Professional Documents
Culture Documents
Ubl Profile
Ubl Profile
Ubl Profile
OPERATION &MAINTENANCE, PROJECT DEVELOPMENT, DPR, TECHNICAL AUDIT, AMC, TECHO-COMMERCIALFEASIBILITY, DESTINATION MANAGEMENT PLAN
Disclaimer: all contents and images are property of Usha Breco Limited. Any copy or reproduction of any part of this report in any form shall require prior written consent from Usha Breco Limited, India.
Ropeways Conceptualization, Construction, Erection, commissioning, Operation & Maintenance Passenger Ropeways
Gondola Lifts Ski lifts and chair lifts Jig backs Pulsed Gondola Funicular
Industrial Ropeway Developing ropeways as tourist place Consultancy for Ropeway Solution Developing Urban Transportation Ropeway
Registered Office UshaBreco Limited 701, Surya Kiran Building, 19, K G Marg New Delhi - 110001
Head Office UshaBreco Limited Parsvnath Majestic Arcade (3rd Floor) 18A, VaibhavKhand, Indirapuram Ghaziabad, U.P.201014 Ph. 91-0120- 418700 (30 Lines) Fax 0120-4183760 Email: ukddelhi@ushabreco.com URL: www.ushabreco.com
Most Environmental friendly No emissions, noise generation. Most Energy Efficient. Least Land requirement. Least deforestation. High service quality continuous transportation. No disturbance to flora and fauna. Cost effective. Least Installation time. Most suitable for difficult terrains. Most reliable. High adaptability.
To hill top Across River Across Gorge At Ski Resorts At Amusement parks Site seeing over forest, park, open air museum For Mass Urban Transportation in major cities For Material Transportation At construction site like bridges & dams
UBL carries about 60 million passengers on its own Ropeways every year. With over 100 cumulative Ropeway operating years experience, it has carried over 90 million passengers till date. With high level of expertise in the field of Industrial Ropeways, Cableways and Passenger Ropeways and by adopting state of the art Design Engineering and Modern Techniques in operations and maintenance through tie-ups with OITAF and world-renowned technology providers in ropeways, UBL has emerged as a leader in the field of Ropeways Operation and is uniquely positioned to be the Passenger Transportation Company of choice.
Project Management:
UBL, a passenger transportation management company derives its present strength from providing end-to-end solution for passenger ropeway systems. Its own core competency is in the field of development, operation and maintenance of the ropeway projects. In order to acquire expertise in the realm of project management, it raised Usha Breco Realty Limited (UBR), a wholly owned subsidiary, specializing in the field of project management and infrastructure development. With experience of UBR in structuring transaction and in infrastructure creation, UBL is highly capable of managing complex problems from Commissioning to Passenger Transportation. With continual aim of enlarging its expertise, the company aims to become the leading company for providing total solutions in the realm of Ropeway Transport Industry.
Amenities:
For the comfort of pilgrims, amenities like food courts, pure and cold drinking water, toilets, refreshment counters, landscaped gardens, first aid facilities, resting areas, car parking, CCTV etc... have been made available.
Type of Ropeway
Max. designed Speed Designed Capacity (at max. design speed) Horizontal Length between station fronts Vertical Rise between Lower & Upper station floors Travel Length (One way) Type of Cabin/Chair No. of cabins as per designed capacity Hauling Rope No. of Trestles Year of Commercial Operation.
511 M
686 M
Kalidevi Ropeway
2005 (Refurbished) Detachable Grip 6seater Monocable 1350 PPH 3.5 m/s 297 meters 763 meters Totally enclosed 36 of each 13.42 6 Seater
Capacity Speed Vertical Rise Travel Length Type of Cabin No. of Cabins Traffic Volume for the year 2012-13 (in Lakhs)
Route of Maa Kalidevi Udankhatola, Carrying Pilgrims with Ease through A Difficult and Arduous Terrain
Ropeway:
In order to develop Ambaji Pilgrimage, Maa Ambaji Udankhatola on the mountain of Gabbar has been installed, so that more and more pilgrims can visit and enjoy the beauty and holiness of Gabbar with ease and joy. Ropeway on Gabbar Hill has in fact encouraged more and more pilgrims, especially the aged and infirmed, senior citizens and people from all corners of the world come to visit the temple through the ropeway.
