M/S. K J S Cement Limited For-6000 TPD Cement Plant

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 8

M/S.

K J S CEMENT LIMITED
FOR- 6000 TPD CEMENT PLANT
CONTRACTORDESCRIPTIONSL.
NO.

M/S. OM ENGINEERING
R.A. BILL-10 ( FABRICATION & ERECTION WORK)

DESCRIPTION

DATE : 20.03.12

RATE
(Rs.)/MT

CLAIMED
QTY. (MT)

THIS BILL
QTY. (MT)

DIFF.
(MT)

AMOUNT
CLAIMED (Rs.)

PAYABLE
AMOUNT (Rs.)

Exess/Hold
(Rs.)

REMARKS

Fabrication Work at Lime


Stone Crusher Area

5500

24.751

18.302

6.449

136130.50

100661.00

35469.50

Re-Fab. at TT-6
50% Payable

Erection Work at Lime


Stone Crusher Area

5500

102.540

101.560

0.980

563970.00

558580.00

5390.00

Excess Weight

Equipment Work for Belt


Conveyor

6500

37.454

36.804

0.650

243451.00

239226.00

4225.00

Excess Weight

Equipment Work at Lime


Stone Crusher Area

8500

5.180

5.180

0.000

44030.00

44030.00

0.00

5 Erection of EOT Crane

6500

6.344

6.344

0.000

41236.00

41236.00

0.00

6 Erection of Bag Filter

6000

5.500

5.500

0.000

33000.00

33000.00

0.00

7 Pipe Line Fitting Work

..

0.000

36837.00

36837.00

0.00

8.08

1098654.50

1053570.00

45084.50

ABOVE SUM

Net Excess/Deduct Amount = Rs. 45084.50


Net Payable Amount = Rs. 1053570.00
Net Payable Amount -- Rs. Ten Lac Fifty Three Thousand Five Hundred Seventy Only

TRUSST ENGINEERS

M/S. K J S CEMENT LIMITED


FOR- 6000 TPD CEMENT PLANT
CONTRACTORDESCRIPTIONSL.
NO.

M/S. OM ENGINEERING
SUPPLEMENTARY COPY FOR HOLD RELEASE----CLAIMED IN R.A. BILL-10

DATE : 29.03.12

RATE
(Rs.)/MT

CLAIMED
QTY. (MT)

THIS BILL
QTY. (MT)

DIFF.
(MT)

AMOUNT
CLAIMED (Rs.)

PAYABLE
AMOUNT (Rs.)

Exess/Hold
(Rs.)

REMARKS

5500

24.751

18.302

6.449

136130.50

100661.00

35469.50

Re-Fab. at TT-6
50% Payable

5500

102.540

101.560

0.980

563970.00

558580.00

5390.00

Excess Weight

6500

37.454

36.804

0.650

243451.00

239226.00

4225.00

Excess Weight

8500

5.180

5.180

0.000

44030.00

44030.00

0.00

5 Erection of EOT Crane

6500

6 Erection of Bag Filter

6000

7 Pipe Line Fitting Work

6.344
5.500
..

6.344
5.500
..

0.000
0.000
0.000

41236.00
33000.00
36837.00

41236.00
33000.00
36837.00

0.00
0.00
0.00

8.08

1098654.50

1053570.00

45084.50

1
2
3
4

DESCRIPTION

Fabrication Work at Lime


Stone Crusher Area
Erection Work at Lime
Stone Crusher Area
Equipment Work for Belt
Conveyor
Equipment Work at Lime
Stone Crusher Area

ABOVE SUM

Summary of R.A. Bill-10 ---- already submitted 0n 20.03.12 (for reference )


Net Excess/Deduct Amount = Rs. 45084.50
Net Payable Amount = Rs. 1053570.00
Hold Claimed in R.A. Bill-10 (Against R.A. Bill-08 ) = Rs. 167048 .00
Rs. One Lac Sixty Seven Thousand Forty Eight Only
Note:- The Above Hold Amount Rs. 167048/- Only may be released alongwith R.A. Bill-10
TRUSST ENGINEERS

M/S. K J S CEMENT LIMITED


FOR- 6000 TPD CEMENT PLANT
CONTRACTORDESCRIPTIONSL.
NO.

