Client : Equipment Details : Connection Symbol : Make and Sr. No. : Rating : ________MVA ____/____ KV; ONAN/ONAF/OFAN/OFAF. HV Amps : LV Amps: Outdoor/Indoor Installation Tap Changer : On Load/Off Circuit Range of Taps : +_______% to -_______% in ______ equal steps of ______% of HV % Impedance : ______/______/______ at Tap ____/____/____ Temperature Rise : _____ C/ _____ C in Winding/Oil above _____ C Details of Accessories Buchhol OSR OTI WTI MOG PRV Bushing z s Make
Description 1. Physical Inspection a. Transformer Tank b. Radiators (Check for valves) c. Bushing (Check for oil level and earthing cap) d. Explosion Vent (Check for diaphragm) e. Accessories(as mentioned above) f. HV/LV Jumpers 2. Installation / Connection a. Disposition vis-a-vis drawing b. Mounting direction of Buchholz c. Removing of Transportation Hood for condenser bushing d. Oil / Wdg. Temp indicator probes and oil pots. e. Breather mounting f. Stoppers g. Valves at radiators/B.relay h. Sampling/Filter/ Drain Valves i. Divertor Valve i. Fire Protection System 3. a.CT circuit checks
Checked For leakage/damage Correctness / Operation position of Valves as per Transformer Manual
Remarks
Tested By
Siemens Ltd.
Witnessed By
Date
:
Dept./Ref.No.
Office
SIEMENS LTD.
PI Ref.
Circuits checked by secondary injection Colour (Should be blue) For Trapped Air
5. Air Released from Buchholz Mechanical relay, radiators, Tank, OLTC, Bushings. a. Check for oil leakage 6. Earthing Mechanical a. Body Earthing b. Neutral Earthing c. Tank Band to Band Earthing d. Transformer Core & Frame . Earthing 7. Oil dielectric strength Instrument Used : Type of Electrode: Gap Setting: Electrical
Correctness
8. Insulation Resistance Electrical Instrument used : Make & Sr.No. : Temperature (OTI)-_____ C Min : 1M O /KV at 75 C Rt1 = 2Rt2 t2-t1 = 10C 9. * Vector group Electrical 10. * Ratio 11. * No load magnetising current 12 * Load current (reduced .impedance voltage) 13. Bucholz relay function (by hand pump / compressed O2 / by simulation / by oil draining.) 14. MOG and PRV check by simulation 15. OTI / HV WTI / LV WTI Remote indication * AS PER SHEET 5. Electrical Electrical Electrical Mechanical
Condition of Oil/Wdg
IR HV -E LV - E HV - LV
Correctness of Terminal Marking Tap Change Connection Damage to core assembly Balanced Current Operation
Tested By
Siemens Ltd.
Witnessed By
Date
:
Dept./Ref.No.
Office
SIEMENS LTD.
PI Ref.
Remote manual Remote automatic Master / Follower Correctness Wdg condition Ph-E : Ph-Ph :
Electrical Current measurement of fans Direction. Group Control. Manual Control. Automatic Control. Proper instn. Proper contact. Oil in pockets.
d. WTI for fans. e. Overload settings for fans f. WTI - HV settings for auto controls g. Remote annunciation check h. 415 V supply change over trial i. Space heater ON Settings on Transformer MB OTI WTI WTI (Fans)
Alarm
Trip
(Stop)
(Start)
Tested By
Siemens Ltd.
Witnessed By
Date
:
Dept./Ref.No.
Office
SIEMENS LTD.
PI Ref.
= = =
. . .
1W - 2W < 1W - 2V (1U - 2N) + (2N - 1V) = 1U - 1V 1V - 2V < 1V - 2W (1U - 2N) + (2N - 1W) = 1U 1W (1U - 2N) + (2N - 1N) = 1U - 1N 1W - 2W = 1V - 2V
RATIO TEST Ratio test done by applying 415V on primary side and measuring voltage on secondary Voltage applied (In Volts) 1U-1V 1V-1W 1U-1W Measured Ratio (In Volts) 2V-2N (2V-2W)
2U-2N (2U-2V)
2W-2N (2W-2U)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Tested By
Siemens Ltd.
Witnessed By
Date
:
Dept./Ref.No.
Office
SIEMENS LTD.
PI Ref.
Measurement of no load magnetising current / load current is done with Ammeters connected in primary circuit. Dotted lines indicate shorting of phases for load (reduced %ZV). Balanced secondary currents to be measured either with Ammeter or Tong Tester. CAUTION: The open circuit and short circuit test are always to be done with 3 Ph 415V supplies connected to HV terminals. No load magnetising current mA I0 U I0 V I0 W Load current primary Amps I1 U I1 V I1 W Load current secondary Amps I2 U I2 V I2 W
Yes / No
Tested By
Siemens Ltd.
Witnessed By
Date
:
Dept./Ref.No.
Office
SIEMENS LTD.