CITY DEVELOPMENT PLAN

NARSINGHPUR CITY
Narsinghpur District, Madhya Pradesh




Final City Development Plan Report







March 2011


Submitted to
Urban Administration & Development Department, GoMP
Project Coordination
City Managers Association Madhya Pradesh
Submitted by
SAI Consulting Engineers Private Limited
Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh



































Disclaimer
All rights reserved. The report and maps have been prepared as part of the Study for City Development Plan for
Gadarwara, Narsinghpur District, Madhya Pradesh. No part of this publication may be reproduced, stored in a
retrieval system or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or
otherwise, without prior written permission of Urban Administration & Development Department, Government of
Madhya Pradesh (UA&DD).
The designations employed and the presentation of the material in the report, maps or any part of the document
prepared for the City Development Plan for Gadarwara, Narsinghpur District, Madhya Pradesh do not imply the
expression of any opinion whatsoever on part of UA&DD or SAI Consulting Engineers Private Limited concerning
the legal status of any state, territory, city or area, or of its authorities, or concerning delimitation of its boundaries,
or regarding the degree of data and development. The analysis, conclusions and recommendations of the report do
not necessarily reflect the views of UA&DD or SAI Consulting Engineers Private Limited.









COPY OF RESOLUTION PASSED BY
THE MUNICIPAL COUNCIL



Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh









TABLE OF CONTENT




Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
TABLE OF CONTENTS
A. CHECKLIST OF CONTENTS
B. EXECUTIVE SUMMARY
1.0 CITY DEVELOPMENT PLAN ......................................................................................................... 1
1.1 CITY DEVELOPMENT PLAN UNDER JNNURM: AN OVERVIEW ................................... 1
1.2 UADD & ITS ROLE 1
2.0 METHDOLOGY ................................................................................................................................ 2
2.1 FRAME WORK ................................................................................................................... 3
2.1.1 SCOPE OF WORK .................................................................................................. 3
2.1.2 OBJECTIVE OF CDP .............................................................................................. 3
2.1.3 APPROACH ............................................................................................................ 3
2.1.4 PUBLIC CONSULTATION:STAKEHOLDERS MEETING,WORKSHOP ............ 4
2.1.5 OUTCOMES ........................................................................................................... 4
2.2 KICK OFF WORKSHOP ..................................................................................................... 5
2.3 MEETING WITH COLLECTOR NARSINGHPUR DISTRICT ............................................ 6
2.4 CITY VISION SECOND WORKSHOP................................................ 6
2.5 SUMMARY OF SECOND WORKSHOP PROCEEDINGS.................................................... 6
2.5.1 AGENDA FOR SECOND WORKSHOP.. 6
2.5.2 VISION STATEMENT NARSINGHPUR. 6
2.6 STRATEGIES & PRIORITY PROJECTS THIRD WORKSHOP... 7
2.7 THIRD WORKSHOP PROCEEDINGS.. 7
2.8 AGENDA FOR THIRD WORKSHOP 8
2.9 FINALISING STRATEGIES 8
2.10 SECTOR PRIORITY. 9
2.11 PRIORITY ACTION AND PROJECTS... 10
2.12 FOURTH WORKSHOP 11
2.12.1 FOURTH WORKSHOP PROCEEDINGS. 11
3.0 CITY PROFILE ............................................................................................................................... 13
3.1 DISTRICT INFORMATION ................................................................................................. 13
3.1.1 SPECIAL FEATURES: ........................................................................................... 13
3.1.2 HISTORICAL BACKGROUND:.............................................................................. 13
3.1.3 GEOGRAPHICAL LOCATION: .............................................................................. 13
3.1.4 DISTRICT POPULATION COMPOSITION: ........................................................... 13
3.1.5 DISTRICT ADMINISTRATIVE UNITS: ................................................................. 15
3.1.6 MAJOR ROAD CONNECTIVITY: .......................................................................... 15
3.1.7 INDUSTRIES IN THE DISTRICT: .......................................................................... 15
3.2 CITY PROFILE: HISTORIC IMPORTANCE/IDENTITY OF THE TOWN ........................... 15
3.3 LOCATION ................................................................................................................... 17
3.4 REGIONAL CONNECTIVITY .............................................................................................. 17
3.5 PHYSIOGRAPHY AN DLANDFORM .................................................................................. 17
3.5.1 TOPOGRAPHY & DRAINAGE ............................................................................... 17
3.5.2 CLIMATE AND RAINFALL ................................................................................... 17
3.5.3 WIND DIRECTION ................................................................................................. 17
3.6 DEMOGRAPHY ................................................................................................................... 17
3.6.1 AREA & POPULATION .......................................................................................... 17
3.6.2 DENSITY ................................................................................................................. 17
3.6.3 LITERACY RATE ................................................................................................... 18
3.6.4 SEX RATIO ............................................................................................................. 18
3.6.5 SC/ST POPULATION AND BPL POPULATION .................................................... 18
3.6.6 MIGRATION PATTERN ......................................................................................... 19
3.6.7 KEY ISSUES-DEOMOGRAPHY................................................................................. 19
3.6.8 WORKSHOP PARTICIPATION (PRIMARY, SECONDARY AND TETTIARY
OCCUPATION AND INCOME LEVEL .................................................................. 19
3.6.9 POPULATION FORECAST AND ESTIMATION ................................................... 20
Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
3.7 URBAN ECONOMY ............................................................................................................. 20
3.7.1 INDUSTRIAL ACTIVITIES .................................................................................... 20
3.7.2 AGRICULTURE ...................................................................................................... 21
3.7.3 TRADE AND COMMERCE .................................................................................... 21
3.7.4 TOURISM ................................................................................................................ 21
3.7.5 KEY ISSUES ........................................................................................................... 21
3.7.6 CITY SPECIFIC STRATEGIES ............................................................................... 21
3.8 PHYSICAL PLANNING AND GROWTH MANAGEMENT ................................................. 22
3.8.1 MUNICIPAL AREA & PLANNING AREA ............................................................. 22
3.8.2 SPATIAL GROWTH TRENDS ................................................................................ 22
3.8.3 SPATIAL DISTRIBUTION OF POPULATION ....................................................... 22
3.8.4 MUNICIPAL LEVEL MAPPING & LAND USE ANALYSIS .................................. 23
3.8.5 WARD DELINEATION MAP .................................................................................. 24
3.8.6 MASTER PLAN PROVISION ................................................................................. 24
3.8.7 HOUSING SCENARIO & HOUSING DEMAND .................................................... 25
3.8.8 HOUSING DEMAND .............................................................................................. 27
3.9 KEY ISSUES FOR SPATIAL GROWTH ............................................................................... 27
3.10 CITY SPECIFIC STRATEGIES ............................................................................................ 27
4.0 PHYSICAL INFRASTRUCTURE .................................................................................................... 28
4.1 WATER SUPPLY ................................................................................................................ 28
4.1.1 WATER SOURCES ................................................................................................. 28
4.1.2 DISTRIBUTION SYSTEM ...................................................................................... 29
4.1.3 WATER SUPPLY PROJECTS UNDER UIDSSMT .................................................. 29
4.1.4 AREA AND POPULATION COVERAGE ............................................................... 30
4.1.5 WATER TREATMENT ........................................................................................... 30
4.1.6 DEMAND SUPPLYASSESSMENT & COMPARATIVE ANALYSIS .................... 30
4.1.7 SWOT ANALYSIS .................................................................................................. 30
4.1.8 STAKEHOLDERS PERCEPTION .......................................................................... 31
4.1.9 PROJECTS IDENTIFIED ......................................................................................... 31
4.1.10 ISSUES AND CITY SPECIFIC STRATEGIES ........................................................ 31
4.1.11 ACTION PLAN ........................................................................................................ 32
4.1.12 INVESTMENT PLAN-PHASING TILL 2035 .......................................................... 33
4.1.13 SERVICE LEVEL BENCHMARKING AND STRAGEGIES ................................... 33
4.2 SEWERAGE ........................................................................................................................ 34
4.2.1 EXISTING SEWERAGE SYSTEM ......................................................................... 34
4.2.2 MEANS OF SEWAGE DISPOSAL .......................................................................... 34
4.2.3 HOUSEHOLD TOILETS (DRY LATRINES AND FLUSH LATRINES) ................. 34
4.2.4 PUBLIC TOILETS ................................................................................................... 35
4.2.5 PRESENT AND FUTRUE DEMAND AND SUPPLY GAPS & COMPARATIVE
ANALYSIS .............................................................................................................. 35
4.2.6 SANITATION PROJECTS UNDER UIDSSMT ....................................................... 35
4.2.7 SWOT ANALYSIS .................................................................................................. 35
4.2.8 STAKEHOLDERS PERCEPTION ........................................................................... 36
4.2.9 PROJECTS IDENTIFIED ......................................................................................... 36
4.2.10 ISSUES AND CITY SPECIFIC STRATEGIES ........................................................ 36
4.2.11 ACTION PLAN ........................................................................................................ 37
4.2.12 INVESTMENT PLAN PHASING TILL 2035 ........................................................ 38
4.2.13 SERVICE LEVEL BENCHMARKING AND FINANCING STRATEGIES .............. 38
4.3 TRAFFIC AND TRANSPORTATION ................................................................................ 39
4.3.1 EXISTING TRAFFIC & TRANSPORTATION SCENARIO .................................... 39
4.3.2 VEHICLE POPULATION ........................................................................................ 39
4.3.3 AGENCIES IN TRAFFIC & TRANSPORTATION .................................................. 40
4.3.4 TRAVEL CHARACTERISTICS CIRCULATION PATTERN ............................... 40
4.3.5 PUBLIC TRANSPORT / MASS TRANSIT BUS STAND ........................................ 41
4.3.6 TRAFFIC MANAGEMENT AND CIRCULATION ................................................. 41
Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
4.3.7 TRANSPORT STUDY WITH EMPHASIS ON LOW COST PUBLIC TRANSPORT
AND LIVELIHOODS .............................................................................................. 42
4.3.8 PARKING REQUIREMENTS .................................................................................. 42
4.3.9 PRESENT AND FUTURE DEMAND AND SUPPLY GAPS & COMPARATIVE
ANALYSIS .............................................................................................................. 43
4.3.10 SWOT ANALYSIS .................................................................................................. 43
4.3.11 STAKEHOLDERS PERCEPTION ........................................................................... 44
4.3.12 PROJECTS IDENTIFIED 44
4.3.13 ISSUES AND CITY SPECIFIC STRATEGEIS ........................................................ 45
4.3.14 ACTION PLAN ........................................................................................................ 45
4.3.15 INVESTMENT PLAN- PHASING TILL 2035 ......................................................... 46
4.3.16 SERVICE LEVEL BENCHMARKING AND STRATEGIES ................................... 46
4.4 STREET LIGHTING AND FIRE FIGHTING SERVICES ................................................ 47
4.4.1 EXISTING SITUATION OF STREET LIGHTS ....................................................... 47
4.4.2 FIRE SERVICES ...................................................................................................... 47
4.4.3 VEHICLES AND EQUIPMENT FOR FIRE FIGHTING AND RESCUE OPERATIONS
................................................................................................................................. 48
4.4.4 PRESENT AND FUTURE DEMAND AND SUPPLY GAPS & COMPARATIVE
ANALYSIS .............................................................................................................. 48
4.4.5 ACTION PLAN FOR FIRE FIGHTING ................................................................... 49
4.4.6 INVESTMENT PLAN- PHASING TILL 2035 ......................................................... 50
4.5 STORM WATER DRAINAGE ........................................................................................... 51
4.5.1 EXISTING DRAINAGE SYSTEM .......................................................................... 51
4.5.2 MAJOR WATER BODIES ....................................................................................... 51
4.5.3 FLOOD PRONE AREAS ....................................................................................... 51
4.5.4 PRESENT AND FUTURE DEMAND AND SUPPLY GAPS & COMPARATIVE
ANALYSIS .............................................................................................................. 51
4.5.5 SWOT ANALYSIS .................................................................................................. 51
4.5.6 STAKEHOLDERS PERCEPTION ........................................................................... 52
4.5.7 PROJECTS IDENTIFIED ......................................................................................... 52
4.5.8 ISSUES AND CITY SPECIFIC STRATEGY ........................................................... 52
4.5.9 ACTION PLAN ........................................................................................................ 52
4.5.10 INVESTMENT PLAN-PHASING TILL 2035 .......................................................... 53
4.5.11 SERVICE LEVEL BENCHMARKING AND STRATEGIES ................................... 53
4.6 SOLID WASTE MANAGEMENT ...................................................................................... 54
4.6.1 QUANTITY OF WASTE GENERATED .................................................................. 54
4.6.2 CONSTITUENTS OF MUNICIPAL WASTE ........................................................... 54
4.6.3 CURRENT PRACTICES, WASTE STORAGE, SEGREGATION, COLLECTION .. 54
4.6.4 PROCESSING AND DISPOSAL ............................................................................. 54
4.6.5 VEHICLES FOR SOLID WASTE COLLECTION AND TRANSPORTATION ....... 54
4.6.6 PRESENT AND FUTURE DEMAND AND SUPPLY GAPS & COMPARATIVE
ANALYSIS .............................................................................................................. 55
4.6.7 PROJECT PROPOSAL : SOLID WASTE MANAGEMENT .................................... 55
4.6.8 SWOT ANALYSIS .................................................................................................. 56
4.6.9 STAKEHOLDERS PERCEPTION ........................................................................... 56
4.6.10 PROJECTS IDENTIFED .......................................................................................... 56
4.6.11 ISSUES AND CITY SPECIFIC STRATEGIES ........................................................ 58
4.6.12 ACTION PLAN ........................................................................................................ 58
4.6.13 INVESTMENT PHASING TILL 2035 ...................................................................... 59
4.6.14 SERVICE LEVEL BENCHMARKING AND FINANCING STRATEGIES .............. 59
5.0 SOCIAL INFRASTRUCTURE SECTORAL ANALYSIS............................................................. 60
5.1 HEALTH FACILITIES .......................................................................................................... 60
5.1.1 OVERALL HEALTH FACILITIES...............................................................................60
5.1.2 BASIC HEALTH INDICATORS................................................................................... 60
5.1.3 ROLE OF MUNICIPAL BODY IN THE HEALTH ROGRAMS.................................. 61
Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
5.2 EDUCATION FACILITIES ................................................................................................... 61
5.2.1 OVERALL EDUCATION FACILITIES ................................................................... 61
5.2.2 BASIC EDUCATION/LITERACY INDICATORS .................................................. 61
5.3 RECREATIONAL FACILITIES ............................................................................................ 62
5.3.1 PARKS/GARDENS .................................................................................................. 62
5.3.2 SPORTS FACILITIES AND PLAY GROUNDS....................................................... 62
5.4 OTHR SOCIAL INFRASTRUCTURE ................................................................................... 63
5.5 COMPARATIVE ANALYSIS WITH THE UDPFI GUIDELINES ......................................... 64
5.6 KEY ISSUES SOCIAL INFRASTRUCTURE ..................................................................... 65
5.7 STAKEHOLDERS PERCEPTION ......................................................................................... 65
5.8 PROJECTS IDENTIFIED ...................................................................................................... 65
5.9 CITY SPECIFIC STRATEGIES ............................................................................................. 66
6.0 URBAN POOR AND THEIR ACCESSIBILITY TO BASIC SERVICES ....................................... 67
6.1 POVERTY IN THE TOWN ................................................................................................... 67
6.2 INFORMATION ON SLUM POPULATION ......................................................................... 67
6.3 SLUMS IMPROVEMENT PROGRAM ................................................................................. 67
6.4 LOCATION OF SLUM ON TOWN MAP .............................................................................. 68
6.5 GENERAL CHARACTERISTIC OF SLUM .......................................................................... 68
6.6 STATUS OF SLUMS (NOTIFIED/UN-NOTIFIED).............. ................................................. 68
6.6.1 LAND OWNESHIP & TENURE STATUS ............................................................... 68
6.6.2 TENTURE STATUS ................................................................................................ 69
6.7 URBAN BASIC SERVICES IN SLUMS.............. .................................................................. 69
6.8 SOCIAL SECURITY SCHEMES AND BENEFICIARIES...................................................... 69
6.9 SWOT ANALYSIS.............. ................................................................................................... 70
6.10 DEMAND SUPPLY GAPS.. 70
6.11 PROJECTS IDENTIFIED.............. ......................................................................................... 70
6.11.1 ISSUES AND CITY SPECIFIC STRATEGIES.............. ........................................... 71
6.12 ACTION PLAN.............. ........................................................................................................ 71
6.13 INVESTMENT PHASING TILL 2035.............. ...................................................................... 72
6.14 SYSTEM BENCHMARKING AND FINANCING STRATEGIES.............. ............................ 72
7.0 ENVIRONMENT................................................................................................................................ 73
7.1 FLORA AND FAUNA ........................................................................................................... 73
7.1.1 KEY ISSUES FLORA FUANA ............................................................................. 74
7.2 POLLUTION LEVELS( AIR , WATER AND SOIL ) ............................................................ 74
7.2.1 AIR POLLUTION LEVELS ..................................................................................... 74
7.3 KEY ISSUES AIR & WATER POLLUTION ...................................................................... 76
7.4 CONTROL MEASUREMENT ............................................................................................... 76
7.5 CITY GREEN SPACES (GARDENS AND RECREATION TOTAL COVERAGE RATIO . 76
7.6 WATER FRONT DEVELOPMENT AND CONSERVATION ............................................... 76
7.7 DISASTER MITIGATION AND MANAGEMENT PLAN .................................................... 77
7.7.1 ACTION PLAN FOR MITIGATION OF DISASTER ............................................... 77
7.7.2 ACTION PLAN.. 78
7.7.3 INVESTMENT PLAN PHASING TILL 2035... 79
8.0 HERITAGE AND CONSERVATION ............................................................................................... 80
8.1 IDENTIFICATION OF HERITAGE STRUCTURE/AREAS .................................................. 80
8.2 URBAN MORPHOLOGY...................................................................................................... 80
8.3 URBAN LINKAGES ............................................................................................................. 80
8.4 URBAN ELEMENTS ............................................................................................................ 80
8.5 RESTORATION & CONSERVATION HERITAGE GUIDELINES .................................... 81
8.5.1 SIGNIFICANCE OF THE RELIGIOUS HISTORIC AREA ................................... 81
8.5.2 CULTURAL HERITAGE ASSETS OF THE RELIGIOUS ....................................... 81
8.5.3 MANAGEMENT FRAMEWORK FOR HISTORIC AREA ...................................... 81
8.5.4 UNDERSTANDING PEOPLES PERCEPTION OF THE HISTORIC AREA........... 82
8.6 EXISTING REGULATIONS.................................................................................................. 83
8.7 POSSIBILITY OF TOURISM CIRCUITS AT THE REGIONAL LEVEL .............................. 83
Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
8.8 KEY ISSUES - HERITAGE ................................................................................................... 83
8.8.1 RIVER FRONT DEVELOPMENT/ RIVER CONSERVATION/ PROTECTION ...... 84
9.0 EXISTING INSTITUTIONAL FRAMEWORK FOR DEVELOPMENT ....................................... . 85
9.1 URBAN LOCAL BODY STRUCTURE ................................................................................. 85
9.2 SWOT ANALYSIS ................................................................................................................ 85
9.3 TOWN AND COUNTRY PLANNING DEPT - MP ............................................................... 87
9.4 DEVELOPMENT AUTHORITIES ........................................................................................ 87
9.5 PUBLIC HEALTH ENGINEERING DEPARTMENT ........................................................... 87
9.6 MADHYA PRADESH HOUSING BOARD ........................................................................... 87
9.7 MADHYA PRADESH POLLUTION CONTROL BOARD .................................................... 87
9.8 PROJECTS IDENTIFIED ...................................................................................................... 87
9.9 CITY SPECIFIC STRATEGIES ............................................................................................. 88
9.10 ACTION PLAN... .................................................................................................................. 88
10.0 MUNICIPAL FINANCE.................................................................................................................... 90
10.1 FINANCIAL STATUS ........................................................................................................... 90
10.2 REVENUE ACCOUNT.......................................................................................................... 92
10.2.1 REVENUE INCOME ............................................................................................... 92
10.2.2 REVENUE EXPENDITURE .................................................................................... 92
10.3 CAPITAL ACCOUNT .......................................................................................................... 94
10.4 COST RECOVERY ON SERVICES ...................................................................................... 94
10.5 KEY FINANCIAL INDICATORS ......................................................................................... 96
10.6 SWOT ANALYSIS ......................................................................................................... 96
10.7 PROJECT IDENTIFIED ........................................................................................................ 97
10.8 ISSUES AND CITY SPECIFIC STRATEGY ......................................................................... 98
11.0 SWOT ANALYSIS OF THE CITY AND REFORMS .. ................................................ 99
11.1 REFORMS ACTION PLAN ................................................................................................... 99
11.2 MANDATORY REFORMS BY MCI ..................................................................................... 100
11.3 OPTIONAL REFORMS ......................................................................................................... 104
12.0 CITY INVESTMENT PLAN AND ACTION PLAN .. ................................................... 105
12.1 CITY INVESTMENT PLAN (CIP) ........................................................................................ 105
12.2 INSTITUTIONALISING THE CIP PROCESS ....................................................................... 105
12.3 SUMMARY OF INVESTMENTS .......................................................................................... 105
13.0 INVESTMENT CAPACITY AND SUSTENANCE OF MCI .. ..................................... 108
13.1 FINANCING STRATEGIES FOR THE CIP .......................................................................... 109
13.2 FINANCE PROJECTIONS .................................................................................................... 109
13.2.1 MUNICIPAL ACCOUNT- GROWTH PROJECTIONS AND ASSUMPTIONS........ 109
13.3 INVESTMENT CAPACITY/SUSTENANCE ......................................................................... 111
13.3.1 IMPACT OF UIDSSMT REFORMS ON INVESTMENT CAPACITY ..................... 111
13.3.2 FUNDING PATTERN .............................................................................................. 111
Annexure

















ABBREVIATIONS



Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

ABBREVIATIONS:
APMC : Agricultural Produce Market Committee
BPL : Below Poverty Line
BOD : Biochemical Oxygen Demand
BPL : Below Poverty Line
BT : Bituminous
CAGR : Compound Annual Growth Rate
CBDM : Community based disaster management
CBDRM : Community based disaster risk management
CC : Cement Concrete
CDP : City Development Plan
CFL : Carbide Florescent Light
CIP : City investment plan
CPCB : Central Pollution Control Board
CPHEEO : Central Public Health & Environmental Engineering Organisation
DCR : Development Control Regulation
DM : Disaster Management
DPR : Detail Project Report
DFID : Department for International Development
ESR : Elevated Storage Reservoir
FSI : Floor Space Index
GDCR : General Development Control Regulation
GIS : Geographic Information System
GoMP : Government of Madhya Pradesh
GoI : Government of India
IHSDP : Integrated Housing and Slum Development Program
HQ : Head Quarter
HP : Horse Power
JNNURM : Jawarlal Nehru National Urban Renewal Mission
Kl : Kilo Liters
lpcd : Liters per Capita per Day
MPHB : Madhya Pradesh Housing Board
MPPCB : Madhya Pradesh Pollution Control Board
MPUSP : Madhya Pradesh Urban Services for Poor
MCL : Municipal Council
MLD : Million Liters per Day
ML : Million Liters
mps : Meter per second
MT : Metric Ton
NGO : Non Government Organisation
NH : National Highway
O & M : Operation and Maintenance
PHED : Public Health Engineering Department
PWD : Public Works Department
ROB : Road Over Bridge
SWM : Solid Waste Management
SH : State Highway
SWOT : Strengths, Weaknesses, Opportunities and Threats
T & CPD : Town and Country Planning Department
UADD : Urban Administration & Development Department
UBS : Urban Basic Services
UFW : Unaccounted for Water
UIDSSMT : Urban Infrastructure Development Scheme for Small and Medium Towns
ULB : Urban Local Body
WBM : Water Bound Macadam
Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
LIST OF FIGURE

Figure 1 Lord Narsimha .......................................................................................................................................... 13
Figure 2 Narsimha Mandir ...................................................................................................................................... 15
Figure 3 Ram Mandir & Krishna Mandir .................................................................................................................. 16
Figure 4 Archaeological Art .................................................................................................................................... 16
Figure 5 Jirna Kund ................................................................................................................................................ 16
Figure 6 Market area .............................................................................................................................................. 20
Figure 7 Agriculture area ........................................................................................................................................ 21
Figure 8 Singri River .............................................................................................................................................. 28
Figure 9 Natural Source of Water (Schematic Diagram) ............................................................................................. 28
Figure 10 Existing Storage Tank .............................................................................................................................. 28
Figure 11 Location Plan for various component of water supply scheme ..................................................................... 29
Figure 12 Waste water Nala .................................................................................................................................... 34
Figure 13 Open Surface Drain ................................................................................................................................. 34
Figure 14 Pay & Use Toilets ................................................................................................................................... 35
Figure 15 Means of Transportation .......................................................................................................................... 39
Figure 16 Mixed Vehicular Traffic........................................................................................................................... 39
Figure 17 Private & Public Transportation Agencies.................................................................................................. 40
Figure 18 Existing/Old Bus Stand ............................................................................................................................ 41
Figure 19 Site for New Bus Stand ............................................................................................................................ 41
Figure 20 Narsinghpur Railway Station .................................................................................................................... 41
Figure 21 Parking on Road side ............................................................................................................................... 42
Figure 22 Proposed sites for new Bus Stand .............................................................................................................. 44
Figure 23 Street Light Facilities ............................................................................................................................... 47
Figure 24 Fire Fighting Service ............................................................................................................................... 47
Figure 25 River & Natural drains within City ............................................................................................................ 51
Figure 26 Prop. New site for solid waste disposal ...................................................................................................... 57
Figure 27 Civil Hospital .......................................................................................................................................... 60
Figure 28 Mushran Inst. Of Mang. & Tech. .............................................................................................................. 61
Figure 29 Kendriya Vidhyalaya ............................................................................................................................... 61
Figure 30 Utkrusht Vidyalaya .................................................................................................................................. 61
Figure 31 Mushran Park .......................................................................................................................................... 62
Figure 32 College Playground ................................................................................................................................. 62
Figure 33 Sports facilities ....................................................................................................................................... 62
Figure 34 Cinema Halls .......................................................................................................................................... 63
Figure 35 Dr Ambedkar Community Hall ................................................................................................................. 63
Figure 36 Crematorium ........................................................................................................................................... 63
Figure 37 Post Office .............................................................................................................................................. 63
Figure 38 Collector Office ...................................................................................................................................... 63
Figure 39 Tehsil Office ........................................................................................................................................... 63
Figure 40 Location of the slum pockets .................................................................................................................... 68
Figure 41 Housing condition in Slum area ................................................................................................................ 68
Figure 42 IHSDP Housing Scheme - Slum Relocation site ......................................................................................... 69
Figure 43 Sources of Air Pollution ........................................................................................................................... 75
Figure 44 Narsinghpur Lake .................................................................................................................................... 77
Figure 45 Narsinghpur Temple ................................................................................................................................ 80
Figure 46 Archaeological art ................................................................................................................................... 80
Figure 47 Organisational setup of Narsinghpur Municipal Council. ............................................................................. 85
Figure 48 Bar Chart Revenue Account ..................................................................................................................... 90
Figure 49 Bar Chart-Capital Accounts ...................................................................................................................... 91
Figure 50 Percentage Contributions - Revenue Income .............................................................................................. 91
Figure 51 Percentage Contribution-Revenue Account ................................................................................................ 92
Figure 52 Water Tax Collection performances ........................................................................................................ 95
Figure 53 Property Tax Collection Performance ....................................................................................................... 95
Figure 54 Sectorwise Investment need upto 2015 .................................................................................................... 106

Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
LIST OF TABLES

Table 1 Sector Priority ............................................................................................................................................ 9
Table 2 Geographical Details ................................................................................................................................ 13
Table 3 Population composition as per Census 2001 .............................................................................................. 14
Table 4 District Administration ............................................................................................................................. 14
Table 5 Decadal Population Growth ...................................................................................................................... 17
Table 6 Population Density ................................................................................................................................... 18
Table 7 Literacy rate 1991-2001 ............................................................................................................................ 18
Table 8 Decadal Sex Ratio .................................................................................................................................... 18
Table 9 Population growth of SC and ST population in last decade ........................................................................ 18
Table 10 Migration Trend District ...................................................................................................................... 19
Table 11 Work Participation of Narsinghpur city ................................................................................................... 19
Table 12 Decadal Growth of Urban Population & Projection ................................................................................. 20
Table 13 Population Forecast ................................................................................................................................ 20
Table 14 Planning Area ......................................................................................................................................... 22
Table 15 Land Availability .................................................................................................................................... 22
Table 16 Ward wise spatial distribution ................................................................................................................. 23
Table 17 Existing Land Use .................................................................................................................................. 23
Table 18 Planning Units ........................................................................................................................................ 24
Table 19 Proposed Land Use Distribution ............................................................................................................. 24
Table 20 Imbalanced land use ............................................................................................................................... 25
Table 21 Housing Deficit ...................................................................................................................................... 26
Table 22 Distribution of Census Houses by Predominant Material of Roof............................................................. 26
Table 23 Distribution of Census Houses by Predominant Material of Wall ............................................................. 26
Table 24 Type of structure in Narsinghpur............................................................................................................. 27
Table 25 Proposed requirements of housing units .................................................................................................. 27
Table 26 Details of Storage Reservoir ................................................................................................................... 29
Table 27 Water Demand as per Proposal ............................................................................................................... 29
Table 28 Demand-Supply-Gap for water supply .................................................................................................... 30
Table 29 Number of Latrines................................................................................................................................. 34
Table 30 Demand-Supply-Gap for Sewerage system.............................................................................................. 35
Table 31 Vehicular growth (Narsinghpur District) ................................................................................................. 39
Table 12 Details of Bus Trips ................................................................................................................................ 40
Table 33 Road Width proposed in Development Plan ............................................................................................ 40
Table 34 Details of Accidents................................................................................................................................ 42
Table 35 Demand-Supply-Gap for Traffic & Transportation .................................................................................. 43
Table 36 Details of Street Lights ........................................................................................................................... 47
Table 37 Requirements for Fire Fighting ............................................................................................................... 48
Table 38 Demand-Supply-Gap for Streetlight ........................................................................................................ 48
Table 39 Demand-Supply-Gap for Storm Water Drainage ..................................................................................... 51
Table 40 Source & amount of waste Collection ..................................................................................................... 54
Table 41 Demand-Supply-Gap for Solid waste Management ................................................................................. 55
Table 42 Requirement of vehicles and containers .................................................................................................. 55
Table 43 Health facility in Civil Hospital .............................................................................................................. 60
Table 44 Birth & Death Registered for last Five Years in Urban area Narsinghpur Dist. ...................................... 60
Table 45 Infant Mortality for last five Years in Urban area Narsinghpur Dist. ..................................................... 61
Table 46 Social Amenities within the city .............................................................................................................. 64
Table 47 Commercial activities in the city ............................................................................................................. 64
Table 48 Future Requirement of Health & Education ............................................................................................. 65
Table 49 Ward wise slum population ..................................................................................................................... 67
Table 50 Action Plan for Implementation Urban Poor ......................................................................................... 71
Table 51 Annual Deaths Due To Air Pollution in Urban and Rural Areas ............................................................... 75
Table 52 Financial Status at a Glance .................................................................................................................... 91
Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Table 53 Source-wise Revenue income ................................................................................................................. 92
Table 54 Application of funds by head of Account ................................................................................................ 93
Table 55 Section-wise establishment expenditure .................................................................................................. 93
Table 56 O & M Expenditure ................................................................................................................................ 93
Table 57 Details of Capital Account ...................................................................................................................... 94
Table 58 Water Tax Demand Collection ................................................................................................................ 94
Table 59 Property Tax Demand Collection ............................................................................................................ 95
Table 60 Financial Indicators ................................................................................................................................ 96
Table 61 Lands Belongs to Govt. (Nazul) ......................................................................................................... 97
Table 62 Capital Investments .............................................................................................................................. 105
Table 63 Sector wise Capital Investments ............................................................................................................ 106
Table 64 Important assumptions made in the projections Head ............................................................................ 110
Table 65 FOP Summary ...................................................................................................................................... 111
Table 66 CIP Funding Pattern ............................................................................................................................. 111






































Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

EXECUTIVE SUMMARY NARSINGHPUR TOWN

1. CITY DEVELOPMENT PLAN
The city development plan (cdp) for narsinghpur city aims at improvement in urban infrastructure in a planned
manner, so as to create economically productive, efficient, equitable and responsive city to achieve systematic
development of city keeping in view the futuristic planning for 30 years by outlining vision, strategies and tasks for
the citys preferred future with objectives to
A. Improve infrastructural facilities and help create durable public assets and quality oriented services in cities
& towns.
B. Enhance public-private-partnership in infrastructural development and
C. Promote planned integrated development of towns and cities.

2. TOWN PROFILE
NARSINGHPUR CITY
POPULATION (2001) 56203
AREA 14.71 SQ KM
GROWTH RATE OF LAST DACADE 32.69
DENSITY 38.2 PERSONS PER HECT.
LITERACY RATE
DISTRICT LEVEL: 77.12 %
STATE LEVEL: 64.11 %
87.7 %
URBAN ECONOMY (2001)

MAIN WORKERS 14729
MARGINAL WORKERS 1912
TOTAL NON-WORKERS 39562
WORK PARTICIPATION RATE 29.61 %
ECONOMIC POTENTIAL
INDUSTRIES Soya bin plant, cement pipe manufacturing industries etc.,
small scale industries include food products, furniture,
paper roll, photo colour lab and mineral based industries
etc.
TRADE AND COMMERCE As a district headquarters commercial activities are
situated on major roads of the city: some of them are
situated at railway station, bus stand, old cinema road,
kandeli main road, outer ring road, main market area,
wholesale and retail markets
OTHERS Sugarcane, tendu plantation for bidi making industries are
the majot agriculture products


3. STAKEHOLDERS CONSULTATION ACTION AGENDA (BRIEF OF 1
ST
, 2
ND
, 3
RD
,4
TH

WORKSHOP)
Stakeholders from diverse backgrounds like industries associations, business associations, resident welfare
associations, ngos, citizens groups, line agencies, representative from academic institution, representative of
industries and chamber of commerce, etc were consulted and tried to find out their involvement/role towards the
growth & development of the city.
Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
The stakeholders were requested to focus their discussion on following aspects
1. The major issues related to city and factors affecting economic growth.
2. Issues related to urban services.
3. Citys strength, weakness
4. The vision for a city
5. Identification of projects & priority
6. Strategy options and actions required
7. Contribution of stakeholders towards the betterment of a city
8. Municipal finance
9. Economy of the city

4. SWOT ANALYSIS
(ON THE BASIS OF RECONNAISSANCE, RAPID ASSESMENT, STAKE HOLDERS CONSULTATION &
IN-DEPTH STUDY & ANALYSIS)
STRENGTHS WEAKNESSES
Being a district head quarter, narsingpur
has good economic base of trade &
commerce, transportation activity,
agriculture products etc
Soil of surrounding area has a good fertility
property
Narsinghpur temple is one of the important
features of the town and narmada zarna
kund is the most amazing place to visit. A
mela is organized every year on the day
of makarsankranti.
Availability of river water
Average rainfall in the region is 1105.2
mm which is good enough for summer
crops
Healthy condition of commercial market
based on agricultural products like
soyabean, chana and wheat, sugarcane,
pulse etc.
Good connectivity of town by roads and
railways to other major cities of the state.
Preparation of city development plan
Absence of major industrial units
More dependency on agricultural activities,
constrains the development of agriculture sector
No major agro based industry situated in town
Unconstructive investor perception due to lack
of development approach
High dependency on grants and subsidies.
Imbalance work participation ratio
Inadequate physical and social infrastructure
facilities
No garden or openspace or picnic spot exist in
the town where the people can go and enjoy
Lack of facilities in bus stand and absence of
day shelter
No public transportation system resulting air
pollution due to large no of two and three
wheelers
OPPORTUNITIES THREATS
Enough opportunity to develop livestock,
rural industries to promote household
industries, trade and commerce
Favorable weather and good soil property
available for the garden products like
mango, awla, papaiya etc. And for
medicine plants like white mushli,
ashwagandha satavre, chandsur and
kalmegh. On this basis agrobased
industries can be established which will
help to generate employment
To develop narsinghpur as a centre of
education and health facilities
400 years old narsinghpur mandir and
surrounding place can be develop as a
The important constraint in making of
industrialization of town is absence of facilities
for education and communication about
technical information required before to
promote the industrialist and to establish the
industries.
City will have to face more power cutoff and
the amount of power generation is not enough
to cater the future industrial growth along with
the demand from the agriculture sector
Lacking in transportation facility can restrict
the economic growth
It is required to promote the finance agencies to
make fund available to interested industrialist
/businessmen/manufacturer group
Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
tourist spot
To develop silk industries & pulse mills
To utilise fund at central and state level
Due to water is extracted from the tube well,
ground water level goes on decreasing
No proposals on provision of basic services
Probable deterioration in socio economic status
due lack of infrastructural facilities
Degradation of environment due to air and
water pollution.

5. VISION STATEMENT
The vision for narsinghpur was drafted based on stakeholder consultations wherein the citizens and various
stakeholders expressed how they envisaged narsinghpur to develop in the next 30 years.
Based on the citys strengths, futuristic desires, perspectives and potential of narsinghpur, the citizens have
expressed their thoughts & wish on the vision for narsinghpur in the following statement:

NARSINGHPUR TO BE THE MAJOR HUB FOR TRADE, COMMERCE AND TOURISM IN THE RIGION
AND ALL BASIC SERVICES TO MAKE AVAILABLE TO ALL CITIZENS OF NARSINGHPUR TOWN

6. PROJECT IDENTIFICATIONS AND PRIORITIES (RESULT OF SERIES OF STAKE
HOLDERS CONSULTATION)

SR.
NO.
SECTOR DESCRIPTION
(I) PHYSICAL INFRASTRUCTURE
1 WATER SUPPLY Maximum utilazation of water from river singri and sher.
Stop dam should be proposed on river singri to recharge ground water
table.
Water treatment system should be proposed to maintain the quality of
potable water.
Newly developed area should be connected with water distribution
system.
2 SEWERAGE
SYSTEM

Designing of the underground drainage system along with sewerage
treatment plant should be taken up in priority.
3 TRAFFIC AND
TRANSPORTATION

Initiate proposals for widening key roads in the city along with
footpath development, encroachment removal and land
acquisition/land pooling with the help of legal tool.
Initiating functioning of new bus stand immediately.
Development of important junctions to reduce the accident and easy
flow of traffic movement.
Proposal of separate parking lot near the major commercial centres and
market place to remove traffic bottleneck due to on-street parking.
Construction of divider on main road of the city.
Proposal of truck terminal or transport nagar for truck parking.
Availability of bus service as a public transportation facility.
Development of new roads for newly developed areas.
Proposal for construction of underpass at jail and fly over at railway
chowki and sindhpur road.
4 SOLID WASTE
MANAGEMENT

There is a need to develop a comprehensive solid waste management
system
The proposed system should aim at applying best practices solid waste
management, including in waste segregation at source, community-
based collection systems, efficient transportation and scientific
treatment and disposal of waste.
Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Capacity building of municipal council should be assured by availing
required no of equipments to cater the need of solid waste collection
and disposal by provision of site away from town.
5 STORM WATER
DRAINAGE

Need of designing well planned storm water drainage network to avoid
contamination of rain water with sewerage water.
(II) URBAN POOR
Construction of residential houses by taking advantages of central/stat
government schemes for urban poor.
Removal of encroachment of slums from public places.
Employment generation by development of trade and commerce.
(III) PUBLIC PLACES AND HERITAGE BUILDING
Upgradation of existing gardens with modern entertaining rides,
landscaping, provision of refreshment stall etc should be taken up
immediately.
Restoration of narsinh temple, ram and krishna temple situated in the
city.
Conserving and beautification of the singhri river and narsingh talav and
develop it as a picnic spot with garden and amusement park to attract the
visitors.
Jirna kund should be conserved and developed as a picnic spot.
(IV) LAND USE AND SPATIAL GROWTH PATTERN
Municipal council should make a conscious effort to get their
development plan sanctioned by the government. So that they can
control the city development in a phased and planned manner, adopting
best practices in urban development and planning norms.
Implementation of development plan proposals to arrest indiscriminate
sprawl and ensure equitable and sustainable urban development
(V) MUNICIPAL ADMINISTRATION
To tackle and control natural disaster and critical situation citizens,
community participation & infrastructure should be made available in
the town.
Municipal council, as part of its strategy to build in-house capacity, to
train the existing manpower resource through training programs and
workshops. Staff to be rotated inter-department in order to promote in
multi-skilling and team building.
Billing system should be implemented for tax collection
Construction of stadium and auditorium in the city.
Civil hospital should be developed and modernized in terms of facilities
Proposal of development plan should be made and implemented to
achieve organized / well planned development of the city.

7. POPULATION FORECAST
For the last four decades, the decadal growth rate of population has been declining continuously except in 2001
which have observed increase. The past and current trends of population growth in narsinghpur city have been
projected using various methods, the results of which are presented below. After detail analysis, giving suitable
deliberation to development growth rate, it was concluded to presume the exponential method for population
projection. Looking to the status of the city, the exponential method for population projection is the most suitable for
considering future requirements.




Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
TABLE 2 DECADAL GROWTH OF URBAN POPULATION & PROJECTION
Year Population as per exponential method Population as per cagr (@ 2.9%)
2001 56203
2009 73306 71134
2015 89469 85308
2025 124708 113638
2035 173828 151375

TABLE 3 POPULATION FORECAST
SR.
NO.
METHOD 1991 2001 2009 2015 2025 2035
1
ARITHMETIC
PROGRESSION METHOD
29529 39194
63856 69595 79161 88727
2
GEOMETRIC
PROGRESSION METHOD

70397 83349 110445 146349
3
INCREMENTAL INCREASE
METHOD

65352 73087 87640 104272
4 EXPONENTIAL METHOD 73306 89469 124708 173828
5 GRAPHICAL METHOD 71407 84415 111573 147467
6
BASED ON PAST
DECADAL GROWTH

71134 85308 113638 151375

The Population Projection For Narsinghpur Is Thus Assumed As 89469 By 2015, 124708 By 2025 And 173828 By
2036.

8. SECTORS COVERED FOR INFRASTRUCTURE STUDY & ANALYSIS
(BASED ON PROJECT IDENTIFICATION, PRIORITIES & POPULATION PROJECTIONS)
SECTORS COVERED ASSESSMENT
Water Supply
Sewerage System
Road , Urban Transport & Streetlight & Fire Service
Storm Water Network
Solid Waste Management
Urban Poor
Other Capital Works:-
River Conservation/Protection
Tree Plantation & Garden
Urban Governance/E-Governance
Regular Capital Works
Disaster Management
Sector Wise Key Issues
Existing Supply Gap
Future Demand
Strategies For Indentified Projects
Investment Need
Action Plan With Measures
Sector Notes
Performance Indicators

9. SECTOR ISSUES AND STRATEGIES

ISSUES STRATEGIES

WATER SUPPLY
Faulty & damaged Water supply Distribution
system.
Present Per capita water supply is much below
the national standard.
No water treatment plant exists in Narsinghpur
Bring in efficiencies in system and operational
performance: A comprehensive operational
manual needs to be prepared and the Municipal
Council staff to be trained in operating the
system in a scientific manner. Undertake
Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
ISSUES STRATEGIES
city.
Only ground water is used as a major water
supply source by extracting water from
tubewells, resulting the ground water table goes
on decreasing.
Poor cost recovery is the major policy issues to
be addressed in the immediate future.
Surface water source and distribution system are
major challenges against the need of water for
the present and future population.
Though Singri River passes through the city, it is
not utilised as a major surface water source.
Unacceptable quality of ground water.
No provision of check dam or stopdam in Sigri
River for recharging ground water table.
training and capacity building of core team.
The service has the potential to involve the
private sector in the current format to bring in
efficiency in O & M and recovery.
The water supply distribution system should be
implemented by way of systematic zoning
system to avoid cross-connections, leakage,
head loss, contamination and spare power
consumption.
Norms for the revision of water tariff should be
taken immediately add-on by awareness
programs with regard to cost recovery and
plugging of illegal connections
SEWERAGE & SANITATION
Underground drainage system for a whole town
is proposed under UIDSSMT but not
implemented yet, results water logging & over
flooding conditions in city.
De silting operations in existing drains have not
taken regularly. These drains are normally built
unplanned without considering water
consumption levels resulting in inefficient
design and working.
Ever-increasing sewerage generation due to
rapid urbanization put extra burden on existing
infrastructure.
No system coverage with a large quantum of
sewerage being allowed to flow into water
bodies.
Mixing up of sewerage and storm water is a
predominant issue in Narsinghpur.
40% of the towns area and population is
covered with septic tank.
Existing nalas which are passing through or
nearby town should be integrated and can be
used as rain water drains.
No sewage treatment plant exists in Narsinghpur
town and all waste water disposed in open,
creates health hazards and act as a mosquito
breeding place.
A Proposal for underground sewerage system
should be planned according to the topography
of the city with priority focus on the densely
populated areas and potential development
areas.
Commissioning of the underground Drainage
system along with sewerage treatment plant
should be taken up in priority. The treated water
can be utilized for cultivation.
A detailed slum sanitation program needs to
developed and implemented.
STORM WATER DRAINAGE
Road infrastructure in the city is badly affected
and damaged at several locations during
monsoons due to the unavailability of storm
water drainage networks. Desilting operation of
the natural drains are not done regularly, results
chock up of the drains.
Future population addition is expected to
increase the pressure on the drainage system of
the town, requiring Nagarpalika to stress on the
City should develop an adequate and separate
storm water drainage .
Open drains should be cleaned regularly.
Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
ISSUES STRATEGIES
development of road networks along with that of
storm water drains.
The existing open drains are very small and use
for waste water drainage as well as storm water
drainage.
SOLID WASTE MANAGEMENT
No Storage of waste is done at source.
Domestic, Commercial and industrial waste are
thrown on the street, foot paths, drains and water
bodies.
Along with the domestic waste construction and
demolition waste are also deposited on road
sides, obstructing traffic and causing nuisance.
There is no system of primary collection.
The bins used are unhygienic and waste can be
seen more on outside the bin than inside.
Street sweeping is not done regularly. The tools
used for the sweeping are outdated and
inefficient.
No processing of waste is done and disposal of
waste is done in most unsatisfactory method and
dumped in open low lying area.
Comprehensive study for solid waste
management is required for selecting
appropriate site of disposal and system has to be
implemented for assessment of type and
quantum of waste generated.
Waste collection should ensure segregation at
source and separate management of segregated
waste. Market waste management - Vegetable
and market wastes could be separately
transported to a common facility for disposal
Bio-medical waste management-. As per the
statutory requirements, the collection and
management needs to be enhanced to ensure
proper segregated management of this category
of waste. The capacity of the existing
incinerator facility needs to be reviewed and
augmented if required to dispose all such waste
generated in the city.
Solid waste should be disposed scientifically so
not to cause health and environment hazardous.
Primary and secondary waste collection should
be modernized so as to achieve 100% waste
collection.
Throwing of solid waste on road side and
burning of solid waste should be banned by
conducting Public awareness programs
TRAFFIC AND TRANSPORTATION
Lack of coordination between land use and
transportation systems.
The provision of truck terminals and arterial ring
roads/ bypasses are not planned to avoid
unwanted freight movement and parking inside
the town.
Due to railway line passes through the city at
railway crossing traffic congestion can be seen
frequently, provision of under pass near jail and
flyover near railway chowky in Tilak ward are
to be proposed for better vehicular movement.
Road side parking, encroachment by footpath
seller, loading and unloading activities on road
etc., which reduce capacity of right of way and
obstruct the traffic flow.
The proposed right of way as per the
Development plan for most of the roads is either
not available or has been encroached upon. Even
the available right of way in most roads,
Parking lot should be proposed to remove
encroachment on road.
Narrow roads should be one way so as not to
cause traffic congestion.
The provision of high mast light at every major
junction and improvement of Road junction to
rectify the problem of traffic congestion.
Municipal council should take initiative for
widening key roads in the City, which will
involve substantial encroachment removal and
land acquisition.
A study which covers all elements like Road
capacity, Surface, Bottleneck formation,
connectivity, parking allocation and
management should be taken up.
Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
ISSUES STRATEGIES
especially in core city areas is encroached upon
by hawkers and on-street parking.
Most of the roads are without signage and other
functional elements such as pedestrian pathways,
lighting, arboriculture, road markings etc. The
riding surface of the roads is poor due to
inadequate maintenance.
Public Transport system is almost non-existent,
auto rickshaw and cycle rickshaws are the
predominant mode of public transport.
Parking plot needs to be provided in commercial
area.
Khery naka to NH-26 road, cinema road,
Shubhash chowk to Sanichara chowk, Main road
in market are required to be widened.
Major junctions need to be improved to avoid
the accidents and for smooth traffic movement.
URBAN POOR
Slow execution of present proposal of IHSDP
scheme for slum relocation.
Sluggish economic growth and inadequate
infrastructure has resulted in poverty and
development of slums.
Lack of educational facilities and health care to
improve the living standards.
Lack of basic infrastructure like roads with
reasonable width to take care of vehicular traffic
growth, insufficient water supply, poor housing
conditions, poor sanitation, absence of sewerage
system and disposal of domestic waste
water/sewage and solid waste.
Absence of public toilets and baths.
Lack of policies and proposals for their up
gradation.
Proposal of City-wide integrated slum
improvement and redevelopment program
covering housing, economic development core
civic services, health and education and other
social amenities under Central / State
Government scheme.
Promotion of initiatives by the govt/community
groups to make town slum free through
various schemes.
Discourage development of further slums by
announcing cut-off dates. Declaring the existing
status of slums. Slums developed after cut-off
dates should be demolished by framing rules
and strict enforcements.
Formation of ward level committee to
discourage the further development of slums.
Municipal Council should ensure appropriate
inclusion of slums and economically weaker
section settlements in their infrastructure
development plans.
Municipal Council needs to carry out a
comprehensive study of slum and economically
weaker section settlements to identify specific
needs and priorities.
SOCIAL INFRASTRUCTURE
Provision of school access to unseen habitations
Quality of existing pre service teacher education
is underprivileged and poor quality elementary
education
Water logging problems are severe resulting into
the health hazards.
Unavailability of medical facilities and required
expertise in emergency cases.
The population of the surrounding villages also
Land having tenure of government / other
parastatal department which is available and
lying fallow should be identified and put
request to the concern department for utilising it
for public purposes.
Upgradation of existing Gardens with modern
entertaining rides, landscaping, provision of
refreshment stall etc by introducing PPP model
in Operation & Maintenance.
Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
ISSUES STRATEGIES
depends upon the resources of civil hospital,
resulting overcrowding and inaccessibility of
proper treatment in time.
For the present population, city does not even
have a good cinema theatre of Multiplex stature,
properly landscaped gardens with childrens
play area.
In addition to the population of Narsinghpur
City, a large quantum of population in the region
around Narsinghpur depends upon the socio-
cultural facilities and recreational open spaces.
Looking to the population growth & slow down
of economic activities has resulted into the
problems like theft & robbery.
Due to unskilled staff & shortage of fund Nagar
Palika is not in position to deliver timely
services.
Introducing modern and reliable equipment and
machinery, with appropriate facilities for their
upkeep and maintenance in Fire service
Cleaning campaigning and Health checkup
programme in slum should be taken up
frequently
Leakage of water pipeline should be repaired to
stop contamination with sewerage water.