DATE :

M/S. OM ENGINEERING
R.A. BILL-14 ( MANPOWER SUPPLY FOR--FABRICATION & ERECTION WORK)
DESCRIPTION

AMOUNT
CLAIMED (Rs.)

PAYABLE
AMOUNT (Rs.)

Exess/Hold
(Rs.)

6844.00

6844.00

0.00

17990.00

17990.00

0.00

Fabrication & Erection of Base Frames for Air


Compressor, Receiver Tank & Dryer to 211 BF-2

211 BC-3 Conveyor Tail Side Work, Top Cover Plate,


Discharge Chute & Scrap Cutting

Rectification Work at Level +13.416 for Operator Cabin &


Platform Extension Work

7522.00

7522.00

0.00

Fabrication & Erection of Base Frames for Air


Compressor, Receiver Tank as Per Site Condition

6844.00

6844.00

0.00

211 BF-1 Discharge, Air Rotary Lock and Pipe Line &
Reducer Work up to BC-7

3364.00

3364.00

0.00

211 BF-1 Venting Line Rectifivcation Work-- Apron


Conveyor and Wobbler Feeder & Rectification Work

24553.00

19093.00

5460.00

Rectification Work for Appron Conveyor Reject Hopper


Side

4652.00

4630.00

22.00

211 BF-1 & 211 BF-2 Fan, Damper & Actuator Base
Frame Work

2614.00

2614.00

0.00

17922.00

17922.00

0.00

5625.00

5625.00

0.00

97930.00

92448.00

5482.00

9 211 BF-1 Fan to Bag Filter Duct Bend Distance Work


10 211 BF-1 & BF-2 Header Support Work
ABOVE SUM

NOTE:- The Above Amounts ( Claimed & Payable are inclusive of Service Taxes)
Net Excess/Deduct Amount = Rs. 5482.00
Net Payable Amount = Rs. 92448.00
Net Payable Amount -- Rs. Ninety Two Thousand Four Hundred Forty Eight Only

05.04.12

REMARKS

Excess Amount Claimed


Excess Amount Claimed

Only
TRUSST ENGINEERS

M/S. K J S CEMENT LIMITED


FOR- 6000 TPD CEMENT PLANT
CONTRACTORDESCRIPTION-

DATE: 28.04.12

M/S. OM ENGINEERING
MAN POWER SUPPLY WORK

SL.
NO.

DESCRIPTION

RATE
(Rs.)

CLAIMED
QUANTITY

CHECKED
QUANTITY

DIFF.
(Excess)

AMOUNT
CLAIMED (Rs.)

AMOUNT
CHECKED (Rs.)

EXCESS
/ HOLD

REMARKS

Millwright Fitter

450.00

46.000

45.880

0.120

20700.00

20646.00

54.00

Excess

Fitter

250.00

101.500

100.130

1.370

25375.00

25032.50

342.50

Excess

Welder

250.00

158.500

156.500

2.000

39625.00

39125.00

500.00

Excess

Rigger

250.00

178.300

173.750

4.550

44575.00

43437.50

1137.50

Excess

Khalashis

200.00

378.300

363.130

15.170

75660.00

72626.00

3034.00

Excess

Oxygen Cylinder

230.00

32.000

32.000

0.000

7360.00

7360.00

0.00

LPG Cylinder

1600.00

10.500

10.500

0.000

16800.00

0.00

16800.00

Welding Electrode
Packet

1200.00

32.000

32.000

0.000

38400.00

38400.00

0.00

14 MT Hydra on
Hour Basis

800.00

2.000

2.000

0.000

1600.00

1600.00

0.00

270095.00

248227.00

21868.00

ABOVE SUM
Net Payable Amount = Rs.

These Amounts verified


as per Debit Note for
M/s. Om Engg. & LPG
Rate not Found

Rate not Found

248227.00

Net Payable Amount -- Rs. Two Lac Forty Eight Two Hundred Twenty Seven Only