Details
Monocable Detachable grip 4-Seater cabin 600 PPH 2.75 m/s 363 m 138 m Semi enclosed 18 80 kW 36 mm dia SWR 1 1998 9.89
Route of Maa AmbaJi Udankhatola, Carrying Pilgrims with Ease through A Difficult and Arduous Terrain
Malampuzha Udankhatola:
Amidst the various attractions existing at Malampuzha, the star of course is the Udankhatola, South India's first and the only Passenger Ropeway of its kind. Flying over the garden at a height of 60 ft., providing the best panoramic view of the beautiful landscapes protected by the mammoth Dam, unique by nature, extremely safe and economical too, the twenty minutes sky-ride on Malampuzha Udankhatola provides an unforgettable experience.
Malampuzha
Monocable Fixed grip 2 seater chair lift 500 PPH 1.1 m/s 626 m 7m Semi enclosed with hood protection 80 18.5 kw 28 mm dia SWR 8 1991 3.36
Route of UdanKhatola, carrying pilgrims providing a magnificent view of the serene beauty of Malampuzha
Parameters
Type of Ropeway
Tara Tarini
Monocable Fixed Grip 4 Seater Closed Cabin ride 150 PPH 1.39m/S 333m 149m 4-Seater Closed Cabin 4 14.91 KW 26 mm Dia 1 2013
Route of Maa Tara Tarini UdanKhatola, carrying pilgrims with ease through a difficult and arduous terrain
Designed Capacity (At Max. Speed) Max. Designed Speed Travel Length Vertical Rise Type Of Cabin No. Of Cabin Main Motor Hauling Rope No. Of Trestles Year Of Commissioning
Ropeway Engineering & Solutions DELIVERING PROJECT ACROSS INDIA & ASIA
Tara Tarini
Pan India presence - Registered Office in New Delhi, Corporate office at Indirapuram, Ghaziabad, UP & Regional Offices at Kolkata and Haridwar.
Mr. PrashantJhawar
Prashant is a second generation entrepreneur who joined Usha Martin the family business as a trainee in 1982. Serving in increasingly progressive capacities at the organization, he has handled complex responsibilities over the years. Prashant was instrumental in listing Usha Martin on the Luxembourg Stock Exchange in 1994. In the same year, he founded Usha Martin Telekom, a GSM cellular network provider, in partnership with Telekom Malaysia and other international investors, from which he successfully exited by trade sale to Hutchison Whampoa.
Mr. S. K. Barasia
Mr. S. K. Barasia, Director, is a Fellow Member of The Institute of Cost and Work Accountants of India. He has over 50 years of experience in Accounts, Finance and Administration. He is on the Board of Directors of several companies and presently serving as the Whole-time Director of Usha Martin Ventures Limited. Mr. Barasia started his career in the year 1955. He had worked with HINDALCO from 1962 to 1974 as Accounts Executive. Later he joined Usha Martin Group in the year 1974 and still associated with the same group in various capacities and in different companies, last being with Prashant Investments Limited as Managing Director. Then he retired and again joined as Whole time Director in Usha Martin Ventures Ltd in the year 2007.
Feasibility study of Metro Cable Car (Ropeway) systems for Mass Urban Transportation:
Site visit and inspection of the proposed alignment of the Ropeway site. Study of city master plan and layout. Traffic survey at site and nearby areas for assessment of the traffic flow Assess and finalise design capacities, parameters and operational hours in the context of continuous operational needs throughout the year Confirm initial proposed ropeway routing with respect to avoid any constraints and to meet all technical and operational needs of the system Topographical survey of the route Discuss and finalise the layout of the Ropeway stations and customer amenities for maximum comfort of the passengers Assessment of the land requirements for the ropeway stations and line Finalise the ropeway parameters with Authorities with due regard to ropeway operational issues Preparation of techno-commercial feasibility report of the ropeway. Preparation of Operation & Maintenance details for the Ropeways. Project structuring and financial analysis Preparation of Detailed Feasibility Report
Identifying the location with ropeway needs Evaluation of the Site and Project Feasibility Complete Survey & Investigations Discussion with concerned State Government as per the prevailing aerial ropeway act or policy in place and approval of the project Execution of Agreement and securing site lease Prepare Detailed Project Report Secure land and various non-statutory clearances Obtain statutory clearances like Environment & Forest clearances, clearances from Airport Authority of India etc.