MUNICIPAL ADMINISTRATION AND FINANCE
Nagar Palika is highly dependent on the grants
received from Government.
Nagar Palika is also facing problem of tax
recovery on total demand against service
provided.
The cost recovery on water supply service is
very poor, indicating the large quantum of non-
revenue water in the form of unauthorised
connections, subsidised water, etc.
Because of no permanent & planned sewerage
disposal facility, tax collection is negligible.
No billing system for collection of tax.
Due to unavailability of proper infrastructure
Nagar Palika is not in position to perform
effectively and efficiently.
Total establishment cost of Nagar Palika is quite
high against total income/revenue received from
various sources.
To tackle and control natural disaster and
critical situation citizens, community
participation & infrastructure should be made
available in the City.
Municipal Council should act & follow-up for
strict enforcement of development activities as
per development control regulations.
Municipal Council, as part of its strategy to
build in-house capacity, to train the existing
manpower resource through training programs
and workshops. Staff to be rotated inter-
department in order to promote in multi-skilling
and team building.
Municipal Council will need to formulate a
framework for promoting or facilitating PPP in
project development using various tools of
Concession or models of Build Operate
Transfer (BOT) depending upon the project
requirement.
Revision of the Annual Rateable Value at
certain levels. Maintenance of the collection
performance of taxes and charges at certain
minimum levels for current and for arrears.
Revision of water and sewerage charges at
specific intervals. Various committees should
be formed with action plans for the tax recovery
so as to improve Municipal Councils financial
condition.
Public private partnership should be encouraged
to improve infrastructural facility in financial
sustainable manner.
Incentives should be offered for timely payment
of charges against various services. Wide
publicity should be made to achieve required
recovery.
Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
ISSUES STRATEGIES
ECONOMIC DEVELOPMENT
No Major industrial establishment in the city.
Less employment Opportunity
Lacking in higher Education Facilities and
Health Facilities
Looking to the development of the Mandi
Market, District should be declared as an
Agricultural Economic zone
Soyabean and Sugarcane related industries
should be encouraged by new strategies and
project, so that employment opportunities can
be generated which results in economic
development of the city.
Agro based Industries, small scale industries
and household industries should be encouraged
for over all industrial development.

10. MUNICIPAL FINANCE: KEY INDICATORS
Table 1: Key Indicators of Municipal Finance

Sr. No Indicator Average Unit
Value
Minimum Maximum
Financial indicators
A Resource mobilisation
%
1 Per capita income 789.09 Rupees 515 1332
2 Sources of funds
I
Share of own sources in total revenue
income
Share of octroi 23.87 % 16.93 34
Share of taxes 35.74 % 22.94 46.22
Share of non taxes 8.88 % 4.16 13.15
Ii
Share of revenue grants & subsidies in total
revenue income 31.51 % 14.75 53.91
3 Growth in income sources
I Growth in own sources' receipts
Growth in octroi income 21.91 % p.a [17.14] 80.37
Growth in taxes 24.42 % p.a [32.77] 0.00
Growth in non taxes 49.66 % p.a [27.50] 147.99
Ii
Growth in revenue grants & subsidies,
contributions 154.80 % p.a [71.55] 661.02
Iii Growth in total receipts 36.30 % p.a [30.66] 147.09

B Expenditure management
1 Per capita expenditure 721.31 Rupees 468 1111
2 Functional allocation
I Share of establishment 67.29 % 60.48 77.88
Ii Share of o & m expenditure 32.71 % 22.12 39.52
Iii Share of debt servicing expenditure 0.00 % 0.00 0.00
Iv Share of establishment expenditure in total 44.26 % 17.25 103.01
Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
revenue income
V
Share of capital expenditure in total
expenditure 49.64 % 35.67 66.87
3 Growth in items of expenses
I Growth in establishment expenditure 33.99 % p.a [24.0 195
Ii Growth in o & m expenditure 27.08 % p.a [4.0] 46
Iii Growth in total revenue expenditure 15.78 % p.a [15.0] 135
Iv Growth in capital expenditure 27.25 % p.a [0.1] 0.0
C Performance
1 Operating ratio 0.97 Ratio 0.62 1.52
2 Capital utilisation ratio 5.87 Ratio 2.08 18.20
3 Debt servicing ratio(d.s/revenue income)
No debt
service
4 Per-capita performance assessment
I Growth in per capita total income 23 % [23.0] 41
Ii
Growth in per capita revenues, grants,
subsidies & contributions 146 % [72.48] 636.17
Iii Growth in per capita revenue income 32 % [32.93] 139.02
Iv
Growth in per capita establishment
expenditure 30 % [26.33] 185.52
V Growth in per capita revenue expenditure 23 % [17.46] 127.03
Vi Growth in per capita o&m expenditure 23 % [7.43] 41.12
11. INVES`TMENT NEED
As an outcome of the previous arrangement & analysis, following projects have been identified to cater the
demands of the city populace by the year 2015, 2025 and 2035 according to their short, medium and long-term
infrastructure needs. The project identification has been done through a demand-gap analysis of the services and
details available with the municipal council. Further, project prioritization and strategising of the investments/
phasing of investment are based on strategies, listed under each service sector as identified through stakeholder
consultations.
Table 2: Component wise Summary
Component wise Summary of Capital Investments up to 2015-16 (Rs. In Lakhs)
Sr.No Sector Investment till 2015-16
1. Water Supply 911.74
a Source/ system capacity augmentation 416.42
b Treatment capacity augmentation 121.78
c Distribution network augmentation 282.04
d Elevated Storage capacity augmentation 14.95
e Refurbishment of old Distribution Network 19.20
f Metering System 58.35
2. Sewerage 2206.00
a System Coverage/Collection System 2061.00
b Treatment 145.00
3. Roads & Urban Transport 4895.24
a Roads Up-gradation 217.00
b Roads New Formation 228.25
c Public Transport/ Improvements/BRTS 0
d Road Infra Dev (Imp. Roads) incl. Widening & Junction Improvements 450.00
e Flyovers and ROB/Under Pass 4000.00
4. Storm Water Drains 2576.70
a Drains Up-gradation 0.00
b Drains New Formation 2576.70
5. Street Lights 85.11
Final City Development Plan Narsinghpur
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Component wise Summary of Capital Investments up to 2015-16 (Rs. In Lakhs)
Sr.No Sector Investment till 2015-16
a Replacement - Tube Lights- 2.00
b New Installation - Tube Lights 0
c New Installation - High power Lamps 83.00
d New Installation - High Mast Lamps 0.11
6. Conservancy & Sanitation 308.99
a New Vehicles (Primary Collection) 8.95
b New Vehicles (Secondary and Disposal) 12.50
c Acquiring New Disposal Site 80.00
d Infrastructure at Disposal Site 23.40
e DLDPs & Container Bins 18.93
f Public Convenience Systems 165.21
7. Urban Poor/ Slums 790.00
a Slum Improvement - Rehabilitation/ Housing 702.00
b Slum Improvement - Infrastructure 88.00
8. Others 250.50
a River Conservation/ Protection 50.00
b Tree Plantation & Gardens 15.00
c Fire Services 135.50
d Urban Governance/ E-Governance/ GIS 50.00
Investment till 2015-16 12024.29
Investment from 2015-16 to 2025-26 8154.12
Investment from 2025-26 to 2035-36 7338.04
Total Investment Need Up to 2035-36 27516.45

The total estimated capital investment required for providing efficient services to the present and future population
of Narsinghpur City by the year 2015-16 is Rs.120.24 crores and total investment up to year 2035-36 will be
275.16 crores.












1. CITY DEVELOPMENT PLAN: AN OVERVIEW

Final City Development Plan Narsinghpur Page: 1
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
1. CITY DEVELOPMENT PLAN

1.1. CITY DEVELOPMENT PLAN BASED ON JNNURM: AN OVERVIEW
With the goal of creating economically productive, efficient, equitable and responsive cities City Development Plan
is prepared. A CDP is anchored on the Jawaharlal Nehru National Urban Renewal Mission (JNNURM). As a step to
achieving this goal, the CDP focuses on the development of economic and social infrastructure, strategies that deal
specifically with issues affecting the urban poor, strengthening of municipal governments and their financial
accounting and budgeting systems and procedures, creation of structures for bringing in accountability and
transparency, and elimination of legal and other bottlenecks that have stifled the land and housing markets. It
provides a basis for cities to undertake urban sector reforms that help direct investment into city-based
infrastructure.
A City Development Plan (CDP) is both a perspective and a vision for the future development of a city. It presents
the current stage of the citys development where are we now? It sets out the directions of change where do we
want to go? It identifies the thrust areas what do we need to address on a priority basis? It also suggests
alternative routes, strategies, and interventions for bringing about the change what interventions do we make in
order to attain the vision? It provides a framework and vision within which projects need to be identified and
implemented. It establishes a logical and consistent framework for evaluation of investment decisions.

1.2. UADD & ITS ROLE
Madhya Pradesh is Urbanising at a fast rate and the Urban Local Bodies of the State are facing the challenge of
meeting the requirements of the growing population with limited technical and financial resources. GoI as well as
GoMP have initiated a number of programmes to meet the growing demands of infrastructure and service delivery.
These are GoI schemes: Urban Infrastructure Development Scheme for Small and Medium Towns (UIDSSMT type
funding) and Integrated Housing and Slum Development Programme (IHSDP), the GoMP initiated DFID funded
MPUSP, which links reform with investment in infrastructure for the urban poor etc. Other than this there are
several programmes that have been initiated by the GoI and GoMP.

With the enactment of the 74
th
Constitution Amendment Act, major urban related tasks have been transferred to
Local Bodies. The UADD is also responsible for implementation of various public welfare schemes sponsored by
the Central and State Governments. Being the parent organization of Municipal Corporations, UADD monitors the
functioning of all municipal corporations in the state.

The City Development Plan will adhere with the JnNURMs CDP preparation toolkit and it will be as per the
required framework of UADD. The inadmissible components (Requirement of basic physical infrastructure will be
detailed out while broadly considering other social areas such as Education, Health, Livelihood etc.) will also be
included in the task. The CDP will include the Broad Master Planning of the town and will be prepared keeping in
view the Master Plan (wherever exists) provisions as prepared by the Town and Country Planning department.
The government of Madhya Pradesh through the UA&DD has initiated the task of preparation of city development
plans for 96 towns and cities within MP. This initiative has been done in coordination with CMAMP. These CDP
documents include the growth management plan, infrastructure plans and financial management plans till 2035.
These plans are based on the toolkit and frame work adopted for JnNURM projects.

UADD has awarded SAI Consulting Engineers Pvt. Ltd, Ahmedabad with the task of preparing CDPs for the
selected towns of Madhya Pradesh. Narsinghpur is one among such selected town.










2. METHODOLOGY AND FRAMEWORK



Final City Development Plan Narsinghpur Page: 2
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

2. METHODOLOGY

Preparation of a CDP is a multi-stage exercise, involving:
(i) In-depth analysis of the existing situation, covering the demographic, economic, financial, infrastructure,
physical, environmental and institutional aspects: The purpose of this stage is to review and analyse the
current status of the city with regard to the state of its development, systems and procedures, as equally its
institutional and financial context. This stage is meant to identify the strengths and weaknesses in the citys
development and to provide an understanding of what impedes service delivery and management within the
existing set-up and what contributes to better service provision. This stage offers an opportunity to bring out the
unique features of the city that may distinguish it from other cities.
(ii) Development of a perspective and a vision of the city: Using the results of the first stage of analysis combined
with consultations with key stakeholders and civil society, this stage is meant to develop a vision for the future
development a shared vision of where the city wants to be in a medium-term perspective. It is a collective
vision of the future direction expressed in terms of expectations and often even goals, such as water for all.
(iii) Formulating a strategy for bridging the gap between where the city is and where it wishes to go:
It is in this stage that strategies and interventions are identified for attaining the vision and future development
perspectives. This stage is used to first identify the options and strategies and second, to evaluate the strategies
from the perspective of their contribution to the goals and objectives of the JNNURM. The chosen strategies are
translated into programmes and projects in this stage. This is the phase where the city needs to decide which
programmes would contribute most to the vision and mediumterm perspectives. It is at this stage where criteria
are selected, with appropriate consultative processes, for prioritising the strategies, programmes and projects.
(iv) Preparing a City Investment Plan (CIP) and a financing strategy:
An investment plan and a financing strategy are an integral part of the CDP. Crucial to this stage is a plan that
considers the alternative sources of financing the vision and the accompanying strategy and programmes. The
process of formulating a CDP is illustrated in the chart (see diagram).
The CDP further elaborates on how the Municipal Councils intends to manage public finances in a modern and
transparent way; execute urban planning and governance in line with an established framework; and become more
responsive - cost and time efficient by availing of technology in its governance and service delivery processes.
Final City Development Plan Narsinghpur Page: 3
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Finally, the CDP reveals the Municipal Councils strategy to manage its resources, i.e. how it intends to increase
revenues and expand its tax base to allow for self-sustaining urban service delivery; improve its creditworthiness;
and recruit and retain a skilled workforce. This objectives were appraised during the various meeting held with the
Interested groups.

2.1. FRAMEWORK
The CDP outlines the strategic and investment interventions required to achieve the vision for a city including
formulation of sectoral plans for the identified sectors. The scope of CDP is to:
2.1.1. SCOPE OF WORK
Assess the existing situation with regard to demographic and economic growth, access to infrastructure
services, municipal finances etc.
Identify gaps in service delivery
Outline issues faced by the citys poor
Prepare a vision and sectoral strategic framework outlining the goals, strategies, interventions/projects to
achieve the overall vision
Formulate a city investment plan (CIP) with appropriate financing strategies and an implementation action
plan, and
Focus on the reforms to be carried out at the State and city level in consonance with the vision and strategic
plan outlined to sustain the planned interventions.

2.1.2. OBJECTIVES OF CDP
To scale up existing urban development and poverty alleviation schemes within a comprehensive and
coherent strategic planning framework in order to ensure optimal benefit from available resources for the
citizens of the concerned ULBs.
To catalyse new thinking and provoke debate through a consultative stakeholder drive process. The vision
and strategic thrusts of the CDP will be built around the lessons and finding of a comprehensive and rigorous
stakeholder consultation and documentation process.
To revitalise local economic development by attracting private sector funding.
To serve the requirements of the JnNURM, and other development schemes.
To generate specific priority actions and projects that can be the basis for mobilizing funding from diverse
sources.

2.1.3. APPROACH
Preparation of a CDP is considered essential not only for accessing GoI and IHSDP program funding but also for a
strategic framework for converging and co-ordinating various department inputs towards guiding the city on a
development path. The toolkit would provide guidance for the formulation of CDP, through a consultative strategic
planning process that is responsive to local requirements.
It will also enable elected representatives, key staff of MC departments, para statal agencies and other institutions,
policy makers and the citizens to participate and plan for spatial, social and economic development of the city. A
City development plan will present both a vision of a desired future perspective for the city and the MCs strategic
framework of sectoral plans translated into actions that define how the MC, together with other stakeholders, intends
to work towards achieving the long term vision in the next fifteen years. The process of planning for improved
governance and slum up gradation will form an integral part of the CDP, which has been outlined below.
Statutory City development plan will be prepared for the given plan period and the projected population
Ongoing and proposed projects, schemes announced by the govt. (UIDSSMT TYPE FUNDING TYPE
FUNDING , IHSDP etc) & their provision will be incorporated;
Review of the key reform actions and priority slums taken for infrastructure improvement if any initiated.
Study of the overall spatial planning and policy framework of Master Plan
Study of the annual municipal budgeting for understanding of the Operation and Maintenance and
sustainability of the infrastructure assets.
In-depth analysis of the existing situation covering the demographic, economic, financial, infrastructure,
physical, environmental and institutional aspects.
Identify gaps in service delivery
Outline issues faced by the citys poor
Final City Development Plan Narsinghpur Page: 4
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Development of a perspective and a vision of the city.
Formulating a strategy for bridging the gap between where the city is and where it wishes to go by outlining the
goals, strategies, interventions/projects to achieve the overall vision
Preparing a City investment plan (CIP) with appropriate financing strategies and an implementation action
plan.




The CDP shall clearly define how ULBs will serve its customers (businesses and citizens). For example, the CDP
shall talk about how the ULBs intends to guarantee a basic level of urban services to all citizens; make urban
planning responsive to emerging needs; and become responsive to the needs of, and improve its services, to local
business.
The CDP shall further elaborate on how the ULBs intends to manage public finances in a modern and transparent
way; execute urban planning and governance in line with an established framework; and become more responsive -
cost and time efficient by availing of technology in its governance and service delivery processes. Finally, the
CDP shall reveal the ULBs strategy to manage its resources, i.e. how it intends to increase revenues and expand its
tax base to allow for self-sustaining urban service delivery; improve its creditworthiness; and recruit and retain a
skilled workforce. This objective shall be appraised during the various meeting which shall be anticipated at various
stages with the stakeholders during the entire planning process.

2.1.4. PUBLIC CONSULTATION: STAKEHOLDERS MEETING, WORKSHOP
The primary objective of Public consultation in the form of stakeholders from the diverse sectors will be to discuss
various details/data collected from different sectors, present level of services, underlying issues and emerging
opportunities for understanding their perspective on town. It is important to understand their future plans by urging
them to identify challenges which the ULBs need to overcome to achieve specified vision for the city. The process
will enable elected representatives, key staff of Municipal Corporation departments, parastatal agencies and other
institutions, policy makers and the citizens to participate and plan for spatial, social and economic development of
the ULBs.

2.1.5. OUTCOMES
The CDP must take into account the integration of current initiatives, schemes and strategic framework for priority
development actions. The outcome of the CDP would be reflected in the annual plans (related to MC budgets),
infrastructure and sustainability.
This will be crucial in ensuring the O&M and sustainability of the infrastructure assets created. The CDP will be
linked into the overall spatial planning and policy framework of the existing Master Plan. It will also prepare the
ground for mobilizing funding beyond existing programmes, addressing the issues of revitalizing the local economic
TOOLKIT , UADD GUIDANCE FOR
FORMULATION OF CDP
CONSULTATIVE PLANNING
PROCESS
CDP
ACCESSING
GOVERNMENT FUND
IHSDP FUND
PROVIDE STRATEGIC
FRAMEWORK FOR
DEVELOPMENT INPUTS
LEAD CITY ON DEVELOPMENT PATH
Final City Development Plan Narsinghpur Page: 5
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
development scenario by attracting private sector funding. The below flowchart identifies the broad outcome of this
project.



2.2. KICK OFF WORKSHOP
As part of our next task of the assignment and to kick start the project we had organise a one day kick off
Workshop with the Key Personnels and various stakeholders of the towns on 30.10.2009 from 10.30 am to
12.30pm at the Parishad hall.

Agenda of these meeting was
To familiarize the stakeholders with the purpose, process, and expected outcomes of the CDP.
Interact with personnel of different departments and key stakeholders for identifying the key issues and also
build enthusiasm, understanding and commitment to the CDP by forming a structured programme to take the
CDP forward.
Formation of a city level Steering Group comprising of Citizen Forum.
Points discussed were
Explaining the CDP, its purpose, process and outcomes to the invitees
Discussion on the formulation of steering committee with the Nagar Palika officials
Explain how to formulate the steering committee and how they will work and review the progress of CDP
Take the views and suggestion from the citizen & important stakeholders
All the stakeholders were requested to give their suggestion in writing
Discuss the further line of action regarding CDP
The Minutes of this meeting are as under
The meeting started with giving an overall idea of the City Development Plan based on JnNURM goals and
explained the purpose, what will be the process, what will be the outcomes of this process and how it helps in
making city better in terms of infrastructure. Later on the discussion happened about various parameters which will
be used for preparing the City Development Plan with Officials and President of Narsinghpur Nagar Palika
Parishad. The Consultant explained the importance of public consultation and why the formulation of steering
committee was necessary. The names for the Steering Committee were suggested and their role in shaping the CDP
was discussed.

Proceedings of the Meeting


STRATEGIC FRAMEWORK
FOR PRIORITY
INITIATIVES, SCHEMES
AND STRATEGIC
CDP
ANNUAL PLANS
OVERALL SPATIAL
PLANNING FOR MASTER
PLAN
O & M AND
INFRASTRUCTURE
SUSTAINABILITY
REVITALISE LOCAL
ECONOMIC
M.C.BUDG
ET
MOBILISING FUNDING
Final City Development Plan Narsinghpur Page: 6
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
2.3. MEETING WITH COLLECTOR - NARSINGHPUR DISTRICT

Shri Vivek Porwal
The meeting started with introduction of the Consultants representative and team. The Collector was appraised
about the firm and its projects. Later the process of CDP was discussed. He ensured to give any kind of support
during the preparation of CDP.

2.4. CITY VISION SECOND WORKSHOP
Second workshop is organised on Monday 19
th
January, 2010 at Assembly Hall, Govt. Higher secondary school
Campus. All the stakeholders from different field were invited by Nagar Palika through invitation letter.
As a new Parihsad has been formed after Nagar Palika Parishad election, an introduction about the City
Development Plan and their components, work done till date was briefed to new elected Parishad before second
workshop proceed. Then a broad explanation on City profile which includes demographic details and economic base
of the city, perspective, and requirements of the projects, City vision and strategies was presented to Nagar Palika
Parishad President, Chairmen of all the committees, councillors, Chief Municipal Officer, Assit. Engineer, Head of
all the departments, doctors, engineers, representative of Merchant Association, other stakeholder group and citizen
of Narsinghpur.
In second phase of this workshop city priorities, perceived by the stakeholders has been discussed. The participants
gave their view in form of written suggestion and contributed in developing a city vision for next 30 Year. What will
be the major actions required for Long term and short term need of the city was also discussed and tried to grab their
opinion on city priorities. The strategies which are required to fulfil the City Vision and its goals were also
discussed.

2.5. SUMMARY OF SECOND WORKSHOP PROCEEDINGS


2.5.1. AGENDA FOR SECOND WORKSHOP
The Stakeholders were requested to focus their discussion on the following aspects:
The major issues related to town and factors affecting economic growth
Issues related to Urban services
Citys Strength and forthcoming opportunities
Project identification
City Vision
Strategies required to complete the city vision

2.5.2. VISION STATEMENT NARSINGHPUR
The vision for Narsinghpur was drafted based on stakeholder consultations wherein the citizens and various
stakeholders expressed how they envisaged Narsinghpur to develop in the next 30 years. Based on the citys
strengths, futuristic desires, perspectives and potential of Narsinghpur, the citizens have expressed their thoughts &
wish on the vision for Narsinghpur in the following statement:
Final City Development Plan Narsinghpur Page: 7
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

NARSI NGHPUR TO BE THE MAJOR HUB FOR TRADE, COMMERCE AND TOURISM
IN THE RIGION AND ALL BASI C SERVICES TO MAKE AVAILABLE TO ALL
CITIZENS OF NARSINGHPUR TOWN


2.6. STRATEGIES & PRIORITY PROJECTS THIRD WORKSHOP
Two days workshop was organised on 5
th
and 6
th
February, 2010 at Parishad Hall - Narsinghpur Municipal Council.
All the stakeholders from different field were invited by Municipal Council through invitation letter.
On first day of the workshop stakeholder groups like merchant association, Advocate association and doctors
association were invited. On second day media representatives, Engineers, Officers from various departments like
PWD, PHE, Education board etc. came and gave their valuable remarks and contributed in preparation of City
Development Plan for Narsinghpur. An introduction about the City Development Plan and their components, work
done till date was briefed to invited stakeholders.
The collector of Narsinghpur District - Shri Vivek Porwal remained present in this workshop and addressed the
meeting. He gave some valuable suggestion & said to keep focus on self sustain governance, improve the level of
basic services delivered to the citizens. He has also urged to the people of Narsinghpur to pay taxes regularly and
contribute in developing the city.
The following point has been discussed with Collector (Narsinghpur Dist.), Municipal Council President, Chairmen
of all the committees, councillors, Chief Municipal Officer, Assit. Engineer, Head of all the departments, doctors,
engineers, representative of Merchant Association, other stakeholder group and citizen of Narsinghpur.
In second phase of this workshop city priorities action, perceived by the stakeholders has been discussed. By giving
views in form of written suggestion, participants contributed in preparation of City Development Plan for next 30
Year. The strategies and priority projects, financial status of Parishad were also discussed which are required to
attain the City Vision.
2.7. THIRD WORKSHOP PROCEEDINGS



Final City Development Plan Narsinghpur Page: 8
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
2.8. AGENDA FOR THIRD WORKSHOP
The Stakeholders were requested to focus their discussion on the following aspects:
Finalise Strategy
Priority Action and Projects
Preliminary Funding
Reform Programme
2.9. FINALISING STRATEGIES
Followings are the sector wise strategies to be finalized for completing the mission and vision derived for the city.
Water Supply
Bring in efficiencies in system and operational performance: A comprehensive operational manual needs to be
prepared and the Municipal Council staff to be trained in operating the system in a scientific manner.
Undertake training and capacity building of core team.
The service has the potential to involve the private sector in the current format to bring in efficiency in O & M
and recovery. The water supply distribution system should be implemented by way of systematic zoning
system to avoid cross-connections, leakage, head loss, contamination and spare power consumption.
Norms for the revision of water tariff should be taken immediately add-on by awareness programs with regard
to cost recovery and plugging of illegal connections.
Sewerage system
A Proposal for underground sewerage system should be planned according to the topography of the city with
priority focus on the densely populated areas and potential development areas. Commissioning of the
underground Drainage system along with sewerage treatment plant should be taken up in priority. The treated
water can be utilized for cultivation. A detailed slum sanitation program needs to developed and implemented.
Storm Water Drainage
City should develop an adequate storm water drainage network in a scientific manner, taking into consideration
key parameters of precipitation intensity, catchments delineation, percolation characteristics and surface runoff.
Open drains should be cleaned regularly.
Traffic and Transportation
Parking lot should be proposed to remove encroachment on road.
Narrow roads should be one way so as not to cause traffic congestion.
The provision of high mast light at every major junction and improvement of Road junction to rectify the
problem of traffic congestion. Municipal council should take initiative for widening key roads in the City,
which will involve substantial encroachment removal and land acquisition. A study which covers all elements
like Road capacity, Surface, Bottleneck formation, connectivity, parking allocation and management should be
taken up.
Solid Waste Management
Comprehensive study for solid waste management is required for selecting appropriate site of disposal and
system has to be implemented for assessment of type and quantum of waste generated.
Waste collection should ensure segregation at source and separate management of segregated waste. Market
waste management - Vegetable and market wastes could be separately transported to a common facility for
disposal
Bio-medical waste management-. As per the statutory requirements, the collection and management needs to
be enhanced to ensure proper segregated management of this category of waste. The capacity of the existing
incinerator facility needs to be reviewed and augmented if required to dispose all such waste generated in the
city.
Solid waste should be disposed scientifically so not to cause health and environment hazardous.
Primary and secondary waste collection should be modernized so as to achieve 100% waste collection.
Throwing of solid waste on road side and burning of solid waste should be stopped by conducting Public
awareness programs
Urban Poor
Proposal of City-wide integrated slum improvement and redevelopment program covering housing, economic
development core civic services, health and education and other social amenities under Central / State
Government scheme. Promotion of initiatives by the govt/community groups to make town slum free
through various schemes.
Final City Development Plan Narsinghpur Page: 9
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Discourage development of further slums by announcing cut-off dates. Declaring the existing status of slums.
Slums developed after cut-off dates should be demolished by framing rules and strict enforcements. Formation
of ward level committee to discourage the further development of slums. Municipal Council should ensure
appropriate inclusion of slums and economically weaker section settlements in their infrastructure development
plans.
Municipal Council needs to carry out a comprehensive study of slum and economically weaker section
settlements to identify specific needs and priorities.
Social Infrastructure
Land having tenure of government / other parastatal department which is available and lying fallow should be
identified and put request to the concern department for utilising it for public purposes.
Upgradation of existing Gardens with modern entertaining rides, landscaping, provision of refreshment stall etc
by introducing PPP model in Operation & Maintenance.
Introducing modern and reliable equipment and machinery, with appropriate facilities for their upkeep and
maintenance in Fire service
Cleaning campaigning and Health checkup programme in slum should be taken up frequently
Leakage of water pipeline should be repaired to stop contamination with sewerage water.
Municipal Administration and Finance
To tackle and control natural disaster and critical situation citizens, community participation & infrastructure
should be made available in the City. Municipal Council should act & follow-up for strict enforcement of
development activities as per development control regulations. Municipal Council, as part of its strategy to
build in-house capacity, to train the existing manpower resource through training programs and workshops.
Staff to be rotated inter-department in order to promote in multi-skilling and team building. Municipal Council
will need to formulate a framework for promoting or facilitating PPP / PSP in project development using
various tools of Concession or models of Build Operate Transfer (BOT) depending upon the project
requirement.
Revision of the Annual Rateable Value at certain levels. Maintenance of the collection performance of taxes
and charges at certain minimum levels for current and for arrears.
Revision of water and sewerage charges at specific intervals. Various committees should be formed with action
plans for the tax recovery so as to improve Municipal Councils financial condition.
Public private partnership should be encouraged to improve infrastructural facility in financial sustainable
manner.
Incentives should be offered for timely payment of charges against various services. Wide publicity should be
made to achieve required recovery.
Economic Development
Looking to the development of the Mandi Market, District should be declared as an Agricultural Economic
zone
Soyabean and Sugarcane related industries should be encouraged by new strategies and project, so that
employment opportunities can be generated which results in economic development of the city.
Agro based Industries, small scale industries and household industries should be encouraged for over all
industrial development.

2.10. SECTOR PRIORITY
On the basis of detailed analysis of existing situation (Spatial & Statistical), Identification of Issues, quantification
of gaps base on target, Stakeholders Perceptions during Workshops strategies are formulated and identification and
prioritization of Projects has been defined as mentioned below.

Table1: Sector Priority
No. Sector
1. Water Supply
2. Under Ground Drainage System
3. Traffic and Transportation
4. Urban Poor
5. Solid Waste Management
Final City Development Plan Narsinghpur Page: 10
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
6. Storm Water Drainage System
7. Land use & Master Plan
8. Public Places and Heritage Building
9. Municipal Administration

2.11. PRIORITY ACTION AND PROJECTS
No. Sector Description
(I) Physical Infrastructure
1 Water Supply Maximum utilization of water from river Singri and Sher.
Stop dam should be proposed on river Singri to recharge ground water table.
Water treatment system should be proposed to maintain the quality of potable water.
Newly developed area should be connected with water distribution system.
2 Sewerage system

Designing of the underground Drainage system along with sewerage treatment plant
should be taken up in priority.
3 Traffic and
Transportation

Initiate proposals for widening key roads in the city along with footpath development,
encroachment removal and land acquisition/Land pooling with the help of legal tool.
Initiating Functioning of New Bus Stand immediately.
Development of Important junctions to reduce the accident and easy flow of traffic
movement.
Proposal of separate parking lot near the major commercial centres and market place
to remove traffic bottleneck due to on-street parking.
Construction of Divider on main road of the city.
Proposal of Truck terminal or Transport Nagar for truck parking.
Availability of Bus Service as a Public Transportation facility.
Development of new roads for newly developed areas.
Proposal for Construction of underpass at Jail and fly over at Railway Chowki and
Sindhpur road.

4 Solid Waste
Management

There is a need to develop a comprehensive solid waste management system
The proposed system should aim at applying best practices solid waste management,
including in waste segregation at source, community- based collection systems,
efficient transportation and scientific treatment and disposal of waste.
Capacity building of Municipal Council should be assured by availing required no of
equipments to cater the need of solid waste collection and disposal by provision of site
away from Town.
5 Storm Water
Drainage

Need of Designing well planned storm water drainage network to avoid contamination
of rain water with sewerage water.


(II) Urban Poor
Construction of residential Houses by taking advantages of Central/Stat government
schemes for Urban Poor.
Removal of encroachment of slums from public places.
Employment generation by development of Trade and commerce.
(III) Public Places and Heritage Building
Upgradation of existing Gardens with modern entertaining rides, landscaping,
provision of refreshment stall etc should be taken up immediately.
Restoration of Narsinh Temple, Ram and Krishna Temple situated in the City.
Conserving and Beautification of the Singhri River and Narsingh Talav and develop it
as a picnic spot with garden and amusement park to attract the visitors.
Jirna Kund should be Conserved and Developed as a picnic spot.
(IV) Land use and Spatial growth pattern
Municipal Council should make a conscious effort to get their development plan
sanctioned by the Government. So that they can control the city development in a
Final City Development Plan Narsinghpur Page: 11
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
phased and planned manner, adopting best practices in urban development and
planning norms.
Implementation of Development Plan Proposals to arrest indiscriminate sprawl and
ensure equitable and sustainable urban development
(V) Municipal Administration
To tackle and control natural disaster and critical situation citizens, community
participation & infrastructure should be made available in the Town.
Municipal Council, as part of its strategy to build in-house capacity, to train the
existing manpower resource through training programs and workshops. Staff to be
rotated inter-department in order to promote in multi-skilling and team building.
Billing system should be implemented for Tax collection
Construction of Stadium and Auditorium in the city.
Civil Hospital should be developed and modernized in terms of facilities
Proposal of Development plan should be made and implemented to achieve organized
/ well planned development of the city.

2.12. FOURTH WORKSHOP
As a part of city investment plan and city level workshop, one day workshop was arranged on 11
th
March, 2010 at
Parishad Hall of Nagar Palika bhavan. All the state holders were invited through invitation letter (Annexure 5).
Agenda for the fourth workshop is as follows
Overview on City Profile
Key Issues and present status
Future Requirements & Project Priorities
City Investment plan & available resources of Fund
Performance Monitoring
After discussion on above agenda stakeholders put their view in form of written suggestion and expressed their
perception for development of the city
The Minutes of the meeting
The meeting started with giving an overview of the City Development Plan, anchored on the JNNURM goal and
explaining the purpose of City investment Plan as a part of fourth workshop procedures. Various factors and
parameters which affect the municipal finance and governance were discussed and tried to formulate the investment
strategies to achieve the vision.
Shri Pritam puri Goswami , President of Narsinghpur Nagar palika Parishad addressed the meeting and urged to
people of Narsinghpur to contribute towards the development of the town, pay taxes in time. He requested to leading
NGOs and finance agencies to come forward and give their inputs towards the beautification of the city.

2.12.1. FOURTH WORKSHOP PROCEEDINGS

Final City Development Plan Narsinghpur Page: 12
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh



























3. CITY PROFILE



Final City Development Plan Narsinghpur Page: 13
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

3. CITY PROFILE
3.1. DISTRICT INFORMATION
3.1.1. SPECIAL FEATURES
Figure: 1 Lord Narsimha


Narsinghpur district is situated in the central part of Madhya Pradesh & Madhya Pradesh is located in the Central
part of India. It attracts special attention because of its natural situation as well. On the Northern ends Vindhyachal
& on the southern ends throughout the lengths are Satpura ranges of Mountains. In the Northern part river Narmada
flows from East to West. Which is a sacred as holy as river Ganga.Narsinghpur district has received many natural
gifts as Narmada Kachhar. In the ancient period, this area was ruled by many Rajvansh including great historical
worrier Rani Durgawati which was referred by various names in that period. In the Eighteenth Century Jat Sardars
got constructed a large Temple, in which Idol of Lord Narsimha placed & worshiped & so in the name of Lord
Narsimha. The village Gadariya Kheda becomes "Narsinghpur" & later on it became headquarter of the district.

3.1.2. HISTORICAL BACKGROUND
Narsinghpur district is having many historical Rocks, which are being revered, from time to time during various
archaeological surveys. According to district Gazetteer of Narsinghpur, about 10 K.M. away from Gadarwara ,
village called 'Bhatra' certain "Fossil of animals " & apparatus of said stones are found during various
surveys.During other surveys various ancients monuments & remnants are also found at Devakachhar, Dhubghat,
Kumadi, Ratikarar & Bramhanghat. Caves of rocks showing architecture of ancient times are also found at a village
called Bijori which is associated with the ancient periods of this district as well as during various service conducted
on the banks of river Narmada between BRAMHANGHAT & JHANSIGHAT various "Fossil of animals &
ancients tools are also found showing the Historical & ancient periods of this area. According to historical portraits
discovered in this area belong to the periods of Ramayan & Mahabharat. According to reference, Barmanghat is the
place where Lord Bramha had done a Yagya on the sacred banks of river Narmada.

3.1.3. GEOGRAPHICAL LOCATION

Table 2: Geographical Details
Name of District Latitude Longitude Length Breadth Area sq.km Height From Sea Level
22.45 North 78.38 East 121 Km.
23.15 North 79.38 East East to West Narsinghpur 64 Km. South to North 5125.55 359.8 Meters
Narsinghpur is a district, which is well known for its fertile land, it is said to be the most fertile land all over Asia.
Black soil suited for any kind of cultivation blessed with adequate irrigation facilities.
District is famous for its rich agricultural production. Being situated at upper part of Narmada Valley, which is much
important for agriculture. District's production of grains is more than the actual requirement. For agriculture both old
and new techniques are equally in practice. In old equipments there are Ploughs, Bullock Carts, Bakhar, Hnasiya
various types of knives and khurpi etc.

3.1.4. DISTRICT POPULATION COMPOSITION
The district Narsinghpur, people belonging to all castes & creeds, live harmoniously, kshatrias are the main class
among them. The Kaurav, Lodhi,Kirar, Rajpoot & Gurjar classes are very hard working & live peacefully
basically engaged in agriculture & farming. The society here comprises of mainly the Hindus, but even the
Final City Development Plan Narsinghpur Page: 14
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Muslim & Christian people from other religions also live with the feeling of brotherhood & unity here. There is
no sign of any communal hatred here.
In this district, people respect all the religions. Festivals like Deepawali, Holi, Eid, Gurunanak Jayanti, Mahaveer
Jyanti & Paryushan parve are celebrated. People love the story of Ramayan, & often Ramayan mandal, manas
sammelans, religious lectures are organized in villages.

Table 3: Population composition as per Census 2001
Particulars
Male Female Total Male Female Total
Gotegaon 78,456 72,112 150,568 12,172 11,423 23,595
Gadarwara 168,354 151,541 319,895 28,522 25,945 54,467
Narsinghpur 70,499 65,300 135,799 10,962 10,262 21,224
Kareli 59,446 53,889 113,335 9,296 8,493 17,789
Tendukheda 44,329 40,370 84,699 6,699 6,320 13,019
Total Rural
Population 421,084 383,212 804,296 67,651 62,443 130,094
Gotegaon 12,119 11,298 23,417 1,590 1,512 3,102
Gadarwara 20,693 18,477 39,194 2,771 2,380 5,151
Narsinghpur 29,441 26,790 56,203 3,758 3,286 7,044
Kareli 13,170 11,865 25,035 1,796 1,558 3,354
Tendukheda 4,900 4,350 9,250 767 646 1,413
Total Urban
Population 80,323 72,780 153,103 10,682 9,382 20,064
Grand Total
Of District 5,01,407 4,55,992 9,57,399 78,333 71,825 1,50,158
Rural
Urban
Population Population 0-6 years


3.1.5. DISTRICT ADMINISTRATIVE UNITS
For the ease of administration, the whole district has been divided into 3 sub-divisions, each sub-division consisting
of 1 or 2 tehsils. 5 Tehsils are formed in Narsinghpur district considering the area covered under these tehsils. As
usual Tehsils are further divided into 6 blocks. District Collector being the top level of this hierarchy, sub-divisional
magistrates (SDM), Tehsildars becomes the head of the sub-division and tehsil respectively. For block level
administration Chief Executive Officer (CEO) acts as the co-ordinator of the functions of the respective block. To
implement this administrative setup Police department assist the local administration through various police stations
spread all over the district.

Table 4: District Administration
No Administrative Units Number
1 Tahsils 5
2 Blocks 6
3 Towns 5
4 PopulatedVillages 1040
5 Revenue Villages 1078
6 Forest Villages 12
7 Inhibited Villages 41
8 Revenue Inspector Circles 12
9 Revenue Circles 220
10 Police Stations/Sub Stations 20
11 Assembly constituencies 4
12 Municipal committees 2
13 Nagar panchayats 2
14 Janpad panchayats 6
15 Gram panchayats 457




Final City Development Plan Narsinghpur Page: 15
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
3.1.6. MAJOR ROAD CONNECTIVITY
Major sources of connectivity are roads and railways, Distt. HQ is on the route of Mumbai- Kolkata Central Railway
track. District is having 11 railway stations from West to East they are Bankhedi, Gadarwara, Bohani, Karapgaon,
Kareli, Narsinghpur, Ghatpindrai, Belkheda, Karakbel, Shridham(Gotegaon), Vikrampur. Through the middle of the
district, National Highway No. 26, Nagpur-Jhansi passes, which comes from Seoni,Lakhnadon goes towards Sagar
via Kareli and the southern part of the district National Highway No. 12, Jabalpur- Bhopal passes via Tendukheda.
Apart from these two National highways there are three State Higways .They are State Highway No. 47 from
Narsinghpur-Chindwara,State Highway No. 44 from Garatganj-Silwani covering Saikheda and Gadarwara and State
Highway No. 22 from Jabalpur-Piparia.

3.1.7. INDUSTRIES IN THE DISTRICT
Narsinghpur being an agricultural land huge industry are rare; also most of the industrial institutions are
agriculture oriented. Industries include agricultural equipments, iron items and Tendukheda and Dangidhana is
well known for these industries.
Gur/Sugar from Sugarcane: In many places Gur has been prepared from sugarcane all over the district. Kareli is
very famous for Gur Mandi. In Narsinghpur and Gadarwara there are sugar mills.
Beedi industry: This work mainly done in Narsinghpur, Gadarwara, Gotegaon.
Daal Mills: Tuwar(arhar) pulses prepared mainly at Narsinghpur and Gadarwara.
Oil Mills: There are many oil mills in the district where Soya bean, Groundnut and Tilli oil extracted. Apart from
the above mentioned there are so many industries which include Cement pipes, paper mills, plastic and rubber
industry, leather goods manufacturing, earthen utensils and pots, poultry farms, goats farming, fish farming are
the other works which is also done in many places of the district.

3.2. CITY PROFILE: HISTORIC IMPORTANCE/ IDENTITY OF THE TOWN
Figure 2: Narsimha Mandir

Narsinghpur derives its name after ancient temple of Lord Narsingh. Narsinghpur has a large temple of Lord
Narsingh. This temple was 400 years old, constructed by Jat Sardar in the 18th century. Khirwar clan Jats came to
this place from Brij and founded the city of Narsinghpur, where they ruled for a long period. Khirwars of
Narsinghpur were followers of god Narsingh. Here they constructed two temples of Narsingh avatar.

Ram Mandir & Krishna Mandir
Ram Mandir & Krishna Mandir are located in the centre of the city. They are about more than 150 years old
structure. It needs to be conserved and developed.





Final City Development Plan Narsinghpur Page: 16
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Figure 3: Ram Mandir & Krishna Mandir


Archeological Art
There are so many old ancient statues and archeological arts found in scattered manned all around the Narsinghpur
city and surrounding areas which have beautiful carving over it. They need to be conserved and placed in the
museum. Some of the beautiful statues which have lovely carving over it collected from Barhata and other places
are placed in public parks of town hall.
Figure 4: Archaeological Art


Zarna Kund (Natural Spring)
Zarna kund is also known as Narmada kund spring in which water is remained stored for whole year. At present this
place is not maintained properly and kund water is spoiled by throwing garbage and waste into it. This place needs
to be re-planned so that it can be developed as a tourist place. A Mela is organized every year on day of Makar
Sankranti.
Figure 5: Jirna Kund




Final City Development Plan Narsinghpur Page: 17
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
3.3. LOCATION
Narsinghpur or Narsimhapur is a district headquarters on the Mumbai Allahabad railway line. It is situated around
80km from Jabalpur and 241 km from the Bhopal capital of Madhya Pradesh. It is centrally located in the State of
Madhya Pradesh. It geographically lies at 2347 N Latitude and 7636E Longitude at the altitude of 347m (1,138
ft) above sea level. Towards the north of the town, Vindhya hill ranges are present whereas towards the South
Satpura hill ranges are present.
3.4. REGIONAL CONNECTIVITY
Road Linkage
Narsinghpur town is connected to NH 26 thus linking it to other important towns of the state like Seoni, Sagar etc.
Rail Linkage
Narsinghpur lies on the Mumbai Allahabad Trunk railway route and also has a railway station.
Air Linkage
The nearest airport, however, is at Jabalpur which is 80 km from Narsinghpur.

