Forest Hills Commons Developer's Presentation To Egleston Square Main Streets, 9-24-13
Forest Hills Commons Developer's Presentation To Egleston Square Main Streets, 9-24-13
Boston Redevelopment Authority Impact Advisory Group Design Update Forest Hills Arborway, LLC Utile, Inc. Architecture and Planning Offshoots, Inc. Howard/Stein-Hudson Associates, Inc. Fort Point Associates, Inc.
utile
Meeting Agenda
Project Summary
utile
Project Summary
Redevelopment of former petroleum distribution depot into a mixed use development with active street level uses 280 Rental Apartments (37 designated Affordable) 7,960 SF Commercial, retail and Amenity Space
utile
Oblique View
Design Objectives
Initial Proposal
utile
Project Summary
Design Objectives
Initial Proposal
utile
Community Feedback
Initial Proposal
utile
2.
Washington Streetscape
Develop continuous public realm along Washington St. Create more breaks on the street particularly midblock Planting width of 3 is too small at edge of building Crosswalk at Burnett
3.
Landscape / Parking
Add more street level greenspace Reduce surface parking Consider parking surface treatment Pedestrian access across Easement Consider that there may be a future public path behind property Support a new bicycle path along MBTA land at the rear of the property
4.
Stakeholder Feedback
Massing
1. Massing
Change the shape of Bldg. A and its relationship to Washington Street Soften massing along rear edge Provide more active street frontage Move density away from the neighborhood
2.
Washington Streetscape
Develop continuous public realm along Washington St. Create more breaks on the street particularly midblock Planting width of 3 is too small at edge of building Crosswalk at Burnett
3.
Landscape / Parking
Add more street level greenspace Reduce surface parking Consider parking surface treatment Pedestrian access across Easement Consider that there may be a future public path behind property Support a new bicycle path along MBTA land at the rear of the property
4.
Revised Proposal
utile
Revised Proposal
utile
10
Revised Proposal
utile
11
Public amenities and active frontage work to enhance the Washington Streetscape
Initial Proposal
Revised Proposal
utile
12
utile
13
Stakeholder Feedback
Washington Streetscape
1. Massing
Change the shape of Bldg. A and its relationship to Washington Street Soften massing along rear edge Provide more active street frontage Move density away from the neighborhood
2.
Washington Streetscape
Develop continuous public realm along Washington St. Create more breaks on the street particularly midblock Planting width of 3 is too small at edge of building Crosswalk at Burnett
3.
Landscape / Parking
Add more street level greenspace Reduce surface parking Consider parking surface treatment Pedestrian access across Easement Consider that there may be a future public path behind property Support a new bicycle path along MBTA land at the rear of the property
4.
Revised Proposal
utile
15
Accentuate public realm and provide relief for the sidewalk at major lobby entries
Perspective Vignette
utile
16
Accentuate public realm and provide relief for the sidewalk at major lobby entries
Perspective Vignette
utile
17
Accentuate public realm and provide relief for the sidewalk at major lobby entries
Perspective Vignette
utile
18
Revised Proposal
utile
19
Revised Proposal
utile
20
Stakeholder Feedback
Landscape / Parking
1. Massing
Change the shape of Bldg. A and its relationship to Washington Street Soften massing along rear edge Provide more active street frontage Move density away from the neighborhood
2.
Washington Streetscape
Develop continuous public realm along Washington St. Create more breaks on the street particularly midblock Planting width of 3 is too small at edge of building Crosswalk at Burnett
3.
Landscape / Parking
Add more street level greenspace Reduce surface parking Consider parking surface treatment Pedestrian access across Easement Consider that there may be a future public path behind property Support a new bicycle path along MBTA land at the rear of the property
4.
utile
22
utile
23
utile
24
Relevant Precedents
utile
25
Stakeholder Feedback
2.
Washington Streetscape
Develop continuous public realm along Washington St. Create more breaks on the street particularly midblock Planting width of 3 is too small at edge of building Crosswalk at Burnett
3.
Landscape / Parking
Add more street level greenspace Reduce surface parking Consider parking surface treatment Pedestrian access across Easement Consider that there may be a future public path behind property Support a new bicycle path along MBTA land at the rear of the property
4.
Revised Proposal
utile
27
utile
28
utile
29
utile
30
Design Enhancements
Total commercial space increased by 28% Surface parking spots reduced by 65% Area of surface pavement dedicated to cars reduced by 30%
utile
31