Tie-up suppliers/contractors for equipments/civil works Obtain Financial Closure Complete Detail Engineering and Start Construction works Manufacturing, Erection, Commissioning and O&M of
Spare
Parts
for
Passenger
and
Material
Preparation of specifications Preparation of Quality Assurance Plan for the component Testing and Inspection
with
methodology
for
Milestones
1977
1988
Worlds first highest capacity Mono-cable ropeway for Udaipur Cement Works, Udaipur, Rajasthan, India. 300 TPH, 5.8 KM long for transportation of limestone. Commissioned 11KM long Bi-cable Material ropeway with two fixed anchored span of 1 km for Hetauda Cement Industries, Nepal Commissioned Maa Kalidevi Passenger Ropeway in Gujarat under BOOT model UBL with Poma, France commissioned detachable grip, 1200 PPH Passenger ropeway with special steel suitable for sub zero temperature and in avalanche prone area from Gulmarg to Aparwat in J&K, India Commissioned 1600 M long (free span of 1400 M), Twin track rope, Twin hauling rope Jig back passenger ropeway system, 17 Persons / cabin at Parwanoo, H.P.
Milestones
2000 2003
2013
Milestones
CLIENT LIST: UBL till date has successfully designed, supplied, erected & commissioned Industrial Ropeways (with automation) & Cableways, Passenger Ropeways in India, Nepal, Bangladesh and Iran. List of projects executed by UBL is as follows: Name of Company & Project Location
S N
1
Details of Work
Design, manufacture, supply, civil work, erection, testing and commissioning of Ropeway on Turnkey basis Design, manufacture , supply, civil work, erection, testing and commissioning of ropeway Supply of line sheaves, mount beams, box-heads, buckets and all structures, erection, testing and commissioning. 2 Nos. 2 motors radial cableways on turnkey basis for construction of Srisailam dam
Parameters of Equipment
150 TPH, 14.96 Km long First longest Industrial single section Monocable Ropeway for transportation of Lime stone 700 M Long, twin cable Jig back passenger cum goods ropeway across river Noa-Dehing. Capacity 8 persons per cabin or 2000 Kgs payload 140 TPH, 22 Km (Longest) Mono cable Industrial Ropeway. And to its credit is the highest industrial ropeway tower (53 mtrs) 12.9 Tonnes Hook load 700 M span each cableway for construction of Srisailam dam
MysoreCement Ltd, Ammasandra, Karnataka, India Oil India Ltd. Duliajan, Assam, India
1975
1977
1977
Details of Work
Design. Manufacture, supply, civil work, erection, testing & commissioning of ropeway on Turnkey basis Design, manufacture , supply, civil work, erection, testing and commissioning of ropeway Design, Manufacture, supply, civil work, erection, testing and commissioning of ropeway. Design, manufacture, supply, civil work, erection, testing and commissioning of ropeway. On turnkey basis Design, Manufacture, supply, erection, testing and commissioning of ropeway Design, manufacture, supply, erection, testing and commissioning of Bicable aerial ropeway. Design,
Parameters of Equipment
Worlds first highest capacity 650 T, 4.18 Km Bi cable Industrial Ropeway along with associated belt conveyors for transportation of limestone 450 TPH 1 KM long Bicable Ropeway for transportation of limestone. 506 M long 800 PPH First Mono cable Detachable grip cabin ride Passenger Ropeway 300 TPH, 5.8 Km Mono cable Industrial Ropeway with Double Box-head. (Worlds highest capacity Monocable.) 300 TPH, 11.3 Km Bi cable ropeway in Nepal with 2 free spans of 1Km long 600 TPH, 2.5 KM long 27icable ropeway for transportation of limestone.
1981
1983
1985
10
1985
11
Jaiprakash
1985
Details of Work
manufacture, supply, erection, testing and commissioning of Bi cable ropeway Design, Manufacture, supply, civil work, erection, testing and commissioning of aerial ropeway including construction of lake foundation on turnkey. Design, manufacture, supply, erection , testing and commissioning of ropeway. Design, Manufacture, supply, erection, testing and commissioning of ropeway on turnkey basis Design, Manufacture, supply, erection, testing and commissioning of ropeway on turnkey basis Design, Manufacture, supply, erection, testing and
Associates, Chamera Dam, India 12 Manikgarh Cement, Gadchandur, Maharashtra, India 1986
13
J.P. Rewa Cement, Rewa. MP, India UshaBreco Ltd., Pawagadh, Gujarat, India
1986
650 TPH Designed 500 TPH equipped 3.55 KM long 28icable ropeway for carrying limestone. 800 PPH designed capacity 700 M long Mono cable Detachable grip cabin ride Passenger Ropeway at Kali Devi, Gujarat 500TPH 3 km long BiCable Ropeway for carrying limestone.