3.5. PHYSIOGRAPHY AND LANDFORM
3.5.1. TOPOGRAPHY & DRAINAGE
Narsinghpur town has a flat topography. This flat topography includes Narsinghpur as well as Khandeli area. This
region has a small River Singri flowing from the South towards the north. Storm water and domestic waste water
passes through open drains which ultimately discharge into the River Singri.

3.5.2. CLIMATE AND RAINFALL
The climate of the town is pleasant and healthy. It is generally dry except in Monsoon. The temperature of
Narsinghpur varies from 32.70C to 18.50C. The three main seasons are Monsoon starting from mid- June to
September, winter from November to February, summer from March to Mid June. May is the hottest month of the
year. Average rainfall is approx 1079 mm.

3.5.3. WIND DIRECTION
Winds are controlled by the shifting of pressure belts. They are predominately from south-west and east during
monsoon months. In the post-monsoon and winter months, southerly and south-easterly winds prevail. In the
summer months, winds blow from directions between SouthEast and North West. Except during monsoon seasons,
wind speed is generally light to moderate. In the monsoon months winds are stronger and on few occasions, reach
the velocity at 40 to 50 km per hour.

3.6. DEMOGRAPHY
3.6.1. AREA & POPULATION
The territorial jurisdiction of the Narsinghpur Municipal Council spans 14.71 Sq.km. The current population as per
Census 2001 is 56203. The city has experienced a steady increase in the growth rates in population upto 1971 and
then it has started declining up to 1991, again in 2001, the growth rate has increased. This increase can be attributed
to the economic growth and simultaneously reduction in migration due to availability of employment opportunity.
There are total 10897 household as per the Census 2001 and the average household size for the city is 5.0 persons.

Table 5: Decadal Population Growth
Increase % of growth
1971 25,552 7,612 42.43
1981 34,266 8,714 34.1 3.0
1991 42,356 8,090 23.61 2.1
2001 56,203 13,847 32.69 2.9
Decadal Variation
CAGR Population Year

Source: Census of India

3.6.2. DENSITY
The current population density in Narsinghpur is 49.62 pph. There has been steady rise in the density since last four
decades. Though at the city level, the gross density is quite low, the core and inner city area are densely populated.

Final City Development Plan Narsinghpur Page: 18
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Table 6: Population Density
Year Population
Municipal Council
Area (Ha)
Density
(Persons/ha)
Increase in density
(%)
1971 25,552 1,471 17
1981 34,266 1,471 23 34.10
1991 42,356 1,471 29 23.60
2001 56,203 1,471 38 32.70
2011* 73,000 1,471 50 28.70

Source: Census of India and * Census 2010 provisional figures

3.6.3. LITERACY RATE
Total No. of Literates in Narsinghpur is 42,612 of which 23,696 are males and 18,916 are females. The literacy level
in the town has improved over the years. The overall literacy level has also improved from 68.55 % in 1991, which
was highest in the district and now stands at 87.7 % as per the Census 2001, making it highest among all other
taluka. Table below show the comparison of literacy rate in the urban area of the town, district and State. The
literacy rate of female has seen an increase from 42 % in the year 1991 to 81 % in the year 2001 as per census. The
net rise in female literacy is 39 % in the last decade whereas the male literacy rate has increased from 57 % and
increased to 92.7%.

Table 7: Literacy rate 1991-2001
Year Narsinghpur Narsinghpur District (Urban) Madhya Pradesh (Urban)
1991 68.55 55.65 44.67
2001 87.7 77.12 64.11

Source: Census of India

3.6.4. SEX RATIO
The current sex ratio in Narsinghpur is 908. Since last decade, the sex ratio has shown a positive sign as it is
increasing at steady rate. This can be attributed to the increase in literacy rate and decline in out migration of the
population. Sex ratio for 0-6 age group is 873.The sex ratio among SC population is 891, whereas in ST population
it is 899.

Table 8: Decadal Sex Ratio
Year Total
1981 884
1991 900
2001 891

Source: Census of India

3.6.5. SC/ST POPULATION AND BPL POPULATION
As per census 2001 population the SC population is 6967 which is 12.40% of the total population and ST population
is 2739 which is 4.87% of total population. By comparing the SC-ST population of 1991 and 2001 about 50%
increase in SC population and about 94% increase in ST population can be seen.

Table 9: Population growth of SC and ST population in last decade
Year wise SC population ST population
1991 4,660 1,409
2001 6,967 2,739
% increase 49.5 94.39

Source: Census of India

BPL Population:
The total BPL population in city is 24,365, which is about 40% of the total population. Ward wise BPL population is
shown in Chapter no 6.2.


Final City Development Plan Narsinghpur Page: 19
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
3.6.6. MIGRATION PATTERN
Owning to the absence of city wise census data on Migration, the overall migration pattern of the district has been
taken. Though the town has observed growth, but due to vicinity of nearby developed town, Outmigration in the
total district has been seen. Below table shows the migration pattern for the total population as well as gender wise
migration.

Table 40: Migration Trend District
Migration pattern Total Male Female
Natural increase 869,470 479,460 390,010
Immigration 81,536 19,238 62,298
Outmigration 177,348 49,219 128,129
Total Population 951,006 498,698 452,308
Immigration to % of total population 8.6 3.9 13.8
Outmigration to % of total population 18.6 9.9 28.3

Source: Census of India

The total in-migration observed is 8.6% and the out-migration is 18.6 % of the total population of the district, which
shows that net migration is about 10 % and the pattern observed is out-migration. The reason for this out-migration
can be attributed to better employment opportunities, advanced health and educational facilities in other bigger
towns.

3.6.7. KEY ISSUES - DEMOGRAPHY
The current population is largely concentrated in the core city area, resulting in enormous stress on the
infrastructure and deteriorating quality of life, apart from increasing disaster vulnerability.
The primary barriers to the urban sprawl are the inadequate coverage of infrastructure throughout the city.
There is a pressure on citys infrastructure systems from fringe areas that rely on the city for economic as well
as other services.

3.6.8. WORKFORCE PARTICIPATION (PRIMARY, SECONDARY AND TERTIARY OCCUPATION
AND INCOME LEVEL)
Analysis of workers in Narsinghpur city in the year 1991 is shown in the table given below. In 1991 Work
participation rate was 28.11%, it is increased up to 29.61% in 2001. The tertiary activities has seen rise from 81.28%
to 88.08 % followed by the rise in the marginal workers which has increased from 1.36% to 11.49 %.
Table 51: Work Participation of Narsinghpur city
Distribution of main workers 1991 Percentage 2001 Percentage
Cultivators 538 4.58 598 3.59
Agricultural Labourers 686 5.84
Livestock, Forestry, Fishing and Hunting
Plantation, Orchards & Allied Activities 546 4.65
Mining and Quarrying 4 0.03
Household industries 424 3.61 979 5.88
Other than Household Industries 1244 10.59
Construction 642 5.47
Trade and commerce 2724 23.2
Transportation and communication 838 7.14
Other services 4097 34.89
Total main workers 11743 100 16641 100
Percentage Growth in Tertiary Sector 81.28 88.08
Marginal workers 162 1.36 1912 11.49
Main workers 11743 98.64 14729 88.51
Total workers 11905 28.11 16641 29.61
Total non-workers 30451 71.89 39562 70.39
Total population 42356 100 56203 100
Work Participation Rate 28.11 29.61
407 2.45
14657 88.08
Percentage share of Total workers

Source: Census of India
Final City Development Plan Narsinghpur Page: 20
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
3.6.9. POPULATION FORECAST AND ESTIMATION
For the last four decades, the decadal growth rate of population has been declining continuously except in 2001
which have observed increase. The past and current trends of population growth in Narsinghpur city have been
projected using various methods, the results of which are presented below. After detail analysis, giving suitable
deliberation to development growth rate, it was concluded to presume the exponential method for population
projection. Looking to the status of the city as a District Head quarter, the exponential method for population
forecast is the most suitable for considering future requirements.

Table 62: Decadal Growth of Urban Population & Projection
Year Population as per Population as per CAGR
2001 56,203
2010 73,306 71,103
2015 89,469 85,308
2025 124,708 113,638
2035 173,828 151,375


Table 73: Population Forecast
No. Method 1991 2001 2010 2015 2025 2035
1 Arithmetic Progression Method 29,529 39,194 63,856 69,595 79,161 88,727
2 Geometric Progression Method 70,397 83,349 110,445 146,349
3 Incremental Increase Method 65,352 73,087 87,640 104,272
4 Exponential Method 73,306 89,469 124,708 173,828
5 Graphical Method 71,407 84,415 111,573 147,467
6 Based on Past Decadal Growth 71,134 85,308 113,638 151,375

The population projection for Narsinghpur is thus assumed as 89,469 by 2015; 124,708 by 2025 and 173,828 by
2036.

3.7. URBAN ECONOMY
3.7.1. INDUSTRIAL ACTIVITIES
Figure 6: Market area

There are only two industries at Narsinghpur namely Soya Plant, Cement Pipe industry which employs more than
100 persons. The total area used by industrial unit is approximately 17 Ha, which is 3.80% of the gross area. The
registered small scale industries at Narsinghpur are 26 which include food products, furniture, paper roll, photo
colour lab and mineral based industries etc.
Narsinghpur is well connected with big cities of the state and the country by road and rail network. The agricultural
produce in the district is reasonably high and the availability of minerals is attracting industrialists to establish
industrial units.
The economic base of the town is reflected by the participatory rate i.e percentage of working population to the total
population which indicates that Narsinghpur has mixed economic bases. Only 32.35% are classified as main
workers. The economy of the town is manufacturing and services activity based. Previously this town was famous
for handicrafts like cloth weaving, dying etc. At present it is an important trade centre. This town caters to the hinter
land for its economic, educational, administrative and health care needs. As per 2001 census, the total working
population of main workers is 16250 of the total population. The participation rate of main workers in Agriculture is
18.07%, Manufacturing activities is 1.57% and other services are 8.18%.


Final City Development Plan Narsinghpur Page: 21
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
3.7.2. AGRICULTURE

Figure 7: Agriculture area

As it is centrally located between the Vindhya and Satpura hill ranges it has fertile land. Thus the hinterland of the
town is agricultural in nature. Due to the Tendu plantation in the region Bidi making is an important industry in this
town.
3.7.3. TRADE AND COMMERCE
The commercial activities are situated on major roads of the city: some of them are Railway station, Bus stand, Old
cinema road, Khandeli main road, Outer ring road and main market area. Wholesale and retail markets are present
on various other roads. The town is an important commercial node in the district. The hinterland of the town is
predominately agricultural in nature. The town caters to the trading and other activities of the surrounding area.
Weekly market is also held in the town. The major items for trading are PVC color oil, cement pipe, paper, copies
register, PVC shoes, and stationery.

3.7.4. TOURISM
As such there is no tourism related activity in Narsinghpur. But the city has some unique features that may
contribute in developing the tourism activity. Narsimha Mandir, Ram mandir, Krishna Mandir, Jirna Kund have
enough potential to attract the tourists. To link all these ancient structure and by developing heritage walk along
with the lake conservation we can push the tourism activities in the City which will also help in generating income
and support the commercial activities.

3.7.5. KEY ISSUES
No Industrial Estate area designated for industrial activities
Existing market yard is located in centrally located, creating traffic congestion.
The commercial areas are lacking in basic infrastructures like parking, public toilets,
Sufficient dustbins etc.
No tourism promoting activities undertaken.
Absence of any policies or proposals for tourism

3.7.6. CITY SPECIFIC STRATEGIES
Economic Development
Looking to the development of the Mandi Market, District should be declared as an Agricultural Economic zone
and Agro Export Zones. Agri Export Zones (AEZ) has been initiated by the Government under all aspects of
efficient agriculture practice such as production, R&D, post harvest management, packaging, leading to final
exports. Further market promotion and development are also undertaken in the AEZs.
Soybean and Sugarcane related industries should be encouraged by new strategies and project, so that
employment opportunities can be generated which results in economic development of the city.
Agro based Industries, small scale industries and household industries should be encouraged for over all
industrial development.
Encouraging Contract farming: Contract farming is an emerging concept in MP that provides vast opportunities
for potential investors wherein the production and supply of agricultural/ horticultural produce are pre agreed
under forward contracts between producers/ suppliers and buyers. The contract details the type of agri
commodity required at a time and a price, and in the required quantity. Contract farming provides a proper
linkage between the farm and the market. Basic elements of Contract farming are Pre-agree price, Quality of
acreage (maximum, minimum).
Final City Development Plan Narsinghpur Page: 22
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Some of the key opportunities in the agriculture zones are Polishing, packaging, pappadums, toasted pulses,
snack mixes, Noodles, Dried soup mixes.
3.8. PHYSICAL PLANNING AND GROWTH MANAGEMENT
3.8.1. MUNICIPAL AREA & PLANNING AREA
The administrative jurisdiction of Narsinghpur Municipal area spreads over 14.71 Sq.kms. As per notification no
897/33-73 dated 18-03-1974 of M P Administration for housing and environment department Narsinghpur area is
declared as a planning area under rule no. 13(1) of the Madhya Pradesh Town and rural Planning act 1973. Planning
area includes Narsinghpur city and surrounding seven villages having an area of 35.38 sq km.

Table 84: Planning Area
No Name of Spatial Unit Area (Ha)
Population
(2001)
1 Karhaiya Kheda 317.03 359
2 Dhedwara 190.74 1,791
3 Khairy (Gavji) 568.47 1,094
4 Khamtara 462.56 3,652
5 Rosra (Station) 245.70 1,384
6 Baskunwari 84.74 858
7 Naktua 197.86 744
8 Rural area 2,067.10 226
9 Nagar Palika area 1,471.10 46,095
Total 3,538.20 56,203

Source: Development Plan, Narsinghpur

3.8.2. SPATIAL GROWTH TRENDS
Within the planning area about 4.48 sq.km of land is already developed and for future development about 29.55 sq km is
available in which agriculture land and open land are covered. Development of city is concentrated mainly on Railway
station, Ganj, Bus Stand, Shanichara Bazar, Talkies Road. Kandeli Road divides the urban settlement of the city. At
present the city is growing towards the Sankal Road, Jarjala Road, and Old Sagar Road and beyond the Singri River. The
classification of the land fall within the planning area is given below.

Table 95: Land Availability
No. Land Use Area (ha) Percentage of total
land available
1 Developed 448 12.68
2 Waste land (Water bodies and others) 135 3.16
3 Urbanisable area 2955 83.66
Total 3538 100
Source: Development Plan, Narsinghpur

3.8.3. SPATIAL DISTRIBUTION OF POPULATION
The entire planning area is divided into 31 wards. Out of 31 wards 24 fall in Narsinghpur Municipal limit. Ward
wise details is shown in the below table:

Final City Development Plan Narsinghpur Page: 23
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Table 106: Ward wise spatial distribution
No Ward number Total Population Male Female
1 Ward no 1 1,425 772 653
2 Ward no 2 1,765 930 835
3 Ward no 3 2,002 1,061 941
4 Ward no 4 1,481 784 697
5 Ward no 5 1,561 801 760
6 Ward no 6 1,883 973 910
7 Ward no 7 2,307 1,201 1,106
8 Ward no 8 3,457 1,866 1,591
9 Ward no 9 2,187 1,140 1,047
10 Ward no 10 1,800 966 834
11 Ward no 11 2,058 1,070 988
12 Ward no 12 1,994 1,139 855
13 Ward no 13 2,672 1,502 1,170
14 Ward no 14 1,387 724 663
15 Ward no 15 1,408 694 714
16 Ward no 16 1,238 655 583
17 Ward no 17 1,605 808 797
18 Ward no 18 1,594 802 792
19 Ward no 19 1,792 912 880
20 Ward no 20 1,579 813 766
21 Ward no 21 1,670 847 823
22 Ward no 22 2,328 1,204 1,124
23 Ward no 23 2,300 1,144 1,156
24 Ward no 24 2,602 1,356 1,246
25 Ward no 25 1,791 964 827
26 Ward no 26 1,384 729 655
27 Ward no 27 359 172 187
28 Ward no 28 858 451 407
29 Ward no 29 744 398 346
30 Ward no 30 226 113 113
31 Ward no 31 4,746 2,471 2,275
Total 56,203 29,462 26,741


3.8.4. MUNICIPAL LEVEL MAPPING & LAND USE ANALYSIS
It can be seen that at present about 53.14% of land is used for residential purpose followed by traffic and transportation
with 24.05%. Public and semipublic use is about 12.57%, Public Utility services is about 2.55%, recreational use is about
0.90% and Commercial and industrial use share 3.01 % and 3.81% respectively. It can be observed that because of
imbalanced land use infrastructural facility is inadequate.

Table 117: Existing Land Use
Landuse Development in 2001 (Ha)
Developmet in 2001 in
Percentage As per UDPFI
Proposed LandUse
(2035 ) in Ha
Proposed LandUse
(2035 ) in
Percentage
Vacant Land
0.00 0.00 - 0.00 0.00
Residential 433.53 61.71 40-45% 631.41 54.88
Commercial 22.27 3.17 3-4% 31.59 2.75
Industrial 21.79 3.10 8-10% 67.02 5.82
Public/Semi-public 70.97 10.10 2-3% 96.91 8.42
Recreational area 29.56 4.21 18-20% 112.25 9.76
Traffic and transportation 119.37 16.99 12-14% 200.15 17.40
Public Utility 5.09 0.72 11.27 0.98
Developed area 702.58 100.00 1150.60 100.00
Agriculture area 2707.15 BALANCE 2259.04
Water Body 76.38 76.38
Total 3486.11 100.00 3486.02

3.8.5. WARD DELINEATION MAP
Final City Development Plan Narsinghpur Page: 24
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Looking to the population density core are of city is more dense compare to fringe area. In Nagarpalika area buildings are
situated closely to one another which is be one of the reasons for more density in core part. As per population of 1991
population density is 213 persons per hectare while in 2005 it is increased to 260 persons per hectare. Maximum density
can seen in ward no 19 with 743 persons per hectare and minimum density in ward no 3 with 121 persons per hectare.
Ward wise map attached.

3.8.6. MASTER PLAN PROVISION
The main objectives of the development plan proposal are
1. Be the centre for trade and commerce
2. Be the industrial focal point based on agro product and minerals
3. Be the centre for transportation
4. Be the centre for Health and Education
5. Be the administrative centre at district level
6. Be the collection and distribution centre for the region

Development Plan Proposals are based on
1. Proper use of land according to land use zoning
2. Remove the encroachment from the present residential area
3. Arrangement of proper circulation system for safe and speedy traffic flow
4. To make land free from imbalanced land use.
5. Landscaping and development of natural bodies.
6. To make land available for fast growing commercial activities and industries.
7. To provide Basic services

Proposed land use
Entire planning area has been divided into two Planning Units. Main road of the city is considered as a boundary of the
planning units, area on north of this road is considered as planning unit 1 and the southern part as a Planning unit 2.

Table 18: Planning Units
Planning Unit Area
(in Hectare)
Undeveloped land
(Agriculture & Others)
Total area (in
Hectare)
1 525 1105.7 1630.7
2 310 1597.5 1907.5
835 2703.20 3538.20
Source: Development Plan, Narsinghpur
Proposed land use Planning
Mix Land use adopted for Narsinghpur city so that minimum transformation of landuse is carried out. Above all there is a
proposal for shifting up the imbalanced land use to appropriate place, further it is taken care about proper coordination
between proposed development with present developed area, decentralization of work centers and future social, economic
and cultural activities.

Commercial Use
At present there is no transport nagar within the city, so that related activities are taken place haphazardly on the street,
near shops. In planning unit no 2.12 hectare of land is proposed to be allocated for transport nagar on existing by-pass.

Industrial Use
Looking to the industrial growth in the city in Planning Unit no 2 about 28 hectares of land is proposed to be allocated for
industrial estate.

Public semi public use
About 80 hectares of land is proposed for this use in development plan which 9.58% of developed land. All govt. semi
govt. institutions are proposed to be established in a single campus.

Recreational use
Final City Development Plan Narsinghpur Page: 25
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Under recreational use 40 hectares of land is proposed in development plan which is 4.79 % of total developed area. Old
Sagar road and river front area in Baskunwari village are proposed to be developed as a garden or green space, which
can be used as a picnic spot. Lake conservation is also proposed in development plan.

Traffic and transportation
Under which all private bus stands, taxi stand are to shifted in Madhya Pradesh state transport premises.

Shifting of Imbalanced Landuse
Looking to the asymmetry between some activities with surrounding landuse, environmental problem etc. some of the
activities have been included in imbalanced landuse, which are proposed to be relocated. They are:

Table 120: Imbalanced land use
No Land use Proposed relocation site Proposed use of land after
relocating
1 Meat Market Village Dhedwara, on river bank Commercial
2 Grain market Nr APMC, Rosra village Commercial
3 Gupta Iron Store In Proposed transport Nagar Commercial
4 Stone flooring On ring road, Village Dhedwara Residential
5 Pulse mill and oil mill In proposed industrial zone Res./Comm.
6 Saw mill In proposed industrial zone Res./Comm.
7 State bank of India In proposed public semi public Res./Comm.
8 State bank of India Krushi
Shakha
In proposed public semi public Res./Comm.
9 Sale tax - Office In proposed public semi public Residential
10 Central bank In proposed public semi public Res./Comm.
11 Workshop, Old Bus Stand Nr Mahila Polytechnic Commercial
12 Whole sale vegetable market Nr Galla Mandi Commercial
Source: Development Plan, Narsinghpur
3.8.7. HOUSING SCENARIO & HOUSING DEMAND
In 2001 total population of city is 51067 having 8344 household resides in 8219 houses. Average household size
comes out 6.12.Hosing deficit comes out 125 in 2001 based on assumption that every house hold requires one
house. Considering reconstruction of 70% of Slum Housing and 1% of housing, total housing deficit comes out
1685.

Table 131: Housing Deficit
No Description No of Houses % of Housing require
reconstruction
Housing
Deficit
1. Housing Deficit in Year
2001
- - 125
2. Un habitable houses for
residence in Slum
2112 70 1478
3. Reconstruction of Houses in
Bad condition in 2001
8219 1 82
Total 1685
Source: Development plan Narsinghpur

According to Development Control Regulation of Development plan of 2021 for Narsinghpur, Nagar Palika offers 1
to 1.5 FSI and ground coverage of 30 to 60% for residential development based on size of plot, 0.6 to 1.25 FSI and
ground coverage of 70 to 80% for commercial development based on type of development, 0.75 to 1 FSI and ground
coverage of 33 to 60% for industrial development based on size of plot.

Pattern of Housing
Looking at the pattern of housing, it has been analyzed that most of the housing whether under various schemes or
through private developers is in the form of plotted development. Further, as per the visual survey, it was observed
Final City Development Plan Narsinghpur Page: 26
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
that the majority of households are residential houses. Mixed use of houses that is for both residential cum
commercial use has been observed in the city.

Housing Condition
Besides looking at the housing stock in terms of growth of number of residential houses, the condition of the
housing stock has also been looked upon to qualitatively ascertain the condition of the available houses in the city.
The housing condition has been assessed based on the predominant use of materials in housing in the city and based
on the visual survey of the city which is explained below.
Predominant Use of Material in Housing:
In order to ascertain the housing condition in the Narsinghpur City, the predominant use of material for roof, wall
and floors have been analyzed. The table shown below, describes the distribution of census houses based on the
predominant use of roof material. It can be analyzed that only 42% of the houses have pucca roof i.e made of
concrete, 50% of the houses have Tiles roof, where as remaining 8% are with temporary roofing of grass, thatch,
bamboo, wood ,mud Plastic ,Polythene tiles, slate, G.I. Metal ,Asbestos sheets, Bricks etc.

Table 142: Distribution of Census Houses by Predominant Material of Roof
Area Name
No. of
Census
Houses
Grass
Thatch
Bamboo,
Wood,
Mud etc
Plastic,
Polythene Tiles Slate
G.I.
Metal,
asbestos
sheets Brick Stone Concrete other
Narsinghpur 12782 86 52 6421 32 516 74 270 5319 12
Source: Census of India, 2001
From the table given below, it can be analysed that 78% of the houses in the Narsinghpur city are made of burnt
bricks i.e have pucca walls while the remaining 22% of the houses have grass, thatch, bamboo, un-burnt bricks, GI
metal, asbestos sheets, stone and plastic polythene used for the construction of walls.
Table 153: Distribution of Census Houses by Predominant Material of Wall
Area Name
No. of
Census
Houses
Grass
Thatch
Bamboo,
Wood, Mud
etc
Plastic,
Polythe
ne Tiles
Slat
e
G.I.
Metal,
asbesto
s sheets
Bric
k
Sto
ne
Con
cret
e other
Narsinghpur 12782 215 29 2377 28 96 9948 4 81 4
Source: Census of India, 2001

Further the type of the existing housing structures were also analyzed in the Narsinghpur Municipal Council which
has been explained in the table below. It has been found that 76% of the housing structures are permanent and
remaining 23% are semi permanent in nature. Only a negligible number of 1% houses are temporary. This signifies
Semi permanent and temporary structures are having more nos. compared to other Cities.

Table 164: Type of structure in Narsinghpur
Permanent
Semi
permanent
Temporary
Unclassifiable
Total number of
Households
Serviceable Non Serviceable
7853 2401 34 43 0 10331
76% 23% 0.33% 0.42% 0% 100
Source: Census of India, 2001
3.8.8. HOUSING DEMAND
According to development plan with reference to 2001 population total housing shortage in the city is analysed about 125
housing units. At the end of planning period by in addition to present shortage assuming 5 persons per family total housing
shortage will be 11609 housing units.

Table 175: Proposed requirements of housing units
Final City Development Plan Narsinghpur Page: 27
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
No Description 2001 2011 2021
1 Population 0.56 0.75 1.0
2 Additional Population - 0.10 0.25
3 Avg. Household size 6.12 5.25 5.0
4 Additional Households - 3619 5000
5 Housing units requirements at the rate of 85% in
2011 and at the rate of 90% in 2021
3257 4500
6 Requirements of Housing Units in addition to 2001
requirements
925 4544 5925
7 Renovation of existing housing units at rate of 2%
per year
909 1184
Total 925 8710 11600
3.9. KEY ISSUES FOR SPATIAL GROWTH
The general development control regulations are not strictly enforced. There is a rise in commercial activities
and illegal residential colonies in the city. Lacking in implementation of zoning regulations, regulating and
controlling such commercial development has resulted into haphazard growth of commercial development
undesirably mixed with residential use- in the city
There is a pressure on citys infrastructure systems from the surrounding areas that rely on the city for socio
economic as well as other services.
Non-Conformity of Land Uses with traffic and transportation pattern

3.10. CITY SPECIFIC STRATEGIES AND ACTION PLAN
Municipal Council should make a conscious effort to get their development plan sanctioned by the Government. So
that they can control the city development in a phased and planned manner, adopting best practices in urban
development and planning norms.
Implementation of Development Plan Proposals to arrest indiscriminate sprawl and ensure
equitable and sustainable urban development.
Removal of unauthorized construction and strict adherence to the byelaws.











4. PHYSICAL INFRASTRUCTURE


Final City Development Plan Narsinghpur Page: 28
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

4. PHYSICAL INFRASTRUCTURE - SECTORAL ANALYSIS
4.1. WATER SUPPLY
4.1.1. WATER SOURCES
At present major source of water is ground water. In a longer period ground water sources cannot be considered as a
dependable and economical source, only surface water source may be adopted for the future water supply. Presently
there are 35 tube wells and 144 hand pumps are in working condition by which Nagar Palika makes water available
to the city.
Figure 8 Singri River

As Singri river passes though the middle of the city, Nagar Palika can extract this surface water for water supply
with applying some water treatment. Even Nagar Palika has prepared a DPR on water supply under UIDSSMT
program, in which water from Singri river is proposed as a source of water. This project should be implemented as
soon as possible to overcome the burden on ground water.
Figure 9 Natural Source of Water (Schematic Diagram)


As per the report prepared on water supply scheme under the UIDSSMT for Narsinghpur
the reliable surface source of water are Narmada, Sher & Singri River. Sher river is
distributory of Narmada river situated at 5 km away from the Narsinghpur Town, can be
the major surface water source for future requirement. Narmada being the source is 18
km away from the city but it cannot be the economical source. Singri and Sher River are
considered as most reliable and economical source as it passes through the city. Canal
water can be used to recharge the Narsinh Talav as it passes 1 or 1.5 km away from the
city in the north and there is a possibility to draw water from the canal by gravity
mains only.
Figure 10 Existing Storage Tank





Final City Development Plan Narsinghpur Page: 29
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
4.1.2. DISTRIBUTION SYSTEM
Three Over head water tanks are used as a storage reservoir with following capacity.
Table 186 Details of Storage Reservoir
S.No Location of Overhead tank No. Capacity of over head tank (ML)
1 Itwara Bazar 1 0.9
2 Station Ganj 1 0.05
3 Kishan ward 1 0.9
3 1.85 Total
Source : Narsimhapur Water supply report

At present the maximum daily quantity of water supplied is about 3.75 MLD, with the present population of 73306
approximately at the rate of 51.16 lpcd which is far below the standard rate of 140 lpcd.
4.1.3. WATER SUPPLY PROJECTS UNDER UIDSSMT
A DPR has been prepared on water supply scheme for the year 2040 considering population of 1, 06,370
needs to be revised as per the population forecast is worked out as shown in 3.6.8. According to population
projection about 24.34 MLD of water will be required at the end of planning period.
Salient features of water supply scheme prepared under UIDSSMT
Source : Singri river
Standard adopted : 135 lpcd + 15% UFW.

Table 197 Water Demand As per Proposal
No Year Population Clear water
required (MLD)
Raw water
required (MLD)
Clear water at
TP(MLD) 95% of Raw
water
1 2010 64245 8.67 10.2 9.7
2 2025 82190 11.1 13.1 12.4
3 2040 106370 14.35 16.89 16.1
Source : Narsimhapur Water supply report

Treatment Plant : 13.10 MLD treated water capacity
: 1 no. Clarriflocculator 22.85 meter diameter
: 3 no. Filter beds of 4.36 MLD capacities each
: 7.25m x 5.55 x 2.50m
Clear water pump house : Total discharge: 12.40 MLD
Pumps : 3 nos. 45.00 KW/156 lps/41/61 HP
Over head storage reservoir : Storage capacity of existing ESR is 1850 Kl as per the stageI
: Additional requirement 2150 Kl overhead tank at
Narsinghpur
: Cumulative storage capacity 4000 Kl.
Figure 11 Location Plan for various component of water supply scheme

Final City Development Plan Narsinghpur Page: 30
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
4.1.4. AREA AND POPULATION COVERAGE
The total domestic and non domestic connections are approximately 8822 with a tariff of Rs. 125/- Per
year per connection (For Domestic Connection) Rs. 300/- Per year per connection (For Non-Domestic
Connection). There is no metered connection in the city. Almost about 80% of the Nagar Palika area is
facilitated with the water supply services through piped connection, by Hand pumps and by public
standposts.
4.1.5. WATER TREATMENT
As far as the water treatment is concerned there is no scientific treatment is applied, only bleaching powder
and chlorine is added to the water supplied to the town.

4.1.6. DEMAND SUPPLY ASSESSMENT & COMPARATIVE ANALYSIS

Table 28 Demand-Supply-Gap for water supply
Demand Gap Demand Gap Demand Gap
Populatn. 73000
1 Daily Supply Per-capita supply 51.16 lpcd 135 lpcd MLD 3.75 12.08 8.33 16.84 4.76 23.47 6.63
2 Treatment
Treatment capacity
against supply 0 % 100 % MLD 0 12.08 12.08 16.84 4.76 23.47 6.63
3
Distribution
Network
Distribution Network
length against road length 44.99 % 85 % KM 26 73.01 47.01 101.76 28.76 141.84 40.08
4
Elevated Storage
capacity
Elevated Storage capacity
w.r.t Supply 49.33 % 33 % ML 1.9 3.99 2.14 5.56 1.57 7.74 2.19
5 0 0 KM 0 KM KM 0 5 5 10 5 10
6
0
0 HHs. all Nos Nos 10767 1945 15008 4241 20919 5911
No Service head
Current / Desired level Service Levels, Demand and Gaps
Indicator Current Level
Desired Level
as per UDPFI
Standard
Unit Existing
By Year 2015 By Year 2025 By Year 2035
89469 124708 173828
Refurbishment of old distribution network
Metering System/ Installation of water
meters

4.1.7. SWOT ANALYSIS
Strength
Availability of dependable surface water source in the vicinity.
DPR for water supply prepared.
Public support and cooperation
Availability of distribution network.
Weakness
Non availability of competent expertise and technical knowhow.
Very limited technical manpower in the Municipality.
Very low supply duration and frequency despite having a good water source in the vicinity.
Low tax rates/water charges and irregular revision of taxes/water charges.
Old distribution system, high proportion of unaccounted for water.
Old and inefficient pumping systems, high power consumption and high O & M expenses.
Lack of framework for Private sector participation/ interaction with the private sector. Faulty &
damaged Water supply Distribution system.
Present Per capita water supply is much below the national standard.
No water treatment plant exists in Narsinghpur city.
Only ground water is used as a major water supply source by extracting water from tube wells,
resulting the ground water table goes on decreasing.
Poor cost recovery is the major policy issues to be addressed in the immediate future.
Surface water source and distribution system are major challenges against the need of water for the
present and future population.
Though Singri River passes through the city, it is not utilized as a major surface water source.
Unacceptable quality of ground water.
No provision of check dam or stop dam in Sigri River for recharging ground water table.
Opportunities
Good rainfall in the last 3-4 years.
Final City Development Plan Narsinghpur Page: 31
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Opportunity of developing Sher River, as perennial water source.
Active participation of eminent citizens and NGOs in public awareness on water conservation.
Waste water recycling and reuse.
Private sector participation in the delivery of basic services.
Threats
Low and erratic rainfall in the region.
Increase in ground water salinity levels and changes in the water quality.
Non-availability of technical manpower to operate augmented water supply system.
Lack of willingness to charge/political will for reforms.

4.1.8. STAKEHOLDERS PERCEPTION:

Water logging problem near Station area.
Recharge well should be constructed in every ward
Rain Water harvesting system should be implemented
Causeway should be constructed on River Singri.

4.1.9. PROJECT IDENTIFIED
Maximum utilization of water from river Singri and Sher.
Revised the water supply scheme prepared under UIDSSMT TYPE FUNDING as per future growth in
population.
Use of Canal water by augmentation of gravity main to recharge the Narsinh Talav.
Stop dam should be proposed on river Singri to recharge ground water table.
Water treatment system should be proposed to maintain the quality of potable water.
Newly developed area should be covered with water distribution system.
Metered water connection to minimize the wastage and improve the tax collection performance.
By lining work of Singri River Soil erosion can be prevented.

4.1.10. ISSUES AND CITY SPECIFIC STRATEGIES

ISSUES STRATEGIES
Faulty & damaged Water supply Distribution system.
Present Per capita water supply is much below the
national standard.
No water treatment plant exists in Narsinghpur city.
Only ground water is used as a major water supply source
by extracting water from tubewells, resulting the ground
water table goes on decreasing.
Poor cost recovery is the major policy issues to be
addressed in the immediate future.
Surface water source and distribution system are major
challenges against the need of water for the present and
future population.
Though Singri River passes through the city, it is not
utilised as a major surface water source.
Unacceptable quality of ground water.
No provision of check dam or stopdam in Sigri River for
recharging ground water table.
Bring in efficiencies in system and operational
performance
Implementation of Distribution System of water
Supply should be in planned manner
Revision of water tariff norms for cost recovery and
plugging of illegal connections






Final City Development Plan Narsinghpur Page: 32
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
4.1.11. ACTION PLAN :
Sector Strategies & Investment Need
Strategy identified By Augmenting distribution system and Sher and Singri river can be
use as a source of water to reduce dependency on ground water source
and strive for equitable distribution of potable water to all through piped
supply.
Expected Outcome Assured ability to meet year 2035 demand
Total Investment Need Rs. 2384 lakhs
Long-term needs (2035)
The desired level of per capita supply is proposed at 135 lpcd as per the standards. The total quantity of Water
supply required is estimated to be in the range of 23.47 MLD against the current supply of 3.75 MLD. Accordingly,
treatment capacity and an additional elevated storage of 7.74 ML capacity is required at 33% of total Water supply
by 2035.
The total investment need for water sector by 2035 is estimated at Rs. 2384 lakhs. However the above mentioned
gaps in the system are proposed to be filled in phases in line with the quantum of population addition. Accordingly
part of the identified investment is proposed to be funded by 2015 to cater the current gaps and meet the immediate
requirements.
Priority needs (By 2015)
A sum of Rs. 911.74 lakhs (38% of total investment need in the water supply sector) is the capital cost estimation
for the proposed interventions for the augmentation of water supplies through Sher and Sigri River, improvement of
distribution network and provision of additional storage reservoirs by 2015
While the present ground water extract requires disinfection only, Narsinghpur Municipal Council proposes to have
a treatment facility for future extracts from ground water. Hence based on authentic analysis to be conducted by
ground water resources/ irrigation department on the quality of ground water and reliability, Narsinghpur Municipal
Council may act upon providing treatment facilities at an appropriate time.
Action Plan for Implementation Water Supply
Water Supply 2010-11 2011-12 2012-13 2013-14 2014-15
Investment by
2015
Rs.911.74 lakhs
47.16 292.77 285.73 148.99 137.08
Capital
Facilities
Water supply capacity Augmentation

Treatment Plant for entire capacity

Storage capacity Augmentation
Distribution Network
Support &
System
Sustenance
Measures
Metering System
Regularize unauthorized connections, Check distribution leaks
and reduce UFW

Improve collections to reach 10% collection efficiency by 2015
Revision of tariff every 3 years starting
Other actions/
Measures
Identify potential location for check dams for further augmentation of water supply and reduce dependency on ground water
as drinking water source
Conduct water sample and reliability analysis for ground water and assess the appropriate time for providing conventional
treatment facilities
Prepare an asset inventory and map the water supply systems for effective monitoring
The planning should take into account out growth area falling within the Narsinghpur Municipal Council Controlled Area
limits, but lacking in basic infrastructure.
Conduct a water audit and leak detection study to identify leaks, unaccounted for water (UFW) and worn-out networks for
refurbishment.
Sector Note Municipal Council shall be primarily responsible for the implementation of all the suggested actions
Capital investments on system refurbishment and replacement s shall happen only after conducting a water audit and
identification of UFW sources.
Improvement of collection efficiency is applicable to both arrears and current demand.
Assessed gaps and investment needs also includes the urban poor/ slum locations/clusters
Performing
Monitoring
Indicators
Daily per-capita water supply 135 lpcd
Elevated storage capacity w.r.t supply (33%)
Distribution network reach as % of road length (85% of road length)
System coverage water HSCs as % of PT Assessments (min 75%)
Cost recovery through user charges (100% O&M Expenses)


Final City Development Plan Narsinghpur Page: 33
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
4.1.12. INVESTMENT PLAN-PHASING TILL 2035.
Water supply 2015 2025 2035 Investment
Source/ System Capacity Augmentation 416.42 238 332 986
Treatment Capacity Augmentation 120.78 48 66 235
Distribution Network Augmentation 282.04 173 240 695
Elevated Storage Capacity Augmentation 14.95 11 15 41
Refurbishment Of Old Distribution Network 19.2 45 0 64
Metering System 58.35 127 177 363
Total In Lakhs 911.74 641 831 2384


4.1.13. SERVICE LEVEL BENCHMARKING AND FINANCING STRATEGIES:













































No Sectoral Goals Indicators Unit
Base Scenario
(2010)
Desired
Outcomes
(2035) 2010-11 2011-12 2012-13 2013-14 2014-15
Desired
outcome
Demand
2015 Gap
Desired outcome
Demand 2025 Gap
Desired
outcome
Demand
2035 Gap
1 Distribution network percentage 45% 100% 14 33 52 76 100 89469 124708 173828
2 lpcd 51.1 135 135 135 135 135 135 12.53 8.78 17.46 0 24.34 0
3 Treatment
Treatment Capacity against
water supplied MLD 0 100% 0 50% 100% 100% 100% 12.53 0 17.46 0 24.34 0
Distribution Network
Coverage of total road
length km 26 9 9 9 10 10 73.01 47.01 101.76 28.75 141.84 40.08
percentage 49.33 33%
5 MLD 1.9 2.23 4.13 2.23 5.76 1.63 8.03 2.27
6 km 26 100% 3 3 6 6 20 14 0 0
7 Metering system Metering System Coverage 0 100% HHS. 0% 0% 0% 50% 100% 10767 1945 15008 4241 20919 5911
8
Metered Piped water supply
network connected to HH HHs 8822 100% HHS 973 1945 10767 1945 15008 4241 20919 5911
9 Piped water supply network percentage 44.99% 100% 51% 11% 72% 20% 100% 28%
10
Water tax Collection
performance percentage 36.22% 100% 40% 80% 100% 100% 100% 100% 100% 100%
11
Efficiency in redressal of
customer compliants percentage 80% 100% 80% 80% 80% 90% 100% 100% 100% 100%
12
Extent of non revenue
water(UFW) percentage 20% 15% 20% 15% 15% 15% 15% 15% 15% 15%
25%tariff
revision every
3 years
Updating of
accounting
systemto
determine the
O&Mcost
Timeline to set
up a body for
rveving user
charge is three
years
Recovering of
100%O&M cost
Decentralisatio
n of functions
at ward level
Encouraging
PPP for
maintenance
of water
supply
Revision o f
byelaws to
make rain
water
harvesting
Framing of bylaws
for reuse of
recycled water



Funding
pattern in
Lakhs for 2015 80:10:10
GoI:
729.39
GoMP
91.17
ULB:
91.17
Planning indicators Action plan for five years Demand -Supply gaps
Daily supply
ESRs Elevated storage capacity
Refurbishment of old distribution network
Coverage
Collection
performance
Reforms in
Water Supply
System
Mandatory
Study the impact of subsidies
on each service on a periodic
basis
Financing strategies for the CIP: Narsinghpur MCL plans to
raise resources through:
1. Grants available under UIDSSMT.
2. Revision of Annual Rateable value at certain levels
3. Revision of water charges
4. Maintenance of the collection performance of taxes and
charges at certain minimum levels for current adn for arrears.
5. Borrowings
Optional
ACTION PLAN FOR IMPLEMENTATION
Alternate mode of Funding
Support
System and
Sustenance
Measures
Funding through UIDSSMT
Metering System Outsourcing - Private agency for installment &O&M
Regularise unauthorised connections Can be undertaken by Narsinghpur MCl.
Improve collection to reach 100% collection efficiency by 2015 Outsourcing: Billing and Collection
Revision of tariff every 3 years To be undertaken by Narsinghpur MCl.
Storage capacity Augmentation
Distribution Network
Total investment for 2015 : 911.74 lakhs
Design Parameters for achieving the Sectoral Goals
Daily per capita water supply-135 lpcd
Sector note:
- Municipal Council shall be primarily responsible for the
implementation of all the suggested actions
- Capital investments on system refurbishment and replacements shall
happen only after conducting a water audit and identification of UFW
sources.
-Improvement of collection efficiency is applicable to both arrears and
current demand
- Assessed gaps and investment needs also includes the urban poor/
slumlocations/clusters
Elevated storage capacity w.r.t supply 33%
Distribution network reach as % of road length (100%)
System coverage-water HSCs as % of PT assessment(min 75%)
Cost recovery through user charges(100% O&M expenses)
Capital
facilities and
Phasing
Water supply capacity Augmentation
Treatment Plant for entire capacity



Final City Development Plan Narsinghpur Page: 34
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
4.2. SEWERAGE
4.2.1. EXISTING SEWERAGE SYSTEM
Presently there is no underground sewerage system existing in City. The sewage from households and other
commercial establishments is flowing on the open surface drains. The flow is following natural ground
topography. Finally the sewage along with storm water is flowing in the form of nallahs and ultimately
disposed off in the river water which makes water pollution. Taking 80% of water supplied as sewage,
approximately 3-4 MLD sewage is flowing into various Nallahs daily or has accumulated in the low lying
areas creating unhygienic atmosphere for the local residents.
Figure 12 Waste water Nala

The sewage from Municipal waste water is having BODs as high as 200mg/l. Thus one can easily assess the
quantum of organic load flowing every day in water course due to non existence of sewerage system in
Narsinghpur. Moreover the nuisance and health hazards may be prevented due to flow of sewage on the
surface causing contamination of ground water and posing foul conditions in the town and in low lying area.

4.2.2. MEANS OF SEWAGE DISPOSAL
Presently as far as the sewage disposal is concern about 40% of total residents uses soak pit/septic tank and
remaining dispose the waste water directly to the open drains. Through this drains waste water is plunked into
natural drains and finally discharged in the Sigri River creats water pollution.
Figure 13 Open Surface Drain


4.2.3. HOUSEHOLD TOILETS (DRY LATRINES AND FLUSH LATRINES)
As per census 2001 number of latrines in Narsinghpur are shown in table below

Table 29 Number of Latrines
WATER_BOR SERVICE LAT_OTH
3,731 455 1,492


4.2.4. PUBLIC TOILETS
There are five public pay & use toilets with urinal facilities are situated at various public places in Narsinghpur
town. Each public toilets having 10 units of toilets.
Final City Development Plan Narsinghpur Page: 35
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Figure 14 Pay & Use Toilets


4.2.5. PRESENT AND FUTURE DEMAND AND SUPPLY GAPS & COMPARATIVE ANALYSIS

Table 30 Demand-Supply-Gap for Sewerage system
Demand Gap Demand Gap Demand Gap
Projected
Population 73000
1
System Coverage/ Collection
System
Collection Length against Road
Length 0 % 80 % KM 0 68.71 68.71 95.78 27.06 133.5 37.72
2 Treatment
Treatment capacity against
supply 0 % 100 % MLD 0 9.66 9.66 13.47 3.81 18.77 5.3
No Service head
Current / Desired level Service Levels, Demand and Gaps
Indicator
Current
Level
Desired Level
as per UDPFI
Standard
Unit Existing
By Year 2015 By Year 2025 By Year 2035
89469 124708 173828

4.2.6. SANITATION PROJECTS UNDER UIDSSMT TYPES PROJECTS
Looking to the above condition, the Municipal council of Narsinghpur has prepared a detailed project report
for the Sewerage system for the next 30 years. The proposed project will enable Municipal Council to collect
the sewerage and storm water otherwise flowing on the surface and carry it to a suitable place for providing
desired treatment before the waste water finally being disposed off to river or reused for any other purposes
like irrigation or community purposes.
Providing and laying of sewer network within the town, providing of pumping facilities if necessary for
cleansing purposes along with the treatment facility will be carried out in the proposed project. However any
further extension and expansion of sewer network can be done to suit the future needs of the town.
Salient features of DPR prepared under UIDSSMT
An average flow of 80% of water supply @ 135 lpcd i.e. 108 lpcd has been adopted.
All appurtenances, conduits, channels etc has been designed for the maximum flow i.e 2.25 times
the average flow.
Sedimentation tanks have been designed on the basis of average flow, while consideration of both
maximum and minimum flow has been given importance for designing of screens and grit
chambers.
The velocity shall range within 0.6 mps to 3.0 mps.
Sewers shall be at no point of time run more than 80% full. Based on this value of v/V, q/Q and
d/D has been adopted.
Sewerage treatment: Looking to the scarcity of land availability and high land cost Facultative
Aerated Lagoon has been provided for treatment of sewage for 8.88 MLD capacities.
Cost: The total estimated cost of Narsinghpur Sewerage Project is approximately Rs. 424.70
Lacs.
Construction of chamber for House connection.
Providing and laying 140 mm diameter HDPE Pipe class PE100 PN2.5 as per IS 14333-1996
from house chamber to sewer trunk main.
4.2.7. SWOT ANALYSIS:
Strengths:
Public support and cooperation: demand for proper sewerage system.
Availability of land for development of treatment Plant
Weakness:
Non availability of competent expertise and technical know-how with the ULB.
Very low duration and frequency of water supply.
Lack of awareness on recycling and reuse of waste water.
Final City Development Plan Narsinghpur Page: 36
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
No technical manpower for sewerage system operation.
Underground drainage system for a whole town is proposed under UIDSSMT but not
implemented yet, results water logging & over flooding conditions in city.
De silting operations in existing drains have not taken regularly. These drains are normally built
unplanned without considering water consumption levels resulting in inefficient design and
working.
Ever-increasing sewerage generation due to rapid urbanization put extra burden on existing
infrastructure.
No system coverage with a large quantum of sewerage being allowed to flow into water bodies.
Mixing up of sewerage and storm water is a predominant issue in Narsinghpur.
40% of the towns area and population is covered with septic tank.
Existing nalas which are passing through or nearby town should be integrated and can be used as
rain water drains.
No sewage treatment plant exists in Narsinghpur town and all waste water disposed in open,
creates health hazards and act as a mosquito breeding place.
Opportunities:
Private sector participation in the delivery of basic services.
Capital market available to undertake urban infrastructure schemes.
Threats:
Lack of willingness to charge/political will for reforms.
State policies especially related to tariffs etc. not being in place.

