2006
S$ 800,000
LRCCU
Dec 2005
S$ 500,000
LRCCU
Nov 2004
S$ 6,500,000
HCU
2003
S$ 300,000
CD4 LOC
2002
S$ 1,600,000
HCU
2001
S$ 1,500,000
LRCCU
Nov 6 00 - Dec 3 00
S$ 6,500,000
CD5
Oct 3 - Nov 5 99
S$ 689,000
HCU
Oct 1 - Oct 10 98
S$ 910,000
LRCCU
Nov 5 - Dec 3 97
S$2,500,000
\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : Shell
Page 2 of 16
Sept 05 - Sept 05 FinFan & Exchanger repair works Supply labour Jul 05 - Aug 05 FinFan & Exchanger repair works Supply labour Mar 05 - May 05 AFC Retubing & O/H Line Replacement Heater,FG Ducting & A/Preheater Drum Maintenance works FinFan & Exchanger repair works Supply labour Aug 04 - Sept 04 Mechanical repair works
S$38,000
MPHC
S$250,000
SRU#4/CHD#2/CDU#1 VIS/LHDC/SRU#5/SWS#2
S$2,800,000
S$520,000
Apr 04 - Jun 04
S$2,432,000.00
Oct - Nov 03
LHDC Reactor Charge Heater Towers/Drums Cleaning Exchanger/Fin fan tube cleaning Gas Compressor Piping replacement Service PSV Change/Repair Reactor Repair/Replace/Hydrojet cleaning & Hydrotest of Exchanger Metals Works Activities Feet distributor Replace 5 beds of packing
S$1,500,000
CCR MPHC/CYCLOHEX
S$210,000 S$100,000
S$100,000 S$200,000
\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : MBM
Page 3 of 16
Solfolane S/D
Oct - Nov 02
Clean internal rain deck extractor Repair Trays/Recovery column Repair/Replace B/v/Gasket Pipings Revamp Towers/Drums Furnaces Additional Work For Above Furnace Repair Pipings Replacement Towers/Drums Cleaning And Trays Supports Replacement
S$210,000
S$1,200,000 S$7,000,000
S$5,000,000
\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : MBM
Page 4 of 16
APS I TAR 00
Oct 9 - Nov 5 00
S$ 4,000,000
APS I TAR 99
Jun 13 - Oct 31 99
S$ 1,300,000
APS II TAR 98 Sep 7 - Oct 6 98 One Single Contractors Concept On Lump Sum Basis Managing Entire Plant Turnaround Including Overall Planning & Scheduling Safety Management And Other Services Such As: Scaffolding Insulation Blasting/Painting NDT Civil Single Contracting Concept APS I TAR 99
S$4,600,000
Jun 13 - Oct 31 99
Heat Exchangers AirFin Coolers / Retube Exchangers High Pressure Jet Cleaning Exchangers Towers/Drums / Furnace Up Grading Piping & Valves Replacement Heat Exchangers AirFin Coolers / Retube Exchangers High Pressure Jet Cleaning Exchangers Towers/Drums / Furnace Up Grading Piping & Valves Replacement Tower Internal Shell Side Weld Overlay
S$ 1,300,000
APS I TAR 00
Oct 9 - Nov 5 00
S$ 4,000,000
\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : PAC
Page 5 of 16
Jobs Completed Furnace, Tower, Drums Air Preheaters Heat Exchanger Servicing Piping Repairs Cooling Tower Air Fin Coolers Heat Exchangers Rotating & Stationary Equipment Tower Tray Repair Piping Replacement Vessel Cleaning Furnace / CO Boiler Repair Regenerator Misc Hot & Cold Works Heat Exchangers Tower Tray Renewal Piping Replacement Rotating Equipment Vessel Cleaning Heat Exchangers Rotating & Stationary Equipment Tower Tray Repair Piping Replacement Vessel Cleaning Furnace / CO Boiler Repair Regenerator Misc Hot & Cold Works Heat Exchangers Rotating & Stationary Equipment Tower Tray Repair Piping Replacement Vessel Cleaning Furnace / CO Boiler Repair Regenerator Misc Hot & Cold Works Heat Exchangers Tower Tray Renewal
LRCCU
S$ 1,000,000
HCU
2006
S$ 800,000
LRCCU
Dec 2005
S$ 500,000
LRCCU
Nov 2004
S$ 6,500,000
HCU
2003
S$ 300,000
\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : SRC
Page 6 of 16
Piping Replacement Rotating Equipment Vessel Cleaning CD4 LOC 2002 Heat Exchangers Tower Tray Renewal Piping Replacement Rotating Equipment Vessel Cleaning S$ 1,600,000
\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : SRC
Page 7 of 16
U3100
Apr 04 - May 04
MPG De- Bottlenecking Project Relocate 3 reboiler Modify platform Modify connection piping Change out column internal Boiler/Cogen Mom Inspection Open Man Holes Internal Cleaning Removal Of Steam Drum And Mud Drum Internals Hot Works Support For Chemical Cleaning Boiler/Cogen Mom Inspection Open Man Holes Internal Cleaning Removal Of Steam Drum And Mud Drum Internals Hot Works Support Fitters For Spading Work Steam Header Piping Misc Works Replacement of F-1301 Gas Ducts C-605 Repair Works Over hauling works of Sea water intake Pump -5604