14
1986
15
1987
16
Parwanoo, H.P.
1988
1650 M long Twin Track Twin hauling rope Jig back passenger Ropeway of 150 PPH
Details of Work
commissioning of ropeway on turnkey basis. Design, Manufacture, supply, erection, testing and commissioning of ropeway Design, manufacture, supply, erection, testing and commissioning of ropeway Design, Manufacture, supply, civil work, erection, testing and commissioning of chair lift passenger ropeway. Design, manufacture, supply, erection, testing and commissioning of ropeway Survey, design, supply of fabricated structurals, customs clearance and transportation of imported equipments from port to site, civil work and erection of ropeway Design, manufacture, supply erection,
17
1988
18
1989
19
1991
20
1992
250 TPH AND 100 TPH capacity 14.10 Km long bidirectional ropeway for Clinker & Coal respectively. 1500 PPH, 2.2 Km Mono cable detachable grip passenger ropeway with 6 seater cabin (In collaboration with Pomagalski. SA, France)
21
Gulmarg J&K
1992
22
1993
Details of Work
testing, commissioning of ropeway on turnkey basis.
23
1993
24
Chandidevi Hardwar, UP
1997
Design, manufacture, supply, erection, testing and commissioning of ropeway on turnkey. Design, manufacture, supply erection, testing, commissioning of ropeway . Design, manufacture, supply, civil work, erection, testing, commissioning of ropeway Revamping of old ropeway
25
1998
26
2005
27
2009
Design, manufacture, supply, civil work, erection, testing, commissioning of ropeway across river Bhilangana ( Old Tehri to MadanNegi)
Details of Work
Design, manufacture, supply erection, testing, commissioning of ropeway.
Parameters of Equipment
Passenger Transportation Ropeway
1 2 3 4 5 6 7 8 9
S. N.
Name of Client
Shri ChatuShirangiDevasthan, Pune Tata Chemicals, Meethapur, Gujarat Hindustan Electro Graphite James Finlay, Sri Lanka Tea Garden Kanyakumari Malana, Himachal Pradesh Joshi math Auli Karni Mata Udaipur Sabarimala Palani, Tamil Nadu
Survey
Scope of Work
Type of Ropeway
Jig back Monocable passenger ropeway Jig back Monocable material ropeway for transporting Salt Monocable material ropeway for transporting coal Fixed grip Monocable ropeway for transporting tea leaves. Bi- Cable passenger ropeway Bi- Cable material ropeway Bicable, Chair lift and Ski lift, passenger ropeway Monocable Detachable grip passenger ropeway Monocable Detachable grip passenger ropeway Monocable Detachable grip
Feasibility study Feasibility study Feasibility study and survey Feasibility study Feasibility study Technical Audit Survey Survey Survey
10
18
19 20
21
22
Feasibility Study
24
Tourism Ropeway
Key Strengths:
Well Qualified and Trained Team of Engineers Team of skilled operation and maintenance Staff Well defined operation & maintenance guidelines, procedures and checklists Advanced Safety Systems for plant and machinery Operating and Maintaining 5 Ropeways in India with excellent as follows:
Operational since
1981 1991 1997 1998 2005 2013
In order to manage traffic volume of about 6.0 million/yr on our ropeways, which is quite a challenge in itself, we had to innovate and adopt to various customer friendly models for O&M to meet seasonality & daily variations in traffic pattern and at the same time comply with highest level of safety norms Contributing towards integrated development of the area, where ropeway is operating due to increased tourist flow resulting in rising income, better amenities and infrastructure, development of tour and hotel operations etc.
Training:
Continual Training Modules for all employees in different facets of ropeway O&M o Condition Based maintenance o Total predictive Maintenance o Rescue techniques o Fire fighting Skills o Planning and managing maintenance practices. Safety Aspects in Maintenance
PLEASE CONTACT FOR PROJECT RELATED QUERIES:1. LT. COL. (RETD.) RAKESH SHARMA MANAGING DIRECTOR M. NO. +91 9811663348 E-MAIL:rakeshsharma@ushabreco.com 2. MR. MANOJ PANWAR SENIOR GENERAL MANAGER M. NO. +91 9999689230 E-MAIL:manoj@ushabreco.com