4.2.8. STAKEHOLDERS PERCEPTION:
Periodic desilting and cleaning of the drains is not done.
DPR for sewerage has already been prepared, early implementation of the same.
There is no public toilet on Sankal road near Bus Stop, causing inconvenience to the visitors.
Dust bins and containers are placed in the middle of the road which creates problems for the
pedestrians.

4.2.9. PROJECTS IDENTIFIED
Under Ground Drainage System covering entire city
Sewerage Treatment Plant to prevent the river water pollution and recycled water can be used for
cultivation.
Provision of Public Toilets at all public places should be provided.

4.2.10. CITY SPECIFIC STRATEGIES
ISSUES STRATEGIES
Underground drainage system for a whole town is
proposed under UIDSSMT but not implemented
yet, results water logging & over flooding
conditions in city.
De silting operations in existing drains have not
taken regularly. These drains are normally built
unplanned without considering water
consumption levels resulting in inefficient design
and working.
Ever-increasing sewerage generation due to rapid
urbanization put extra burden on existing
infrastructure.
No system coverage with a large quantum of
sewerage being allowed to flow into water bodies.
Mixing up of sewerage and storm water is a
A Proposal for underground sewerage system
should be planned according to the topography
of the city with priority focus on the densely
populated areas and potential development areas.
Commissioning of the underground Drainage
system along with sewerage treatment plant
should be taken up in priority. The treated water
can be utilized for cultivation.
A detailed slum sanitation program needs to
developed and implemented.
Final City Development Plan Narsinghpur Page: 37
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
ISSUES STRATEGIES
predominant issue in Narsinghpur.
40% of the towns area and population is covered
with septic tank.
Existing nalas which are passing through or
nearby town should be integrated and can be used
as rain water drains.
No sewage treatment plant exists in Narsinghpur
town and all waste water disposed in opens,
creates health hazards and act as a mosquito
breeding place.

4.2.11. ACTION PLAN:
Sector Strategies & Investment Need
Strategy Identified Capacity expansion and up gradation to UGD of the existing Open Drain
collection and conveyance system to match additional water supply and
provide for environmentally safe disposal
Expected Outcome Synchronisation with water supply capacity
Total Investment Need Rs. 4287 Lakhs
Long-term needs (2035)
The demand-gap assessment above presented is against an assumed sewerage generation of 80% of water
supply that is 18.77 MLD by 2035. Identified investments in the sector are meant to upgrade open drain to
UGD networks in line with the proposed increase in water supply and road network, as well as refurbishments
to the existing network and augmentation of sewerage treatment plants. The system plans to cover 70% of the
population and 85% of the road network for efficient service delivery. Construction of public convenience
systems in the immediate future to cater the needs of the urban poor is also envisaged as a part of the sanitation
sector.
The total investment need for sewerage sector by 2035 is estimated at Rs. 4287 lakhs. However the above
mentioned gaps in the system are proposed to be filled in phases in line with the quantum of population
addition and augmentation of water supplies to the town. Accordingly part of the identified investment is
proposed to be funded by 2015 to cater the current gaps and meet the immediate requirements.
Priority needs (2015-16)
A sum of Rs. 2206 lakhs (51.46 % of total investment need in the sewerage sector) is proposed for sewerage
infrastructure by 2015. Priority capital investments are expected to cater the current service gap as well the
medium-term needs of the estimated population by 2025. Accordingly, 68.71 KM of sewerage network is
proposed to be put in place by 2015.
Sewerage treatment of 9.66 ML through new sewerage treatment plants (STPs) is proposed by 2015. Further,
Municipal Council will need to plan beyond 2015 for further augmentation of capacity by another 9.11 ML of
STPs and about 64.79 KM of UGD network to cater the long-term needs of 2035.
Action Plan for Implementation Sewerage System
Sewerage System/UGD 2010-11 2011-12 2012-13 2013-14 2014-15
Investment by
2015
Rs. 2206 lakhs
0.00 0.00 687.00 759.50 759.50
Capital
Facilities
Conveyance and rising mains for capacity augmentation


Collection network augmentation by about 68.71 km


Sewerage Treatment Plants having 9.66 ML capacity
Support &
System
Sustenance
Measures
Ensure every house tax assessment & water connection is also
corelated to the UGD


Improve collections to reach 100% collection efficiency by
2015


Other actions/
Measures
Segregate sewerage system and storm water lines.
Prepare a comprehensive UGD master plan to explore the possibility of the Decentralization of the system of operations
for effective service delivery.
The planning should take into account outgrowth area falling within Municipals limits, and lacking in basic
infrastructure.
Promote the use of Decentralized Waste Water Treatment Systems (DEWATS) in areas that cannot be served by the
centralized system and in appropriate locations where the use of DEWATS is beneficial.
Final City Development Plan Narsinghpur Page: 38
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Plan the UGD system and ensure the location of STPs so that benefits are maximized.
Improve and ensure access to sanitary facilities for the urban poor and slum dwellers.
Sector Note There is no system of sewerage tariff, based on the number of Septic tanks/soak pits the cost should be laid down of
service even it should be linked with water supply.
Assessed gaps and investment needs also includes the urban poor/ slum locations/clusters.
Performing
Monitoring
Indicators
Collection network reach as % of road length (min 85%)
System coverage UGD HSCs as % of water supply connections (min 90%)
Cost recovery through user charges (100% O & M expenses)

4.2.12. INVESTMENT PLAN - PHASING TILL 2035.
Water Supply 2015 2025 2035 Total Investment
Underground - Network 2061 812 1132 4005
Underground-Sewerage Treatment Plant 145 57 80 282
Total In Lakhs 2206 869 1212 4287


4.2.13. SERVICE LEVEL BENCHMARKING AND FINANCING STRATEGIES:





No Sectoral Goals Indicators Unit
Base
Scenario
(2010)
Desired
Outcomes
(2035) 2010-11 2011-12 2012-13 2013-14 2014-15
Desired
outcome
Demand
2015 Gap
Desired outcome
Demand 2025 Gap
Desired
outcome
Demand 2035 Gap
percentage
0.00% 80%(UG)
30% 80% 100%
In Km
35
20.61 54.97 68.71 68.71 68.71 95.78 27.06 133.50 37.20
2
Treatment
facilities
Adequacy of sewage treatment
capacity MLD
0 100%
50% 100% 9.66 9.66 13.47 3.81 18.77 5.3
3
Recycling
Extent of reuse and recycling of
sewage MLD
0 20%
10% 20% 1.932 1.25 2.694 0.762 3.754 1.06
Efficiency in redressal of
customer compliants percentage
80% 80%
80% 80% 80% 80% 80% 80% 80% 80%
Efficiency in collection of
sewerage charges percentage
0 90%
80% 90% 90% 90% 90%
15% tariff
revision
every 3
years
Framing
accounting
system to
determine the
O&M cost
Levy of
reasonable
charges
Recovering of
100% O&M
cost
Encouraging
PPP for
maintenance
Promote
DEWATS
Framing of
bylaws for
reuse of
recycled
sewage water





Funding
pattern in
Lakhs for 2015
80:10:10
GoI:
1764.8
GoMP:
220.6
ULB:
220.6
Collection
performance
Planning indicators Action plan for five years Demand -Supply gaps
System
Coverage
Coverage of sewerage Network
services to road length
4
1
Reforms in
Sewerage
System
Mandatory
Financing strategies for the CIP: NarsinghpurMCL plans to
raise resources through:
1. Grants available under UIDSSMT types funding.
2. Revision of Annual Rateable value at certain levels
3. Periodic revision of charges
4. Maintenance of the collection performance of taxes and charges
at certain minimum levels for current adn for arrears.
5. Borrowings Optional
Support
System and
Sustenance
Measures
ACTION PLAN FOR IMPLEMENTATION
Alternate mode of Funding Funding through UIDSSMT
Ensure every house tax assessment and water connection is also
connected to the UGD
Can be undertaken by Narsinghpur MCL
Collection network by about 68.71 km
Sewerage Treatment Plants having 18.77 ML capacity
Total investment for 2015 : 2206 lakhs
Improve collection to reach 90% collection efficiency by 2015
Can be undertaken by Narsinghpur MCL
Design Parameters for achieving the Sectoral Goals
Collection network reach as % of road length(min 80%)
connection(min 90%)
Cost recovery through user charges(100% O&M expenses)
Capital
facilities and
Phasing
Conveyance and rising mains for capacity




Final City Development Plan Narsinghpur Page: 39
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
4.3. TRAFFIC AND TRANSPORTATION
4.3.1. EXISTING TRAFFIC & TRANSPORTATION SCENARIO
Narsinghpur has a railway station, situated on National Highway no 26. By that way Narsinghpur is well
connected by rail and road way with Bhopal, Indore, Sagar, Nagpur, Raypur, Jabalpur and Alhabad. So that
intensity of traffic which is passed through the town is more.

Figure 15 Means of Transportation

Due to spatial expansion of the city a well organized and well planned traffic and transportation services is
much required. Social, Physical and economical activities of the city are depended on circulation pattern and
transportation facilities available to them.
Narsinghpur is a major centre of trade and commerce in Jabalpur region. It plays an important role in
distribution and collection of different commodities like oil, clothes, pulse, grains, and construction materials
etc. which are supplied to other cities of the state.
As per the traffic study, at Centre point and other various points, about 30% of regional traffic continuously
flowing on Jabalpur Narsinghpur and Lakhanaudan Narsinghpur National Highway no 26. Traffic
congestion and parking problems are the major constrains in growth of the city.

4.3.2. VEHICLE POPULATION
Different type of vehicles like cycle, rickshaw, auto rickshaw, scooter, car, Handcarts, tractor trolley, trucks are
used for transportation purpose. Because of mixed traffic it affects the vehicular capacity of the road.

Table 31 Vehicular growth (Narsinghpur District)
Year Scooter/ Motor Cycle Heavy Vehicle Taxi/Three Wheeler Bus Car Others Total % Growth
2001-02 26914 316 298 914 6336 35005 70010
2002-03 30222 326 315 1034 6710 38848 77696 10.98
2003-04 33947 355 336 1117 7287 43366 86652 11.53

Source: Regional Transport Office

Figure 16 Mixed Vehicular Traffic


Final City Development Plan Narsinghpur Page: 40
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
4.3.3. AGENCIES IN TRAFFIC & TRANSPORTATION.
Mainly two types of transport agencies are established in the city, one type are involved in public
transportation and others are in goods transportation. There are very few buses of Madhya Pradesh road
transport co. involves in public transportation, majority buses are of private transportation agencies.

Figure 17 Private & Public Transportation Agencies


Table 32 Details of Bus Trips
Down
1 Private Chindwara 67
Sagar 61
Lakhanaudan 76
2 MPRTC Nagpur
Chindwara
No Agency To Station
No of Trips
1
Up
8
21
13
4


4.3.4. TRAVEL CHARACTERISTICS - CIRCULATION PATTERN
In Narsinghpur circulation pattern of road is in east-west direction. Majority of city traffic is
passing through PWD Kandeli road, Kandeli outer Road, Mandi road and Cinema road.
In addition to above Jarjola road, Sankal road, NH 26, Simariya road, Umariya road and old
Sagar road connect regional traffic to outgrowth area of the city.
Continuous traffic flow can be seen on Lakhnaudan Railway crossing and Kheri Naka, which
connect core area of city along with other area.
Because of the railway line spread over on a large area, it restricts the city area and so that
different parts of the city are not connected with each other.
Because of encroachment, footpath sellers, moving shops/Laurie, parking on road, loading
and unloading activities, width of streets become narrow and it obstructs the traffic
movement.

Table 33 Road Width proposed in Development Plan
No Name of Road Proposed Width in Mt
1 Station to Hamidkhan Mal Gujar 12
2 Hamidkhan mal gujar to Jain Temple junction 24
3 Jain Temple jn. To Main Road (Opp Station) 18
4 Lakhanudan Railway Crossing to Mushran Park 36
5 Mushran Park to Subhash Park 18
6 Mushran Park to LIC Jn. 18
7 LIC J. to Sunka Jn. 12
8 Sunka Jn. To Sankal Jn. 18
9 Sankal Jn. To Subhash Jn. 24
Final City Development Plan Narsinghpur Page: 41
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
No Name of Road Proposed Width in Mt
10 Subhash Park to Gandhi Chowk (Opp. Civil Hosp) 36
11 Subhash Park to Gandhi Chowk (Kacheri Road) 18
12 Degree college Road 12
13 Gandhi Chowk to Rajesh Dal Mill 18
14 Rajesh Dal Mill to Nirmal Chand jain 9
15 Niraml Chand Jain to narsinh Talav jn. 12
16 Narsinh Talav to Prop. R2 18
17 Outer side of R-2 36
4.3.5. PUBLIC TRANSPORT / MASS TRANSIT
BUS STAND

Figure 18 Existing/Old Bus Stand Figure 19 Site for New Bus Stand

Bus stand is located in middle of the city, creates difficulty in circulation. It has no infrastructural
facility for the travelers. Narsinghpur is a district headquarters but there no provision of day shelter in
the city where visitors can rest. A new building for bus stand is being constructed near railway station
and it should be completed and started as soon as possible. It is also very important to make allocation
of two more pickup stands.

RAILWAY STATION
Like the bus stand, the railway station is also centrally located, also the railway go down lies in the
near vicinity. There is insufficient parking place near the station creating traffic congestion.

Figure 19 Narsinghpur Railway Station


4.3.6. TRAFFIC MANAGEMENT AND CIRCULATION
Narsinghpur is a district headquarter and hence there is continuous flow of visitors, traffic is
continuously generated from bus stand, railway station, Shanichara bazaar, Vegetable market, main
market etc. and end at Mandi road, Bus stand and outer road.
Details of accidents occurred during 2001 to 2003 are show in table below.
Final City Development Plan Narsinghpur Page: 42
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Table 34 Details of Accidents

Bus Truck Car/Taxi Scooter/ Motor cycle Others Total
2001-02 Total vehicles 20 54 45 89 48 256
Fatal 6 16 7 4 12 45
Injury 40 83 68 87 51 329
2002-03 Total vehicles 21 31 37 53 53 195
Type of vehicles
Year Type of accidents

With the increase in vehicles, the accident rate in the above years have reduced, but still due to
absence of bifurcation in fast moving and slow moving vehicles, the population is vulnerable to
accidents. With increase in vehicles, the number of heavy vehicles have also risen leading to need for
separate route for their movement. Not only the road needs traffic bifurcation and widening but there
are junctions which need to improve its geometry. Due to absence of well planned junctions , blind
turnings and sharp turns , these road crossings creates havoc to traffic causing accidents, delaying
journey time and reducing easier traffic movement. Below is the list of accident prone junctions:
Bye pass junction on Magardha road.
Crossing near sunka
Society crossing near Branch school
Gulab junction
Crossing near Ram mandir
Singpur crossing
Crossing near Musran park.

4.3.7. TRANSPORT STUDY WITH EMPHASIS ON LOW COST PUBLIC TRANSPORT AND
LIVELIHOODS
There is no public transport facility in Narsinghpur city. Auto rickshaw and Paddle rickshaw are the
predominant mode of public transport within the city.
4.3.8. PARKING REQUIREMENTS
Figure 21 Parking on Road side

As far as parking facility is concerned, no separate parking facility is made available by Nagar Palika
in the city. People use to park their vehicle on the road, results in traffic congestion and narrow down
the right of way.

TRUCK TERMINAL
Narsinghpur is a major centre of trade and commerce and there are so many transport agencies in the
city. Presently there is no delineated truck parking area in the city. Though there exists large number
of transport agencies due to which there is constant truck movement in the city. Owning to this traffic
congestion and accidents are caused. Banskuwari is the most suitable place for Transport Nagar in
which such transport agencies can be shifted.

Final City Development Plan Narsinghpur Page: 43
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
4.3.9. PRESENT AND FUTURE DEMAND AND SUPPLY GAPS & COMPARATIVE ANALYSIS

Table 35 Demand-Supply-Gap for Traffic & Transportation
Service Levels, Demand and Gaps
Demand Gap Demand Gap Demand Gap
Projected
Population 73000
1 Degree of Connectivity
Per-capita road length
(mt) 0.79 mt 0.96 mt KM 57.79 85.89 28.10 119.72 33.83 166.87 47.15
2 Road surface Concrete (%) 58.38 % 15 % KM 33.74 12.88 0.00 17.96 0.00 25.03 0.00
BT (%) 6.92 % 85 % KM 4 73.01 69.01 101.76 28.76 141.84 40.08
WBM (%) 4.07 % 0 % KM 2.35
Earthen (%) 0 % 0 % KM 17.7
3 KM 57.79 85.89 119.72 166.87
Up-gradation KM
KM 2.35
KM 17.7
Newformation KM
KM 15.22 28.755 40.08134
4
Improvements to identified major
roads
Widening &
Strengthening, utility
shifting,
beautification KM 10 KM KM 0 5 5 10 5 0 0
5 ROBs/ Flyovers Nos 3 Nos Nos 0 2 2 3 1 0 0
6 Truck Terminal Nos Nos Nos 0 2 0 2 2 0 0
Unit Existing (2009)
No Service head
By Year 2015 By Year 2025 By Year 2035
BT
89469 124708 173828 Indicator Current Level Desired Level
Total municipal road length
WBM to CC
WBM to BT
Earthen to BT
CC
Current / Desired level


4.3.10. SWOT ANALYSIS
Strengths:
Good connectivity with the region- highway, railway station.
Presence of a good network of city roads.
Weaknesses:
Lack of coordination between land use and transportation systems.
The provision of truck terminals and arterial ring roads/ bypasses are not planned to avoid unwanted
freight movement and parking inside the town.
Due to railway line passes through the city at railway crossing traffic congestion can be seen
frequently, provision of under pass near jail and flyover near railway chowky in Tilak ward are to be
proposed for better vehicular movement.
Road side parking, encroachment by footpath seller, loading and unloading activities on road etc.,
which reduce capacity of right of way and obstruct the traffic flow.
The proposed right of way as per the Development plan for most of the roads is either not available or
has been encroached upon. Even the available right of way in most roads, especially in core city areas
is encroached upon by hawkers and on-street parking.
Most of the roads are without signage and other functional elements such as pedestrian pathways,
lighting, arboriculture, road markings etc. The riding surface of the roads is poor due to inadequate
maintenance.
Public Transport system is almost non-existent, auto rickshaw and cycle rickshaws are the
predominant mode of public transport.
Parking plot needs to be provided in commercial area.
Khery naka to NH-26 road, cinema road, Shubhash chowk to Sanichara chowk, Main road in market
are required to be widened.
Major junctions need to be improved to avoid the accidents and for smooth traffic movement.
Opportunities:
Bus service on public private partnership can provide improved mobility to residents.
Constructions of bridges instead of causeway can provide better connectivity in flood conditions.
Off- street parking on PPP can help in providing parking in the core area.
New links of roads and bridges can improve the network of city roads and provide good connectivity.
Signalization and junction improvement can improve traffic flow.
Pedestrian facilities and parking management will reduce congestion.
A dedicated transport division at Municipality can be created to address transport issues. This division
can coordinate various development projects.
Training in road behavior and traffic safety can be taken up with the help of police and citizen groups.
Threats:
Delay in road improvement, junction improvement and new construction will increase congestion.
Improper parking arrangement s can increase congestion.
Final City Development Plan Narsinghpur Page: 44
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Absence of pedestrian facilities may increase accidents.
Mix of traffic modes and change in driving habits are difficult to change.

4.3.11. STAKEHOLDERS PERCEPTION
Widening of Sankal road due to heavy freight movement.
Comprehensive traffic transportation plan needs to be prepared for the entire city.
Removal of encroachment from road sides.
Developments of proposed Narsinghpur bye pass.
Signage, Indicators, Road dividers, footpath should be placed for better traffic movement
and safety.
Development of all major junctions in terms of signage, streetlights.
Provision of parking space to avoid road side encroachment.
All the railway crossings should be provided with flyover/ under pass to reduce traffic congestions.
Transport nagar should be developed immediately.
Implementation of all the proposals under Master Plan.
Formation of a separate cell for removal of encroachment.
Bus stop with shelter should be proposed to facilitate the visitor and provide space for bus parking.

4.3.12. PROJECTS IDENTIFIED
Initiate proposals for widening key roads in the city along with footpath development, encroachment
removal and land acquisition/Land pooling with the help of legal tool.
Initiating Functioning of New Bus Stand immediately.
Figure 22 Proposed site for new Bus Stand

Development of Important junctions to reduce the accident and easy flow of traffic movement.
Proposal of separate parking plot near the major commercial centres and market place to remove
traffic bottleneck due to on-street parking.
Provision of Divider on major roads of the city.
Development of Truck terminal or Transport Nagar for truck parking proposed under Master plan.
Availability of Bus Service as a Public Transportation facility.
Development of new roads for newly developed areas.
Proposal for Construction of underpass near Jail and fly over at Railway Chowki and Sidhpur road.
Pick stand with Bus shelter should be proposed on road side to facilitate the travellers and to prevent
the chaotic parking of Bus on the road.
A Bye pass proposal as per Master Plan needs to be implemented as soon as possible to prevent
unwanted freight movement within the city.
Decentralisation of commercial activity from the core area especially near Itwara Bazar to decongest
the traffic flow. Mandi Market in Itwara Bazar should be shifted to Trenching Ground.



STATION ROAD
POLICE
CHOWKY
PROPOSED
SITE FOR
NEW BUS STAND
Railway Line
Final City Development Plan Narsinghpur Page: 45
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
4.3.13. CITY SPECIFIC STRATEGIES
ISSUES STRATEGIES
TRAFFIC AND TRANSPORTATION
Lack of coordination between land use and transportation
systems.
The provision of truck terminals and arterial ring roads/
bypasses are not planned to avoid unwanted freight
movement and parking inside the town.
Due to railway line passing through the city at railway
crossing traffic congestion can be seen frequently, provision
of under pass near jail and flyover near railway chowky in
Tilak ward are to be proposed for better vehicular
movement.
Road side parking, encroachment by footpath seller, loading
and unloading activities on road etc., which reduce capacity
of right of way and obstruct the traffic flow.
The proposed right of way as per the Development plan for
most of the roads is either not available or has been
encroached upon. Even the available right of way in most
roads, especially in core city areas is encroached upon by
hawkers and on-street parking.
Most of the roads are without signage and other functional
elements such as pedestrian pathways, lighting,
arboriculture, road markings etc. The riding surface of the
roads is poor due to inadequate maintenance.
Public Transport system is almost non-existent, auto
rickshaw and cycle rickshaws are the predominant mode of
public transport.
Parking plot needs to be provided in commercial area.
Khery naka to NH-26 road, cinema road, Shubhash chowk
to Sanichara chowk, Main road in market are required to be
widened.
Major junctions need to be improved to avoid the accidents
and for smooth traffic movement.

Narrow roads should be one way so as not to cause
traffic congestion.
Improvement of road junction for smooth flow of
traffic
Municipal council should take initiative for
widening key roads in the City, which will involve
substantial encroachment removal and land
acquisition.

4.3.14. ACTION PLAN
Sector Strategies & Investment Need
Strategy identified Increase carrying capacity through widening and improve riding quality through
strengthening of existing roads. New roads will cater missing links and
developing areas. Remove Encroachment
Expected Outcome Hassle-free travel on the roads, safe driving during nights
Total Investment Need Rs. 8652.25 lakhs

Long-term needs (2036)
Identified investments based on the demand-gap assessment above presented are meant for the up-gradation of
existing un-surfaced roads; new road development; widening and strengthening of major roads; traffic
management systems and junction improvements; provision of street lighting, etc. An average road width of 7
mt, a total length of 166.87 km of road network would provide a fair degree of connectivity at an average of
0.96 meters per capita by 2035. Improve identified major roads and the construction of ROBs at various critical
intersections to achieve an efficient traffic management system.
The total investment need for roads, street lighting, transportation and traffic management sectors by
2035 is estimated at Rs 8652.25 lakhs. However the above mentioned gaps in the system are proposed to be
filled in phases in line with the area being developed and quantum of population addition. Accordingly 56.58%
Final City Development Plan Narsinghpur Page: 46
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
of the identified investment for Road and Urban Transport is proposed to be funded by 2015 to cater the
current gaps and meet the immediate requirements.

Priority needs (2015-16)
A sum of Rs. 4895 lakhs (56.58 % of total investment need) in the roads and transport sector is proposed by
2015; this sum includes investment for organizing all utility corridors for better service management. Priority
capital investments are meant to cater the current service gaps and medium-term needs of 2025.
As a long-term strategy, Nagar Palika proposes widening/ strengthening and improvement of important roads
of the city along with the construction of two ROBs, and Truck terminals would be planned. Also, every new
road shall be designed to have utility corridors as a part of better asset management practice; the cost of this
facility is in-built into road improvement cost.
Action Plan for Implementation Traffic & Transportation
Road-Urban Transport & Streetlight 2010-11 2011-12 2012-13 2013-14 2014-15
Investment by
2015 (Rs.
lakhs)
Rs. 4895. lakhs
72.33 184.83 260.92 2188.58 2188.58
Capital
Facilities
Roads Up-gradation of 17.70 km. of earthen to BT & 2.35 km
WBM roads to BT

New formations of BT roads
Road Widening & Strengthening
Improvement of identified major corridors
ROB, improvement traffic system and junction improvements
Street lighting (about 1183 poles with fixtures to be installed
and 186 tube lights to be replaced by high power lamps )

Other actions/
Measures
Road widening of main road from railway station to Narsinh Talav, Kandeli Road
Regional traffic passing through city needs to be bypassed, Ring Road should be implemented as per master plan proposal
Enforcement to use Hawker zones, identified by Nagar Palika to avoid encroachments
Provide parking plots and introduce parking fee in prime areas or in commercial area
Provide road side footpath facilities for pedestrian, provision of signboard, indicators to prevent accidents
Rail over bridge on sindhpur road and under pass near jail
Sector Note
Design of new roads shall necessarily have provision for shoulders, foot paths, utility ducts and storm water drains under the
foot paths, landscaped median and concealed cabling for lighting system
Construction of new roads shall be integrated with drain construction (i.e., for any new road drainage facility to be planned and
constructed first)
Street lighting systems shall comprise automation of switching, dimming mechanism, etc.
Performing
Monitoring
Indicators
Road network degree of connectivity in terms of per-capita road length (min 0.96 meters)
Road condition percentage of municipal roads surfaced (100% - CC/ BT surfacing)
Street lighting- spacing between two poles not to exceed 30 m.
4.3.15. INVESTMENT PLAN- PHASING TILL 2035

Roads & Urban Transport 2015 2025 2035 Total Investment
Roads Up gradation 217 0 0 217
Roads New Formation 228.25 431 601 1260
Road Infra Dev (Imp. Roads) Incl. Widening 375 375 0 750
Flyovers And Rob/ Underpass 4000 2000 0 6000
Junction improvements 75 50 50 175
Truck Terminal 0 125 125 250
Total in Lakhs 4895 2981 776 8652


4.3.16. SERVICE LEVEL BENCHMARKING AND FINANCING STRATEGIES



Planning indicators Action plan for five years Demand -Supply gaps
No Sectoral Goals Indicators Unit
Base
Scenario
(2010)
Desired
Outcomes (2035) 2010-11 2011-12 2012-13 2013-14 2014-15
Desired
outcome
Demand
2015 Gap
Desired
outcome
Demand 2025 Gap
Desired
outcome
Demand
2035 Gap
1
Degree of
connectivity Per capita road length
mt 0.79 0.96
85.89 28.1 119.72 33.83 166.87 47.15
2 Road surface Concrete Km 58.38 15% 0% 0% 0% 0% 0% 12.88 17.96 25.03
Bituminous Km 6.9 85% 3 6 9 12 0 73.01 66.09 101.76 28.75 141.84 40.08
WBM Km 4.1 0% 19 16 13 10 0
3 Earthern Km 30.63 0 0 0 0 0 0
4 Total Municipal road length km 57.79 85.89 119.72 166.87
6 Up-gradation WBM to BT km 2.35 2.35
7 Earthern to BT km 6 12 17.7 17.7
9 New formation BT km 5 10 15.22 15.22
10 Improvement
to identified
major roads
Widening & Strengthening,
utility shifting, beautification
km
11
km
2 4 5 5 5 10 5 10 0
12 ROBs/Flyovers No. 1 2 2 2 3 1 3 0
Truck Terminal No. 2 0 2 2 0 0
Junction improvement No. 1 2 3 3 3 5 2 7 0
13
Streetlighting
Spacing between lamp poles
mt 34.4 30
2863 1183 3991 1128 5562 1571
14 Tube lights + CFL percentage 62.2 30% 859 0 1197 338 1669 472
15 High power lamps percentage 37.8 70% 2004 1369 2793 789 3894 1100
16 High mast lamps percentage 0.12 0.10% 1 3 1 4 1 6 2
17 Replacement
Tube lights with high power
lamps
Nos.
37 74 149 186 186
18
New
installation Tube lights
Nos.
. 338 472
19 High power lamps Nos. 300 600 900 1183 1183 789 1100
20 High Mast lamps Nos. 1 1 1 2
Fire Fightning
Development of new fire
stations and Acquisition of
equipment
Nos. 1 2
1 1 1 1 0 0 0
ACTION PLAN FOR IMPLEMENTATION


Design Parameters for achieving the
Sectoral Goals
Road network-degree of connectivity in terms of per capita road length(min 0.96 meters)
Road condition-percentage of municipal roads surfaced(100%-CC/BT surfacing)
Streetlighting -spacing between two poles not to exceed 30 m.

Capital
facilities
and
Phasing
Road upgradation of 2.35 km of WBM to BT and 17.7 km of Earthern to
BT.

New formations
Road widening & strengthening


Improvement of identified major roads

Land acquisition, ROB, improvement traffic system and junction
improvements

Development of new fire stations and Acquisition of equipment

Streetlights (about 1183 poles with fixtures to be installed and
186tubelights to be replaced by high power lamps).


Funding
pattern in
Lakhs for
2015
ULB: 4895.25 Lakhs(T&T) and 85.11
Lakhs(Streetlights)
Total investment for 2015 : 4980.35 lakhs

Final City Development Plan Narsinghpur Page: 47
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
4.4. STREET LIGHT & FIRE FIGHTING SERVICES
4.4.1. EXISTING SITUATION OF STREET LIGHTS
The operation and maintenance of street lights in the city is taken care by Nagar Palika including repairs and
replacement of fixtures, switching on and off operations and complaint receipt. Power is supplied by Madhya
Pradesh Electric Board (East Region) for street lighting.
Figure 23 Street Light Facility


The power supply for the streetlights is allocated at 12 different locations in the city by which power is being
supplied to 1680 streetlights. Almost all the roads in city are covered by the streetlight facilities. Average
spacing between two poles is 34 mt which is quite more than national standards of 30mt.

Table 36 Details of Street Lights
Sr No Type of Fixtures Nos.
1 Tube lights 945
2 CFL 100
3 High Power Lamps 635
4 High Mast Light 2

4.4.2. FIRE SERVICE
Figure 24 Fire Fighting Service

At present Narsinghpur Nagar Palika has only one fire fighter with no separate storage facility for the water.
Water is directly pumped out and filled in the tanker.
As per CPHEEO manual the fire fighting demand in kilolitre per day for communities with population more
than 50000 is equal to 100 times the population in thousand. According to this Fire fighting demand is shown
below.

Final City Development Plan Narsinghpur Page: 48
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Table 37 Requirements for Fire Fighting
Year Water Demand in ML Storage Capacity Requirement
2015 0.94 0.31
2025 1.13 0.37
2035 1.31 0.43

4.4.3. VEHICLES AND EQUIPMENT FOR FIRE FIGHTING AND RESCUE OPERATIONS
No ambulance services are provided by Nagar Palika and it has no other extra equipment like hydraulic
platforms, trailers, rescue vans, ambulances, mortuary van etc. for fire fighting and disaster management. The
present fire brigade of Nagar Palika though is effectively handling fire calls are seriously strained with lack of
infrastructure and personnel. There should be a central fire station with all facilities like parade ground,
workshop, training areas and residential facilities etc.

4.4.4. PRESENT AND FUTURE DEMAND AND SUPPLY GAPS & COMPARATIVE ANALYSIS

Table 38 Demand-Supply-Gap for Streetlight
Demand Gap Demand Gap Demand Gap
Projected
Population 73000 89469 124708 173828
1 Street lighting
Spacing between
lamp poles 27.8 mt 30 mt Nos 2230 1852 0 2446 594 3230 785
Tube lights+Bulbs 57.4 % 30 % Nos 1280 555 0 734 0 969 0
High power lamps 42.6 % 70 % Nos 950 1296 346 1712 416 2261 549
High mast lamps 0 % 0.1 % Nos 0 2 2 3 1 4 1
2 Replacements
Tube lights with
high power lamps Nos Nos 0 311 311 0 0 0 0
3 New installations Tube lights Nos
High Power Lamps Nos 35 416 549
High mast lamps Nos 2 1 1
9 Traffic Mgmt
Junction
improvements 7 Nos Nos 0 3 3 5 2 7 2
Desired level as
per UDPFI
Standard Service head
Existing/ desired level
Service Levels, Demand and Gaps
Unit Existing
By Year 2015 By Year 2025 By Year 2035
Indicator
Current
level


Street Lighting:
Key Issues:
Mainly streetlights are of tube lights and CFL bulbs.
Out of total streetlights only 37% streetlights having high power lamps fixtures.
Major junctions of the city dont have any high mast lamp fixtures, results in vehicular accidents.
Due to outdated cabling it is difficult to fix energy saver system and power consumption is more.
Projects identified:
Replacement of required tube lights into high power lamps.
Installation of additional streetlight with high power lamps in unserved areas and new formed roads
with minimum 30 meters spacing.
Installation of high mast lamps on major intersections.
ACTION PLAN FOR STREETLIGHTING
Sector Strategies & Investment Need
Strategy identified Installation of lighting systems on the roads in line with new road
development
Expected Outcome Coverage of all the roads with streetlights
Total Investment Need Rs. 247.42 lakhs
Installation of lighting systems on the roads will be in line with new roads development and shall maintain a
spacing of not more than 30 mt per light pole. Total Rs.85.11 lakhs (34.40 % of total investment) in the street
Final City Development Plan Narsinghpur Page: 49
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
lighting sector is proposed by 2015.
Street Light 2010-11 2011-12 2012-13 2013-14 2014-15
Investment by
2015(Rs. lakhs)
Rs 85.11 Lakh 0.40 0.40 23.64 23.64 36.92
Capital
Facilities
Street lighting (about 35 poles with
fixtures to be installed and 311 to
be replaced by high power lamps )

Sector Note
Design of new roads shall necessarily have provision for shoulders, foot paths, utility ducts and
storm water drains under the foot paths, landscaped median and concealed cabling for lighting
system
Street lighting systems shall comprise automation of switching, dimming mechanism, etc.
Assessed gaps and investment needs also includes the urban poor/ slum locations.
Performing
Monitoring
Indicators
Street lighting- spacing between two poles not to exceed 30 m.
Key Issues:
Fire Fighting:
Present fire fighting service is not adequate enough to cater the need of Narsinghpur city & surround
area.
Supporting infrastructural facilities like hydraulic platforms, trailers, rescue vans, ambulances,
mortuary van need to be
strengthened
Projects identified:
Strengthening of the central fire station with all the required facilities
Development of new fire station.
Acquisition of equipment, hydraulic platforms, trailers, and rescue vans, ambulances, mortuary van.
4.4.5. ACTION PLAN FOR FIRE FIGHTNING:
Sector Strategies & Investment Need
Strategy identified Strengthening disaster management aspects in the city
particularly fire hazard management systems.
Expected Outcome Effective and timely tackling of industrial, commercial and
domestic fire calls
Total Investment Need Rs. 400 lakhs
The present fire fighting system effectively is seriously strained with lack of infrastructure and personnel. It is
proposed to construct one central fire station with all facilities like workshop, training areas and residential
facilities etc on NP/ identified land. The equipment required along with trailers, rescue vans, ambulances etc. A
total of Rs. 135.50 lakhs is required as an immediate need for the fire department of NP.

Action Plan for Implementation Fire Service
Fire Service 2010-11 2011-12 2012-13 2013-14 2014-15
Investment by
2015 (Rs. lakhs)
Rs 135.50 Lakh
23 60 17 29 6.50
Capital Facilities
Setting up of Central Fire station on identified land
with all facilities

Development of new fire stations
Acquisition of equipment, hydraulic platforms,
trailers, rescue vans, ambulances, mortuary van etc

Coordination
Measures
Coordinated efforts between Municipal Council, Industries associations for effectively managing the fire hazard
are necessary through awareness creation.
Resident Welfare Associations to be taken into confidence by Municipal Council towards educating them on
tackling minor fire accidents before Fire brigade can answer the situation.
Other
Action/Measures
Municipal Council need to initiate a study on Fire Hazard Management system to identify the types of fire calls in
the past, divide the town area into hazard prone zones and accordingly locate the new fire stations to effectively
manage fire calls
Town planning department of Municipal Council to ensure fire safety for all existing and new constructions in the
Final City Development Plan Narsinghpur Page: 50
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
form of adequate setbacks, fire detector systems, sprinkler systems etc as necessary

Fire codes and Byelaws:Bereau of
Indian standards Details Units
Projected Population 2035-173828
35.38 Sq.km
Every 10 Sq.km 1 Fire station 3
Every 50000 Population 1 Fire fighting vehicle 4
Salary per month
Driver cum Pump operator 4 3200/month-4900/month
Firemen 12 5200/month-20200/month
Leading Fireman 4 7200/month-25000/month
Sub- officer for every shift 1*3 shift per firestation 9300/month-34800/month
Station in charge 1*3 shift per firestation 15600/month-39100/month
Fire vehicle 8 18400000
Tanker 4 7200000
Hydraulic platform 4 5600000
Trailer 4 480000
Ambulances 4 3200000
Mortuary van 4 2000000
Total 36880000
For Urban areas
Manpower per fire station
Equipment


4.4.6. INVESTMENT PLAN-PHASING TILL 2035.
Street Lights and fire services 2015 2025 2035 Total investment
Replacement - Tube Lights- 2 0 0 2
New Installation - Tube Lights 0 13 17 30
New Installation - High power Lamps 83 55 77 215
New Installation - High Mast Lamps 0.105 0.105 0.21 0.42
Fire Services 135.5 200 64.5 400
Total in lakhs 220.605 268.105 158.71 647.42





















Final City Development Plan Narsinghpur Page: 51
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
4.5. STORM WATER DRAINAGE
4.5.1. EXISTING DRAINAGE SYSTEM
At present there is no planned storm water drainage system exist in the city. Rain water is flowing
through road side surface or open drains results damage of road surfaces. At present this open drains
are choked up because of garbage dumping and over flooded in rainy season create unhygienic
condition.
4.5.2. MAJOR WATER BODIES
In monsoon rainwater from all the primary and secondary natural drains disposed off in Sigri River.
The natural drains flowing through old settlement area like Kishani ward, Pathak ward, Shivaji ward,
Nehru ward, Tilak ward and Belapurkar ward, by which rain water is runoff and finally met to Sigri
River.

Figure 25 River & Natural drains within City


4.5.3. FLOOD PRONE AREAS
Major flood prone zone in Narsinghpur is along the railway line where the drain crosses the line and on
western side near Karbala. Under these circumstances as on date there is no well designed facility for proper
disposal of storm water. The monsoon in the region is seasonal and is active between the months of June to
September. The average annual rainfall is 1079mm, however the fluctuation in the rainfall is much more
frequently which poses severe problem of disposal and submergence. All the natural drains in town are
encroached & dumped with garbage resulting overflow in rainy season.

4.5.4. PRESENT AND FUTURE DEMAND AND SUPPLY GAPS & COMPARATIVE ANALYSIS
Table 39 Demand-Supply-Gap for Storm Water Drainage
Demand Gap Demand Gap Demand Gap
Projected
Population 73000
1 Network reach Road length covered with drains (%) 0 % 100 % KM 35 85.89 85.89 119.72 33.83 166.87 47.15
Pucca open (%) 60.56 % 0 % KM 0 0 0 0
Underground (%) 0 % 100 % KM 35 85.89 85.89 119.72 33.83 166.87 47.15
KM 35 85.89 119.72 166.87 Total network length
Service head
Existing/ desired level
Service Levels, Demand and Gaps
Unit Existing
By Year 2015 By Year 2025 By Year 2035
Indicator Current level No
Desired level as per
UDPFI Standard 89469 124708 173828

4.5.5. SWOT ANALYSIS
Final City Development Plan Narsinghpur Page: 52
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Strengths:
Availability of natural drainage channels to dispose the storm water safely.
Fairly well developed storm water drainage system.
Weakness:
Road infrastructure in the city is badly affected and damaged at several locations during monsoons
due to the unavailability of storm water drainage networks. Desilting operation of the natural drains
are not done regularly, results chock up of the drains.
Future population addition is expected to increase the pressure on the drainage system of the town,
requiring Nagarpalika to stress on the development of road networks along with that of storm water
drains.
The existing open drains are very small and use for waste water drainage as well as storm water
drainage.
Opportunities:
Capital market available to undertake urban infrastructure works.
Private sector participation in the delivery of basic services
Threats:
Ground/Soil characteristics do not facilitate permeability and retention of water.
Rapid urbanization, encroachment of natural drains, choking of drains due to solid waste disposal.

4.5.6. STAKEHOLDERS PERCEPTION
During monsoon the open drains get choked, resulting in overflowing of these drains, underground
drainage system should be planned.
Water logging is observed along the railway line where the drain crosses the line and on western side
near Karbala

4.5.7. PROJECTS IDENTIFIED
Entire city should be covered with separate storm water drainage to avoid mixing with sewer water
To make Narsinh Talav as an Ultimate disposal point by which water harvesting can be done and also
improve the ground water table.

