110 RG PNC 00000 000558 EOR Apps AbbeyMillsRoute
110 RG PNC 00000 000558 EOR Apps AbbeyMillsRoute
Please note: Further details are provided in the Final Report on Site Selection Process (doc ref: 7.05) that can be found on the Thames Tideway Tunnel section of the Planning Inspectorates web site.
Appendix A Assumptions register ....................................................................... 1 Appendix B Drawings............................................................................................ 3 Appendix C Time chainage ................................................................................... 9 Appendix D Geology ........................................................................................... 15
Page i
List of figures
Page number
Figure B.1 Shortlisted sites and zones plan sheet 1 of 5 ......................................... 4 Figure B.2 Shortlisted sites and zones plan sheet 2 of 5 ......................................... 5 Figure B.3 Shortlisted sites and zones plan sheet 3 of 5 ......................................... 6 Figure B.4 Shortlisted sites and zones plan sheet 4 of 5 ......................................... 7 Figure B.5 Shortlisted sites and zones plan sheet 5 of 5 ......................................... 8 Figure C.1 Time chainage diagram Abbey Mills route Option W1/E1 ................. 10 Figure C.2 Time chainage diagram Abbey Mills route Option W1/E3 ................. 11 Figure C.3 Time chainage diagram Abbey Mills route Option W2/E6 ................. 12 Figure C.4 Time chainage diagram Abbey Mills route Option W3/E4 ................. 13 Figure C.5 Time chainage diagram Abbey Mills route Option W3/E5 ................. 14 Figure D.1 EA groundwater levels Jan 2008 ......................................................... 16 Figure D.2 Geological section for Abbey Mills route ................................................. 17
Page ii
6.5m internal diameter 6m internal diameter Reinforced concrete segment lining thickness 0.35m In situ reinforced concrete lining thickness 0.3m Alignment to give adequate clearance to third-party infrastructure (including the proposed National Grid Kensall Green cable tunnel) with tie in to Abbey Mills Shaft F. Not less than 2m clearance below existing BT Openreach tunnel Gradient as close as possible to 0.12% (ie, 1 in 850)
Minimum radius 600m (450m radius in special circumstances) Drive lengths to be dependent upon the requirements of meeting the overall project programme dates.
CSO connections Connection tunnel internal diameter Connection tunnel primary lining Connection tunnel secondary lining (assumed it is required for this EOR) Horizontal alignment Connection tunnel to main tunnel 2.2m to 5m internal diameter Reinforced concrete segment lining thickness 0.35m In-situ reinforced concrete lining thickness 0.3m Minimum radius to suit construction method 70 degree angled connections are preferred but allowing exceptions where the construction risk associated with a longer connection in the Thanet Sand and Chalk becomes excessive.
Shaft requirements Distance between main tunnel shafts for permanent access Main tunnel shaft size 9km maximum distance, but to be minimised where possible. 15m to 30m internal diameter
Page 1
Page 2
Appendix B Drawings
Appendix B Drawings
Page 3
Appendix B Drawings Figure B.1 Shortlisted sites and zones plan sheet 1 of 5
Page 4
Appendix B Drawings Figure B.2 Shortlisted sites and zones plan sheet 2 of 5
Page 5
Appendix B Drawings Figure B.3 Shortlisted sites and zones plan sheet 3 of 5
Page 6
Appendix B Drawings Figure B.4 Shortlisted sites and zones plan sheet 4 of 5
Page 7
Appendix B Drawings Figure B.5 Shortlisted sites and zones plan sheet 5 of 5
Page 8
Page 9
Appendix C Time chainage Figure C.1 Time chainage diagram Abbey Mills route Option W1/E1
CS01X Acton CS04X Hammersmith PS CS05X West Putney CS06X Putney Bridge CS09X CS10X Falconbrook Lots Road PS PS CS14X Ranelagh S5 Battersea CS22X Regent Street CS27X Fleet Main CS29X North East Storm Relief
Drive Direction
W1/E1
CSO interception
SO Acton
Drive Direction
Week No. 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 275 280 285 290 295 300 305 310 315 320 W1/E1
Year No.
Start of Construction
20 26 1 40 44 54 56 LC 77 2 100m/wk 76 82 92 94 76 82 92 94 68 26
109 115 119 140m/wk 133 138 132 LC 141 120 118
LC 118 118
109 LC
80m/wk 100m/wk
161 165
140m/wk 178
S11
CS31X Earl PS
S0
S2
S5
S7
CS33X Greenwich PS
4 188 50m/wk
188
Mobilise shaft build and excavate shaft 5 Base slab shaft Tunnel eye Tunnel worksite set up TBM Installation Shaft Lining Shaft Internal Structures 6 M&E `Main tunnel Drives Main tunnel Secondary Lining 276 284 246 251
218 226
273 283
273 283
End of Construction
313 321
313 321
Page 10
Appendix C Time chainage Figure C.2 Time chainage diagram Abbey Mills route Option W1/E3
CS01X Acton CS04X Hammersmith PS CS05X West Putney CS06X Putney Bridge CS09X CS10X Falconbrook Lots Road PS PS CS14X Ranelagh S5 Battersea CS22X Regent Street CS27X Fleet Main CS29X North East Storm Relief
S6 Shad
Drive Direction
W1/E3
SO Acton
Drive Direction
Drive Direction
CS31X Earl PS
Week No. 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 275 280 285 290 295 W1/E3
Year No.