$206,000.00
PODU SMPO2
Jul 03 - Dec 03
$90,000.00
PODU SMPO2
Sep 02 - Dec 02
$60,000.00
June 01
Feb 01 - Mar 01
$15,000.00
CW intake system/Basin
March 00 - Ap 00
Inspection and cleaning of CW intake Pipe Inspection and cleaning of CW basin Assistance to Divers to do under water welding works C-602 replacement of corroded CS nozzles to SS E-613A/B/C draw bundles repair works
$35,000.00
SMPO 1 U-600
Feb 00 - March 00
$50,000.00
\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : Seraya
Page 8 of 16
March 00 - Apr 00
$20,000.00
April 99 -May 99
$120,000.00
SMPO U-100
April 99 -May 99
$200,000.00
PODU (MPG plant) SMPO And Utilities Planning & Scheduling Warehouse & Material Mgt Supply of Field Supervision To Client SMPO sea cooling water exchangers inspection and repair works
$15,000.00 S$1,800,000
Sep 97 - Dec 97
Open exchangers,pull bundle and repair works overlay works for covers,tube sheet
$300,000.00
\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : Seraya
Page 9 of 16
\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : Invista
Page 10 of 16
Duration
Jun' 2005
Jobs Completed
Mechanical Works & Motor Replacement
Mechanical Works & Motor Replacement Mechanical Works & TCR Bundle Change Out Mechanical Works & Motor Replacement Mechanical Works & TCR Bundle Change Out Mechanical Works & Motor Replacement Mechanical Works & TCR Bundle Change Out
S$ 170,000
Jul' 2004
S$ 232,000
IPG
S$ 150,000
Oct' 2003
S$ 180,000
IPG
S$ 193,000
Oct' 2002
S$ 350,000
\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : Fab
Page 11 of 16
Duration
Oct - Nov 03
Jobs Completed
LHDC Reactor Charge Heater Towers/Drums Cleaning Exchanger/Fin fan tube cleaning Gas Compressor Piping replacement Service PSV Furnaces Air-Preheaters Towers (Exclude 4151 E) Heat Exchangers Breechlock Exchnagers & Neutralisation Work Airfin Coolers, Drums, Rvs, Cvs, Pipings, System Blind, Additional Heat Exchangers 1042 L Dereactor 1041 L Cooler Tower 2141 L HCU 2 Flare Stack 2101 L Unplug CRU Flare Pilot Gas Line Heat Exchangers Retube Exchangers High Pressure Jet Cleaning Exchangers Towers/Drums Reactor/Furnance Piping & Valves Replacement Tower Internal Shell Side Weld Overlay Heat Exchangers Rotating Equipment Tower Tray Repair Piping Replacement Vessel Cleaning Furnace Repair Heat Exchangers AirFin Coolers Retube Exchangers High Pressure Jet Cleaning Exchangers Towers/Drums Furnance Up Grading Piping Replacement Valves Replacement Logistics * Crane and heavy equipment services Pipings Revamp Towers/Drums Furnaces Additional Work For Above Trays Supports Replacement
Peak Manpower
400
Aug 03 - Sept. 03
350
Jul 03 - Aug 03
280
Shell LRCCU
Nov 99 - Dec 00
600
ESPL APS II TAR 98 One Single Contractors Concept On Lump Sum Basis Managing entire Plant Turnaround including overall planning & scheduling, safety management & other services such as: Scaffolding, Insulation, Blasting/Painting, NDT & Civil Mobil CDU Plant Revamp CDU Plant S/D Maintenance
Sep 98 - Oct 98
500
Feb - Apr 97
1000
Page 12 of 16
EPC Jobs Summary Project Name SER-DUP:8" FRP High Grade Industrial Water to Dupont Phase 1 & 2 HP Steam & Associated High Pressure Boiler Feedwater 16 nos of Metering Skid for China Project Operation Streamlining Project - EPC SCC Hydrogen and Steam Line One Unit of Waste Water Equalization Tank Gray & Black Water Tank Fabrication Work for Singapore Olefins Project Ethoxylation Plant (Detailed Engineering, Procurement And Construction)
Year
2002
SUT Sakra Pte Ltd Fisher-Rosemount ExxonMobil ExxonMobil Infinieum Exxon/KOCJV
Witco
1998
Construction Jobs Summary Project Name Pfizer, Bulk Pharmaceuticals Facility Organic Synthesis Plant Client Jacobs Lend Lease Pte Ltd
Styrene Monomer Propylene Oxide 2 Project - Area X ABB Lummus Global/JGC Corp. Singapore Piping Works JV Piping Erection Work for ISBL Area on Singapore Olefins Project Electronic Polish Plant Piping Works for PCS II Project Crude Splitter Unit Project Exxon Chemical / KOCJV
1998 / 2000