4.5.8. CITY SPECIFIC STRATEGIES
ISSUES STRATEGIES
Road infrastructure in the city is badly affected
and damaged at several locations during
monsoons due to the unavailability of storm
water drainage networks. Desilting operation
of the natural drains are not done regularly,
results chock up of the drains.
Future population addition is expected to
increase the pressure on the drainage system of
the town, requiring Nagarpalika to stress on
the development of road networks along with
that of storm water drains.
The existing open drains are very small and
use for waste water drainage as well as storm
water drainage.
City should develop adequate and separate storm
water drainage.
Open drains should be cleaned regularly.
4.5.9. ACTION PLAN:
Sector Strategies & Investment Need

Strategy identified Network expansion, conversion of kutcha and pucca open drains to closed Pucca
drains
Expected Outcome Universal coverage and disposal capability, restrict sewerage flow into storm
water drains
Total Investment Need Rs. 5006.24 lakhs
Final City Development Plan Narsinghpur Page: 53
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Long-term needs (2036)
Identified investments based on the demand-gap assessment above presented are meant for construction of
166.87 km of new pucca closed drains to cater service gaps by 2035. The system plans to cover 100% of the
road network for service efficiency. The total investment need for drains sectors by 2035 is estimated at Rs.
5006.24 lakhs. However the above mentioned gaps in the system are proposed to be filled in phases in line
with the road network being developed and quantum of population addition. Accordingly 51.47% of the
identified investment is proposed to be funded by 2015 to cater the current gaps and meet the immediate
requirements.
Priority needs (2015-16)
A sum of Rs. 2576.70 lakhs (51.47% of total investment need in the drains sector) is proposed to be invested in
storm water drainage by 2015. Priority capital investments are meant to cater the current service gap as well as
to the medium-term needs of the proposed storm water drainage network by 2025. The majority of the
investment is dedicated to the formation of new networks in un-serviced and newly developed areas of
Narsinghpur. Further, Municipal Council will need to plan beyond 2015-16 for further augmentation of
network by another 80.98 km to cater the long-term needs of 2035.
Action Plan for Implementation Storm Water Drainage
Storm Water Drain 2010-11 2011-12 2012-13 2013-14 2014-15
Investment by
2015 (Rs. lakhs)
Rs. 2576.70 lakhs
0.00 0.00 858.90 858.90 858.90
Formation of pucca closed drains
Support &
System
Sustenance
Measures
Ensure that every divided road has closed drains on
either side and undivided roads have drains on at least
one side

Other actions/
Measures
Isolate storm water drainage from the sewerage system
Identify, delineate, sanitize and protect the natural drainage system of the town
Develop common washing areas in identified hawking areas with connections to treated water and drainage
Sector Note
Improve drainage network on a priority basis in flood-prone areas
Ensure that all new roads designed make adequate provision for storm water drains
Construction of new roads should be integrated with construction of drains
Assessed gaps and investment needs also includes the urban poor/ slum locations
Performing
Monitoring
Indicators
Drainage network reach as percentage of road length (min 100%)
All divided roads to have drains on either side and undivided roads on at least one side
Drains to be cleaned before and after monsoon for better functioning

4.5.10. INVESTMENT PLAN PHASING TILL 2035
Storm Water Drains 2015 2025 2035 Total investment
Drains Up gradation 0 0 0
Drains New Formation 2576.7 1015 1415 5006
Total in lakhs 2576.7 1015 1415 5006


4.5.11. SERVICE LEVEL BENCHMARKING AND FINANCING STRATEGIES.





Planning indicators System benchmarking Demand -Supply gaps
No
Sectoral
Goals Indicators Unit
Base
Scenario
(2010)
Desired
Outcomes
(2035)
2010-11 2011-12 2012-13 2013-14 2014-15
Desired
outcome
Demand
2015 Gap
Desired
outcome
Demand
2025 Gap
Desired
outcome
Demand
2035 Gap
1
Network
reach
Road length
with covered
drains
percentage 0% 100% 33% 66% 100% 100% 100% 100%
2 In Km
0
Total
Road L 28 46 85.89 85.89 85.89 119.72 33.83 166.87 47.15

Reforms
in Storm
water
drains
Mandatory



Optional

Encouraging PPP for
maintenance
ACTION PLAN FOR IMPLEMENTATION
Funding through UIDSSMT

Support
System
Ensure that every divided road has closed drains in
either side and undivided roads have drains on at
least one side



Design Parameters for achieving the Sectoral Goals
Drainage network reach as percentage of road
length Sector note

All divided roads to have drains on either side and
undivided roads on at least one side
Improve drainage network on a priority basis in flood-prone
areas

Drains to be cleaned before and after monsoon for
better functioning
Construction of new roads should be integrated with
construction of drains

Capital
facilities Formation of underground drains

Ensure that all new roads designed make adequate provision for
storm water drains

Funding
pattern in
Lakhs for
2015
80:10:10
GoI:
2061.6
GoMP
257.7
ULB:
257.7
Total investment for 2015 : 2576.70
lakhs
Assessed gaps and investment needs also includes the urban
poor/ slum locations





Final City Development Plan Narsinghpur Page: 54
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
4.6. SOLID WASTE MANAGEMENT
4.6.1. QUANTITY OF WASTE GENERATED
Presently the solid waste management practices are highly unsatisfactory. On an average 18.25 MT waste is
generated in the city. Practically no storage of waste is done at source. Domestic, Commercial and Institutional
waste are thrown on the streets, foot paths drains and water bodies. Recyclable waste is not generated at
source. Along with the domestic waste construction and demolition wastes are also deposited on the road side
or open space, obstructing traffic and causing nuisance.
Presently the solid waste is managed with the following staff and machinery. There is one health officer, one
sanitary inspector, two nos Daroga, 102 no. Sweeper and 2 no. Drivers. There exists 3 tractor trolley, 20 no.
Hand cart and 23 no.dustbins.
4.6.2. CONSTITUENTS OF MUNICIPAL WASTE
Table 40 Source & amount of waste Collection
Source Collection ( in MT)
a. Domestic waste 11.94
b. Vegetable waste 1.12
c. Fruit market waste 0.025
d. Meat market waste 0.025
e. Hospital waste 0.25
f. Hotel/ Restaurant waste 0.25
g. Market waste 1
h. Slaughter house waste 0.002

4.6.3. CURRENT PRACTICES, WASTE STORAGE , SEGREGATION, COLLECTION
There is no system for primary collection of waste in the city. Absence of waste storage depots, open sides or
cement concrete bins, metal bins and structures are used for temporary storage of waste. The bins used are very
unhygienic and waste can be seen scattered. These bins are not cleared every day. Street sweeping is not
carried out regularly. The tools used for street sweeping are inefficient and outdated. Transportation of waste is
done through a variety of vehicles ranging from hand carts, three wheelers, tractor trolleys and trucks etc. Most
of the transport vehicles are loaded manually.
4.6.4. PROCESSING AND DISPOSAL
No processing of waste is done in towns. Disposal is done in most unsatisfactory method. Generally crude
open dumping is adopted for disposal of waste in low lying area at trenching ground. Institutional
arrangements are not efficient and no community involvement.
4.6.5. VEHICLES FOR SOLID WASTE COLLECTION AND TRANSPORTATION
At present the solid waste is managed with the following staff & Machinery.
Staff
1. Health Officer 1
2. Sanitary Officer 1
3. Daroga 2
4. Sweeper 102
5. Driver 2
Machinery
1. Trucks --
2. Tractor trolley 3
3. Hand Carts 20
4. Dumper --
5. Dust Bin 23







Final City Development Plan Narsinghpur Page: 55
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
4.6.6. PRESENT AND FUTURE DEMAND AND SUPPLY GAPS & COMPARATIVE ANALYSIS
Table 41 Demand-Supply-Gap for Solid waste Management
Demand Gap Demand Gap Demand Gap
Projected
Population 73000
1 Waste generation
Per-capita
waste
generation 250 gpcd 250 gpcd MT 18.25 22.37 4.12 19.11 4.64 25.24 6.13
2 Waste Collection
Collection
performance 80 % 100 % MT 14.6 22.37 3.29 19.11 4.64 25.24 6.13
3 Vehicle utilisation
Trips per
Vehicle per
day 6 Nos 2.5 Nos 2.5 2.5 2.5
4 Primary collection Nos 20 179 159 250 71 348 98
Nos 0 10 10 14 4 19 5
23 45 22 62 18 87 25
Nos 0 4 4 6 2 8 2
6
Waste
transportation MT 3 5 2 7 2 9 2
Acre 0 5 5 7 2 9 2
67 % Tonne/Day 1.5 3.35 3.35 4.69 1.34 6.03 1.34
33 % Tonne/Day 0 1.65 1.65 2.31 0.66 2.97 0.66
8
Slums/ Sanitation/
Public
conveniences person 90 person Seat
5X10seated
= 50 330 280 461 130 642 181
Dual loaded dumper placers (4.5 Cum)
89469 Service head No
Desired level as per
UDPFI Standard
Secondary
collection
No.s of Hand carts against proposed 80% privatisation
7 Disposal
By Year 2025 By Year 2035
Indicator Current level 124708 173828
Existing/ desired level
Service Levels, Demand and Gaps
Unit Existing
By Year 2015
5
Container bins (4.5 CUM capacity=2.25 MT)
Dust bins (500 kg capacity)
487
Vehicle requirement (Tractor + trolley) 2 tonne Capacity
Landfill site
Composting infrastructure
Landfill infrastructure

4.6.7. PROJECT PROPOSAL : SOLID WASTE MANAGEMENT
Looking to the above condition, Narsinghpur Municipal council has prepared a report on solid waste
management for the city.
Salient features
Collection of household waste at source by providing suitable litre/garbage bins at convenient
places.
Sweeping of streets, paths, lanes every day
Sweeping of public places like bus stands, Bazar and Hat area periodically at least twice a day.
Collection and transportation of waste collected in bins to central collection point through
manually driven hand carts. Transportation of waste from central collection points to dumping
grounds through tractor trolleys and dumper placers for sorting out.
Dumping and spreading of waste for segregation into recyclable, compostable and inert waste.
Disposal of recyclable waste through public auction to earn some revenue.
Utilizing other waste for land filling operation by spreading the waste in thin layers and
compacted.
Providing 10 cm. Layer of earth or any other inert material waste over compacted layers of waste.
Collection of waste from slaughter houses vegetable markets, meat and fish markets separately
and used for composting.
Table 42 Requirement of vehicles and containers
S.no Details In numbers
1 Dumper places 3
2 Container 155
3 Tractor trolleys 4
4 J.C.B 1
5 Containerized hand cart 100
6 Refuse collector 1
7 Auto rickshaw with trolley 4
8 Truck (Big) 1
9 Land Fill Site 6 Ha.
Source: Solid waste management Report: Narsinghpur



Final City Development Plan Narsinghpur Page: 56
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
4.6.8. SWOT ANALYSIS:
Strengths
The current system is partly mechanized, eliminating manual waste collection partially,
transportation through introduction of waste containers and tractor trolley.
Land is already identified for waste processing /disposal facility.
Waste characteristics suitable for composting.
Presence of informal rag picking activity and recycling market.
Weaknesses:
Existing Solid waste management operations do not confirm to MSWM Rules, 2000.
No SWM expertise and technical knowhow in the ULB: the employees have no experience in
the operation of scientific waste collection, processing and disposal systems.
No qualified technical staff
Low levels of public awareness: public behavior leading to street littering. Domestic,
Commercial and industrial waste are thrown on the street, foot paths, drains and water bodies.
No Storage of waste is done at source.
Along with the domestic waste construction and demolition waste are also deposited on road
sides, obstructing traffic and causing nuisance.
There is no system of primary collection.
The bins used are unhygienic and waste can be seen more on outside the bin than inside.
Street sweeping is not done regularly. The tools used for the sweeping are outdated and
inefficient.
No processing of waste is done and disposal of waste is done in most unsatisfactory method and
dumped in open low lying area.
Opportunities:
Scope of involvement of NGOs in SWM.
Opportunity to involve private sector in solid waste management, mainly in waste
transportation, processing and disposal.
Availability of funds for capital investment in solid waste management.
Opportunity to levy solid waste collection charge with the introduction of door to door
collection.
Threats:
Site identified for waste processing and landfill is not sufficient for design life.
High O&M costs for scientific waste disposal.
Untrained manpower.
Public cooperation in waste segregation at source and adherence to door-to-door collection
schedule.
Lack of willingness to charge.

4.6.9. STAKEHOLDERS PERCEPTION
Sufficient containers bins which are easily accessible to be provided in the entire city.
Scientific disposal of solid waste needs to be done.
Incinerators facility should be proposed by Nagarpalika so that biomedical waste disposal is
done within the city and generate income.
Burning of waste and throwing of waste in public places should be prohibited.

4.6.10. PROJECTS IDENTIFIED
A separate site should be provided for scientific disposal & treatment for solid waste.
Nagar palika should provide an incinerator for Bio-medical waste disposal to reduce the
dependency on Seony town and it will the income generating source for Nagar Palika.
Present SWM infrastructure should be upgraded with modern equipment
Door to Door collection (Collection at source) should be initiated with the help of PPP or
Privatisation of the service
Source segregation should be carried out for better disposal of solid waste.



Final City Development Plan Narsinghpur Page: 57
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Proposed manpower requirement.
Category No. Responsibility
Assistant Executive engineer 1 Head of SWM department for Planning , Operations, Management, Monitoring
Assistant Engineer-Civil 1 Treatment(Centralised/Decentralised) and landfill-Planning ,Procurement, Operations
Assistant Engineer-
Mechanical/Automobile 1 Collection and Transportation-Planning, Procurement, Repair, Maintenance
Health Inspector(Grade-I) 1 Vehicle allotment, Compliant cell monitoring, MIS, Contingencies/Emergencies
Overseer Grade-1 1 Supporting staff
Vehicle mechanic 1 Inspection of vehicle/supervision of repairs
Junior Health Inspector grade II 10 Daily operations(one per 3 wards)
Total 16
Office superintendent 1 Head of administration
Division clerk 1 Accounts, budget
Other supporting staff 2 Assisting office staff
Driver 2 SWM Department vehicle-CAR/Jeep drivers etc.
Total 6
Technical and field staff
Office staff
Proposed staffing requirement



Figure 26 Prop. New site for solid waste disposal
NEW SITE FOR
SOLID WASTE
DISPOSAL
JARZOLA
Final City Development Plan Narsinghpur Page: 58
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
4.6.11. CITY SPECIFIC STRATEGIES
ISSUES STRATEGIES
No Storage of waste is done at source.
Domestic, Commercial and industrial waste are
thrown on the street, foot paths, drains and water
bodies.
Along with the domestic waste construction and
demolition waste are also deposited on road sides,
obstructing traffic and causing nuisance.
There is no system of primary collection.
The bins used are unhygienic and waste can be
seen more on outside the bin than inside.
Street sweeping is not done regularly. The tools
used for the sweeping are outdated and
inefficient.
No processing of waste is done and disposal of
waste is done in most unsatisfactory method and
umped in open low lying area.
Comprehensive study for solid waste
management is required for selecting
appropriate site of disposal and system has to
be implemented for assessment of type and
quantum of waste generated.
Waste collection should ensure segregation at
source and separate management of segregated
waste. Market waste management - Vegetable
and market wastes could be separately
transported to a common facility for disposal
Bio-medical waste management-. As per the
statutory requirements, the collection and
management needs to be enhanced to ensure
proper segregated management of this
category of waste. The capacity of the existing
incinerator facility needs to be reviewed and
augmented if required to dispose all such
waste generated in the city.
Solid waste should be disposed scientifically
so not to cause health and environment
hazardous.
Primary and secondary waste collection
should be modernized so as to achieve 100%
waste collection.
Throwing of solid waste on road side and
burning of solid waste should be banned by
conducting Public awareness programs

4.6.12. ACTION PLAN:
Sector Strategies & Investment Need
Strategy identified Source segregation and door-to-door collection, effective transportation and
environmentally safe disposal
Expected Outcome Reduced waste generation, hygienic conditions and a clean city
Total Investment Need Rs. 1326.81 lakhs
Long-term needs (2035)
The demand-gap assessment above presented indicates generation of 43.46 MT of waste in the city by 2035
against the current generation of 18.25 MT at 250 grams per capita per day; the future generation of solid
waste is assumed at 250 grams per capita per day. Accordingly, the requirements are planned for the horizon
year 2035.
At present Nagar Palika has no separate landfill area for solid waste disposal, Nagar Palika needs to acquire 4
acres after 2015-16 for future landfill and composting purposes. About 6 tons capacity addition by 2015
through increasing fleet size would be required for efficient primary and secondary collection of solid waste.
The total investment need for conservancy and sanitation sectors by 2035 is estimated at Rs. 1327.81 lakhs.
However the above mentioned gaps in the system are proposed to be filled in phases in line with the road
network being developed and quantum of population addition. Accordingly 23.29% of the identified
investment is proposed to be funded by 2015 to cater the current gaps and meet the immediate requirements.
Priority needs (2015-16)
A sum of Rs. 308.99 lakhs (23.29 % of total investment need in the sector) is proposed by 2015. Priority
capital investments are meant to cater to the current service gap and the medium-term needs of 2025.
Final City Development Plan Narsinghpur Page: 59
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
The requirements at the disposal site are planned for the horizon year 2035. Accordingly, infrastructure for
land fill and composting is proposed on a total land of 9 acres. Infrastructure development for land fill would
be a year-to-year capital expense. In line with these developments, augmentation of vehicle capacity by 5.0
tons would be required by 2015 to meet the current gap and immediate needs. About 179 handcarts are
proposed to be acquired; 10 container bins are proposed to meet the gap by 2015.
Further, Nagar Palika will need to plan beyond 2015-16 for further augmentation of vehicle capacity by 5 tons
as well as the construction of more intermediate transfer stations in line with the changing land use pattern and
waste generation trends, to cater the long-term needs of 2035. Rs. 165 lakhs is proposed for construction of
public convenience systems mainly to cater to the urban poor and slum locations by 2015. These would be in
the form of 10 seat complex to be operated on pay & use format. This however is to cater the present slum
population only and not a long term measure as earlier suggested.

Conservancy & Sanitation 2010-11 2011-12 2012-13 2013-14 2014-15
Investment by
2015
Rs. 308.99 lakhs
42.50 44.74 44.74 50.84 126.18
Capital
Facilities
Acquisition of new vehicles -three bin handcarts for
door to door collection

Acquisition of new vehicles for secondary collection
Acquiring a new disposal site of approx.
Land fill infrastructure and composting facility
development at disposal site

Construction of pay & use public convenience
systems in slums

Support &
System
Sustenance
Measures
Implementation of complete door -to-door collection
House-to-house collection
Awareness campaign on source segregation
Other actions/
Measures
Create a wardwise committee for better collection & disposal of solid waste
Increase the ambit of Solid Waste Management to include recycling and to facilitate and regulate the sector
accordingly.
Ensure optimum utilization of existing fleet ,Initiate information-Education-Communication (I-E-C) campaigns to raise
awareness
Initiate steps towards sharing the responsibility of primary collection of segregated garbage with citizens
Improve and ensure access to sanitary facilities for the urban poor and slum dwellers.
Sector Note
Nagar Palika shall be the prime implementing agency for the sector
For establishment of Intermediate Transfer Stations to reduce cost of transportation, identify sites which are cost-
effective
Identify localised/ decentralised locations for processing/ disposal/ reuse of bio-degradable and plastic waste
Assessed gaps and investment needs also includes the urban poor/ slum locations
Performing
Monitoring
Indicators
Source segregation reduction of waste to be collected (min 70 % of waste generated)
Door-to-door collection as percentage of households covered (min 80%)
Optimum fleet utilisation (No. of trips/ vehicle/ day - average minimum of 2.5)
Vehicle capacity as percentage of rated capacity to waste generated (minimum 100%)

4.6.13. INVESTMENT PHASING TILL 2035 :
Conservancy (Swm) & Sanitation 2015 2025 2035 Total Investment
New Vehicles (Primary Collection) 9 13 17 39
New Vehicles (Secondary And Disposal) 28.95 42 55 125.95
Acquiring New Disposal Site 80 112 144 336
Infrastructure At Disposal Site 23 33 42 98
Dldps & Container Bins 2.49 3 5 10.49
Public Convenience Systems 165 230 321 716
Total 309 433 585 1327


4.6.14. SERVICE LEVEL BENCHMARKING AND FINANCING STRATEGIES:




No
Sectoral
Goals Indicators Unit
Base
Scenario
(2010)
Desired
Outcomes
(2035)
2010-11 2011-12 2012-13 2013-14 2014-15
Desired
outcome
Demand
2015 Gap
Desired
outcome
Demand
2025 Gap
Desired
outcome
Demand
2035 Gap
1 Per capita waste generation gpcd
205 250
22.37 7.37 31.18 8.81 43.46 12.28
2 Collection performance percentage 80 100% 80% 80% 90% 100% 100% 22.37 10.37 31.18 8.81 43.46 12.28
Household level coverage percentage 0 100% 50% 100% 100% 100% 100% 100%
Segregation of waste percentage 0 100% 40% 80% 100% 100% 100% 100%
3 utilisation Trips per vehicle per day Numbers 2 2.5 2.5 2.5 2.5 2.5 2.5 2.5
4
Primary
collection
No. of handcarts against
proposed 80% privatisation Numbers 20 53 106 159 179 159 250 71 348 98
5
Container bins(4.5 CuM
capacity=2.25 MT) Numbers
0
2 4 6 8 10 10 10 14 4 19 5
6 Dustbins(500 kg) Numbers 23 10 12 45 22 62 18 87 25
7
Dual loaded dumper
placers(4.5 Cum) Numbers
0
1 2 3 3 4 4 4 6 2 8 2
8
Waste
transportatio
Vehicle
requirement(Tractor+trolle MT 3 1 5 2 7 2 9 2
9 Landfill site 0 5 5 5 7 2 9 2
10 Landfill infrastructure 0 67% 3.35 3.35 3.35 4.69 1.34 6.03 1.34
11 Composting infrastructure 0 33% 1.65 1.65 1.65 2.31 0.66 2.97 0.66
12
Efficiency in compliant
redressal percentage
80% 80%
80% 80% 80% 80% 80%
13 Collection in user charges percentage
0% 90%
20% 40% 60% 80% 90%
15% tariff
revision
every 3
years
Framing
accounting
system to
determine the
O&M cost
Levy of
reasonable
charges
Recovering of
100% O&M cost
Encouraging
PPP for door to
door collection
Encouraging PPP
for disposal and
landfill site
operations
Segregation of
waste at source and
include recycling
and facilitate the
same




Funding
pattern in
Lakhs for
2015
Disposal Acre
Planning indicators Action plan for five years Demand -Supply gaps
Performance
Secondary
collection
Financing strategies for the CIP: Narsinghpur MCL plans to raise
resources through:
1. Periodic revision of charges
2 Maintenance of the collection performance of taxes and charges at certain
minimum levels for current and for arrears. 3.
Borrowings
Optional
ACTION PLAN FOR IMPLEMENTATION
Alternate mode of Funding Funding through UIDSSMT
Service
charges
Reforms in
Solid waste
manageme
nt System
Mandatory
Support
System and
Implementation of complete door to door collection Can be undertaken on PPP model
Awareness campaign on source segregation Can be undertaken on PPP model
ULB: 309 lakhs Total investment for 2015 : 309 lakhs
Nagar Palika shall be the prime implementing agency for the sector
Design Parameters for achieving the
Sectoral Goals
Source segregation
Sector note: Door to door collection
Optimum utilisation of fleet
Capital
facilities
and
Phasing
Acquisition of handcarts for door to door collection For establishment of Intermediate Transfer Stations to reduce cost of
transportation, identify sites which are cost- effective Acquiring a new vehicles for secondary collection
Acquiring a new disposal site Identify localised/ decentralised locations for processing/ disposal/ reuse of
bio-degradable and plastic waste Landfill infrastructure and composting facility development at disposal
Construction of pay and use public convenience systems in slums










5. SOCIAL INFRASTRUCTURE


Final City Development Plan Narsinghpur Page: 60
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
5. SOCIAL INFRASTRUCTURE SECTORAL ANALYSIS
5.1. HEALTH FACILITIES
5.1.1. OVERALL HEALTH FACILITIES
There is one Government Hospital exist in the city, in which 166 beds are available. In addition tothat one
Hospital and one dispensary are there which is operated by Nagar Palika which dont have any bed facilities.
Figure 27 Civil Hospital

As far as population is concerned city is lacking in providing adequate health facility. This unavailable health
services are fulfilled by some private doctors, hospitals and nursing homes to some extent. Existing civil
hospital of the city covers entire population of Narsinghpur.
Block. The details of facilities available in the civil hospital are as follows.
Table 43 Health facility in Civil Hospital
No of Beds 166
Ambulance 1
Chief Health Officer 1
General Physician 19
Nursing Home 1
Gynecologist 3
No of Bed in Nursing Home 22
T.B. Clinic 1
No of Beds in TB Clinic 8
Family welfare centre 1
No of Beds in Family welfare centre 10


5.1.2. BASIC HEALTH INDICATORS
The average birth registered is 10031 and average death registered is 1211 per annum for last five years in
urban area of Narsinghpur dist. Infant mortality Rate for last five years is about 13.74, which is very less
compare to national infant mortality rate of 57.92.

Table 44 Birth & Death Registered for last Five Years in Urban area Narsinghpur Dist.
Year
Male Female Total Male Female Total
2004 3525 2745 6270 701 466 1167
2005 3778 3151 6929 703 457 1160
2006 3345 3332 6677 710 454 1164
2007 8762 7736 16498 765 539 1304
2008 7387 6393 13780 745 517 1262
Average 5359 4671 10031 725 487 1211
No of Birth Registered No of total Death Registered
Source: District Registrar Office

Final City Development Plan Narsinghpur Page: 61
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Table 45 Infant Mortality for last five Years in Urban area Narsinghpur Dist.
Male Female Total
2004 89 49 138 22.01
2005 36 36 72 10.39
2006 57 43 100 14.98
2007 60 51 111 6.73
2008 109 92 201 14.59
Average 70 54 13.74
Total No of Infant
Year Mortality Infant Mortality Rate (Death /1000 Live Birth)

5.1.3. ROLE OF MUNICIPAL BODY IN THE HEALTH PROGRAMS
Nagar Palika is frequently sprinkling pesticides on water logged area to control the mosquito generation and
vaccination program is carried out time to time.

5.2. EDUCATION FACILITIES
5.2.1. OVERALL EDUCATIONAL FACILITIES
Figure 28 Mushran Inst. Of Mang. & Tech.

The city has at present One Arts, One Art Science & Commerce, One Law College, One Polytechnic College
and One institute of Management and Technology. City has 29 Primary, 13 Middle and 7 Secondary School.
The city is dependent on Jabalpur for its 61 specialization and higher degree colleges. To that end, it needs to
earmark an area to induce the private sector to participate in setting up high-class education facilities.
Narsinghpur would also need to influence the state government to expand the scope of the existing colleges to
accredit these institutions.
Figure 29 Kendriya Vidhyalaya Figure 30 Utkrusht Vidyalaya

5.2.2. BASIC EDUCATION/LITERACY INDICATORS
Total No. of Literates in Narsinghpur is 42612 of which 23696 are males and 18916 are females. The overall
literacy level has also improved from 68.55 % in 1991, which was highest in the district and now stands at 87.7
% as per the Census 2001, making it highest among all other talukas. The literacy rate of female has seen 81 %
Final City Development Plan Narsinghpur Page: 62
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
in the year 2001 as per census. The net rise in female literacy is 39 % shows good efforts are being taken
towards the woman education. Whereas the male literacy rate is increased from 57 % to 92.7% during 1991 to
2001.

5.3. RECREATIONAL FACILITIES
5.3.1. PARKS/GARDENS
There are two major green space or open space are located in the city, one is situated near Subhash chowk and
other is a Mushran park. One more space near Narsinghpur Temple can be utilised as a Garden but at present it
is totally neglected. As per the development proposal about 4 Hectares of land is proposed for the recreational
area in which Gardens, amusement parks, green or open spaces are proposed. About 4 Ha of land is available
for this land use. It covers 0.90% of the total developed area. Gardens, amusement park and open spaces are
part of this land use. Out of three green space existing in the city Mushran park is having area of approximately
7500 sqmt, Shubhash park is having an area of 5500 sqmt.

Figure 31 Mushran Park Figure 32 College Playground


5.3.2. SPORTS FACILITIES AND PLAYGROUNDS
A playground located behind the civil hospitals having the facilities of stadium, sports game like volleyball,
Tennis, cricket etc. which needs to be improved further to promote the recreational facilities in the city.

Figure 33 Sports facilities

Final City Development Plan Narsinghpur Page: 63
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh


5.4. OTHER SOCIAL INFRASTRUCTURE
CINEMA HALL
There are two cinema halls situated on cinema road which fulfill the amusement facility of the people of
Narsinghpur to some extent.

Figure 34 Cinema Halls

COMMUNITY HALL
There is one community hall governed by the Nagar Palika which is required to upgrade in terms of
infrastructural facility.

Figure 35 Dr Ambedkar Community Hall


OTHER FACILITIES
There are other many social facilities like Smashan Ghat, Kabrastan, Post Office, Police station, Collector
Office, Office of District education Board, Tehsil Office, Officer of Ex. Engineer (PWD). The table shown
below states the various facilities available in the town
Figure 36 Crematorium Figure 37 Post Office Figure 38 Collector Office Figure 39 Tehsil Office

Final City Development Plan Narsinghpur Page: 64
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Table 46 Social Amenities within the city
Sr.No. Social Amenities Nos
1 Recreational and Cultural facilities 4
2 Stadium 1
3 Cinemas 2
4 Public Library 1
5 Petrol Pump 3
6 Cooking Gas Agency 1
7 Rest House 1
8 S T Depot 1
9 Main Post Office 1
10 Sub Post Office 1
11 Police Station 1
12 Police Chowki 1
Source: Census-2001 and Municipal Council

Table 47 Commercial activities in the city
Sr.No Name of Market Location
1 Meat Market Ittvara bazaar
2 Grain Market & Godown Old Mandi Area, Station Gaung
3 Hardware Market Nr. Bus stand
4 Stone, flooring wood Vardhman Traders
5 State Bank of India Pathak ward, Kachari road
6 State Bank of India Agricultural Branch Pathak ward, Nr. Nagar palika
7 Commercial tax Office Indira ward
8 Oil Mill Bajrang ward
9 Saw mill ward
10 Pulse mill & Oil mill Gaya Dutt ward, Niranjan Ward
11 Work Shop Old Bus stand, Indra Ward
12 Vegetable Market Itvar Bazaar Rajiv Ward


5.5. COMPARATIVE ANALYSIS WITH THE UDPFI GUIDELINES
Final City Development Plan Narsinghpur Page: 65
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Table 48 Future Requirement of Health & Education
Details Quantity Unit Standard Per population
Area in
Ha.Per Unit
Total Requirements for
town (Nos)
TOTAL AREA required
(Ha.) by 2031
2010 2015 2025 2035 2035 2035
73306 89469 124708 173828 173828 173828
Existing Demand Demand Demand Demand Demand
Nursery school 1 school 2500 2500 0.08 0 36 50 70 70 5.56
Primary school (I-V) 1 school 500 students 5000 0.4 29 18 25 35 6 2.31
Senior secondary school (VI XII) 1 school 1000 students 7500 1.6 13 12 17 23 10 16.28
Integrated school without hostel Facility(I-XII) 1 school 1500 students 100000 3.5 7 1 1 2 0 0
Integrated school with hostel Facility(I-XII) 1 school 1000 students 100000 3.9 0 1 1 2 2 6.78
School for handicapped 1 school 400 students 45000 0.5 0 2 3 4 4 1.93
College (including Hostel area ) 1 college 1000-1500 students 125000 4 3 1 1 1 0 0
University Campus 1 125000 10 0 1 1 1 1 13.91
Technical education 1 centre 400-500 students 1000000 4 1 0 0 0 0 0
Technical centre 1 centre 1000000 4 0 0 0 1 0.7
University 1 university 0 60 0 1 1 60
Professional education
Engineering college 1 college 1500-1700 students 500000 60 1 0 0 0 0 0
Medical college 1 college 1500-1700 students 1000000 15 0 0 0 0 0.2 2.61
General hospital (300 -500 beds) 1 hospital 300-500 beds 250000 6 0 0 0 1 1 4.17
Hospital
Residential accommodation
Intermediate hospital (100-300 beds) 1 hospital 100-300 beds 100000 2.7 1 1 1 2 1 1.99
Residential accommodation
Intermediate hospital (B) 1 hospital 80 beds 100000 0 1 1 2 2 0
including maternity beds(20 nos.)
residential accommodation
Poly clinic with some observation beds 1 clinic 100000 0.3 0 1 1 2 2 0.52
Nursing home, child welfare and maternity centre 1 centre 25-30 beds 45000 0.3 2 2 3 4 2 0.56
Dispensary 1 dispensary 15000 0.12 2 6 8 12 10 1.15
PHCs 1 centre per 3 village 0.01 0
Narsinghpur M.CL
YEAR
POPULATION
DETAILS
E
d
u
c
a
t
io
n
S
c
h
o
o
l
C
o
ll
e
g
e
H
e
a
lt
h

H
e
a
lt
h
c
a
r
e
f
a
c
i
lit
ie
s

5.6. KEY ISSUES SOCIAL INFRASTRUCTURE
Provision of school access to unseen habitations
Quality of existing pre service teacher education is underprivileged and poor quality elementary
education
Water logging problems are severe resulting into the health hazards.
Unavailability of medical facilities and required expertise in emergency cases.
The population of the surrounding villages also depends upon the resources of civil hospital,
resulting overcrowding and inaccessibility of proper treatment in time.
For the present population, city does not even have a good cinema theatre of Multiplex stature,
properly landscaped gardens with childrens play area.
In addition to the population of Narsinghpur City, a large quantum of population in the region
around Narsinghpur depends upon the socio-cultural facilities and recreational open spaces.
Looking to the population growth & slow down of economic activities has resulted into the
problems like theft & robbery.
Due to unskilled staff & shortage of fund Nagar Palika is not in position to deliver timely
services.
5.7. STAKEHOLDERS PERCEPTION:
In existing Civil Hospital, Trauma centre should be developed for emergency purpose. It should
have all the latest technology equipments and Ambulance.
Incinerators should be provided by the Nagarpalika, wherein the biomedical waste can be
disposed, it will also be a source of income.
An auditorium with capacity of 5000 persons is required for cultural activities and community
activity.
Play ground and open spaces needs to be well maintained.
Muktidham(Smashan ghat) can be developed on Govt. land located at junction of Jarjola road.
5.8. PROJECTS IDENTIFIED
Up gradation of existing Gardens with modern entertaining rides, landscaping, provision of
refreshment stall etc should be taken up immediately.
Restoration of Narsinh Temple, Ram and Krishna Temple situated in the City.
Final City Development Plan Narsinghpur Page: 66
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Conserving and Beautification of the Singri River and Narsingh Talav and develop it as a picnic
spot with garden and amusement park to attract the visitors.
Jirna Kund should be conserved and developed as a picnic spot.
Smashan (Cremation Ground) should be proposed near vicinity from the centre of the city.
An Auditorium should be proposed for cultural activity.
Play Ground should be developed with stadium facility and a sports complex can be proposed for
various indoors and out door games.
Trauma centre should be proposed in existing Civil Hospital and upgraded by latest equipments,
laboratory and Ambulance etc.
Play Ground and Green spaces should be maintained regularly.
There are so many old archeological art & sculptures found in the village Paretha about 24 km
form Narsinghpur City, which should be restored and conserved by proposing a museum in the
city.

5.9. CITY SPECIFIC STRATEGIES
ISSUES STRATEGIES
Provision of school access to unseen habitations
Quality of existing pre service teacher education
is underprivileged and poor quality elementary
education
Water logging problems are severe resulting into
the health hazards.
Unavailability of medical facilities and required
expertise in emergency cases.
The population of the surrounding villages also
depends upon the resources of civil hospital,
resulting overcrowding and inaccessibility of
proper treatment in time.
For the present population, city does not even
have a good cinema theatre of Multiplex stature,
properly landscaped gardens with childrens play
area.
In addition to the population of Narsinghpur City,
a large quantum of population in the region
around Narsinghpur depends upon the socio-
cultural facilities and recreational open spaces.
Looking to the population growth & slow down
of economic activities has resulted into the
problems like theft & robbery.
Due to unskilled staff & shortage of fund Nagar
Palika is not in position to deliver timely services.
Land having tenure of government / other
parastatal department which is available and
lying fallow should be identified and put
request to the concern department for utilising
it for public purposes.
Upgradation of existing Gardens with modern
entertaining rides, landscaping, provision of
refreshment stall etc by introducing PPP
model in Operation & Maintenance.
Introducing modern and reliable equipment
and machinery, with appropriate facilities for
their upkeep and maintenance in Fire service
Cleaning campaigning and Health checkup
programme in slum should be taken up
frequently
Leakage of water pipeline should be repaired
to stop contamination with sewerage water.


















6. URBAN POOR AND SLUMS


Final City Development Plan Narsinghpur Page: 67
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

6. URBAN POOR AND THEIR ACCESSIBILITY TO BASIC SERVICES
6.1. POVERTY IN THE TOWN
Out of the total population in Narsinghpur around 45 % population resides in slums, squatter and other poor
settlements. Their contribution to the Citys economy has been growing over period. In the absence of the
policy to address their problems, the poor may suffer from many inadequacies in terms of access to basic
services, socio-economic needs. Slums are lacking both in terms of infrastructure provision and social and
economic development.

6.2. INFORMATION ON SLUM POPULATION
In 24 wards of the Municipal Council of Narsinghpur, there are 4873 slum families, which come to 24365
populations. Below is the ward wise slum population and there percentage share to total population. Out of the
total, 550 slum families are notified, the rest are not notified by the MC.

Table 49 Wardwise slum population
Ward no. Ward name Total BPL population % of slum population Density
1 Nehru ward 550 38.6 278
2 Shankar ward 1500 84.98 251
3 Niranjan ward 1695 76.08 116
4 Mahajani ward 385 25.99 463
5 Narsingh ward 810 51.89 244
6 Sanjay ward 830 44.08 368
7 Kisani ward 1440 62.42 400
8 Pathak ward 1930 55.83 257
9 Belapurkar ward 2305 105.39 251
10 Shivaji ward 760 42.22 469
11 Tilak ward 820 29.74 431
12 Mushran ward 1860 60.92 282
13 Krishna ward 1480 55.39 220
14 Gayadutt ward 255 18.38 155
15 Ram ward 255 18.11 440
16 Gandhi ward 420 33.93 387
17 Bajrang ward 565 35.2 358
18 Patel ward 805 50.5 415
19 Indira ward 465 25.95 700
20 Ajad ward 715 45.28 493
21 Kamath ward 1415 48.99 322
22 Shastri ward 775 25.9 223
23 Shakaracharya ward 585 19.47 128
24 Rajiv ward 1745 58.09 276
Total 24365 47.71 265
Source : IHSDP Project Report : Narsinghpur


6.3. SLUMS IMPROVEMENT PROGRAM
The slum relocation scheme has been planned in Narsinghpur City under Integrated Housing & Slum
Development Programme (IHSDP). About 651 slum dwellers are proposed to be benefited for Housing from
ward no 8, 9 and 24 and 5115 nos for infrastructure development under IHSDP scheme. 6 slum pockets are
identified in for Housing under IHSDP scheme. As per Govt. norms each slum dwellers has been given 25
sq.mt. Built-up area.



Final City Development Plan Narsinghpur Page: 68
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
6.4. LOCATION OF SLUMS ON TOWN MAP
Figure 40 Location of the slum pockets

6.5. GENERAL CHARACTERISTICS OF SLUM
Figure 41 Housing condition in Slum area

Majority of slums comprises of the Schedules caste, Scheduled tribes and other backward castes.
Most of the slums have predominantly one caste staying in it or people from one place of origin.
The majority of the working population in slums are engaged in small scale industries or
agriculture i.e activities like bidi making, basket making etc.
The average household size in slums in Narsinghpur is 5 versus 6.15 for the city as a whole. On
an average; slum households have a monthly income per person of Rs. 1000 in the range of Rs.
500- Rs.1500.
Health related obligatory functions of the Municipal Council are restricted and health related
activities are inadequate .The city has to depend on nearby larger city like Jabalpur for higher
medical needs. Lack of awareness of family planning practices is evident.
Basically the houses in the slums are either pucca houses or mud houses with tiled roofs with
narrow lanes, others have houses that are entirely made of makeshift materials like wood,
bamboo.
In most of the slums, children have access to primary schools and middle schools. Literacy levels,
especially female literacy in all, are extremely low.
6.6. STATUS OF SLUMS (NOTIFIED/UN-NOTIFIED)
6.6.1. LAND OWNERSHIP & TENURE STATUS
Most of the slums in Narsinghpur are located on government and private lands. Government land includes land
belonging to the, state or municipal government. Private land, on the other hand, belongs to individuals.

Final City Development Plan Narsinghpur Page: 69
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
6.6.2. TENURE STATUS
Government has from time-to-time issued the slum households legal ownership/title of land/Patta as part of its
policy to ensure tenure security to the poor and landless.
Most of the slum has legal land ownership. The land has been given to all the slum dwellers on pattas. ( The
Patta Act, 1984 & 1998-The Madhya Pradesh Nagriya Kshetron Ke Bhoomiheen Vyakti (Pattadhruti
Adhikaron Ka Pradan Kiya Jana) Adhihiyam, 1984, Popularly known as Patta act was introduced to grant
leasehold rights to the landless persons occupying urbam lands. The act was amended in 1998 under Rajiv
Gandhi Ashray Abhiyan.
6.7. URBAN BASIC SERVICES IN SLUMS ( 7 POINT CHARTER ANALYSIS )
WATER SUPPLY
In present situation most of the residents of the slums obtained their water either from an improved point
source, such as a well or bore well or from the Municipal council piped supply system or from Public stand
post. Bore well are fitted with individual hand pumps for local supply.
Individual house connections should be provided in line with Municipal Corporations policy on flat rate
metering.
SEWAGE SYSTEM
At present slum area of Narsinghpur essentially comparison an individual pour-flush latrines and public latrine
blocks. Residents who do not have access to one of this sanitation, then the common practice is defecation in
an open space or along drainage creating unhygienic condition.
STORM WATER DRAINAGE
The existing condition of surface drainage system is very bad in all slum areas. Most of the roads in the
selected slum areas do not have proper drainage system. During the monsoons most of these roads get
crammed with muddy water, which remains stagnant for weeks and as result give rise to many diseases.
STREET LIGHT
About 35 % have streetlights and mostly in the form of tube lights or bulb fixtures. 65 % slum dwellers have
electric connection in their house. The services are not up to the mark in terms of quality as well as coverage.
ROADS / PAVING
In most of the slums roads are either Kuccha, RCC or partly paved, having inadequate width with poor surface
drain.
PUBLIC TOILET
Most of the slums do not have public toilets and where these public toilets are constructed, those are not
maintaining properly by users. Only 13% of public toilets are available in slums
HOUSING CONDITION IN SLUMS
80% of slum dwellers living in temporary shelters. 70% of houses are entirely made of locally available
materials like bamboo, clay, plastic/tarpaulin sheets.
6.8. SOCIAL SECURITY SCHEMES AND BENEFICIARIES
Salient features of the Scheme
The present population of the settlement will be resettled on the same site except those who are
adjoining river and the flood prone areas and Mushran Van.
Slums shall be redeveloped on a land of 6.07 Ha. Due provisions for drains, basic infrastructure
and amenities shall be made.
Houses will be provided with all infrastructure facilities like water supply, sewerage, drainage,
electrification etc.
Figure 42 IHSDP Housing Scheme - Slum Relocation site
Final City Development Plan Narsinghpur Page: 70
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

Existing open spaces in the ward will be further developed as a play ground.
The existing open space in the ward will be further developed as a play ground.
Houses will be allotted on lease hold basis for thirty years period.
The land freed from the old settlement will be used for commercial development giving rise to
employment to the local population.
6.9. SWOT ANALYSIS:
Strengths
Preparation of IHSDP scheme will result in resolving the issues in service delivery and housing,
if efficiently handled.
Weaknesses:
Slow execution of present proposal of IHSDP scheme for slum relocation.
Sluggish economic growth and inadequate infrastructure has resulted in poverty and development
of slums.
Lack of educational facilities and health care to improve the living standards.
Lack of basic infrastructure like roads with reasonable width to take care of vehicular traffic
growth, insufficient water supply, poor housing conditions, poor sanitation, absence of sewerage
system and disposal of domestic waste water/sewage and solid waste.
Absence of public toilets and baths.
Lack of policies and proposals for their up gradation
Opportunities:
Potential for provision of alternate land for urban poor settlements in low lying areas through
Town planning schemes.
Fairly high levels of willingness to pay among the urban poor, which is one of the first steps
towards sustainable service delivery.
Recognisaton of the need for awareness generation programs for the poor among stakeholders,
including politicians.
Threats:
Inadequate emphasis on programs/fund allocation for urban poor and other disadvantaged groups.
Participatory processes are time-consuming and are therefore often axed in favor of less
Sustainable practices.

6.10. DEMAND SUPPLY GAPS
Demand Gap Demand Gap Demand Gap
Slum Improvement -
Rehabilitation/ Housing
Nos 3981 4859 878 6773 1914 9441 2668
Slum Improvement -
Infrastructure
nos 4859 878 6773 1914 9441 2668
Service head
Service Levels, Demand and Gaps
Unit Existing
By Year 2015 By Year 2025 By Year 2035

6.11. PROJECTS IDENTIFIED
Construction of residential Houses by taking advantages of Central/Stat government schemes for
Urban Poor.
Removal of encroachment of slums from public places.
Employment generation by development of Trade and commerce.
Final City Development Plan Narsinghpur Page: 71
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
6.11.1. CITY SPECIFIC STRATEGIES

ISSUES STRATEGIES
Slow execution of present proposal of IHSDP
scheme for slum relocation.
Sluggish economic growth and inadequate
infrastructure has resulted in poverty and
development of slums.
Lack of educational facilities and health care to
improve the living standards.
Lack of basic infrastructure like roads with
reasonable width to take care of vehicular traffic
growth, insufficient water supply, poor housing
conditions, poor sanitation, absence of sewerage
system and disposal of domestic waste
water/sewage and solid waste.
Absence of public toilets and baths.
Lack of policies and proposals for their up
gradation.
Proposal of City-wide integrated slum
improvement and redevelopment program
covering housing, economic development core
civic services, health and education and other
social amenities under Central / State
Government scheme.
Promotion of initiatives by the
govt/community groups to make town slum
free through various schemes.
Discourage development of further slums by
announcing cut-off dates. Declaring the
existing status of slums. Slums developed
after cut-off dates should be demolished by
framing rules and strict enforcements.
Formation of ward level committee to
discourage the further development of slums.
Municipal Council should ensure appropriate
inclusion of slums and economically weaker
section settlements in their infrastructure
development plans.
Municipal Council needs to carry out a
comprehensive study of slum and
economically weaker section settlements to
identify specific needs and priorities.

6.12. ACTION PLAN:
Sector Strategies & Investment Need
Strategy identified Rehabilitation of slum dwellers currently staying in vulnerable areas and in
proposed project locations, in-site improvements and access to basic services and
amenities
Expected Outcome Improvement in quality of services for the urban poor, preservation of sensitive
geographies, reduced vulnerability of urban poor, removal of slums by year 2035.
Total Investment Need Rs. 4913 lakhs
The requirements in this sector are of immediate priority. Hence, the planning horizon for the sector is 2035
and accordingly projects and investments have been identified to be funded by 2035. A sum of Rs. 790 lakhs is
the investment identified for various slum rehabilitation and improvement projects and for providing basic
services to urban poor by 2015. This however is partly against resolution of the prime issue of the
encroachments of the proposed rehabilitation lands. Of the identified investment, about 16.08% of total
investment has been allocated for improving and rehabilitating housing stock (about 878 units) by year 2015-
16. As part of 10% own funding, it is proposed that 10% will be mobilized as beneficiary contribution.

Table 50 Action Plan for Implementation Urban Poor
Slum & Urban Poor 2010-11 2011-12 2012-13 2013-14 2014-15
Investment by 2015 Rs 790 Lakh 0.00 197.50 197.50 197.50 197.50
Capital Facilities
In situ rehabilitation of slums- housing
Infrastructure development for slum rehabilitation
Support & System
Sustenance Measures
Inventory and geographical mapping of all slums and
infrastructure in slums for Nagar Palika

Socio-Economic Survey of all slums in Nagar Palika
Final City Development Plan Narsinghpur Page: 72
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Training for women in slums and urban poor towards
self-employment and other income generating
activities.

Other actions/
Measures
Providing for reservation of lands for the economically weaker sections (EWS) in each type of commercial/ industrial/
residential land use in the development plan
Organizing frequent meetings with slum dwellers towards encouraging participation in slum development
programmers, creating awareness on beneficiary contribution to project development and also assuming the
responsibility of implementing the projects
Facilitating and encouraging the neighborhood concept in slums to carry out recreational activities such as reading,
sports and drama
Sector Note
Infrastructure and basic services provision in slums shall not be in isolation but in conjunction in line with overall
infrastructure development in the city
Awareness on health and hygiene shall be created among slum dwellers in line with the long-term goal of moving
towards individual toilets and doing away with public convenience systems
Performing
Monitoring
Indicators
Water Supply Individual house service connections to all
Sewerage - Individual house service connections to all
Sanitation Community toilets in the short run and individual toilets in the long run
Solid Waste Management -- Coverage of all slum households under door-to-door collection and awareness campaigns
on source segregation

6.13. INVESTMENT PHASING TILL 2035:
Urban poor/ slums 2015 2025 2035 Total investment
Slum improvement - rehabilitation/ housing 702.00 1531 2134 4367
Slum improvement - infrastructure 88.00 191 267 546
Total in lakhs 790.00 1722 2401 4913

6.14. SYSTEM BENCHMARKING AND FINANCING STRATEGIES:






No Unit
Base
Scenario
(2010)
Desired
Outcomes
(2035)
2010-11 2011-12 2012-13 2013-14 2014-15
Desired
outcome
Demand
2015
Gap
Desired
outcome
Demand
2025 Gap
Desired
outcome
Demand
2035 Gap
1 percentage 100% 200 445 878 4859 878 6773 1914 9441 2668
2 Numbers 200 445 878 4859 878 6773 1914 9441 2668
Criteria for
identification of
the Urban Poor to
be defined
Fresh list to be
prepared based on
criteria
Defining threshold
service levels for
the Urban Poor
Strategic
document
showing physical
and financial
plans
Periodic impact
evaluation by
independent
agencies
appointed by the
state govt.
Earmarking at least
20-25% of developed
land for EWS and
LIG housing





Funding
pattern in
Lakhs for
2015
80:10:10
GoI: 632
Lakhs
GoMP
79 Lakhs
ULB:
79 Lakhs
Demand -Supply gaps
Sectoral Goals
Slum Improvement-
Water supply - Individual house service connections to all
Sewerage- Individual house service connection to all
Slum Improvement--
Infrastructure
Planning indicators Action plan for five years
Sanitation
Solid waste management-coverage of all slumhouseholds under door to door collection and awareness campaign on source segregation
Optional
Support
System and
Sustenance
Measures
Inventory and Geographical mapping of all slums and
infrastructure in slums for Nagarpalika
Socio economic survey of all slums in Nagarpalika
Training for women in slums and urban poor towards self
employment and other income generating activities
Design Parameters for
achieving the Sectoral Goals
Capital
facilities and
Phasing
In situ rehabilitation of slums- housing
Infrastructure development for slum
rehabilitation
Reforms in
Urban Poor
Mandatory
Total investment for 2015 : 790 lakhs










7. ENVIRONMENT



Final City Development Plan Narsinghpur Page: 73
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

7. ENVIRONMENT
7.1. FLORA AND FAUNA
The goal of the Preserving Flora Fauna and vegetation cover is to ensure the conservation and sustainable use
of globally significant dry land biodiversity. This can be achieved by
1. Conserving biodiversity in community managed areas (pastures, grasslands, sacred forests)
peripheral to the project sites, which provide habitat/corridors for endangered species. To develop
and implement sustainable alternative livelihood options and ensure the conservation of
domesticated and agricultural biodiversity.
2. By carrying out upstream activities to ensure the conservation of biodiversity within the protected
area and their buffer zone, as well as to incorporate biodiversity conservation into existing land-
use and development plans and environmental legislation.
The people of Narsinhgpur keen to improve the city beautification and would provide support to Nagarpalika
for such initiative. Nagarpalika can engage NGOs for such beautification of city, development of green space
or landscaping work. By doing such program me Nagarpalika can improve the environmental status of the city.
The goal is to conserve globally significant biodiversity while at the same time improving the standard of
living of local people. This will occur through knowledge intensive biodiversity-friendly activities so that
local stakeholders intensity of forest resource use is reduced, while the value-added incomes and livelihood
benefits derived from the resources are increased.
List of flora and fauna found surrounding Narsinghpur city.