Start of Construction
20 26 1 40 44 54 56 LC 77 2 100m/wk 76 82 92 94 68 76 82 94 92 26
109 115 119 140m/wk 132 3 133 138 LC 141 120 118
LC 118 118
109 LC
80m/wk
90m/wk 163 171 100m/wk 179 183 4 188 Mobilise shaft build and excavate shaft Base slab shaft Tunnel eye 5 Tunnel worksite set up TBM Installation Shaft Lining Shaft Internal Structures M&E 6 Main tunnel Drives Main tunnel Secondary Lining 276 284 End of Construction 286 294 278 286 246 251 246 256 215 219 140m/wk 241 238 248 249 140m/wk 201 207 211 211 140m/wk
Page 11
S11
CS32X Deptford SR
CS33X Greenwich PS
S0
S2
S5
S7
Appendix C Time chainage Figure C.3 Time chainage diagram Abbey Mills route Option W2/E6
CS01X Acton
Main tunnel shaft CSO drop shaft
CS04X Hammersmith PS
Drive Direction
W2/E6
CSO interception
S7 Limehouse SO Acton Drive Direction S2 Barn Elms CS07A Frogmore -Bell Lane Drive Direction CS07B FrogmoreBuckhold Rd CS16X Heathwall PS CS17X South West Storm Relief CS20X Brixton CS19X SR Clapham SR Drive Direction
Week No. 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 275 280 285 290 295 300 305 310 315 W2/E6
Year No.
Start of Construction
80m/wk 3 138 142 140/m/wk 151 155 156 161 140m/wk 90m/wk 161 165
140m/wk 178
4 Mobilise shaft
186 194
182 187
190
S11
188 218 226
S0
S2
S5
build and excavate shaft Base slab shaft Tunnel eye Tunnel worksite set up 5 TBM Installation Shaft Lining Shaft Internal Structures M&E Main tunnel Drives Main tunnel Secondary Lining 271 271 235 239 140m/wk 212 220 50m/wk
281
281
End of Construction
311 319
311 319
Page 12
S7
CS31X Earl PS
CS32X Deptford SR
CS33X Greenwich PS
Appendix C Time chainage Figure C.4 Time chainage diagram Abbey Mills route Option W3/E4
CS01X Acton CS04X Hammersmith PS CS05X West Putney CS06X Putney Bridge CS09X CS10X Falconbrook Lots Road PS PS S3 Wandsworth Bridge CS14X Ranelagh S5 Battersea CS22X Regent Street CS27X Fleet Main CS29X North East Storm Relief
S6 Shad
Drive Direction
W3/E4
SO Acton
Drive Direction
Week No. 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 275 280 285 W3/E4
Year No.
Start of Construction
20 1 40 44 54 56 26 26
80m/wk
170 175 Mobilise shaft build and excavate shaft Base slab shaft Tunnel eye Tunnel worksite set up 140m/wk TBM Installation 5 Shaft Lining Shaft Internal Structures M&E Main tunnel Drives Main tunnel Secondary Lining 6 239 247 238 248 238 248 241 249 200 208 209 214 179 183 188 192 140m/wk 207 211 201 211 188 50m/wk 140m/wk
End of Construction
278 286
278 286
Page 13
S11
S0
S3
S5
S6
Appendix C Time chainage Figure C.5 Time chainage diagram Abbey Mills route Option W3/E5
CS01X Acton CS04X Hammersmith PS CS05X West Putney CS06X Putney Bridge CS09X CS10X Falconbrook Lots Road PS PS S3 Wandsworth Bridge CS14X Ranelagh S5 Battersea CS22X Regent Street CS27X Fleet Main CS29X North East Storm Relief
S6 Shad
Drive Direction
W3/E5
SO Acton
Drive Direction
Week No. 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 275 280 285 W3/E5
Year No.
Start of Construction
20 1 40 44 54 56 26 26 26
68 76 LC 2 94 100m/wk 106 115 LC 118 100m/wk 90m/wk 3 142 146 140m/wk 162 166 140m/wk 183 188 50m/wk 200 208 213 221 205 209 140m/wk 201 211 179 183 190 140m/wk 80m/wk LC 118 109 LC 109 77 82 92 94 82 92 82 92 94 76 76
170 175 Mobilise shaft build and excavate shaft Base slab shaft Tunnel eye Tunnel worksite set up TBM Installation 5 Shaft Lining Shaft Internal Structures M&E Main tunnel Drives Main tunnel Secondary Lining 6
236 246
236 246
S11
S0
S3
S5
S6
241 249
End of Construction
276 284
276 284
Page 14
Appendix D Geology
Appendix D Geology
Page 15
Page 16
Appendix D Geology Figure D.2 Geological section for Abbey Mills route
Page 17