DMIC Rajsthan Infinite Opportunities
DMIC in Rajasthan
39% of the DMICs area of influence lies in the State 60% of the States area covered in the area of influence Close proximity to NCR region Major Industrial concentration along the DMIC:
Bhiwadi, Alwar, Jaipur, Ajmer, Bhilwara, Chittorgarh Jodhpur, and Udaipur
CONNECTIVITIES
The connectivity suggested by the State Government are as follows:
Roads 1. 2. 3. 4. 5. 6. Rail 1. 2. 3. 4. 5. Passenger Rail Link between Palwal to Rewari via Bhiwadi. Extension of metro link beyond Gurgaon to Manesar/Bawal. This is likely to link Daruhera/Bhiwadi if Bawal is linked. Passenger Rail Link from Neemrana to Bhiwadi via Ajarka. Rajsamand to Bhilwara to have linkagae of Rajsamand with Kishangarh. Broadgauge rail linkage of (a) Ajmer-Merta Road (b) Peepar-Bilara-Bar. Four laning of Rewari-Daruhera-Bhiwadi-Palwal Road (NH 71-B) from existing two lanes. Two laning of Sohna-Firozpur-Jhiraka-Alwar. Four laning of Daruhera-Bhiwadi-Tapukara-Tijara-Kishangarh-Alwar. Connecting Neemreana with Alwar via Beraud (SH.25) by four land. Neemrana-Ajarka-Kotkassim-Tapukara (New link road). Four laning of Makrana to Kishangarh via Parbatsar.
DMICDC
GOI through DMICDC is getting the Pre Feasibility for 6 nodes, one in each State and also for the DMIC region as a whole. DMICDC is in the process of appointing consultants.
4-Laning of existing Dharuhera-Bhiwadi-Tapukhera-Tijara-Kishangarh-Alwar 2 lane road (95 Km.) Four Lane Connectivity between Neemrana & Alwar via Baraud (62 Km.).
RIDCOR has already taken up 4 laning of Tapukhera-Alwar therefore a new project can be suggested in place of this project. The possible projects could be as under
Water sourcing and management project for Khushkhera-Bhiwadi-Neemrana IR Broad gauge linkage from Neemrana to DFC (Bhiwadi) Logistic hub in Khuskhera-Bhiwadi-Neemrana region
ii. Rewari iii. Ajmer iv. Palanpur v. Ahmedabad vi. Vadodara vii. Vapi viii. Nari Mumbai ix. Ludhiana
ISSUES
Appointment of consultants for feasibility studies and Master Planning of other four investment regions and industrial areas. Constitution of an Empowered Committee under CM/CS with concerned Ministers/Secretaries as members for approvals and monitoring. Identification of early bird projects in the Khushkhera-BhiwadiNeemrana region. MOU with DMICDC for early bird projects.
Chirttorgarh famous for its mineral based Industry. Cottage & Artisan units based on handloom, leather, terracotta & livestock are other major attractions Proximity to Dedicated Rail Freight Corridor at Ajmer. Lafarge setting up large cement plant
Investment Promotion Policy offers set of attractive incentives A new Investment Promotion Policy in the offing
Infrastructure
Power
Installed capacity: 5647 MW Investment of over US$1.3 billion planned this year Projects to add another 4500 MW by 2012 under implementation State to become surplus power by 2008
Roads
Well developed road network of National and State Highways State Mega Highway Project to build 1053 km of highways, at a cost of Rs.1,500 crore (US$350 million), under implementation
Human Capital
Large pool of qualified manpower Well developed network of higher and technical institutions
183 Industrial Training Institutes 23 Polytechnic Colleges 47 private engineering colleges
An Indian Institute of Technology, the premier institution, coming up in the State Multi-pronged strategy to expand and improve the quality of education both technical and non-technical LN Mittal Institute of Information Technology
Investment Opportunities
Manufacturing Sector Automobile and Autoancillary Cement Textiles Agro-processing Mineral processing Handicrafts Gems and Jewellery Infrastructure development Roads Power, including Non conventional Energy Special Economic Zones Hotels & Tourism infrastructure and services IT Enabled Servicers
Finance Secretary & Commissioner Investment Government of Rajasthan Jaipur Mumbai, July 3, 2007
Umesh Kumar