Flora and Fauna
For studying the aquatic flora and fauna (Phytoplankton and Zooplankton) in the study area Black Domat soil,
smooth soil, rocky soil, and sandy soils are there in which wheat, grams and all type of pulses has been mainly
produced. Narsinghpur is very famous for growing Soya beans, Pulses.
The following is an indicative list of activities for the preserving urban environment:
Strengthen the management of existing protected areas (develop and Implement management
plans).
Clarify the status of protected areas, determine boundaries, gazetting.
Establish biological corridors to ensure safe migration of species.
Build the capacity of government institutions and local communities involved in conservation
activities and develop better communication and coordination networks.
Improve management of sacred groves, community forests and grasslands by helping define
roles, responsibilities of stakeholders and Mechanisms to ensure control and responsibility.
Improve database and inventory of dryland biological resources and indigenous knowledge.
Develop and implement strategies to control exotic, invasive species.
Final City Development Plan Narsinghpur Page: 74
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Add value to indigenous uses of biodiversity, improve technology,
Public awareness and environmental education.
Conserve domestic and agro-biodiversity.
Provide input into development of land-use plans and amendment of environment policies for
drylands at the state and national level .

7.1.1. KEY ISSUES FLORA FAUNA
To conserve and augment critically endangered flora and fauna .
To improve the institutional and technical capacities of the Forest Department for biodiversity
conservation and
To identify and initiate processes of change in order to overcome policy and institutional barriers
hindering the sustainable management and conservation of the environment.

7.2. POLLUTION LEVELS (AIR, WATER AND SOIL)
7.2.1. AIR POLLUTION LEVELS
Air pollution encompasses a diverse array of natural and anthropogenic emissions, including gaseous
constituents, volatile chemicals, aerosols (particulate) and their atmospheric reaction products. Ambient air acts
as an atmospheric sink, where all emissions are released. Many such emissions are in such small quantities that
they get immediately dissipated and absorbed but continuous release of these pollutants build up in the air and
pose hazards to human health. Despite pollution control effects, the air quality has been threatened to alarming
levels in several cities throughout the world. The World Health Organisation (WHO) estimates that as many as
1.4 billion urban residents in the world breathe air exceeding the WHO air quality guidelines (World Resource
Institute, 2000). The health consequences of exposure to dirty air are considerable. On a global basis, estimates
of mortality due to outdoor air pollution is estimated to be around 2.0 to 5.7 lacs, representing about 0.4 to 1.1
percent of total annual deaths. The adverse effects of air pollution are more pronounced in the developing
countries. On the one hand, the developing countries are grappling with the environmental problems associated
with inadequate economic developments, the hallmarks of which are malnutrition, poor sanitation and lack of
basic human needs. On the other hand, in their pursuit for rapid economic development, the developing
countries are confronted with a newer set of environmental problems due to increasing air pollution on account
of industrialization, urbanization and motorization.
Severe air pollution episodes during last century have shown that breathing dirty air can be dangerous and at
times deadly. Many countries have adopted ambient air quality standards to safeguard the public against the
most common and damaging pollutants, which include sulphur dioxide, suspended particulate matter, ground
level ozone, nitrogen dioxide, carbon monoxide and lead, which are directly or indirectly released by the
combustion of fossil fuels. Although substantial investments in pollution control in some countries have
lowered the levels of these pollutants in many cities, poor air quality is still a major concern throughout the
industrialized world.
Indoor Air Pollution
There are four principal sources of pollutants in indoor air viz. combustion, building material, the ground under
the building and biological agents. As dangerous as polluted outdoor air can be to health, indoor air pollutants
can pose even a greater health risk. Indoor air pollution is a concern where energy efficiency improvements
sometimes make the house relatively air tight thereby reducing ventilation and raising indoor pollutant levels.
Indoor air pollution is usually associated with occupational situation particularly through combustion of
biomass fuels. The greatest threat of indoor pollution exists where the people continue to rely on traditional
fuels for cooking and heating. Burning such fuels produces large amounts of smoke and other air pollutants in
the confined space of home, a perfect recipe for high exposures. Liquid and gaseous fuels such as kerosene and
bottled gas although not completely pollution free is many times less polluting than unprocessed solid fuels. In
these circumstances, exposure to pollutants is often far higher indoors than outdoors. The health problems due
to indoor air pollutants are more widespread than those caused by outdoor air pollutants for the following
reasons.
The exposed persons are in close proximity to the source of indoor air pollutants.
A recent report of WHO asserts 'the rule of 1000' which states that a pollutant released indoor is
one thousand times more likely to reach the lungs than a pollutant released outdoors.
Final City Development Plan Narsinghpur Page: 75
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Women and children, particularly those in rural sector spend more time indoors than outdoors.
In rural/small city areas, indoor air pollution is responsible for much greater mortality than
ambient air pollution.
Epidemiological studies have linked exposure to indoor air pollution from dirty fuels with at least
four major categories of illness. These are:
acute respiratory infections (ARI) in children
chronic obstructive pulmonary disease (COPD) such as asthma and bronchitis;
lung cancer and
Pregnancy related problems. Of these, ARI appears to have the greatest health impact in
terms of the number of people affected.
Traditional biomass fuels amount for 80% of domestic energy consumption in our country. When these fuels
are burnt in simple cook stoves during meal preparation, air inside homes get heavily polluted with smoke that
contains large amounts of toxic pollutants such as carbon monoxide, oxides of nitrogen (NOx), sulphur dioxide
(SO2), aldehydes, dioxins, polycyclic aromatic hydrocarbons and respirable particulate matter. The resulting
human exposures exceed the permissible norms by a factor in multiples.
Figure 43 Sources of Air Pollution


Table 51 Annual Deaths Due To Air Pollution in Urban and Rural Areas
Region Urban Outdoors Urban Indoors Rural Indoors Total
Developed Countries 14 (0.5) 252 (8.4) 28 (0.9) 294 (9.8)
Developing Countries 186 (6.2) 644 (21.5) 1876 (62.5) 2706 (90.2)
Total 200 (6.7) 896 (29.9) 1904 (63.5) 3000 (100)

(Source: Pollution Control Board Annual Report 2005-2006)
A citys environment is the most critical determinant of the quality of life of its inhabitants and consequently of
urban productivity. Air, water, greenery and noise levels are the constituents of urban environment. The
Madhya Pradesh State Pollution Control Board (MSPCB) is responsible for monitoring the water and air
quality of the state as well as city.
Present Air quality in Narsinhgpur area:
The principal sources of air pollution in Narsinghpur are largely from vehicular emission and dust pollution
because of the vehicular movement. Use of kerosene as fuel by auto-rickshaw, pollution from emission of
three Wheeler auto rickshaws and relatively more numbers of the two wheelers is the sources of vehicular
emissions. As such there is no major chemical or oil industry in Narsinghpur, so it does not affect the air
quality.
The major cause of air pollution in Narsinghpur is the discharge from automobiles, (carbon monoxide,
particulate matter, hydrocarbons and oxides of nitrogen) burn up of dry (solid) wastes, bio-medical waste, dust
move off by the various activities, and Indoor pollution by combustion of biomass fuels, rely on traditional
fuels for cooking and heating, combustion, building material, use of Liquid and gaseous fuels such as kerosene
and bottled gas.
Final City Development Plan Narsinghpur Page: 76
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
In the absence of specific studies/ monitoring of vehicular emissions, no specific conclusions could be arrived
at. However, it is clear that the large numbers of city vehicles & industry-related heavy vehicles plying the city
roads, burn up of dry (solid) wastes, bio-medical waste, dust move off by the various activities, are the main
cause of air pollution. The reasons for this substantial contribution by trucks/tempos to pollution are
Narsinghpur is a district head quarter so the passing of regional traffic through the city on the State Highway.
7.3. KEY ISSUES - AIR & WATER POLLUTION
Continuous Flow of regional traffic
These contribute significantly to carbon emissions in the city. Narsinghpur receives a lot of regional
traffic and floating population as it is a district head, who travel by private vehicles. This increasing
number of private vehicles is consequently causing more vehicular emissions and higher noise levels
in the city
Lack of infrastructural facilities
The present large quantum of solid waste, the generation of rotten vegetable and fruits would be
equally large and the absence of proper disposal & treatment facilities of this waste is clearly felt in
the wake of the large scale pollution of the river Singri. The city has inadequate quantum of drainage
disposal infrastructure which leads to water pollution and health hazards.
7.4. CONTROL MEASUREMENT
Vehicular Pollution Control:
Introduction of New Vehicles
Improvement in fuel quality
Phasing out and improvement in used vehicles
Up gradation of PUC systems
Centralized inspection & maintenance system for vehicles
By-passing the transit traffic
Proposing of 2T Oil for two stroke engine
Checking adulteration of fuels
Introduction of cleaner fuels LPG/CNG
Institutional plans for implementation of gaseous fuel programmes
Introduction of Bio fuels like ethanol and bio-diesel
Traffic and transport management both for private and public vehicles
Fiscal measures to discourage the use of old vehicles
Industrial Pollution Control:
Installation of adequate pollution control measures in industries
Monitoring programme of industries
Increase in the No. of monitoring station & their frequency
Monitoring of additional pollutants
Other Action Points:
Installation of automatic Air Monitoring Stations
Development of Air Quality Inventory
Health Impact study of Air Pollution
Check on use of generator sets
Check on burning of bio-mass in open
Plantation and green coverage
Paving of roads / footpaths and good carpeting
Traffic planning
City Planning
Cleaner fuel
Check on adulteration of fuel
District level Task Force headed by Collector to monitor the implementation of the Air Pollution
Control Action Plan.
7.5. CITY GREEN SPACES (GARDENS AND RECREATION - TOTAL COVERAGE RATIO)
There are three Gardens/Parks situated in the city. One is Subhash park second is Mushran Van and
third is located near Narsinghpur mandir. These open green spaces are required to be maintained and
improved with better infrastructure facilities which help to improve the city beautification.
7.6. WATER FRONT DEVELOPMENT AND CONSERVATION
Final City Development Plan Narsinghpur Page: 77
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Figure 44 Narsinghpur Lake

Narsinghpur Lake is covering a vast area, needs to be developed in a planned manner. It will be one of the best
picnic spot by developing the green space surrounding the lake along with conservation and restoration of Old
Narsinghpur temple. The action plans for lake conservation are given below.
To carryout Situational analysis - Identify/adapt existing agency
Review body of work done in the past (practical efforts, published/unpublished secondary data)
Collection Climate data, especially related to rainfall, Analysis of In/out flow data for water body
Pollution: Identify Points, sources, scale, existing mitigation
To carry out Ecological assessment: water body, catchments, command
Socio-economic assessment: direct/indirect users, government agencies, NGOs, municipal
bodies, other interest groups/stakeholders
Health status baseline
Institutional analysis: Project Implementing Agency, other government agencies, NGOs.
7.7. DISASTER MITIGATION AND MANAGEMENT PLAN
At present Nagarpalika has no disaster mitigation mechanism and equipment. Nagar Palika has Fire station
only as part of disaster management which is also not well equipped with required disaster mitigation
mechanism.
Heavy rain and flood is a recurring phenomenon. The environmental hazards associated with flood calamities
need to be tackled on a specialized footing. Possible hazards are contamination of Land and Water and
farmlands.
Government has taken several initiatives for strengthening disaster reduction strategies. Government
constituted an Expert Group to examine the related issues and evolve recommendations for improving
preparedness and prevention with respect to natural disasters caused by earthquakes, floods and cyclones. They
also perform the activity like
Monitoring of Hazards
Vulnerability Assessment
Prediction and Forecasting
Structures and Buildings
Hazard Mapping;
Disaster Risk Assessment and Mapping
Preparation of Building Guidelines
Filling them as much as possible
The State level Task Force is to facilitate the identification of gaps and evolve strategies in disaster preparedness
and response. It also will serve the purpose of integrating various sectors like Shelter, Livelihood, Child Focus,
Gender, Vulnerability, Health, ICT, Environment, etc. in to the disaster preparedness.
7.7.1. ACTION PLAN FOR MITIGATION OF DISASTER
Creation of awareness for disaster reduction is urgently needed amongst policy makers, decision
makers, administrators, professionals (architects, engineers and others at various levels) financial
institutions (banks, insurance, house financing institutions) and NGOs and voluntary
organizations.
Creating awareness for improving preparedness amongst the communities, using media, school
education, and the network of the building centre.
Appropriate amendments in the legislative and regulatory instruments (state laws, master plans,
development area plan rules, building regulations and bye-laws of local bodies) along with
strengthening of the enforcement mechanisms at different levels.
Final City Development Plan Narsinghpur Page: 78
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Capacity building at local and regional levels for undertaking rapid-assessment surveys and
investigations of the nature and extent of damage in post disaster situations.
Conducting micro-zone surveys of city areas falling in the disaster prone areas and preparing
appropriate preparedness and mitigation plans on an urgent basis.
To ensure use of disaster resistant construction techniques in all housing and other buildings to be
undertaken under the Central and State schemes.
Making mandatory, the use of disaster resistant codes and guidelines related to disaster resistant
construction in the houses and buildings in all sectors of the society by law and through
incentives and disincentives.
To create a suitable institutional mechanism at state/city level to advise and help the existing
disaster relief set up in formulation and updating of short and long range action plans for the
preparedness, mitigation and prevention of natural disasters. (The mechanisms suggested are
establishment of a National Scientific and Technical Committee at Central level and Natural
Disaster Mitigation Centres at State levels).
To promote the study of natural disaster prevention, mitigation and preparedness as subjects in
architecture and engineering curricula.
To restructure the National Policy on disaster management reflecting the holistic approach
involving prevention, mitigation and preparedness in pre-disaster phase with appropriate
additional funding, along with the so far existent policy of the post-disaster relief and
rehabilitation under crisis management.
Main Objectives for Framing Action Plan and Proposed Mechanism for Disaster Mitigation
1. Mainstreaming vulnerability reduction and increasing capacities of communities through CBDRM.
2. Integrating CBDM into the development policies and programmes.
3. To take cognizance of all types of disasters ranging from, tsunamis, floods, surges, cyclones,
earthquakes, etc.
4. Ensuring uniform/minimum standards and internal and external sharing of programmes, best practices
and lessons learnt with participating agencies in DM.
5. Advocacy and lobbying with the Government to ensure appropriate policies and guidelines in disaster
management.
6. To sensitize the participants on the disaster Management with special focus on Community Based
Disaster Management.
7. To sensitize the participants on the need for integrating various sectors in to CBDM and vice versa.
8. Develop action plan for thematic groups for next six months.
9. The ultimate objective is to Make initiatives in order to protect lives and minimising damages to
property from natural disasters
The various activities envisaged are capacity building, Training of Trainers, orientation on CBDRM,
linkage to resource materials/ institutions, etc. So over all the purpose is to set up structures and
mechanisms on comprehensive disaster preparedness/ management.
7.7.2. ACTION PLAN
Sector Strategies & Investment Need
Strategy identified Appropriate investment for tree plantation and gardens will
reduce pollution within city
Expected Outcome Encouraging tree plantation and gardening policy will improve
environmental condition for city users
Total Investment Need Rs. 35 lac for Tree plantation, creation of gardens
While Municipal Council does not have a direct role to play in the economic development of the city or the
region, they propose to play a proactive role in facilitating and supporting the same through identified
projects from time to time. Initiatives like revitalization of the old cities through decongestion of the core
area, relocation of specific economic infrastructure like markets and wholesale centres are proposed.
A sum of Rs. 10 lakhs is the proposed investment for Tree plantation, creation of gardens, which will be
invested by the Municipal council in the phase 2 of development from 2016 to 2025.


Final City Development Plan Narsinghpur Page: 79
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Action Plan for Implementation City Beautification
City Beautification 2010-11 2011-12 2012-13 2013-14 2014-15
Investment
by 2015
Rs 15 Lakh 3
3 3 3 3
Capital
Facilities
Tree plantation, creation
of gardens

Coordination
Measures
Parks/ gardens development; Beautification of water bodies by creating parks and
carrying out other recreational activities
Encouraging citizens contribution towards the maintenance of neighbourhood
parks


7.7.3. INVESTMENT PLAN PHASING TILL 2035.
City beautification 2015 2025 2035 Total investment
Tree plantation, creation of gardens,
conservation of heritage structures 15 10 10 35
Total in lakhs 15 10 10 35










8. HERITAGE AND CONSERVATION


Final City Development Plan Narsinghpur Page: 80
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

8. HERITAGE AND CONSERVATION
8.1. IDENTIFICATION OF HERITAGE STRUCTURES/AREAS
Narsinghpur Temple is one of the oldest structure in the city followed by Ram Mandir and Krishna
mandir. But due to lack of maintenance they are losing their sharpness as a heritage structures.
Conservation and restoration of these ancient monuments are an immediate requirement for unique
identity of the city.
Figure 45 Narsinghpur Temple

In Narsinghpur and surround area, there are so many historic archeological arts & statues are seen which need
to be conserved. A museum can be proposed to restore these historical arts.
Figure 46 Archaeological art

8.2. URBAN MORPHOLOGY
The historic core area of the city has an organic structure. The network of main linkages has created urban
blocks. These urban blocks house a variety of building types or Urban elements serviced by an intricate
network of lanes known as Gali or Maholla, which is unique to the morphology of the historic area.
8.3. URBAN LINKAGES
The historic core is an organic mesh of streets and lanes locally known as Galis punctuated with squares and
open spaces. The streets developed on pedestrian scale with narrow widths sufficient to allow movement of
palanquins, hand carts and other slow moving means of transport. They curve and turn gently opening and
closing mysterious views adding suspense to the movement. These linkages can be divided into:
Primary Streets: The width of these streets is the maximum. There is specialization of commercial
activities and tremendous social interaction on these streets. Architectural features are richer and
more frequent.
Secondary Streets: These streets run perpendicular to the primary streets and end up in a tertiary
street or a cul-de-sac. Their width is less than the primary streets.
Tertiary Streets: The tertiary streets are purely residential with few small shops. The height-width
ratio is such that they remain shaded for most part of the day.
8.4. URBAN ELEMENTS
Diverse activity pattern in the historic area has given rise to different types of Urban Elements. The types have
typologies that have evolved over several generations. The various urban elements existing in the historic area
are:
Final City Development Plan Narsinghpur Page: 81
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Temples: Temples are places of Hindu worship. Narsinghpur Mandir, Ram Mandir, Krishna
Mandir are the oldest Temples in the city.
8.5. RESTORATION & CONSERVATION - HERITAGE GUIDELINES
8.5.1. SIGNIFICANCE OF THE RELIGIOUS - HISTORIC AREA
A. Assessment of Conservation Value
This section sets out the cultural significance of the city through an assessment of the
conservation values of local, regional, national and international importance. Understanding
the full significance of cultural base of Narsinghpur is the basis for making informed and
effective management decisions and is therefore fundamental. It will assist in ensuring that
the heritage values are protected for future generations and managed properly in the context
of the wider city.
B. Religious Value
The built and un-built spaces are a symbol of the spiritual belief of the people not only from
the local community and region but also as a whole from all over state especially the Hindus.
C. Historic Value
The presences of various temples, ashram and mosque have enriched the history and
importance of the city.
D. Architectural Value
The Historic area has high quality spaces that provide a unique visitor experience. The area is
vernacular in character with late architectural features, materials and building technology
adapted into it.
E. Archaeological Value
There are idols, sculptures, pillars surviving across the historic area from different time
periods that are of archaeological significance.
8.5.2. CULTURAL HERITAGE ASSETS OF THE RELIGIOUS
The cultural assets of Narsinghpur city identified on the basis of their inherent Conservation Values loosely fall
into two categories Tangible and Intangible that are part of the rich tapestry of many years of change and
development. A summary description of these assets follows.
Tangible Assets
A. Built Heritage: The built heritage of Narsinghpur is extensive and spread across the historic core
of the city. Narsinghpur Mandir, Ram Mandir, Krishna Mandir are surviving across the historic
are form different time periods that have archaeological significance.
The qualities in the built heritage assets that need to be preserved include:
Urban pattern as defined by plots and streets.
Relationships between buildings and green and open spaces.
The formal appearance, interior, exterior of buildings as defined by scale, size, style, construction
materials, color and ornamentation.
The relationship between the city or urban area and its surrounding setting both natural and
manmade.
The various functions that the city or urban area has acquired over time.
B. Natural Heritage: The natural environment is of great importance to the historic area. The
topography of the area, the Singri River have influenced and inspired the growth of the city. The
citys origins and development are intimately bound up with the presence of the river. It is also
an important landscape element and plays a crucial role in conveying floodwaters.
Intangible Assets
The importance of Narsinghpur local communities and their diverse culture is essential for its future and must
be understood fully to appreciate the character of the city. The success of a city relies on combining the
protection of not only its tangible assets but also intangible assets. The combination of history and present
living is highly valued.
While the physical remains of Narsinghpur form a unique band, there are also the intangible associations and
traditions which form an important part of its significance. This culture has been at the heart of forming the
outstanding physical elements of the city. The city also has rich associations with prominent people from
different eras. Festival, celebrations, and events an integral part of living in the historic area is part of its assets.
8.5.3. MANAGEMENT FRAMEWORK FOR HISTORIC AREA
Statutory and Legal Framework
Final City Development Plan Narsinghpur Page: 82
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Narsinghpur city has a provision of conserving the heritage structure in development plan regulation.
Conservation of acknowledged Heritage buildings in cities, and villages falls variously under the purview of
Archaeological Survey of India, Department of Archaeology, Government of MP and Public Religious
Charitable Trusts.
INSTITUTIONAL SET- UP AND MANAGEMENT
In the absence of an enabling or guiding framework for heritage conservation in the city, the responsibility for
management of heritage (institutional set up) rests with the district and local administration. Presently, the local
administration does not have any direct or indirect role in specific programs or initiatives related to heritage
conservation. There is no heritage-linked infrastructure existing in the city. For buildings owned by Trusts,
there exist institutional mechanisms for their management and upkeep. These institutions are mandated to
safeguard the preservation of assets owned but no express intent for conservation is reflected. They are also
responsible for the maintenance and upkeep of the records of accounts and numbers.
FINANCIAL ARRANGEMENTS
There are no especially allocated resources for religious, Historical & heritage conservation in the city. No
entry charges to the religious, Historical & heritage buildings are levied. Governments (Local and State), are
the primary stakeholders in religious, Historical & heritage conservation. In addition to being the owner of
religious, Historical & heritage conservation assets, they are responsible for initiatives that impact religious,
Historical & heritage conservation.
8.5.4. UNDERSTANDING PEOPLES PERCEPTION OF THE HISTORIC AREA
Understanding the peoples perception of their Cultural Assets is very crucial before planning any
Conservation program. Very often it is seen that such programs are planned by Government organizations and
Conservation Specialists who have a limited view of the scenario. Cultural Assets are eventually owned by the
local residents therefore incorporating their ideas, views, knowledge and memories of the place, how they
relate and interact with their heritage assets would be crucial for planning and conservation activity in the area.
This approach would also ensure ownership of the Conservation Initiatives.
Delineating the cultural heritage study area
Initially it is essential to delineate a Cultural heritage study area in the larger context of the city through field
reconnaissance for undertaking detailed research and documentation activities. The boundaries of the study
area in the beginning would be flexible so as to incorporate all the cultural assets. This study area after a
Heritage Conservation and Management Plan has been adopted would translate into a Cultural Heritage Zone
with legal sanctity.
Research and documentation of cultural historical, Religious & heritage assets
Intensive research activity and a detailed study of the historic area need to be undertaken before planning any
interventions in the Historic area. The study needs to:
Document and establish the cultural significance of the historic area
Prepare an inventory of historical, Religious & heritage structures and spaces having
Conservation values
Carry out a detailed listing and grading of all potential historical, Religious & heritage structures
and spaces
Document the existing condition of the cultural assets and the issues concerning them
Document the intangible cultural assets like traditional functions, lifestyles, religious beliefs, fairs
and festivals, etc.
This activity would bring to light the exact nature of the Cultural historical, Religious & heritage Assets, type
and typologies existing, their geographical spread, numbers and concentration. It would also highlight the
urgent issues that need to be addressed on an emergency basis to undertake first aid measures for protecting the
Heritage Assets under the guidance of Conservation specialists.
Integrating conservation with developmental initiatives
Till such time that a legal and institutional framework for conservation and redevelopment is put in place a
historical, Religious & heritage Committee needs to be formed having equal representation of all the
stakeholders and specialists in Urban Conservation, historians, artists, sociologists, environmental specialists,
planners, architects, local craftsmen, artisans, local NGOs, etc for monitoring conservation and developmental
activities in the historic area.
Until a historical, Religious & heritage Conservation and Management Plan has been prepared and adopted, all
developmental activities in the historic area need to be scrutinized by the historical, Religious & heritage
Committee to ensure that there is no threat to the Cultural Assets of the Historic area.

Final City Development Plan Narsinghpur Page: 83
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Community participation: integrating conservation with peoples life
The participation and the involvement of all the stakeholders especially the residents are essential to the
success of the Conservation activity and should be encouraged. Strategic partnerships need to be built through
awareness promotion campaigns, workshops and exhibitions educating stakeholders on the history, traditional
lifestyles and cultural significance of the heritage assets needs to be organized. Heritage Walks can be an
effective means for familiarizing the residents with their cultural assets. A sensitive Heritage Signage system
for the historic area can be another way of highlighting the Cultural Assets of the historic area.
Clean and green city campaigns can also be undertaken by the Nagarpalika to ensure sanitation and hygiene in
the Historic area. Local NGOs can be roped in these activities.
These activities would install a sense of pride in the residents of the Historic area, make them aware of the fact
that the Cultural Heritage Assets are substantial investments made by our previous generations and should not
be allowed to waste. Such measures will also sensitize them to the environmental value of these resources.
Reviving traditional materials, technology and skills
There is need to create a database of traditional construction methods, materials and skills that would be of use
for undertaking specific Conservation interventions. Training of local artisans in use of traditional construction
technology, skills and materials needs to be undertaken.
Incentives and concessions for heritage conservation
Fiscal incentives need to be provided to owners/occupants/trustees of heritage, Historical & religious assets to
encourage maintenance and conservation activities. Actual interventions need to be undertaken under the
guidance of conservation specialists.
Formulating a comprehensive Heritage, Religious, and Historical Conservation and management plan
Conservation of the Historic Area is an ongoing activity and is closely linked with urban and regional planning
initiatives. For the successful conservation of the historic area the Heritage, Religious, and Historical
Conservation and Management Plan with a long term perspective needs to be formulated.

8.6. EXISTING REGULATIONS
In development plan of Narsinghpur city there is a provision for conservation of heritage structures. Following
are some of the important regulations for conserving them.
Restricted area for every Heritage building shall be within a radius of 100mt.
Demolition of Selected and listed heritage structure shall not be allowed, even though it falls in
private premises.
Within restricted area infrastructure facilities are not implemented or governed by general
byelaws for the city.
Height and Elevation of Buildings within restricted area shall be harmonised with heritage
structure.

8.7. POSSIBILITY OF TOURISM CIRCUITS AT THE REGIONAL LEVEL
As Narsinghpur has religious structure like narsinghpur mandir, Ram Mandir, Krishna Mandir and Jirna Kund,
it has enough potentiality to grow as a Tourist city. We can also propose lake conservation and upgradation of
the green spaces fall within the city to attract the regional tourist.

8.8. KEY ISSUES - HERITAGE
Old Mandirs are in neglected state and lacking in up gradation, restoration and maintenance.
Historically, there has been limited tradition of cultural / historic documentation of the Cultural
Assets and the region, as a result of which there very little documentation on the rich heritage of
the region.
The river Singri in Narsinghpur city is a prime heritage element over the years, it has lost its
functional relevance and scenic beauty due to neglect and lack of appreciation of its functional
and heritage value.
Changes in life style: Introduction of new functions and expansion of the old ones demanding
adequate planning and larger areas that the old structures cannot accommodate have resulted in
insensitive reuse of spaces, improper additions and alterations and even demolition of religious-
historic structures/elements.
Final City Development Plan Narsinghpur Page: 84
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Modern Infrastructure: Traditional infrastructure has been replaced by insensitive modern
services of water supply, electricity, and sewerage and rainwater disposal.
Developmental regulations: The development control regulations and bylaws contain little to
address the special needs of the historic assets.
Maintenance Practice: In the absence of regular maintenance practices natural process of aging of
the building materials has been aggravated and as lead to weathering and decay.
Traditional, Skills, technology and Materials: There appears to be no technical knowhow among
local artisans in the areas of conservation and traditional construction methods and materials. As
a result of which the built form is undergoing rapid modernization and the living heritage is being
lost at a rapid pace.
Peoples Perception of the Historic-Religious Area: Residents who have been living for
generations have lot of information regarding the cultural history and oral traditions of the
historic area, activity pattern and significance of spaces. While planning interventions peoples
perception of their Cultural Assets is not taken into account.
Heritage Awareness: New residents have moved into the historic area and they do not have
associations with the place, therefore there is ignorance about the cultural assets. They have not
acknowledged cultural significance, which has resulted in a substantial decline in the living
heritage.
Research and Documentation: There has been no systematic research and documentation of the
Cultural Assets, as a result of which there is lack of authentic information regarding the heritage
components in the city.
8.8.1. RIVER FRONT DEVELOPMENT/ RIVER CONSERVATION/ PROTECTION
Sector Strategies & Investment Need
Strategy identified Desilting, clearing encroachments, beautification, treatment facilities for
preserving rivers and the riverine system around or within the city
Expected Outcome Conservation of natural river resource; enriched and enhanced lung
spaces for the city
Total Investment Need Rs. 200 lakhs

Under the conservation of the river Singri and lake Beautification; a sum of Rs. 200 lakhs has been allocated
as contribution by Municipal Council towards the components planned under river conservation for cleaning,
strengthening of river banks and providing for permanent treatment facilities and also including awareness
programs. The investments under the sewerage sector also benefit river conservation since it would clean the
sewerage before discharging it into the river.
Action Plan for Implementation River Front & Lake Development
River Front Development/ Conservation 2010-11 2011-12 2012-13 2013-14 2014-15
Investment by 2015
(Rs. In lakhs)
Rs. 50 Lakh 16.67 16.67 16.67
Capital Facilities
Clearing of encroachments and desilting
operations

Strengthening and lining of river banks
Development and beautification of surroundings
Support & System
Sustenance
Measures
Augmentation/extension of UGD system in the
city for complete coverage and compliance

Implementation of SWM practices and complete
coverage of city through door-to-door collection

Coordination
Measures
Coordinated efforts between Municipal Council, and the Irrigation Department are required for plugging all
inlet points into the rivers, before desilting operations are taken up.
A River Conservation Committee needs to be formed from among the officials of Municipal Council, PWD and
environmental groups of the cities for effective management of the riverside areas.
Other
Action/Measures
Eradicate conditions for malaria, dengue and other water-borne diseases
Ensure location of STPs under the River Conservation Plan in such a way that the benefits are maximised
Identify, delineate, sanitize and protect the natural drainage system of the city
Ensure functioning of UGD network and compliance by citizens
Identify and facilitate conservation of structures of heritage and public importance along riverbanks











9. EXISTING INSTITUTIONAL FRAMEWORK FOR
DEVELOPMENT


Final City Development Plan Narsinghpur Page: 85
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

9. EXISTING INSTITUTIONAL FRAMEWORK FOR DEVELOPMENT
9.1. URBAN LOCAL BODY STRUCTURE
Land, infrastructure, and services provide the foundation for the development of a city. Their efficient and
equitable provisioning is central to economic growth and poverty reduction. Within the general pattern
observed in country, the development and provision of land, infrastructure, and services in Narsinghpur is
regulated by a string of law, procedures and Government orders, whose administration and enforcement rest
with the state Government, city Government and specific purpose authorities. Narsinghpur is a class II
municipality with population less than one lakh as per census 2001. The Narsinghpur Municipal Council is the
key institution for the provision and management of basic urban infrastructure such as water and waste water
disposal services. Garbage disposal, citywide roads and street lighting. As per our observation and discussion
with the officials of the Municipal Council, it is been understood that there is inadequate technical staff in the
organization.

Figure 47 Organisational setup of Narsinghpur Municipal Council.


There are 6 departments in the municipality and their respective heads directly report to the chief officer,
whose responsibilities are over and above his span of control (referring to practicality and standards
prescribed in the theory of public administration). There are multiple departments that have similar job nature
and technical expertise, which could be combined with the hierarchy recognized.
In order to strengthen the system to provide efficient, quality and sustainable services, there is an immediate
requirement to take up a comprehensive study based on the service delivery requirements and revamp the
present human resource management.

9.2. SWOT ANALYSIS
Strengths
Cohesive workforce in the ULB.
Weaknesses
1. Identify capacity building, training needs
Final City Development Plan Narsinghpur Page: 86
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Nagar Palika has limited institutional and technical capacity to plan and implement projects, lack of
technical capability for conceptualizing, planning and implementing city developmental works, as
also in managing them.
For present population, Nagar Palika has to upgrade their capacity with staff as well as equipment
facility for maintenance. Nagar Palika needs to put up a demand for upgrading the setup to the
Government.
2. Absence of appropriate management information system(MIS)
Most of the systems and procedures in the ULB are traditional manual systems, involving
maintenance of registers manually. Inadvertently, over time the record keeping has been inadequate
and critical information required for planning and decision-making is often not available when
required.
i
This may be attributed to shortage of manpower as also the absence of a system of
information maintenance and management.
3. Limited computerization:
Despite the availability of computers, their application is very limited, primarily due to the lack of
customized software systems as also large levels of computer illiteracy.
The human resource capacity and exposure for planning and development is limited and needs to be
strengthened.
There is also a need to streamline systems and procedures for day-to-day functioning and install a
robust management information system that facilitates efficient planning, monitoring and decision-
making.
4. Absence of a well organized Human resource (HR) development: Following should be adopted
5. Absence of E-Governance application: Presently the Nagarpalika lacks in usage of E-governance
application. Usage of these applications will help the Nagarpalika to:
a. Streamlining systems and procedures: The Nagarpalikas mainstream operations are presently
manual and at each step human intervention is involved which is time consuming and depends on
availability and capacity of the key staff.
Maintaining records on an easily retrievable form and developing an integrated database is necessary
for efficient management. There is also a felt need to streamline procedures in order to cut down
response times and for efficient service delivery.
Development of an integrated database would provide a good tool for monitoring consumer base,
licensing, taxation, and service delivery and also ensure integrated billing and collection, and
strengthen Nagarpalika revenue collection function.
b. Development of an integrated system:. Following applications have been proposed to be taken
up: Finance/accounting modules, Citizen Facilitation Centers in Wards and important places, Human
Resource Management, Material Management, Estate Management, Fleet Management and property
tax assessment.
c. Customized software application for simplifying building construction approval procedures: It
is proposed to put in place a customized software package as a tool to simplify procedure for approval
of building and sites for construction.
Nagarpalika should plan to make obtaining of construction permissions a citizen-friendly exercise,
which will encourage property owners to seek legal permissions for their intended developments. Use
of GIS and IT tools will be integrated. Nagarpalika should also propose to outsource the creation of
the Planning and Construction Dept.
6. Absence of use of latest planning tools : Presently the Nagarpalika lacks in usage of latest
planning tools like GIS based application.
7. No land bank :
Though Nagar Palika has land bank, but it is not in position to allocate site for implementing projects
for providing infrastructural facilities both engineering and social infrastructure.
8. No adherence of building regulations
Building Regulations are not strictly followed by the builders & developers, even Nagar Palika cannot
manage to control the development as they have faced problem of skilled staff.
Opportunities:
Proposal of reforms Under Government of Indias UIDSSMT TYPE FUNDING Scheme.
Government of Madhya Pradeshs policy to support urban sector.
Proximity to Jabalpur, providing greater access to training resources.
Threats:
State policies on taxation, which has a bearing on local government autonomy/lack of it.
Resistance to change by Councilors and elected representative.


Final City Development Plan Narsinghpur Page: 87
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Lack of emphasis on training of elected representatives as part of any municipal capacity
building program.
9.3. TOWN AND COUNTRY PLANNING DEPT- MP
The activities of Town and Country Planning Department (T&CPD) are guided by the provisions of the
Madhya Pradesh Nagar Tatha Gram Nivesh Niyam, 1973 (the Rules). The State Government, as per provisions
of the Rules declares a region including major urban areas and its surrounding settlements as a planning area,
and orders the preparation of a development plan for the region. The implementation responsibility of the
development plan proposals vests with the Narsinghpur Nagar Palika and the Madhya Pradesh Urban
Development Authority within their respective jurisdictions. Enforcement of development control regulations
and other guidelines vests with Narsinghpur Nagar Palika for areas within its territorial jurisdictions and with
T&CPD in the rest of the planning area. However, in case of large commercial and residential developments
within Narsinghpur Municipal Council, a no objection certificate from T&CPD is mandatory for sanctioning
building plans.

9.4. DEVELOPMENT AUTHORITIES
Urban Administration and Development Department With the enactment of the 74th Constitution Amendment
Act, major urban related tasks have been transferred to Local Bodies. The Government of Madhya Pradesh
(GoMP) through its Urban Administration & Development Department (UADD) is responsible for overseeing
urban sector reforms, in terms of capital investment in basic infrastructure for the Urban Local Bodies
(ULBs). The UADD is also responsible for implementation of various public welfare schemes sponsored by
the Central and State Governments. Some such schemes include Conversion of Dry Latrine Program, Swarna
Jayanti Urban Employment Scheme, National Slum Development Program, Social Security Group Insurance
Scheme, Janashr Insurance Scheme etc. These schemes are implemented through the District Urban
Development Agency. Being the parent organization of Municipal Corporations, UADD monitors the
functioning of all municipal corporations in the state.

9.5. PUBLIC HEALTH ENGINEERING DEPARTMENT
Public Health Engineering Department PHED has been given the responsibility of planning, design and
construction of the water supply, sewerage and drainage projects of the municipal corporations (MC) since
1995. Under this arrangement, the financial and administrative sanction for a project comes from the PHED.
The assets, however, have to be transferred to the MC on completion for operation and maintenance. Though,
the PHED staffs works under tile functional control of the MC, their administrative control remains with the
PHED. PHED Executive Engineers office situated at Narsinghpur having total staff of 45 out of which 1
Executive engineer, 3 Assistant Engineer, 1 Divisional Officer, 17 Sub Engineer and Other non technical Staff.

9.6. MADHYA PRADESH HOUSING BOARD
Madhya Pradesh Housing Board (MPHB) falls under the administrative and functional control of the Housing
and Environment Department of GoMP. The operations of the Board are governed by the provisions of the
Madhya Pradesh Housing Board Act, 1972. Although MPHB is a semi-governmental organization, GoMP
rules and regulations pertaining to establishment and administrative matters are applicable to it.

9.7. MADHYA PRADESH POLLUTION CONTROL BOARD
Implementation, supervision and monitoring activities pertaining to Central Pollution Control Acts and Rules
vests with the Central Pollution Control Board (CPCB), Government of India, and the respective State
Pollution Control Boards formed/constituted under its rules. Madhya Pradesh State Pollution Control Board
(MPPCB) headquartered in the state capital, Bhopal, carries out its operations through ten regional offices,
each located at the divisional headquarters, 4 sub regional office, 2 monitoring centers and 3 single window
offices. The main function of the regional offices is to monitor the implementation of provisions of various
Acts governing pollution control and prevention.

9.8. PROJECTS IDENTIFIED:
To tackle and control natural disaster and critical situation citizens, community participation &
infrastructure should be made available in the town.
Municipal council, as part of its strategy to build in-house capacity, to train the existing manpower
resource through training programs and workshops. Staff to be rotated inter-department in order to
promote in multi-skilling and team building.

Final City Development Plan Narsinghpur Page: 88
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Billing system should be implemented for tax collection.

9.9. CITY SPECIFIC STRATEGY
A sum of Rs. 15 lakhs has been proposed to be spent over the next five years towards system modernisation, e-
Governance and link with computer programming all the projects. These projects would involve administrative
reforms implementation, computerisation efforts, GIS-based systems development etc. These capital
investments are expected to bring in more accountability and transparency in the administration of
Municipal Council and thereby enhance Municipal Council reach to the citizens.
Action Plan for Implementation Urban Governance
Urban governance 2010-11 2011-12 2012-13 2013-14 2014-15
Investment by
2015
Rs 50 lakhs 10 10 10 20
Capital Facilities
Urban governance, computer programming, GIS
systems, Systems modernisation

Support & System
Sustenance
Measures

Implementation of double entry accrual system
of accounting

Implementing GIS based property tax system
and support engineering services

Rationalisation of tax admin. process
Restructuring of admin. systems
Coordination
Measures
Urban governance & finance
Identifying the training needs of the staff (HR, Administration, Financial Management, Urban Governance,
Service Delivery, Citizens Communication, IT)
Involving city- based institutions in imparting training
Publishing property tax records at the ward level and bringing in transparency in the system
Carrying out a cost audit of all the expenditure, incurred service-wise and identify and assess sector-wise
expenditure to categorise specific expenditure control measures
Communicating with the public and within the organisation to build popular support for the reform initiatives
Outsourcing Property Tax database management, demand notices generation, arrears collection, non-core
functions in the vehicle/ workshop department, etc.

9.10. ACTION PLAN
A) Identify capacity building, training needs: for present population, nagar palika has to upgrade their
capacity with staff as well as equipment facility for maintenance. Nagar palika needs to put up a
demand for upgrading the setup to the government.
B) Adoption of MIS system: there is also a need to streamline systems and procedures for day-to-day
functioning and install a robust management information system that facilitates efficient planning,
monitoring and decision- making.
C) Formulation of a HR policy
Nagarpalika should draft and adopt a comprehensive hr policy that addressed key human resource
development elements like hr maintenance, rewards and incentives, training and development,
recruitment systems, career planning, etc.
A. HR MAINTENANCE: Rationalization of recruitment systems, policy and plan for addressing the
daily-wage workforce, including mechanisms for regularizing/terminating their services, cohesive functional
structures with detailed staffing patterns and job descriptions, prompt filling up gaps arising out of retirements /
resignations, continuous manpower planning to ensure availability of desired quantity and quality of manpower
for various functional departments, etc.
B. HR PRODUCTIVITY: Preparing and implementing a mechanism for performance assessment and
performance-based rewards and incentives. The policy for rewards and incentives could consider factors of
performance, initiatives, commitment, training/capacity building initiatives and target achievements, etc. The
focus of such a mechanism/policy could ensure employee satisfaction and enhance productivity.
C. RIGHT-SIZING: Adopting multi-skilling technique to ensure most effective utilization of
Nagarpalika staff and to achieve the objective of right sizing. A multi-skilling technique through appropriate
training of existing staff for different complementary functions would help in better utilization of Nagarpalika
staff and achieving the objective of right sizing.
d) Training/Capacity Building
Final City Development Plan Narsinghpur Page: 89
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
The Nagarpalika staff and elected members alike need to be exposed on a continuous basis to modern /
alternate methods of planning and development. The strategy for training and capacity building should cover:
a. Carrying out a detailed training needs assessment to address reorganization and restructuring
based on Nagarpalikas functional requirements, considering current staff qualifications, skills and
exposure at all levels;
b. Structuring and implementing a change management orientation program for all levels of
Nagarpalika staff and convincing them of the need for change and hence need for relevant training
and capacity building. The program could highlight challenges that the Nagarpalika is likely to face
in the near term in terms of knowledge and skill gaps at different levels, demands of the reforms
process, functional mechanism, etc.;
c. Developing comprehensive training programs for different levels of Nagarpalika staff and
elected councillors, strategically addressing skills/knowledge enhancement needs of the
Nagarpalikas.
e) Streamlining systems and procedures by adoption of E-governance
The Nagarpalikas mainstream operations are presently manual and at each step human intervention is
involved which is time consuming and depends on availability and capacity of the key staff.
1. Maintaining records on an easily retrievable form and developing an integrated database is necessary
for efficient management. There is also a felt need to streamline procedures in order to cut down
response times and for efficient service delivery.
2. Development of an integrated database would provide a good tool for monitoring consumer base,
licensing, taxation, and service delivery and also ensure integrated billing and collection, and
strengthen Nagarpalika revenue collection function.
3. Development of an integrated system:. Following applications have been proposed to be taken up:
Finance/accounting modules, Citizen Facilitation Centers in Wards and important places, Human
Resource Management, Material Management, Estate Management, Fleet Management and property
tax assessment.
4. Customized software application for simplifying building construction approval procedures: It is
proposed to put in place a customized software package as a tool to simplify procedure for approval of
building and sites for construction.
5. Nagarpalika should plan to make obtaining of construction permissions a citizen-friendly exercise,
which will encourage property owners to seek legal permissions for their intended developments. Use
of GIS and IT tools will be integrated. Nagarpalika should also propose to outsource the creation of
the Planning and Construction Dept.
f) Development of GIS based application:
GIS based application should be proposed for land use management and property tax assessment. GIS
should be proposed as a decision support tool for planning, managing and maintaining local body or
Nagarpalika. It includes both spatial and aspatial information required for facility/assets management,
tax assessment and collection, solid waste disposal and management of grant of plan
approvals/permissions with customized tools.
a. Assessment of land use patterns
b. Assessment of property tax
c. Assessment of land use / floor space index violation
d. Assessment of ownership change / sales transaction
e. Analyze a property for grant of approval / permission








10. MUNICIPAL FINANCE


Final City Development Plan Narsinghpur Page: 90
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

10. MUNICIPAL FINANCE
The first step in analyzing the financial position of Municipality is to differentiate and categorize the account
heads into revenue account and capital account through a budget recasting exercise. For the purpose of
financial assessment, financial data pertaining to the last five years (2003-04 to 2007-08) have been recast into
a standard format, as presented in Annexure 2.

