Planning Project Works
Planning Project Works
Project Work Scope components are mainly:a) Work breakdown structure (WBS) Decomposes project work scope into deliverables & splits up deliverables into various levels such as sub-projects or task groups, tasks, work packages & activities. b) Development of detailed designs, drawings & specifications- They provide the characteristics features & modes of realisation of the deliverables.
1
PROJECT WORK BREAKDOWN into SUBPROJECTS /BREAKDOWN TASK (Highway Construction Project) Highway Construction Project:i) Pre-construction Task groupa) Obligations; b) Preliminary Investigation; c) Road & flyover Design i) Pavement construction Task group :a) sector-1;b) sector-2;c) sector-3 etc. i) Flyover construction Task Groups :a) Flyover 1 b) Flyover-2; c) Flyover-3 etc.
4
PROJECT WORK BREAKDOWN into Workpackage / Activity level (Highway Construction Project)
Under Sector A construction Sector Tasks & work packages i) Drains ii) Lines iii) Culverts Activity Level-Nature of Activity a) Clearing ; b) Earthwok in cutting/filling; c) Sub-grade etc.
5