I: Sourcing


II: Assessment


III: Analysis


Municipal Council current accounting system is cash-based; income and expenditure heads are maintained on a
cash basis. All the expenses towards regular maintenance are treated as revenue expenses, while expenses on
new projects are treated as capital expenses.
The Municipal Council accounts can be classified under two major heads, revenue account and capital account.
The revenue sources of the Municipal Council may be broadly classified as internal or operating income and
external receipts. Internal income includes receipts from the operations of the Municipal Council, in the form
of taxes, water and Conservancy charges and fees and charges on other services etc.. General heads of internal
sources are:
General tax and other taxes levied by the Nagar Palika such as property tax, Water tax and
Entertainment tax.
Income from properties rent receipts from lands, buildings, and other properties
Income from municipal services such as receipts from services Education, health and hospital,
public health, etc.
Miscellaneous income heads such as income from investments and sale proceeds
External fund sources include revenue grants from State and Central Government, loans and contributions for
projects.
Expenditure incurred towards establishment, operation and maintenance of services, as well as repayment of
loans are treated as revenue expenditure. Expenditure on asset creation and investments in new projects or
purchase of equipment are treated as capital expenditure.
Advances, deposits and any item of income or expenditure, which is temporary in nature is treated and
accounted for under the extraordinary account. This account head is not analysed as the items in it are
temporary in nature and have no impact on the overall financial position of Nagar Palika.
10.1. FINANCIAL STATUS
The municipal finances of the Nagar Palika have been reviewed for the last five years, commencing
from the financial year 2003-04 to 2007-08. The items of both receipts and expenditure are classified
under revenue and capital accounts as per their sources and uses.
Figure 48 Bar Chart Revenue Account
0 200 400 600 800 1000
2003-04
2004-05
2005-06
2006-07
2007-08
Rs in Lacs
Y
e
a
r
Revenue Account
Revenue Expenditure Revenue Income



Recast Data: Revenue Account Capital Account
Liabilities: Debt Liabilities Non-debt Liabilities
Municipal Finance Standing

Budget books DCB statements Taxation information
Debt/ non-Debt liabilities data
Final City Development Plan Narsinghpur Page: 91
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Revenue Income
24%
35%
9%
32%
Octroi
Taxes
Non Taxes
Grant &
Subsidies
The revenue income of NAGARPALIKA has grown to a level of Rs. 885 lakhs in FY 2007-08 from Rs 429
lakhs during FY 2003-04, registering a CAGR of 19.85 percent, while revenue expenditure increased at a
CAGR of 15.78 percent. This projects a moderate financial condition of Nagar Palika, NAGARPALIKA has
consistently maintained a revenue surplus of an average 21.69 percent of its revenue income. However, the
pressure of capital expenses on the revenue account is increasing year after year. This situation demands
expenditure control measures and planned capital investments on the part of NAGARPALIKA.

Table 52 Financial Status at a Glance
Financial Year 2003-04 2004-05 2005-06 2006-07 2007-08 CAGR
Revenue Account
Revenue Income 42914885 35231668 24427960 35834441 88543641 19.85
Revenue Expenditure 14052683 13766967 32309572 29589338 25248402
15.78
Surplus 28862202 21464701 -7881612 6245103 63295239 21.69
Capital Account
Capital Income 4025700 6293200 8626100 7198800 2800100 [8.68]
Capital Expenditure 15015770 15275099 17911333 20935874 50959787 35.73
Deficit 10990070 8981899 9285233 13737074 48159687 44.68
All Figures in Rs

(Source: Nagarpalika Annual Accounts)

The capital income of NAGARPALIKA comprises own sources in the form of loans and internal transfers
from revenue to capital account for utilization towards asset creation.
It is observed that external sources in form of grants contributing in capital income during the review period. It
is also observed that capital expenditure has been inconsistent during the review period; this trend can be
attributed to the availability of revenue surplus.

Figure 49 Bar Chart-Capital Account
0.0 100.0 200.0 300.0 400.0 500.0 600.0
2003-04
2004-05
2005-06
2006-07
2007-08
Rs in Lacs
Y
e
a
r
Capital Account
Capital Expenditure Capital Income


The following sections provide an in-depth review of the revenue account, in order to assess the
NAGARPALIKA fiscal status and to provide a base for determining the potential of each of the sources and
the ability of NAGARPALIKA to sustain the extent of planned investments to be identified under the City
Development plan.
Figure 50 Percentage Contribution - Revenue Income








Final City Development Plan Narsinghpur Page: 92
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
10.2. REVENUE ACCOUNT
The revenue account comprises two components - revenue income and revenue expenditure. Revenue income
comprises internal resources in the form of tax and non-tax items. External resources constitute of shared
taxes/transfers and revenue grants from the State and Central Government. Revenue expenditure comprises
expenditure incurred on salaries; operation & maintenance cost; contributions and donations; and debt
servicing.
10.2.1. REVENUE INCOME
The revenue sources of NAGARPALIKA can be broadly categorized into own sources, assigned revenues,
grants and contributions. The source wise income generated during the review period is presented below. The
detailed income and expenditure statement, the sectoral contributions and the growth rates of each item are
presented in Annexure 2.
Table 53 Source-wise Revenue income
2003-04 2004-05 2005-06 2006-07 2007-08 % of Share
CAGR
A
1
i Octroi 16.75 8065639 8041722 6663543 12018875 14986657 23.87
ii Taxes 18.48 10310425 16284531 10948559 14579968 20313783 35.74
iii Non-tax 32.51 1787021 4431635 3212758 2963255 5509287 8.88
Total 19.28 20163085 28757888 20824860 29562098 40809727 68.49
2 20.35 22751800 6473780 3603100 6272343 47733914 31.51
19.85 42914885 35231668 24427960 35834441 88543641 100 Total Revenue Income
Grants & Subsidies
All figures are in Rs.
Revenue Income
Own Sources
(Source: Nagarpalika Annual Accounts)
Own Sources
Own source income includes income from Consolidated tax (Including Property Tax, Light Tax, Sanitation
Tax etc.), other taxes and non-tax income in the form of development charges, income from municipal
properties, fees & fines and other miscellaneous income. Income from own sources accounts for over 68.49%
of the revenue income. The income from own sources is increased at a CAGR of about 19.28 percent.
Non Tax Revenue
Non-tax sources include all non-tax revenues such as fees and charges levied by NAGARPALIKA. These
sources include income from building license fee, development charges, trade license fee, births and death
certificate, income from municipal properties and other fees and fines. The non-tax income of
NAGARPALIKA contributes 8.88 percent of its revenue income and has registered a declining CAGR of
32.51 percent.
External Sources
External sources mainly include grants from local funds and grants from the State and the Central Government.
External sources contribute 31.51 percent of NAGARPALIKAs total revenue income. The growth of these
income sources is inconsistent owing to the unrealistic nature of these sources. During the review period, this
source shows a CAGR of 20.35 percent.
10.2.2. REVENUE EXPENDITURE
The revenue expenditure of NAGARPALIKA has been analyzed, based on expenditure heads. These have
been broadly classified into the following department/sections of NAGARPALIKA - general administration &
tax collection, water supply, roads & drains, municipal works, conservancy, street lighting, town planning and
the miscellaneous like gardens and libraries.
Figure 51 Percentage Contribution-Revenue Account







Revenue Expenditure
33%
67%
Establishment
O & M
Debt Servicing
Final City Development Plan Narsinghpur Page: 93
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Revenue expenditure is further classified under establishment (mainly comprising salaries and wages);
contingencies (O&M) and debt servicing. The application of funds by account head is presented in Table 58,
which indicates that the overall revenue expenditure registered a CAGR of 15.78 percent against the CAGR of
revenue income 19.85 per cent.
Table 54 Application of funds by head of Account
2003-04 2004-05 2005-06 2006-07 2007-08 CAGR Avg % Share
Revenue Expenditure
Establishment Expenditure 10033274 8525028 25162639 19163146 15271336 11.07
67.29
Operation & Maintenance Expenditure 4019409 5241939 7146933 10426192 9977066 25.52
32.71
Total 14052683 13766967 32309572 29589338 25248402 15.78
In Rs

(Source: Nagarpalika Annual Accounts)
The establishment expenditure alone accounts for over 67.29 percent of revenue expenditure. In terms of
revenue income 34.44 % of total revenue income is spent on salaries, which is in reasonable range of 40
percent. O&M expenditure accounts about 32.71 percent of the total revenue expenses, clearly showing that
municipal services have very less preventive or periodic maintenance plans in place.
Establishment expenditure
Establishment expenditure accounts for an average 67.29 percent of total revenue expenditure and registered an
annual growth rate of 11.10 percent during the review period. Conservancy and general administration
accounts for maximum the share of establishment cost at 23.30 and 14.81 percent respectively, followed by the
Revenue Department expenses of 9.66 percent. Water supply accounts for about 10.04 % of total revenue
expenditure.
Table 55 Section-wise establishment expenditure
Financial Year
2003-04 2004-05 2005-06 2006-07 2007-08
Establishment Expenditure
General Administration Expenses 1509693 1603647 12301963 1694075 1979712
14.81
7
Water Supply 1153850 1271066 1444118 6010940 2007783
10.04
14.9
Conservancy 5236974 1651460 5997747 6263578 6943905 23.3 7.3
Public Works 473814 513624 378263 551271 552177
2.46
3.9
Street Lighting 64073 63130 66018 72079 81692
0.34
6.3
Fire Service 162263 177362 185215 147128 146695 0.82 [2.5]
Municipal Institutions-Kanji House 79201 103089 102480 112656 129314
0.5
13
Miscellaneous 0 187950 745208 1909020 991313
2.81
74.1
Pension 0 988212 1810021 0 0
2.56
-
Revenue Department 1353406 1965488 2131606 2402399 2438745 9.66 7.5
Total 10033274 7536816 23352618 19163146 15271336 11.1
Avg % Share CAGR In Rs
(Source: Nagarpalika Annual Accounts)
Operation and maintenance expenditure
As earlier mentioned the O&M expenses of the Nagarpalika have very less preventive or periodic maintenance
plans in place and are day-to-day in nature and hence reflected by the very low O&M expenses of an average
Rs 73.62 lakhs per annum. This is against handling of all core municipal services like water supply, sewerage,
drainage, roads, solid waste management etc by NAGARPALIKA itself.

Table 56 O & M Expenditure
Financial Year 2003-04 2004-05 2005-06 2006-07 2007-08
O & M Expenditure
Water Supply & Sanitation 231166 342654 342318 361245 1056935 2.12 46.2
Public Works 10000 26649 145807 114191 213920 0.39 115.1
Street Lighting 3182485 2987994 5866424 7881908 7417550 23.7 23.6
Fire Service 57099 261654 0 46923 72662 0.55 6.2
Vehicles 538659 1622988 792384 2021925 1215999 5.94 22.6
Total 4019409 5241939 7146933 10426192 9977066 32.79 25.5
Avg % Share CAGR Rs in Lakhs

(Source: Nagarpalika Annual Accounts)
Within the total O&M expenses 2.12 percent is spent on Water supply and sanitation, 0.39 percent on public
works. Surprisingly about 23.70 % of total revenue expenditure is spent over streetlight maintenance. During
Final City Development Plan Narsinghpur Page: 94
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
FY 2007-08, the total O&M expenses of the Nagarpalika were Rs. 99.77 lakhs. During the review period,
O&M expenses have grown at CAGR of 25.50 %. It indicates, Nagarpalika is trying to put their efforts in
maintaining their level of service by periodic repairing and maintenance of the infrastructural services.

10.3. CAPITAL ACCOUNT
In general, the capital income of Nagarpalika comprises own sources in the form of loans, grants and
contributions and transfers from revenue surplus. During the review period, an average of Rs. 182 lakhs per
annum has been the revenue surplus transfer to capital account. Capital grants for the water conservation and
for the basic services contribute in total capital income no other capital income incurred by Nagar Palika.

Table 57 Details of Capital Account
2002-03 2003-04 2004-05 2005-06 2006-07 % Share
CAGR
Capital Income Cap. Inc.
Capital Grants
Water Conservation 176000 611000 99800 0 250000 4.83 9.2
Basic services 3849700 5682200 8526300 7198800 2550100 95.17 [9.8]
Total 4025700 6293200 8626100 7198800 2800100 100 [8.68]
General Administration 2045400 2105600 2635200 2770315 498533 11.27 [29.74]
Water Supply 792337 808194 1837260 917633 3488309 6.41 -29.74
Municipal Institution 678701 1051114 186824 205174 233000 45.38 -23.45
Public Works 8013087 7649694 7164730 12366636 12415569 2.78 11.57
Miscellaneous 3486245 3660497 6087319 4676116 34324376 34.17 77.14
Total 15015770 15275099 17911333 20935874 50959787 100 31.04
Revenue Surplus Transfer 10990070 8981899 9285233 13737074 48159687
In Rs
Capital Expenditure
(Source: Nagarpalika Annual Accounts)
This indicates only 24.10 percent of NAGARPALIKAs capital expenditure during the review period is met
from its capital receipts. The rest is contributed by the revenue/municipal surpluses which is 36 % of total
revenue income.
On an average, over the past five years, the majority of capital expenditure has been directed towards
Municipal Institution (i.e. education). Apart from these, Nagar Palika spends 6.41% of total capital expenditure
for water supply.
10.4. COST RECOVERY ON SERVICES
WATER TAX
The demand collection balance (DCB) statement for water Tax is presented in Table given below indicates that
the average collection efficiency is 36.22 percent of the total demand. Arrears in collection account for 40.54
percent of the arrear in demand. The current Collection for the year 2008-09 is Rs. 21.33 lakhs, which works
out to an average of Rs. 19(Appox.) user charge, per connection per month. The number of persons per house
service connection stands around 8, against an average household size of 6.12, indicating scope for the
presence of unauthorized connections.
Table 58 Water Tax Demand Collection
2004-05 2005-06 2006-07 2007-08 2008-09 Average
a
i Arrear 23.15 23.46 35.64 39.58 43.41 33.05
ii Current 30.5 31.02 30.31 36.41 40.05 33.66
53.65 54.48 65.95 75.99 83.46 66.71
b
i Arrear 9.45 9.57 15.63 17.49 14.35 13.3
ii Current 5.5 5.65 10.55 15.09 21.33 11.62
14.95 15.22 26.18 32.58 35.68 24.92
c 38.7 39.26 39.77 43.41 47.78 41.78
i Arrear 40.82 40.79 43.86 44.19 33.06 40.54
ii Current 18.03 18.21 34.81 41.44 53.26 33.15
27.87 27.94 39.7 42.87 42.75 36.22
Financial year
Water Tax
Total
Demand - Rs.
Lakhs
Total Demand
Collection -
Rs. Lakhs
Total
Collection
Balance
Collection
Performance - %

Final City Development Plan Narsinghpur Page: 95
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
The presence of unauthorized connections is also signified by the poor cost recovery on the service. It is
assessed that the average revenue per connection per month is about Rs. 10 against an average expenditure of
Rs. 25 indicating less than 50% of total expenditure tax incurred upon the users. Ideally, the entire operation &
maintenance (O&M) expenses are expected to be recovered in the form of user charges.
Figure 52 Water Tax Collection performance


Property Tax
The demand collection balance (DCB) statement for Property Tax is presented in Table given below, indicates
that the average collection efficiency is 34.58 percent of the total demand. Arrears in collection account for
33.77 percent of the arrear in demand. The current demand for the year 2008-09 is Rs. 25.96 lakhs.
Table 59 Property Tax Demand Collection
2004-05 2005-06 2006-07 2007-08 2008-09 Average
a
i Arrear 34.08 35.08 38.87 41.33 36.91 37.25
ii Current 22.6 24.59 24.59 23.6 25.96 24.27
56.68 59.67 63.46 64.93 62.87 61.52
b
i Arrear 10.62 11.6 14.63 15.88 10.05 12.56
ii Current 4.1 4.46 10.4 12.15 13.48 8.92
14.72 16.06 25.03 28.03 23.53 21.47
c 41.96 43.61 38.43 36.9 39.34 40.05
i Arrear 32.5 33.07 37.64 38.42 27.23 33.77
ii Current 18 18.14 42.29 51.48 51.93 36.37
25.97 26.91 39.44 43.17 37.43 34.58
Collection Performance - %
Total
Financial year
Property Tax
Demand - Rs. Lakhs
Total Demand
Collection - Rs. Lakhs
Total Collection
Balance


Figure 53 Property Tax - Collection Performance %

Final City Development Plan Narsinghpur Page: 96
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
10.5. KEY FINANCIAL INDICATORS
NAGARPALIKAs financial soundness is revealed by the Financial Indicators presented in Table given below.
Table 60 Financial Indicators
Minimum Maximum
A
1 789.09 Rupees 515 1332
2
i Share of Own Sources in Total Revenue Income
Share of Octroi 23.87 % 16.93 34
Share of Taxes 35.74 % 22.94 46.22
Share of Non Taxes 8.88 % 4.16 13.15
ii Share of Revenue Grants & Subsidies in Total Revenue Income 31.51 % 14.75 53.91
3
i Growth in Own Sources' Receipts
Growth in Octroi Income 21.91 % p.a [17.14] 80.37
Growth in Taxes 24.42 % p.a [32.77] 0
Growth in Non Taxes 49.66 % p.a [27.50] 147.99
ii Growth in Revenue Grants & Subsidies, Contributions 154.8 % p.a [71.55] 661.02
iii Growth in Total Receipts 36.3 % p.a [30.66] 147.09
B
1 721.31 Rupees 468 1111
2
i Share of Establishment 67.29 % 60.48 77.88
ii Share of O & M Expenditure 32.71 % 22.12 39.52
iii Share of Debt Servicing Expenditure 0 % 0 0
iv Share of Establishment Expenditure in Total Revenue Income 44.26 % 17.25 103.01
v Share of Capital Expenditure in Total Expenditure 49.64 % 35.67 66.87
3
i Growth in Establishment Expenditure 33.99 % p.a [24.0 195
ii Growth in O & M Expenditure 27.08 % p.a [4.0] 46
iii Growth in Total Revenue Expenditure 15.78 % p.a [15.0] 135
iv Growth in Capital Expenditure 27.25 % p.a [0.1] 0
C
1 0.97 Ratio 0.62 1.52
2 5.87 Ratio 2.08 18.2
3 No Debt Service
4
i Growth in Per Capita Total Income 23 % [23.0] 41
ii Growth in Per Capita Revenues, Grants, Subsidies & Contributions 146 % [72.48] 636.17
iii Growth in Per Capita Revenue Income 32 % [32.93] 139.02
iv Growth in Per Capita establishment Expenditure 30 % [26.33] 185.52
v Growth in Per Capita Revenue Expenditure 23 % [17.46] 127.03
vi Growth in Per Capita O&M Expenditure 23 % [7.43] 41.12
Value
Finance Indicators
Per Capita Expenditure
No INDICATOR Average Unit
Resource Mobilisation
Per Capita Income
Sources of Funds
Growth in Income Sources
Expenditure Management
Per-Capita Performance Assessment
Functional Allocation
Growth in Items of Expenses
Performance
Operating Ratio
Capital Utilisation Ratio
Debt Servicing Ratio(D.S/Revenue Income)

10.6. SWOT ANALYSIS:
Strengths
Availability of loans to undertake projects.
System of taxation and willingness to pay for services
Weaknesses
Nagar Palika is highly dependent on the grants received from Government.
Nagar Palika is also facing problem of tax recovery on total demand against service provided.
The cost recovery on water supply service is very poor, indicating the large quantum of non-
revenue water in the form of unauthorised connections, subsidized water, etc.
Because of no permanent & planned sewerage disposal facility, tax collection is negligible.
No billing system for collection of tax.
Due to unavailability of proper infrastructure Nagar Palika is not in position to perform
effectively and efficiently.
Final City Development Plan Narsinghpur Page: 97
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Total establishment cost of Nagar Palika is quite high against total income/revenue received from
various sources.
Opportunities:
Sustainability of the Nagarpalika to be increased after 100% cost recovery is achieved.
Increase in own source income after taxation is levied.
Threats:
Inefficiency in collection of taxes.

10.7. PROJECTS IDENTIFIED
To tackle and control natural disaster and critical situation citizens, community participation &
infrastructure should be made available in the Town.
Municipal Council, as part of its strategy to build in-house capacity, to train the existing
manpower resource through training programs and workshops. Staff to be rotated inter-
department in order to promote in multi-skilling and team building.
Billing system should be implemented for Tax collection
Lands belong to Govt. or Parastatal agencies should be transferred to Nagar Palika, which can be
used for Public Purpose and Public utilities.

Table 61 Lands Belongs to Govt. (Nazul)
Sheet
No.
Plot No. Sq.ft. Plot No. Sq.ft.
1
1/1 19840.00 5 7489.00
2/1 169229.00
2
2/1 88213.00 38/1 6764.00
3 1498.00 39/1 6321.00
3
5 1702.00 17 9494.00
7 9562.00 19/1 29755.00
15 15858.00 22 7656.00
4 1 35800.00 6/1 85342.00
5
2 33860.00 14/1 170945.00
4/1 97308.00 15/2 8240.00
5/1 153690.00 17 26543.00
6/1 5027.00 20 144629.00
12/1 15313.00 22/1 279563.00
6
2/1 477493.00 19/1 10358.00
4 3947.00 33 4560.00
7 3/1 67460.00 8/1
8,7 2/6 6000.00 11/5
8
5/1 570.00 11/1 27444.00
5/2 27514.00 13/17 620.00
5/3 17891.00 16/4 415.00
6 4900.00 29/1 149166.00
9
5/1 245138.50 6/1 157270.00

10
4/1 27759.00 9/1 3840.00
4/2 3480.00 9/2 1673.00
4/4 120.00 12/1 8362.25
7/1 2020.00 14/1 16305.00
7/2 839.00 14/2 3702.00
11
2/1 6023.00 30/5 180.00
22 690.00 33/1 2570.00
26 554.00 36/1 4837.00
Final City Development Plan Narsinghpur Page: 98
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
30/1 1551.00 53/1 4837.00
53/3 3620.00 58/1 1377.00
55/1 7744.00 63 3975.00
55/11 570.00 68/1 6317.00
55/12 3720.00 70 2264.00
55/18 713.00 75 647.00
86/1 4060.00
Proposal of Development plan should be made and implemented to achieve organized / well
planned development of the city.
Computer operated system should implemented as soon as possible for speediness in the work.
Rain water Harvesting should be made compulsive before permitting new development.
Nagar Palika should form a separate cell which can be involved in removing encroachment.
10.8. CITY SPECIFIC STRATEGIES AND ACTION PLAN
Issues Strategies
Nagar Palika is highly dependent on the
grants received from Government.
Nagar Palika is also facing problem of
tax recovery on total demand against
service provided.
The cost recovery on water supply
service is very poor, indicating the
large quantum of non-revenue water in
the form of unauthorized connections,
subsidized water, etc.
Because of no permanent & planned
sewerage disposal facility, tax
collection is negligible.
No billing system for collection of tax.
Due to unavailability of proper
infrastructure Nagar Palika is not in
position to perform effectively and
efficiently.
Total establishment cost of Nagar
Palika is quite high against total
income/revenue received from various
sources.
To tackle and control natural disaster
and critical situation citizens, community
participation & infrastructure should be
made available in the City.
Municipal Council should act & follow-
up for strict enforcement of development
activities as per development control
regulations.
Municipal Council, as part of its strategy
to build in-house capacity, to train the
existing manpower resource through
training programs and workshops. Staff
to be rotated inter-department in order to
promote in multi-skilling and team
building.
Municipal Council will need to
formulate a framework for promoting or
facilitating PPP in project development
using various tools of Concession or
models of Build Operate Transfer (BOT)
depending upon the project requirement.
Revision of the Annual Rateable Value
at certain levels. Maintenance of the
collection performance of taxes and
charges at certain minimum levels for
current and for arrears.
Revision of water and sewerage charges
at specific intervals. Various committees
should be formed with action plans for
the tax recovery so as to improve
Municipal Councils financial condition.
Public private partnership should be
encouraged to improve infrastructural
facility in financial sustainable manner.
Incentives should be offered for timely
payment of charges against various
services. Wide publicity should be made
to achieve required recovery.







11. SWOT ANALYSIS OF THE CITY AND
REFORMS

Final City Development Plan Narsinghpur Page: 99
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

11. SWOT ANALYSIS FOR THE CITY
STRENGTHS
Being a district Head Quarter, Narsingpur has good economic base of trade & commerce,
Transportation activity, agriculture products etc
Soil of surrounding area has a good fertility property
Narsinghpur Temple is one of the important features of the town and Narmada Zarna Kund is
the most amazing place to visit. A Mela is organized every year on the day of makarsankranti.
Availability of River water
Average Rainfall in the region is 1105.2 mm which is good enough for summer crops
Healthy condition of commercial market based on agricultural products like soyabean, chana and
wheat, sugarcane, pulse etc.
Good connectivity of town by roads and railways to other major cities of the state.
Preparation of city development plan.
WEAKNESSES
Absence of major industrial units
More Dependency on agricultural activities, constrains the development of agriculture sector
No Major agro based industry situated in town
Unconstructive Investor perception due to lack of development approach
High dependency on grants and subsidies.
Imbalance work participation ratio
Inadequate physical and social infrastructure facilities
No garden or openspace or picnic spot exist in the town where the people can go and enjoy
Lack of facilities in Bus stand and absence of day shelter
No public transportation system resulting air pollution due to large no of two and three wheelers
OPPORTUNITIES
Enough opportunity to develop livestock, rural industries to promote household industries, trade
and commerce
Favorable weather and good soil property available for the garden products like Mango, Awla,
Papaiya etc. and for medicine plants like white mushli, ashwagandha satavre, chandsur and
Kalmegh. On this basis agrobased industries can be established which will help to generate
employment
To develop Narsinghpur as a centre of education and health facilities
400 years old Narsinghpur mandir and surrounding place can be develop as a tourist spot
To develop silk industries & Pulse mills
To utilise fund at central and state level.
THREATS
The important constraint in making of industrialization of town is absence of facilities for
education and communication about technical information required before to promote the
industrialist and to establish the industries.
City will have to face more power cutoff and the amount of power generation is not enough to
cater the future industrial growth along with the demand from the agriculture sector
Lacking in transportation facility can restrict the economic growth
It is required to promote the finance agencies to make fund available to interested industrialist
/businessmen/manufacturer group
Due to water is extracted from the tube well, Ground water level goes on decreasing
No proposals on provision of basic services
Probable deterioration in socio economic status due lack of infrastructural facilities
Degradation of environment due to air and water pollution.
11.1. REFORMS ACTION PLAN
Background
Urban agenda lays emphasis on Development linked with Reforms
Following vital issues are covered under urban reforms:
Final City Development Plan Narsinghpur Page: 100
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
The administration would be made more responsive accountable, transparent and people oriented by
modernizing of urban local bodies.
`Municipalities Act would be amended to make it more people-friendly and responsive and
accountable to the citizens, so that the administrative bodies can discharge duties in an efficient
and transparent manner.
The focus is on:
a) Improving and augmenting the civic, social and economic infrastructure
b) Ensuring basic services for the poor including security of tenure at affordable prices,
c) initiating wide- ranging urban sector reforms, primarily aimed at eliminating legal, institutional and
financial constraints that are impeding investments in urban infrastructure and services, and
d) Strengthening municipal governments and their functioning
The mandatory and optional reforms to be undertaken during the mission period by the Municipal
Council to be eligible for funding; the reforms are at the level of the State Government and the
Municipal Council.
This section deals with the Municipal Council - level reforms. Specific items have been identified
under each reform.
11.2. MANDATORY REFORMS BY Municipal Council.
There are five mandatory reforms that a Municipal Council delivering municipal services need to
implement to be eligible for funding under the scheme. The specific reforms that need to be
implemented are:
1) Adoption of a modern accrual-based double-entry system of accounting
2) Introduction of a system of e-governance using IT applications such as GIS and MIS for
various services provided by the Municipal Council
3) Reform of property tax with GIS and achievement of collection efficiency of 85 percent of
the demand by the end of the mission
4) Levy of reasonable user charges with the objective that the full cost of O&M or the recurring
cost is collected within the next seven years.
5) Internal earmarking in budgets for basic services to the urban poor,
6) Provision of basic services to the urban poor including security of tenure at affordable prices
Property tax
Present Status
Property tax is currently levied on Residential, Commercial and industrial
properties.
Amount of property tax being collected for year 2008-09 is Rs 23.53 Lakhs against
total Demand of Rs.62.87 lakhs having collection efficiency of 37.43 %.
Property Tax is assessed by Area based Method.
Residence >600 sqft 6-14 Rs per sq.ft
Commercial >120 sqft 12-30 Rs per sq.ft
The Property tax is determined by Rateable value.
Property tax record is maintained manually by Property tax register.
Last updation of Property records was conducted in 2009-10
Change of ownership / occupation is captured when amendment for tax payer's details is
applied
Action Measures
a) Extension of property tax regime to all properties should be completed.
b) Elimination of exemptions should be done.
c) Migration to Self-Assessment System of Property Taxation should be implemented.
d) Use of GIS-based property tax system
Appoint Private consultant
Preparation of digital property maps for municipal area
Verification of digital maps and preparation of complete data-base of properties
Full migration to GIS system
e) Next revision of guidance values
f) Fix periodicity for revision of guidance values
g) Establish Taxpayer education programme

Final City Development Plan Narsinghpur Page: 101
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Clarification of doubts and assistance in filling out forms
Setting up a website for property tax issues/ FAQs etc should be taken up
h) Establish Dispute resolution mechanism should be implemented
i) Rewarding and acknowledging honest and prompt taxpayers
j) Achievement of 85% Coverage Ratio
k) Achievement of 90% Collection Ratio
l) Establishing effective arrears recovery mechanism
m) Target for reductive in arrears

E-GOVERNANCE
Present Status
E-Governance applications is absent in all services.
Registration of Births and Deaths is not computerised
Public Grievance Redressal is in progress
Database Regarding property tax is not computerize and same is maintained manually by
Property tax register.
Double entry Municipal Accounting System is not adopted yet.
Building plan approval, Licenses and certificate are not computerized.

Action Measures
a) Appointment of State-level Technology Consultant as State Technology Advisor
b) Preparation of Municipal E-Governance Design Document (MEDD) on the basis of
National Design Document as per National Mission Mode Programme (NMMP)
c) Assessment of Municipal E-Governance Design Document (MEDD) against National E-
Governance Standards (e.g. Scalability, intra-operability & security standards etc.)
d) Agreement on Municipal E-Governance Action Agenda
e) Business Process Reengineering (BPR) for migration to e-governance
f) Appointment of Software consultant(s)
g) Exploring PPP option for different E-Governance initiative that is being taken up
h) Defining monitrable time-table for implementation of each E-governance initiative
i) Ongoing implementation of E-governance initiatives, against monitorable time-table
MUNICIPAL ACCOUNTING
Present Status
single entry cash method based on Municipal account code is being followed
Under the Provisions Municipalities Act, the local fund examiner auditing records of
municipal account and is reported to general board of the municipality and to govt.
Absence of accounting manual
Double entry accrual based double entry accounting system hasnt been accepted

Action Measures
a) Resolution by Government expressing commitment to establish modern municipal
accounting system
b) Legislation/Modification of rules for migrating to double-entry accounting system should
be taken up.
c) Appointment of consultants for development of State manual should be done (either based
on National Municipal Accounting Manual (NMAM) or independently)
d) Commence training of personnel
e) Appointment of field-level consultant for implementation at the city-level
f) Notification of cut-off date for migrating to the double-entry accounting system
g) Business Process Re-engineering (if required)
h) Valuation of assets and liabilities
i) Drawing up of opening balance sheet (OBS):
Provisional OBS
Final City Development Plan Narsinghpur Page: 102
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Adoption of provisional OBS
Finalisation of OBS
j) Full migration to double-entry accounting system
k) Production of financial statements (income-expenditure accounts and balance sheet)
l) Audit of financial statements

INTERNAL EARMARKING FOR BASIC SERVICES FOR POOR
Present Status
a) Per capital income for the B.P.L. family earmarked to Rs, 500 to 1500 per month
b) 24365 numbers of population that have been identified as BPL
c) 80% of slum households living in squatter settlements/ temporary structures
d) percentage of households living in squatter settlements/ temporary structures without access
to
Municipal water supply 1%
Sanitation
Septic tanks 15%
Community toilets - 10%
Solid Waste Management - 5%
Primary Education - 5%
Primary Health 30 %
Action Measures
a) Criteria for identification of the Urban Poor should be defined
b) Fresh enumeration based on the above should be taken up
c) Define threshold service levels for the Urban Poor across various services
d) Strategic document which outlines the requirements both physical and financial timeframes,
sources of funding and implementation strategies including community participation,
monitorable output indicators for each of the services, including outlining convergences
e) Periodic impact evaluation by independent agencies appointed by the state government
f) Other reform steps being undertaken for Slum Networking Project, Project to provide Pay &
Use Toilets, Rain Water Harvesting Project
USER CHARGES
Present Status
a) Presently taxes are levied in the form of Water Tax, Property tax and Combined Tax
b) Water charges :
i. Rs. 125/- Per year per connection (For Domestic Connection)
ii. Rs. 300/- Per year per connection (For Non-Domestic Connection)
c) Combined Tax:
i. Rs. 150/- Per year for property and Open Plot
d) Absence of billing system
e) Inadequate staff for collection of Tax
Action Measures
a) Establishment of proper accounting system for each service so as to determine the O&M
cost separately for both water supply and solid waste Management.
b) Time line for setting up a body for recommending a user charge structure under
consideration of state government
c) The State should quantify/study the impact of subsidies for each service on a periodic basis.
The time line for studying the impact of subsidies for services.
d) O&M costs from user charges are being supposed to recover 100% by Municipal council.
Adoption of a modern accrual-based double-entry system of accounting
As part of the adoption of a modern accrual based double entry system of accounting, the Municipal Council
needs to implement the following actions and generate balance sheets:
Complete audit formalities for all previous years
Prepare accounting manual based on the National Municipal Accounting Manual (NMAM)
Implement function and accounting codes
Develop computer program for the double entry accounting system
Record and value all fixed and flexible assets and liabilities.
Final City Development Plan Narsinghpur Page: 103
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Carry out bank reconciliation work of all the bank accounts.
Educate Municipal Council staff for accurate account coding as per National Municipal
Accounting Manual (NMAM) for the preparation of the balance sheet and the budget.
Introduction of a system of e-Governance using IT applications such as GIS and MIS for various services
provided
E-Governance is an opportunity to transform the Municipal Councils commitment to be
citizen- centric, provide cost-effective services and enhance governance through improved
access to accurate information and transparent and responsive democratic institutions. Thus
e-Governance is no longer an experiment in administrative reform, but a permanent part of
the governing process. For both government organizations and citizens, its advantages are
far-reaching in comparison to investment in establishing e-Governance. The objectives of e-
Governance reforms are:
Promote people-centric administration Common citizens should get the benefits of the
System of accurate billing.
Move from process accountability to productivity accountability and from transactional to
transformative governance The process should be computerized to increase productivity.
Each department of the Municipal Council has reports, giving the exact statistics of how
accountability will be achieved through the system.
Reduce delays and ensure promptness in delivery of services Computerization would
ensure timely delivery of accurate service.
E-Administration Improve administrative processes by cutting cost, managing
performance, making strategic connections within the local bodies and creating
Empowerment.
E-Citizen and EServices connect citizens to the local government by talking to citizens
and supporting accountability; by listening to citizens and supporting democracy; and by
improving public services.
The Municipal Council needs to plan for e-Governance and extend this facility to all citizens
through citizen facilitations centre (CFC) which could provide the following services:
Registration of births and deaths
Public grievance redressal as part of an interactive web site and also at CFCs
Property tax payments through CFC
Works Management System and E-Procurement
Fully computerized pay roll and pension system
Fully automated building plan permissions
Document Management System
GIS-based property tax and overall GIS for engineering, water supply and other services

Property tax on GIS platform and proposed achievement of collection efficiency of at least 85%
Certain reforms in property taxes with the broad objective of establishing a simple, transparent,
non-discretionary and equitable property tax to encourage voluntary compliance; the same is to
be brought under the GIS platform. With regard to reforms in the property tax system, the first
step is to introduce property tax. In this regard, Municipal Council needs to carry out the
following actions:
Draft bylaws and rules for the implementation of property tax
Boards Resolution for the implementation of property tax
Identify the system of property tax (capital, area-based unit rate, etc.)
Institute house tax assessment system (self- assessment or by Municipal Council)
Prepare the inventory of house tax assessments
Map all the properties on the GIS platform
Levy of reasonable user charges by Municipal Council for all services to recover full cost of O&M
The levy of user charges on different municipal services, with the objective of securing effective
linkages between asset creation and asset maintenance and ultimately leading to the self-
sustaining delivery of urban services.
Final City Development Plan Narsinghpur Page: 104
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Water Supply: Municipal Council currently levies water tariff. The collection performance is
very poor about 36.22% of total demand. Hence, Municipal Council needs to revise the tariff to
achieve full cost recovery and a collection performance should be above 90%.
Sewerage: No charge or tax is levied for Sewerage by the Municipal Council; disposal of Waste water is done
through road side open Nallha, Municipal Council needs to plan organized underground sewerage system.
Solid Waste Management: Street light and Sanitation tax is collected through combine tax on Service
delivery for solid waste disposal. No separate charge or tax is levied for solid waste management. Municipal
Council needs to introduce Door to Door collection with PPP model and scientific disposal as part of this
reform need to be implemented.
Internal earmarking within Municipal Council budgets for basic services to the urban poor and provision of
basic services to the urban poor including security of tenure at affordable prices
To endorses the provision of basic services to the urban poor with the objective of providing security of tenure
at affordable prices, improved housing, water supply and sanitation. In addition, delivery of other existing
universal services of the government for education, health and social security will be ensured. In this regard,
Municipal Council needs to earmark a fixed percentage of funds (In proportion of urban poor); Municipal
Council also needs to provide access to basic minimum services to all urban poor citizens.

11.3. OPTIONAL REFORMS
There are seven optional reforms identified that a Municipal Council needs to implement to be eligible under
Scheme. Ideally, the Municipal Council should implement at least two reforms each year. The specific items
under each reform, which Municipal Council needs to implement, are listed below. The difference between the
mandatory and optional reforms exists only in terms of the initiation of the reform. All mandatory reforms
need to be started immediately, whereas of the optional reforms, Municipal Council is free to initiate any two
reforms every year:
1. Revision of bylaws to streamline the approval process for construction of buildings, development
of site, etc.
2. Earmarking of at least 20-25% of developed land in all housing projects (both public and private
agencies) for EWS and LIG category with a system of cross subsidization.
3. Revision of bylaws to make rain-water harvesting mandatory in all buildings and adoption of
water conservation measures
4. Framing of bylaws for reuse of recycled water
5. Administrative reforms, i.e., reduction in establishment costs by adopting the Voluntary
Retirement Scheme (VRS), not filling posts falling vacant due to retirement, etc., and achieving
specified milestones in this regard
6. Structural reforms like decentralisation of functions at ward level
7. Encouraging PPP -- With regard to private sector participation, the following activities can be
considered: door-to- door collection, maintenance of water supply operations, underground
sewerage system, treatment plant operations, disposal and land fill site operations, citizen
facilitation centre.







12. CITY INVESTMENT PLAN AND
IMPLEMENTATION STRATEGY

Final City Development Plan Narsinghpur Page: 105
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

12. CITY INVESTMENT PLAN AND IMPLEMENTATION PLAN
City Investment Plan as align with the identified vision for Narsinghpur town has been prepared through a
comprehensive process of assessment of gaps in the physical and social infrastructure sectors. This assessment
has also led to the identification of sector-specific strategies, implementation actions and associated reforms
with specific inputs from stakeholders. The strategies adopted primarily have three dimensions
Improving service delivery by efficiency measures
Improving service delivery by creating infrastructure assets
Improving the governance aspects of the Municipal Council.
This section summarises the capital investments required for creating infrastructure assets and various strategic
interventions required in the implementation of such projects; these strategies are both investment-oriented and
administration-oriented.

12.1. CITY INVESTMENT PLAN (CIP)
The City Investment Plan is the multi-year scheduling of identified and prioritized investments. The scheduling
or phasing of the Plan is based on studies of fiscal resources availability (for new investments and O&M),
technical capacity for construction and O&M, and the choice of specific improvements to be carried out for a
period of five years.
The CIP is needed for:
Realisation of city growth and meeting of infrastructure needs (to be carried out once every five
years)
Scheduling of investments of ongoing projects due to cost and/ or time overruns
Assigning of priorities within the constraints of available financial resources

12.2. INSTITUTIONALISING THE CIP PROCESS
The City Investment Plan is an important element of the CDP and is significant in terms of the towns
management process and sustainability with regard to the delivery of basic services. The CIP also provides a
framework for the annual budget cycle of Municipal Council for the future 5 year period. As a part of the
Narsinghpur CDP, the CIP prepared includes the following:
Desired norms and standards for infrastructure services;
Roles and responsibilities of various stakeholders in the implementation of identified projects
Project phasing and strategies for implementation.
In Narsinghpur Municipal Council is the primary agency responsible for delivering municipal services and
hence the CDP proposals ought to be implemented by Municipal Council. The project prioritization,
investment phasing, strategies and action plan are framed accordingly.
The CIP involved the identification of public capital facilities to cater the demands of the city populace by the
year 2015, 2025 and 2035 according to their short, medium and long-term infrastructure needs. The project
identification has been done through a demand-gap analysis of the services and DPRs available with the
Municipal Council. Further, project prioritization and strategizing of the investments/ phasing of investment
are based on strategies, listed under each service sector as identified through stakeholder consultations. The
projects derived are aimed at ensuring the optimal and efficient utilization of existing infrastructure systems
and enhancing the capacity of the systems/ services to cater the demands of future population additions.
Certain other projects listed as part of the CIP include developmental projects other than those addressing the
core service sectors viz. system modernization, etc.
The CIP and the forecasted future needs for provision of capital facilities under each identified sector are
presented below. These assets will help Narsinghpur City to universalize services for the current population as
well as accommodate the expected increase in population. In sectors where long-term planning is required (for
example, source development for water supply and development of landfill site etc.), the planning horizon till
the year 2035 is considered. Assets created in such sectors consider the projected population in respective
horizon year.

12.3. SUMMARY OF INVESTMENTS
The total estimated capital investment required for providing efficient services to the present population and
future population of Narsinghpur by the year 2035 is Rs. 275.11 crores at constant prices.
Final City Development Plan Narsinghpur Page: 106
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Table 62 Capital Investments
Sr No Investment Head (Agency/ Period) Rs. crores
1 Total investment Need of Narsinghpur 275.16
2 Total investment need of Narsinghpur by 2015 120.24

The planning horizon for core service sectors of water supply, sewerage, drainage, solid waste management,
land use/development planning, basic service to Urban Poor and other projects is 2035. Hence, only a part of
the identified investment is proposed for funding by 2015. Narsinghpur will need to plan for the remaining
identified investment to be funded beyond 2015 but before 2021.
The table below presents the summary of sector-wise total investment needs and investments up to 2015
Table 63 Sector wise Capital Investments
2015 2025 2035
1 Water Supply 911.74 640.99 831.00 2383.73 8.66
2 Sewerage 2206.00 869.00 1212.00 4287.00 15.58
3 Roads & Urban Transport 4895.25 2981.00 776.00 8652.25 31.44
4 Storm Water Drains 2576.70 1014.90 1414.64 5006.24 18.19
5 Street Lights 85.11 68.11 94.21 247.42 0.90
6 Conservancy & Sanitation 308.99 433.13 584.70 1326.81 4.82
7 Urban Poor/ Slums 790.00 1722.00 2401.00 4913.00 17.85
8 Other Works (8A to 8E) 250.50 295.00 154.50 700.0 2.54
8A
River Front Development/River
Conservation/Beautification 50.00 75.00 75.00 200.00
8B Fire Service 135.50 200.00 64.50 400.00
8C
Garden-new or Up gradation &
Tree Plantation 15.00 10.00 10.00 35.00
8D Urban Governance/e-governance 50.00 10.00 5.00 65.00
Total (1 to 8) 12024.29 8024.12 7468.04 27516.45 100.00
Phase wise Investment Planning for Narsinghpur (2015, 2025 and 2035)
% Total
investment till
2035 Sector
Phase wise Investment
Total
Investment till
2035 (Rs. Lac)
(Rs. Lac)

* Escalated cost includes physical contingencies and technical assistance at 10% of total cost and 6% cost escalation due to inflation.)
Figure 54 Sectorwise investment need upto 2015
Final City Development Plan Narsinghpur Page: 107
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

It can be observed from the table above, Out of total Funding requirement up to 2035, 44% of the identified
investment need is proposed for funding by 2015. From the perspective of sector priorities with respect to
requirement of fund by 2015, with 57% Traffic & Transportation is followed by Storm water drainage and
Sewarage Sectors supply with 51% each. Water Supply, Urban Poor, Street light, and Conservancy and
sanitation follow with 38 %, 36%, 34% and 23 % respectively.
Within the total investment proposed by 2015 for Narsinghpur Municipal Council, maximum share of
investment is taken by Road and Urban Transport at Rs. 4895.00 lacs followed by Storm Water Drain and
Sewerage system at Rs. 2577 lacs and Rs. 2206 lacs respectively. Water Supply sector accounts for Rs. 911.74
lacs and Urban Poor sector accounts for Rs. 790 lacs. Sector wise percentage contribution is shown in pie chart
above.
Sector wise details of the CIP, capital facilities identified to be created, supportive actions and implementation
aspects/ strategies are discussed in the following sections in detail. Demand-gap assessment for each sector is
discussed below and the summary of capital investment phasing under each sector is presented in Annexure 3.








13. INVESTMENT CAPACITY AND SUSTENANCE
OF MUNICIPAL COUNCIL

Final City Development Plan Narsinghpur Page: 108
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

13. INVESTMENT CAPACITY AND SUSTENANCE OF Municipal Council.
Under a Business As Usual scenario, the municipal councils existing revenue surplus is not being utilized
effectively due to the various reasons viz. lack of an integrated approach to town development, inability to
identify the priority sector for investment, inability to raise the required finances for funding and inability to
tap into other sources of funds due to lack of a comprehensive FOP.
Gadarwara Municipal Council Financial Operating Plan is the forecast of the finances for the period starting
2010-2011 to 2034-2035. The bases for assumptions in the FOP are the projections for revenue receipts and
expenditure. These projections are essentially based upon an analysis of past trends and upon volume and
standard of delivery of service/efficiency expected in the future. The plan has been generated to assess the
capacity of the council for investment sustainability. The total investments have been phased out from the FY
2010-2011 to 2034-2035 for which the funding pattern has been worked out as given in the City Investment
Plan.
Gadarwara Municipal Council would acquire to make capital investment amounting to Rs.150.83 Crores. As
the city intends to adopt a service delivery approaches i.e. Integrating asset creation with management and
financing during its lifespan so that intended service is fully sustainable. The municipal council has adopted
certain budgetary reforms and tried to reflect its principles and programmes through the budget which is
helping the municipal council in measuring and promoting accountability in respect of service delivery. The
holistic approach of adopting a logical framework in which the outcome has been related with the performance
of various item will help the city in any deviation during the implementation of the CDP and the deferring of
the finance mobilization.
On a modest scale public and private sector participation needs to be increased through variety of forms in the
city of Gadarwara. The CDP is proposing structuring a policy of private sector participation in urban
infrastructure. To overcome the problems experienced in delivery and expansion of infrastructure services.
Gadarwara Municipal Council intends to adopt a service delivery reform approach wherein the municipal
council is structuring a policy of private sector participation in urban infrastructure with the following
objectives:
Delivery of services with accountability for the standard of services
Efficiency in operations and management
Augmenting public resources for investments in creation of new assets for expanding the services

Hence Gadarwara municipal council intends to promote the following types of private sector participation in
the city:
Contracting out operations and maintenance with performance related accountability.
Management contracts including rights of billing and collecting user fees.
Creation of new assets and their management through Public Private Partnership (PPP) for limited
projects
Corporatization of municipal services where independent revenue stream is available through user
fees.

The cost recovery mechanism for various sectors is mentioned below:
No Reforms Cost recovery mechanism
1 Water Supply
Water tax, connection charges, meter
charges for non residential and residential
use, road reinstatement charges, revision
of tariff
2 Solid Waste Management
Charges for door to door waste collection,
bio medical waste from hospitals and
nursing homes, conservancy charges,
hospital user charges
3 Sewerage
Drainage connection fees, conservancy
charges, revision of tariff
4
Storm Waster Drains including river and
lake
Conservancy fees and user fees for
recreation
5 Roads and Street lighting
vehical tax, road reinstatement charges,
adverisement tax
6 Education Education Cess
7 Parks, open spaces and Playgrounds
User fees, outlets and kiosks for
commercial activities

The project funding structure comprises grants under the UIDSSMT framework (accounting for 90 percent of
the funding) internal resources and loans. The level of investment that Gadarwara can sustain is determined
Final City Development Plan Narsinghpur Page: 109
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
by studying the overall surpluses/year-to-year opening balance and debt service coverage ratio
(DSCR=Net Operating Income/Total Debt Service). If the debt service coverage ratio (amount of surplus
available to pay interest and to repay principal that is due) falls below 1.25 (i.e. less than 25 % cushion), then
the investments are reduced gradually till the DSCR exceeds 1.25 in all the years in the forecast period.
The main items of income and expenditure, classified into the revenue account and the capital account, are
projected in the FOP under the following categories:
Categories of FOP Projections
Revenue Account Receipts:
Octroi, Taxes, Non Tax Sources, and
Grants, Contribution and Subsidies
Revenue Account Expenditure:
Establishment
Operation and Maintenance
Debt Servicing- Existing and New Loans
Phasing of non debt liabilities, and Additional O&M
Capital Income and
Capital Expenditure

13.1. FINANCING STRATEGIES FOR THE CIP
Municipal Council plans to raise resources and fund the CIP through:
Grants available under the UIDSSMT type funding Framework (as percentage of investment proposed for
funding by 2015 in urban governance and the infrastructure sectors - 80% Central Govt. grants and 10% State
Govt. grants) Available internal resources and improving upon the same by:
Revision of the Annual Rateable Value at certain levels
Revision of water and sewerage charges at specific intervals
Maintenance of the collection performance of taxes and charges at certain minimum levels for
current and for arrears
Borrowings

13.2. FINANCE PROJECTIONS
Current revenue sources are projected under built-in growth assumptions for income and expenditure items, to
assess the impact of each such revenue enhancement measure being suggested. The projections also aim at
estimating the surplus that will be available for servicing new debt. Part of the surplus, after meeting the
additional O&M expenses on newly created assets and infrastructure, is translated into debt size and project
size (grant component plus debt component) based on certain assumptions regarding interest rate, repayment
method and loan-grant mix.
A spreadsheet FOP model has been customised to depict the financial position of Municipal Council and the
investment-sustaining capacity of Municipal Council has been assessed based on the FOP assumptions. The
model was used to calculate future surpluses under various scenarios involving combinations of internal
revenue improvement, state support, financing terms, etc.

13.2.1. MUNICIPAL ACCOUNT GROWTH PROJECTIONS AND ASSUMPTIONS
The standard assumptions under which the projections are carried out and certain expenditure control and
revenue augmentation measures proposed in line with the mandatory and optional reforms under the
UIDSSMT type funding framework are presented below. The detailed assumptions and workings are presented
in table below.
Final City Development Plan Narsinghpur Page: 110
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Table 64 Important assumptions made in the projections Head
No Reforms Assumption adopted for forecast Base Case Improved Case
1 Forecast based on
Growth in assesment , Tax
Demand, Periodic revision and
collection performance
2 Growth in Assessment Current CAGR
Minimum of current
CAGR
Maximum of Current
CAGR
3
Average Property Tax
Demand
Computed based on current average
demand per asessment
current level to
continue
Assumed to increase
by 30% in 2012 and
revision every 4
years thereafter
Arrears - 12.56% Arrears - 15 to 45%
Current - 8.92% Current - 10 to 85%
1 Forecast based on
growth in connections, minimum
monthly charges, periodic revision
of tariff, collection performance
2 Growth in Connections current level at
current level to
continue
number of
connections to be
85% of HSC after
the meters are
installed, increase by
2015
3 Minimum monthly Charge
current average demand works out
to be Rs. Xx per month
current level to
continue
revision of charges in
2014 and revision
every 3 years
thereafter
Arrears - 13.3% Arrears - 15 to 45%
Current - 11.62 Current - 15 to 100%
new connection fees (Domestic)-
Rs. Xx per month
increase by 30%
every 3 years from
2014
new connection fees (Non-
Domestic)- Rs. Xx per month
1 Growth in connections No existing connections
to be decided and
approved by the
municipal council
increase by 15%
every 3 years from
2018
2 Collection Effeciency
New connection charges to be
decided
approximately about
90% to be 100%
1 Growth Rate
current CAGR with a minimum of
8% and a maximum of 15% 8% 15%
1 Growth Rate
Current CAGR with expenditure
control measures are proposed 8% 10%
2
Salary wages and pay
commission revision 6th pay commission revision
maximum of 10%
growth
incremental O&M calculated as
percentage of capital cost
Water supply 3%
Sewerage 6%
SWM 10%
Roads & Drainage 4%
Street Lighting 6%
Urban Poor/Slums 2%
4 Outstanding debt
repayment of equal installments
starting 2012 for 10 years
Loan period 20 years (5+15)
Moratorium Period
5 years on principal
amount
Reoayment Method Equal Installments
Interest rate 7.5%
1 Basis of growth assumption Forecast as per current growth rates 10% 12%
1
Income from commercial
activities, rent, fees, user
charges and others Forecast as per current growth rates 10% 12%
1 SFC Grants
Forecast as per current growth rates
(net grant to be considered after
deduction) 8% 12%
2 Other grants and contribution
Forecast adopted as per current
growth rates 8% 12%
1 Debt Service Coverage Ratio DSCR of at least 1.25
General Purpose / Property Tax
Water Tax
current level to
continue
current level to
continue
Grants
Others
Collection Performance 4
New Connection charges
Non Tax Income
current level to
continue
Loan term for commercial
borrowings
3
O&M arising from new
assets
5
5
Collection Performance 4
Sewerage Charges
Other Income Items and Capital Grants
Expenditure Items
Other Taxes


Final City Development Plan Narsinghpur Page: 111
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
13.3. INVESTMENT CAPACITY/SUSTENANCE
Given the existing financial position of Municipal Council, the revenue and capital accounts of Municipal
Council are projected against the growth scenario and assumptions presented above. The FOP is generated
from the sustainable investment point of view in line with current growth trends against the identified
investment of Rs. 120 crores at constant prices till 2015. The results of the FOP are presented in Annexure 4
and the same is summarised below.
Table 65 FOP Summary
2010-11 2011-12 2012-13 2013-14
2014-15
1 Revenue Income 1715 2026 2395 2831 3349 12317
2 Capital Income 40 42 44 46 49 222
T1 Total Income 1755 2068 2439 2877 3398 12539
1 Total Revenue Expenditure 405 456 514 579 655 2608
2 Capital Expenditure 867 990 1131 1292 1477 5757
T2 Total Expenditure 1272 1446 1645 1871 2132 8365
483 622 794 1006 1266 4172 Investment sustainability T1-T2
No Head
Projected Yearly Income (In Lacs)
Total
Proposed New CIP

Municipal Council receipts are expected to be 33.98 crores by 2015 under the projection scenario. The revenue
improvement and expenditure control measures, coupled with the availability of grants under the UIDSSMT
type funding framework, takes the investment capacity of Municipal Council to Rs. 12.66 crores over the
next five years against an investment need of 120 crores by 2015. Thus the investment sustenance capacity
of Municipal Council is 10% of identified need.
13.3.1. IMPACT OF UIDSSMT TYPE FUNDING TYPE FUNDING REFORMS ON INVESTMENT
CAPACITY
The impact of various revenue improvement and expenditure control measures are assessed in terms of
contribution/ addition to this base investment capacity. The own sources (income from Taxes) of Municipal
Council can contribute 28% of total investment need by 2015.
It may also be understood that reforms in service delivery and introducing privatization are the prime
requirements for Municipal Council to position itself as a better governed and financially sound Corporation.
And availability of UIDSSMT type funding type funding grants and associated reforms in various sectors
(property tax revenue enhancement, cost recovery on services, energy efficiency measures, improving
governance aspects etc) are observed to contribute significantly to the base investment capacity.
13.3.2. FUNDING PATTERN
For the investment identified by 2015 of Municipal Council of Rs. 120.24 crores at constant prices, the funding
pattern as worked out in the FOP model is:
Table 66 CIP Funding Pattern
Remarks
ULB GoI GoMP
1 Water Supply 911.74 91.17388583 729.3910866 91.17388583 UIDSSMTtypesoffunding
2 Sewerage 2206.00 220.6 1764.8 220.6 UIDSSMTtypesoffunding
3 Roads & Urban Transport 4895.25 4895.25 Own Sources, Loan, PPP, Grants
4 Storm Water Drains 2576.70 257.6704661 2061.363728 257.6704661 UIDSSMTtypesoffunding
5 Street Lights 85.11 85.11 Own Source, Loan, PPP, Grants
6 Conservancy & Sanitation 308.99 308.99 Own Source, Loan, PPP, Grants
7 Urban Poor/ Slums 790.00 79 632 79 IHSDP/BHSUP
8 Others Works 250.50 250.50 Own Source, Loan, PPP, Grants
I
River Front Development/River
Conservation/Beautification 50.00
II Fire Service 135.50
III
Garden-new or Up gradation & Tree
Plantation 15.00
V Urban Governance/e-governance 50.00
Total (1 to 8) 12024.29 6188.29 5187.55 648.44
No Sector Investment need by 2015
Contribution
(Rs. In lakhs)

In order to improve the sustainability/investment capacity of Municipal Council to the extent of requirement, it
has to execute major revisions in property tax and implement reforms with respect to service delivery aspects
as earlier suggested.
Final City Development Plan Narsinghpur Page: 112
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Checklist For Final CDP- Narsinghpur
Yes
Executive Summary
Project introduction
Methodology adopted
Documentation of Stakeholder meetings and meetings with officials

Physical features of the town
Historic Importance/Tourism importance/Any other Unique identity of the town
District information
Location (Linkages and connectivity)

Physiography and landform (Topography, Drainage, Geology Climate and rainfall
Wind direction)

Municipal area and planning area

Demographic profile of the town
Population growth trend
Population projection
Population density
Other demographic indicators
Issues

Socio - Economic profile of the town
Sex ratio
Literacy rate
Average household size

Workforce participation (Primary, Secondary and Tertiary occupation and income
levels)

Industrial activities
Trade and commerce
Tourism
Issues

Physical planning and Growth management
Spatial growth trends
Spatial distribution of population
Municipal level mapping (to the scale)
Ward delineation map
Landuse analysis
Master plan provisions
Housing scenario
Present and future Housing demand
Illegal colonies
Future growth possibilities
City specific Strategies and action plan
Final City Development Plan Narsinghpur Page: 113
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

City infrastructure
Water supply
Quality and quantity of water at source
Quality and quantity of water in distribution system
Other sources
Water distribution arrangements
Internal distribution networks
Water treatment facilities
Present and Future Demand and Supply Gaps
Water supply projects
Comparative analysis with the UDPFI,CPHEEO guidelines
SWOT analysis
Issues
City specific Strategies and action plan

Sewerage and Sanitation
Existing sewerage system
Means of sewage disposal
Household toilets (Dry Latrines and Flush latrines)
Public toilets
Present and Future Demand and Supply Gaps
Sanitation projects
Comparative analysis with the UDPFI,CPHEEO guidelines
SWOT analysis
Issues
City specific Strategies and action plan

Solid waste management
Quantity of waste generated
Constituents of municipal waste
Current practices of Solid waste management.
Waste storage & segregation
Primary and secondary collection
Processing and disposal
Reuse and recycling
Vehicles for solid waste collection and Transportation
Present and Future Demand and Supply Gaps
Estimation of waste collection
Comparative analysis with the UDPFI,CPHEEO guidelines
SWOT analysis
Issues
City specific Strategies and action plan

Drainage
Final City Development Plan Narsinghpur Page: 114
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Existing drainage system
Major water bodies
Primary drains
Secondary drains
Tertiary drains
Flood prone areas
Flooding in catchment area of major nallah
Present and Future Demand and Supply Gaps
Comparative analysis with the UDPFI,CPHEEO guidelines
SWOT analysis
Issues
City specific Strategies and action plan

Traffic and transportation
Existing traffic & transportation scenario
Vehicle population
Agencies in traffic & transportation.
Travel characteristics
Public transport / mass transit
Traffic management and circulation
Inter - city bus transport
Intermediate public transport
Parking requirements
Present and Future Demand and Supply Gaps
Comparative analysis with the UDPFI, other guidelines
SWOT analysis
Issues
City specific Strategies and action plan

Street lighting and Fire fighting
Existing situation of Street lights
Fire service
Vehicles and equipment for fire fighting and Rescue operations
Operational systems

Power generation and distribution (consumption of electricity by ULBs in street
lighting water supply pumping etc.)
Present and Future Demand and Supply Gaps
Comparative analysis with the UDPFI, other guidelines
SWOT analysis
Issues
City specific Strategies and action plan

Urban poor and their accessibility to basic Services
Poverty in the town
Separate information on BPL population and Slum population
Final City Development Plan Narsinghpur Page: 115
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Slums in the town
Location of slums on town map
General characteristics of slum
Status of slums (Notified/Un-notified)
Land ownership & tenure status
Unidentified slums and homeless population/pavement dwellers
Urban basic services in slums (In line with JNNURMs 7 point charter)
Social security schemes and beneficiaries
Present and future Housing demand
Comparative analysis with the UDPFI,CPHEEO guidelines
SWOT analysis
Issues
City specific Strategies and action plan

Social infrastructure
Overall Health facilities and Medical practitioners in the town
Basic health indicators
Medical facilities provided by Municipal Body
Role of Municipal Body in the health programs
Overall Educational facilities and Teachers in the town
Basic Education/literacy indicators
Education facilities provided by Municipal Body
Recreational facilities (Parks, Playgrounds etc)
Sports facilities
Comparative analysis with the UDPFI guidelines
SWOT analysis
Issues
City specific Strategies and action plan

Environment
Flora and fauna
Pollution levels (Air, Water and Soil)
City green spaces (gardens and recreation total coverage ratio)
Water front development and conservation
Existing environmental regulations
SWOT analysis
Issues
City specific Strategies and action plan

Heritage and Conservation
In case of Holy cities the JNNURMs Heritage toolkit should also be considered to prepare the
CDP
Identification of Heritage structures/Areas
Existing status of Heritage buildings
Existing regulations/Heritage guidelines at the ULB and State Level
Heritage issues
Final City Development Plan Narsinghpur Page: 116
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Tourism potential of the town (No. of visitors and tourist facilities)
Possibility of tourism circuits at the regional level
Comparative analysis with the UDPFI guidelines
SWOT analysis
Issues
City specific Strategies and action plan

Existing Institutional framework for Development
Urban Local body structure
Town and Country planning department
Development authority
Public health engineering department
Madhya Pradesh housing board
Madhya Pradesh pollution control board
Any other
Issues
City specific Strategies and action plan

Investment Plan and Financing Strategies
Revenue account
Revenue income
Revenue expenditure
Capital account
Capital income
Capital expenditure
Key financial indicators
Key issues and conclusion
City specific Strategies and action plan (Phase wise CIP and projects)

Investment Prioritization plan
Project identification
Basis for project identification
Projects for system and infrastructure Augmentation
Projects for system and infrastructure refurbishment
Other developmental projects
Sector wise project identification and costing
Investment plan
Financing plan (Financial operating Plan)
Revenue account
Key assumptions
Non tax sources
Revenue expenditure
Capital income

Urban reforms
Final City Development Plan Narsinghpur Page: 117
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Status of Mandatory reforms (as envisaged under JNNURM/IHSDP/UIDSSMT)
Status of Optional reforms
Issues
City specific Strategies and action plan

City Vision
Summary of Sectoral Strategies
City Vision
SITES










ANNEXURES

Final City Development Plan Narsinghpur Page: 118
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
ANNEXURE: 1
POPULATION FORECAST & ESTIMATION



Geometrical Progression Method
Year Population Increment Rate of Growth
1961 17940
1971 25552 7612 0.42
1981 34266 8714 0.34
1991 42356 8090 0.24
2001 56203 13847 0.33
Geometric Mean (a)= 0.33
P
2010
= P
2001
x ( 1 + a )^
n

= 56203 x ( 1 + 0.33 )^
0.90

= 70397

P
2015
= 56203 x ( 1 + 0.33 )^
1.40

= 83349

P
2025
= 56203 x ( 1 + 0.33 )^
2.40

= 110445

P
2035
= 56203 x ( 1 + 0.33 )^
3.40

= 146349


Incremental Increase method
Year Population Increment Incremental Increase
X Y
1961 17940
1971 25552 7612
1981 34266 8714 1102
1991 42356 8090 -624
2001 56203 13847 5757
Average= 9566 2078
Arithmatic Progression Method
Year Population Increment
1961 17940
1971 25552 7612
1981 34266 8714
1991 42356 8090
2001 56203 13847
Average: 9566
P2010= 56203 + ( 0.80 x 9566 ) = 63856
P2015= 56203 + ( 1.40 x 9566 ) = 69595
P2025= 56203 + ( 2.40 x 9566 ) = 79161
P2035= 56203 + ( 3.40 x 9566 ) = 88727
Final City Development Plan Narsinghpur Page: 119
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Pn = P1 + n x X + n(n+1)Y/2
P2010= 56203 + 0.9 x 9566 + 1496 = 65352
P2015= 56203 + 1.4 x 9566 + 3492 = 73087
P2025= 56203 + 2.4 x 9566 + 8480 = 87640
P2035= 56203 + 3.4 x 9566 + 15546 = 104272


Exponential Method
Year Population
1961 17940
1971 25552
1981
34266
1991
42356
2001 56203
Pt+n = Pt x e
r x n

Pt+n = 2010
Pt = 2000
r =
Pt - Pt-1
Pt-1
r =(
25552 - 17940
)+(
34266 - 25552
)
17940 25552

+(
42356 - 34266
)+(
56203 - 42356
)

34266 42356
r avg =( 0.42 + 0.34 + 0.24 + 0.33 )/4
r avg = 1.33 / 4
r avg = 0.33
Population Projection
Pt+n = Pt x e
r x n

e = 3
P2010 = 56203 x 2.72 ^( 0.33 x 0.90 )
P2010 = 56203 x 1.30
P2010 = 73306
P2015 = 56203 x 2.72 ^( 0.33 x 1.40 )
P2015 = 56203 x 1.59
P2015 = 89469
P2025 = 56203 x 2.72 ^( 0.33 x 2.40 )
P2025 = 56203 x 2.22
P2025 = 124708
P2035 = 56203 x 2.72 ^( 0.33 x 3.40 )
P2035 = 56203 x 3.09
P2035 = 173828









Final City Development Plan Narsinghpur Page: 120
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh




Graphical Method


Year

Population
1961 17940
1971 25552
1981
34266
1991
42356
2001 56203
y = ae
bx

log10y = log10 a + bx log10 e --------------------(1)
Y = A + BX --------------------(2)
Sum(Y) = nA + Sum(x)B --------------------(3)
Sum(XY) = Sum(x)A + Sum(x
2
)B --------------------(4)
Where
Y= log10y
A= log10a
B= b*log10e
Year x Population y log10y=Y xY x
2

1961 0
17940
4.3 0 0
1971 10
25552
4.4 44 100
1981 20 34266 4.5 91 400
1991 30 42356 4.6 139 900
2001 40 56203 4.7 190 1600
sum 100 176317 22.6 464 3000
Equation (3) & (4) will be changed to
22.57 = 5A + 100B --------------------(5)
463.57 = 100A + 3000B --------------------(6)
A = (22.57-100B)/5
substituting the value of A in equation (6)
464 = 100((22.57-100B)/5)+3000B
464 = 20*22.57-2000B+3000B
464 = 451 + 1000B
B = 0.012
A = 4.272
Y = A+BX
Final City Development Plan Narsinghpur Page: 121
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh


= 4.27 + 0.012 X
B = 0.012 = b log10 e
b = 0.012 / log10 e
b = 0.012 / 0.434
b = 0.028
A = 4.272 = log10 a
a = 18719
y = ae
bx

y = 18719 * e
0.0279

* x

Projected Year Projected Population
2010 71407
2015 84415
2025 111573
2035 147467
Final City Development Plan Narsinghpur Page: 122
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

ANNEXURE : 2
MUNICIPAL ACCOUNT
Items CAGR 2003-04 2004-05 2005-06 2006-07 2007-08
Revenue Account All figures are in Rs. Lakhs
Revenue Income
A Own Sources
1 Octroi
1.10 Net Collection 16.75 8065639 8041722 6663543 12018875 14986657
2 Taxes 0
2.10 Entertainment Tax 3.25 17898 40212 20100 21304 20338
2.20 Property tax 51.10 198013 605979 774453 1039792 1032298
2.30 Consolidated tax 34.95 380652 908609 1069299 1425906 1262335
2.40
Water Tax (general &
Special) 21.75 770815 1258756 1069373 1196683 1693708
2.50 Passenger tax 14.11 1316000 2040421 1440304 1834594 2231000
2.60 Pensioners tax 15.02 2172675 1851225 2149100 2452350 3802900
2.70 Others 17.14 5454372 9579329 4425930 6609339 10271204
Sub Total Taxes - 2 18.48 10310425 16284531 10948559 14579968 20313783
3. Non-Tax Income 0
3.10
Income From
Commercial Activity 10.45 53750 436500 292000 0 80000
3.20 Other Income 0

Fees & Charges-
Market/bazaar fees -4.73 352425 350112 323665 323835 290365

Miscellaneous-fees and
charges 38.89 1380846 3645023 2597093 2639420 5138922
Sub Total Non-Tax Income - 3 32.51 1787021 4431635 3212758 2963255 5509287
Total Own Sources - A (1 to 3) 19.28 20163085 28757888 20824860 29562098 40809727
B Grants & Subsidies
1 Revenue Grants
1.10 Stamp duty 46.64 177100 373580 0 838900 818900
1.20
Twelvth Financial
Commission -39 20000900 999500 0 1384500 2769100
1.30
State Finance
Commission 2.05 1641100 2579200 440400 2168300 1779700
1.40
Grant for Roads
Maintenance 37.16 493700 1357500 1438700 1657900 1747100
1.50 Fire -17.43 0 0 0 222743 183914
1.60 Specific purpose 0 0 0 0 0 0
1.70 Ayodhaya Basti 0 0 0 950000 0 0
1.80 SJSRY 0 0 0 0 0 150800
1.90 IHSDP 0 0 0 0 0 40197000
2 NSDP -33.20 439000 1164000 774000 0 87400
Sub Total Revenue Grants - 1 0 22751800 6473780 3603100 6272343 47733914
2 Subsidy 0 0 0 0 0 0
3
Donations (Excl. for Cap.
Works) 0 0 0 0 0 0
Total Grants & Subsidies - B (1 to 3) 20.35 22751800 6473780 3603100 6272343 47733914
Grand Total Revenue Income (A+B) 19.85 42914885 35231668 24427960 35834441 88543641

Final City Development Plan Narsinghpur Page: 123
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

Items CAGR 2003-04 2004-05 2005-06 2006-07 2007-08
Revenue Account All figures are in Rs. Lakhs
Revenue Expenditure
A Establishment Expenditure
1.00
General Administration
Expenses
1.10
Establishment and
salaries 7.29 995076 1262149 11957445 1285799 1318644
1.20 Wages 22.62 222450 220517 208510 256230 502970
1.30 Temporary arrange. -34.90 0 120981 136008 152046 33374
1.30 Miscellaneous- -19.17 292167 0 0 0 124724
2.00 Water Supply 0.00
2.10 Establishment 2.70 461420 508848 500875 4794245 513211
2.20 Miscellaneous 21.21 692430 762218 943243 1216695 1494572
3.00 Conservancy and Sanitation 0.00
3.10 Establishment 6.35 4312717 465089 4835197 4831271 5517181
3.20 Miscellaneous 11.46 924257 1186371 1162550 1432307 1426724
4.00 Public Works 0.00
4.10 Establishment 3.90 473814 513624 378263 551271 552177
4.20 Miscellaneous 0.00
5.00 Street Lighting 6.26 64073.00 63130 66018 72079 81692
6.00 Fire Service -2.49 162263.00 177362 185215 147128 146695
7.00 Kanji house 0.00
7.10 Establishment 9.01 72081 79024 81994 88996.00 101768
7.20 Miscellaneous 40.25 7120 24065 20486 23660.00 27546
8.00 Miscellaneous 74.07 187950 745208 1909020 991313
9.00 Pension 83.16 988212 1810021
10.00 Revenue department 0.00
10.10 Salaries 11.74 1336839 1669008 1806388 2075147 2083883
10.20 Wages -100 16567 19683 21095 41108 0
10.30 Miscellaneous 8.63 0 276797 304123 286144 354862
Sub Total Estab. Expenditure - A (1 to 11) 11.07 10033274 8525028 25162639 19163146 15271336
B Operation & Maintenance Expenditure 0
1 Water Supply 46.23 231166 342654 342318 361245 1056935
2 Public Works 0
2.10 Building 115.06 10000 26649 145807 114191 213920
2.20 Road 0
3 Street Lighting 23.56 3182485 2987994 5866424 7881908 7417550
4 Fire Service 6.21 57099 261654 0 46923 72662
5 Miscellaneous-Vehicles 22.58 538659 1622988 792384 2021925 1215999
Sub Total O & M Expenditure - B (1 to 9) 25.52 4019409 5241939 7146933 10426192 9977066
C Debt Servicing 0
1 Principle Repayment 0 0 0 0 0 0
2 Interest Payment 0 0 0 0 0 0
Sub Total Servicing Expenditure - C (1+2) 0 0 0 0 0 0
Grand Total Revenue Expenditure (A+B+C) 15.78 14052683 13766967 32309572 29589338 25248402
Final City Development Plan Narsinghpur Page: 124
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh


CAPITAL ACCOUNT


2003-04 2004-05 2005-06 2006-07 2007-08
Capital Income In Rs
Capital Grants
Water Conservation 176000 611000 99800 0 250000
Basic services 3849700 5682200 8526300 7198800 2550100
Total 4025700 6293200 8626100 7198800 2800100
Capital Expenditure
General Administration 2045400 2105600 2635200 2770315 498533
Water Supply 792337 808194 1837260 917633 3488309
Municipal Institution 678701 1051114 186824 205174 233000
Public Works 8013087 7649694 7164730 12366636 12415569
Miscellaneous 3486245 3660497 6087319 4676116 34324376
Total 15015770 15275099 17911333 20935874 50959787


































Final City Development Plan Narsinghpur Page: 125
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
ANNEXURE: 3
INVESTMENT PHASING
INVESTMENT PHASING
Sector/ Component
2011-12 2012-13 2013-14 2014-15 2015-16
Source/ system capacity augmentation 416.42 208.21 208.21
Treatment capacity augmentation 120.78 57.37 63.41
Distribution network augmentation 282.04 39.49 53.59 53.59 67.69 67.69
Elevated Storage capacity augmentation 14.95 4.48 4.48 5.98
Refurbishment of old Distribution Network 19.20 7.67 11.53
Metering System 58.35 19.45 19.45 19.45
Total 911.74 47.16 292.77 285.73 148.99 137.08
Sewerage 2011-12 2012-13 2013-14 2014-15 2015-16
UGD - Network 2061.00 687.00 687.00 687.00
UGD - STPs 145.00 72.50 72.50
Total 2206.00 0.00 0.00 687.00 759.50 759.50
Roads & Urban Transport 2011-12 2012-13 2013-14 2014-15 2015-16
Roads Upgrdation 217.00 72.33 72.33 72.33
Roads New Formation 228.25 76.08 76.08 76.08
Public Transport/ Improvements 0
Road Infra Dev (Imp. Roads) incl. Widening 450.00 112.50 112.50 112.50 112.50
Flyovers and ROB/ underpass 4000 2000.00 2000.00
Total 4895.25 72.33 184.83 260.92 2188.58 2188.58
Storm Water Drains 2011-12 2012-13 2013-14 2014-15 2015-16
Drains Upgradation 0.00 0.00 0.00 0.00
Drains New Formation 2576.70 858.90 858.90 858.90
Total 2576.70 0.00 0.00 858.90 858.90 858.90
Street Lights & Fire 2011-12 2012-13 2013-14 2014-15 2015-16
Replacement - Tube Lights- 2.00 0.40 0.40 0.40 0.40 0.40
New Installation - Tube Lights 0
New Installation - High power Lamps 83.00 23.24 23.24 36.52
New Installation - High Mast Lamps 0.11
Fire services 135.50 23 60 17 29 6.50
Total 220.61 23.40 60.40 40.64 52.64 43.42
5115.85 95.73 245.23 301.56 2241.22 2232.00
Conservancy (SWM) & Sanitation 2011-12 2012-13 2013-14 2014-15 2015-16
New Vehicles (Primary Collection) 8.95 2.24 2.24 2.24 2.24
New Vehicles (Secondary and Disposal) 12.50 10.00 2.50
Acquiring New Disposal Site 80.00 80.00
Infrastructure at Disposal Site 23.40 23.40
DLDPs & Container Bins 18.93 4.50 4.50 4.50 0.60 4.83
Public Convenience Systems 165.21 38.00 38.00 38.00 38.00 13.22
Total 308.99 42.50 44.74 44.74 50.84 126.18
Urban Poor/ Slums 2011-12 2012-13 2013-14 2014-15 2015-16
Slum Improvement - Rehabilitation/ Housing 702.00 234.00 234.00 234.00
Slum Improvement - Infrastructure 88.00 29.33 29.33 29.33
Slum Improvement - Land acquisition
Total 790.00 0.00 263.33 263.33 263.33
Others 2011-12 2012-13 2013-14 2014-15 2015-16
River Conservation/ Protection 50.00 16.67 16.67 16.67
Tree Plantation & Gardens 15.00 3.75 3.75 3.75 3.75
Urban Governance/ E-Governance/ GIS 50.00 12.5 12.5 12.5 12.5
Total 115.00 0.00 16.25 32.92 32.92 32.92
Grand Total 12,024.29 185.39 598.99 2,474.18 4,355.70 4,409.92
All Fig. are in Rs. Lacs.
Water supply
Total
Investment up
Phasing Year




Final City Development Plan Narsinghpur Page: 126
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
ANNEXURE: 4
FINANCIAL OPERATING PLAN NARSINGHPUR NAGAR PALIKA
Financial Year
2010-11 2011-12 2012-13 2013-14 2014-15
Total
Revenue Account Rs in Lakhs
Revenue Income
A Own Sources
1 Octroi

1.1 Net Collection 262 301 347 399 458 1767


2 Taxes

2.1 Property tax
355


409


470


540


621


2395


2.2 Lighting & Sanitation
Tax
2.3 Water Tax (general &
Special)
Sub Total Taxes - 2
355 409 470 540 621 2395


3 Non-Tax Income

3.1 Income From
Commercial Activity
96 111 127 147 169 650
Sub Total Non-Tax
Income - 3
96 111 127 147 169 650
Total Own Sources -
A (1 to 3)
714 821 944 1086 1248 4812


B Grants & Subsidies



1 Grants 1001 1205 1451 1746 2101 7504
Grand Total Revenue Income (A+B) 1715 2026 2395 2831 3349 12317

Financial Year 2010-11 2011-12 2012-13 2013-14 2014-15 Total
Capital Account Rs in Lakhs
Capital Income
A Capital Grants
1 Water Conservation
4 4 4 5 5 21
2 Basic Services
37 38 40 42 44 201
Sub Total Grants - A 40 42 44 46 49 222
B Loans

1 From Government

2 From other Institution

Sub Total Grants - B 0 0 0 0 0 0
C Other Capital Income 0 0 0 0 0 0
Grand Total A+B+C 40 42 44 46 49 222


Total Income
1756 2068 2439 2878 3398 12539

Financial Year
2010-11 2011-12 2012-13 2013-14 2014-15
Total
Revenue Account Rs in Lakhs
Revenue Expenditure
A Establishment Expenditure
1 General Administration
Expenses
26 28 30 32 34 149
2 Water Supply 35 40 46 53 61 235
3 Conservancy 92 99 106 114 122 533
4 Public Works
Final City Development Plan Narsinghpur Page: 127
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
4.1 Roads 6 7 7 7 7 35
4.2 Buildings
5 Street Lighting 1 1 1 1 1 6
6 Fire Service 3 3 3 4 4 17
7 Municipal Institutions
7.3 Kanji House 2 2 3 3 3 14
8 Commercial Activities 0 0 0 0 0 0
9 Pension 4 5 5 6 7 28
10 Revenue Department 44 51 59 68 79 301
11 Other Establishment Expenses 17 20 23 26 30 117
Sub Total Estab. Expenditure - A 231 255 283 315 350 1435
B Operation & Maintenance Expenditure
1 Water Supply 18 21 24 28 32 125
2 Public Works
2.1
Roads
4

4

5

6

7

25

2.2 Buildings
3 Street Lighting 130 149 172 197 227 875
4 Fire Service 1 1 1 1 1 5
5 Miscellaneous - Vehicles 21 24 28 32 37 143
Sub Total O & M - B 174 200 230 265 304 1173
Grand Total Revenue Expenditure
(A+B)
405 456 514 579 655 2608

Financial Year 2010-11 2011-12 2012-13 2013-14 2014-15 Total
Capital Account Rs in Lakhs
Capital Expenditure
A General Administration Expenses 9 10 12 13 15 59
B Water Supply 61 70 81 93 107 411
C Conservancy
D Public Works 192 215 239 267 298 1212
E Municipal Institutions
1 Education 4 5 5 6 7 27
F Commercial Activities 0 0 0 0 0 0
G Miscellaneous 600 690 794 913 1050 4048
Total Capital Expenditure 867 990 1131 1292 1477 5757

Total Expenditure 1271 1446 1645 1872 2132 8365

Final City Development Plan Narsinghpur Page: 128
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

ANNEXURE: 5
FOURTH WORKSHOP INVITATION LETTER FORMAT

Final City Development Plan Narsinghpur Page: 129
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

ANNEXURE: 6
LIST OF ATTENDEE

Final City Development Plan Narsinghpur Page: 130
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

Final City Development Plan Narsinghpur Page: 131
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

ANNEXURE: 7
NEWS COVERAGE
HARIBHUMI 12 MARCH, 2010

DAINIK BHASKAR (NARSINGH BHASKAR), 12 MARCH, 2010

Final City Development Plan Narsinghpur Page: 132
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

ANNEXURE: 8
STAKEHOLDERS PERCEPTION
Interaction with various department heads, stakeholders, eminent personalities and citizens were undertaken
and sector specific issues where discussed in length and verbal and written suggestions were taken during the
various workshop conducted in the city. Few of the key/major suggestions are written below to form an
understanding of the city and highlight the underlying issues/Perception, which need to be addressed through
city development plan.
1. Because of Heavy Freight traffic Sankal Road needs to be wider & remove Road side encroachment.
2. Comprehensive traffic study needs to be proposed which covers entire Road network of the City.
3. All the Existing Green Space/Gardens need to be free from encroachment.
4. Road Signage, Indicators, Footpath should be provided for better Traffic movement & Safety.
5. According to road capacity of the city R.T.O should permit the vehicles.
6. In existing Civil Hospital Trauma Centre should be developed for emergency purpose. It should be
upgraded by latest equipment, Laboratory, Ambulance etc.
7. Rain Water Harvesting should be made compulsive before permitting new development.
8. As per Development plan of Narsinghpur a bye pass should be developed as an immediate requirement.
9. Road network should be free from all type of encroachment, Roads should be wider, Provision at
divider as all major roads, provision of foot path.
10. Entire town should be connected by underground drainage system with sewerage treatment plant.
11. For solid waste disposal, a separate land should be provided with required equipment for scientific
treatment.
12. Mandi Market of Itawara Bazaar should be shifted to trenching ground.
13. The major Junction should be developed & furnished by signage, high mast light, indicators to reduce
accidents.
14. Lake Beautification along with restoration of Narsinh Mandir.
15. By lining work of Singri river, erosion of soil can be prevented.
16. Provision of public toilets at all public places should be provided.
17. City should be free from Slum Area by taking advantages of IHSDP or such schemes offered by Central
Govt. or State Govt.
18. Incinerators facility should be proposed by Nagar Palika so that disposal of Biomedical waste can be
done within city & Palika can generate income by such activities.
19. An auditorium having capacity of 5000 persons is required for cultural activities & communities based
programs.
20. Fly over should be proposed over Siddhpur Road, Kapuri Road & railway chowky and underpass near
jail.
21. Provision of parking space to avoid road side encroachment & Smooth traffic flow.
22. Strictly enforce to follow development control regulations for planned development of city.
23. Play ground and open spaces need to be maintained regularly.
24. Muktidham (Smashanghat) can be developed on Govt. land located at junction of Jarjola Raod falls in
the middle of the city.
25. All major Railway Crossing flyover or under pass should be proposed to reduce traffic congestion
during peak hours.
26. Property tax & water tax should be recovered by 100% of demand.
27. Transport Nagar should be implemented as an immediate requirement.
28. All the proposal of Road widening, Junction improvement covered under development plan should be
implemented of priority basis.
29. Vegetable market can be shifted from Itawara Bazaar to trenching ground.
30. For solid waste disposal a separate land should be made available & disposal should be done by
scientific treatment with modern equipments.
31. Solid wastes Burnt pollute the equipments & create health harebells, which should be restricted by
Nagarpalika Parishad.
32. Public toilet should be provided near itavara Bazar and Decentralisation of commercial activity from
Itavara Bazar should be proposed to decongest the area and smooth traffic flow.
Final City Development Plan Narsinghpur Page: 133
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
33. Nagar Palika should form a separate cell which can be involved in removing encroachment.
34. Singri Nadi should be recharged by feeding water from Canal.
35. Pick stand or Bus stop with Bus shelter should be proposed on road side to facilitate the visitors and to
prevent the chaotic parking of Bus on the road.
36. There are so many old archeological art & sculpture found in the village Paretha, which should be
restored and conserved by proposing a museum in the city.
Final City Development Plan Narsinghpur Page: 134
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

ANNEXURE: 9
FINANCIAL REFORMS

1. Future Demand
In developing city Narsinghpur, following are the projected population growth as per the
trend and growth catalyst. To accommodate the same population at each stage, housing
requirements and households has been identified. Particular projections are as under in table
1.
Table 20: Estimated Population and HH Units to accommodate the Population
Description 2001 2015 2025 2035
Population 56,203 89,469 124,708 173,828
Avg. Household size 6.12 5.25 5.00 5.00
No. of housing Units 9,183 17,042 24,942 34,766

To achieve the water supply need as per the standards, following are the investments to be
done at each stage by timeline of 2015, 2025 and 2035 respectively.

2. Finance of Proposal (Water Supply)
Operation & Maintenance
Investment by
2015
Investment by
2025
Investment by
2035
Total Investment
Need
(Rs. Lac) (Rs. Lac) (Rs. Lac) (Rs. Lac)
1 Daily Supply Per-capita supply 416.42 238 332 986
2 Treatment
Treatment capacity
against supply 120.78 48 66 235
3
Distribution
Network
Distribution Network
length against road
length 282.04 173 240 695
4
Elevated Storage
capacity
Elevated Storage
capacity w.r.t Supply 14.95 11 15 41
5 19.2 45 0 64
6 58.35 127 177 363
911.74 641 831 2,384 Total
Particulars Indicator
Refurbishment of old distribution network
Metering System/ Installation of water
No

Municipal Finance (Arrears and Demand)
Above mentioned three aspects should be considered to make water supply system self
sustainable. It is very essential for any municipality to recover capital cost and operations
maintenance cost from users. This will lead to better self sustainability, good Governance
and less dependency on any kind of grants. Targeted collection of arrears and demand
assessment will lead to better funding opportunities for future development.

2.1 Operation and Maintenance
Examining the previous calculation of O & M cost per Mld, forecasting has been done for
the year 2015. In 2008, around 2.8 lacs O & M cost have been spent to supply 1 million liter
per day (MLD) of water. Keeping the base of this expenditure, tentative future O & M cost
in 2015 has been calculated (below in table 3) to supply 12.08 MLD of water.
Final City Development Plan Narsinghpur Page: 135
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
Table 21: Forecast of O & M cost in 2015
Existing Condition
No Particulats Unit
1 Water Supply in 2008 mld 3.75
2 O & M in 2008 Rs 1,056,935
3 Per mld Cost Rs 281,849
4 Water Supply in 2015 mld 12.08
5 O & M Cost Rs 3,404,740
Forecast
Forecast for O&M Cost for 2015


Preparing the best case scenario, some targets have been derived. The same are mentioned
under:
1. 100% HH (as per requirement on 2015) have connections
2. 100% non residential (considering 20% of residential connections) have connections
3. Arrear collection should be completed by 2015
4. Collection demand will reach to O & M cost by 2015
5. Inflation Rate is considered as 8%
6. Water tax will increase at up to 25% in every 3 years as per change in O & M cost
7. Linear regression has been considered which can vary than the actual

Table 22: Increase in Connection and Increase in Per Connection Water Tax
No Year Unit 2008 2009 2010 2011 2012 2013 2014 2015
1
MLD water supply
required MLD 3.75 4.94 6.13 7.32 8.51 9.7 10.89 12.08
2 Total O&M incurred Rs 1,056,935 1,392,335 1,727,736 2,063,137 2,398,537 2,733,938 3,069,339 3,404,739
3
No. of Residential
Connections Required
for 100% coverage number 7136 8448 9760 11072 12384 13696 15008 17042
4
No. of Non -
Residential Connections
Required for 100%
coverage number 1427 1690 1952 2214 2477 2739 3002 3408
5 Total Connections number 8563 10138 11712 13286 14861 16435 18010 20450
6 Per connection charge Rs./HH 123.43 137.34 147.52 155.28 161.4 166.35 170.43 166.49
7 Inflation 8% Rs./HH 148.33 159.32 167.7 174.31 179.65 184.06 179.81
Per connection Water
Tax Rs./HH 143.69 172.43

Above mentioned table shows:
1. Linear regressive increase in total operations maintenance cost
2. Linear regressive target to achieve 100% connection by 2015. This can be targeted
according to the housing demand each year.
3. Per connection water tax has been calculated considering expected total o & m, total no
of connection and 8% inflation.
Final City Development Plan Narsinghpur Page: 136
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
2.2 Capital Cost
To cater the population in 2015, capital investment of around 911 lacs is needed. Linear
regression of the same is explained below in table 5. Total Capital expenditure has divided
into no of total connection expected in 2015. Two options have been evaluated to collect the
same revenue by 2015.
1. One time charge of 4458 Rs in 2015.
2. Every year collection
Considering the acceptance level of people, second option seems more viable. This option is
being worked out in detail below (table 5).

Table 23: Water Charge per Year
Capital Cost and Water Charge
Year 2011 2012 2013 2014 2015
Capital Expenditure in
Rs 182,34,777
182,34,77
7 182,34,777 182,34,777
182,34,77
7
Water Charge in Rs.
(Old Connections) Per
Year 892 892 892 892 892
Water Charge in Rs.
(New Connections) Per
Year
1783
(+892 Rs.
Every year
till 2015)
2675
(+892 Rs.
Every year
till 2015)
3567
(+892 Rs.
Every year
till 2015) 4458

2.3 Municipal Finance (Arrears and Demand)
Municipal finance is being a major issue in present to make municipality self sustainable. As
per the target, collection of arrears should be nil. Linear regression has shown below in table
6. It is very essential to make collection demand same as operation maintenance by 2015.
Target figures as per year demand has been established and shown in table below.

Table 24: Targeted figures of Water Tax each year for Arrears and Demand
Year 2008 2009 2010 2011 2012 2013 2014 2015
Arrear to be Collected
in Rs. 4,005,000 3,432,857 2,860,714 2,288,571 1,716,428 1,144,285 572,142 0
Increase in O&M
Collection per Year in
Rs. 1,162,000 1,482,391 1,757,012 1,992,402 2,194,164 2,367,104 2,515,337 3,404,739
Water Tax collection (Municipal Finance)
Final City Development Plan Narsinghpur Page: 137
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
3. Finance of Property Tax
A property rate has to be decided as the development grows in the city on timely bases. To
reach the highest self sustainability, arrear recovery should reach to minimal on 2015.
Demand by 2015 should reach to actual. Linear regression for the same has shown below in
table 7. From the demand of collection and number of households, per unit taxable amount
can be revised which should be inflated every year as per market rate. Considering the
present scenario, inflation rate has taken as 8% which can vary accordingly as per market
rate.
Table 25: Reforms required in Property Tax by 2015
Year 2007 2008 2009 2010 2011 2012 2013 2014 2015
House Holds
6739 6141 5542 4944 4345 3746 3148 2549 16256
Assumed Non -
Residential
Property @
10% 809 737 665 593 521 450 378 306 1951
Total
7548 6878 6207 5537 4866 4196 3526 2855 18207
Arrear
Recovery (in
Rs.) from Base
Year (2008) 4133000 3691000 3163714 2636429 2109143 1581857 1054571 527286 0
Arrear
Recovery (in
%) from Base
Year (2008) 14.29 28.57 42.86 57.14 71.43 85.71 100.00
Current
Demand 1730000 1775000 1282814 1144264 1005714 867164 728613 590063 3762615
Per Unit
Property Tax
Demand 229.19 258.08 206.66 206.66 206.66 206.66 206.66 206.66 206.66
Per Property
Tax Demand
considering
the Inflation
(8%) 223.19 241.05 260.33 281.16 303.65 327.94

Final City Development Plan Narsinghpur Page: 138
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh
4. Finance of Sewerage and Solid waste Management
At present, city does not have sewerage system or solid waste management systems. It is
essential to set up the system first and incurred the capital expenditure on prior bases from
any grants or in house capabilities. Next stage is to analysis the operation maintenance
cost and all the aspects of it. Based on this procedure, every detail has to be marked and
noticed. It is essential to lay taxes as well as charges based on this analysis. The same above
procedure has to be followed to determine the charges as well as per household taxes.

Final City Development Plan Narsinghpur Page: 139
SAI Consulting Engineers Pvt. Ltd. UA&DD, Government of Madhya Pradesh

ANNEXURE: 10
REFERENCES
1. Toolkit Guidance Provided by UADD
2. Census of Housing and Assets Madhya Pradesh, 2001
3. District Census Hand book 1991,2001
4. District Registrar Office Narsinghpur
5. Detail Project Report for Water Supply Scheme for Narsinghpur - June 2009 by Vastushilpi Project &
Consultants Pvt. Ltd.
6. Detailed Project Report of Rehabilitation and Upgradation of Slum under IHSDP for Municipal Council
Narsinghpur by R.K and Associates
7. Master Plan Narsinghpur by Town & Country Planning Department Madhya Pradesh
8. Electricity Department - Narsinghpur
9. Mandi board details
http://www.mpmandiboard.com/agriinfoE.asp
http://www.mpmandiboard.com/imandibasicE.asp
10. Narsinghpur district website
http://www.narsinghpur.nic.in/history.htm
11. Preliminary Census Abstract 2001
12. Pollution Control Board Annual Report 2005-2006
13. Report on Providing and Laying of Sewerage System of Narsinghpur June 2009 by Vastushilpi Project
& Consultants Pvt. Ltd.
14. Urban Administration and Development Department- Madhya Pradesh Website
http://www.mpurban.gov.in/Org_Struc.asp
15. Various Departments of Narsinghpur Municipal Council

You might also like