1.) Spheroidizing
2. Casting
3. Dumping Cast-box
Mechanical Properties test
1.
Tensile Strength and Elongation Test
3.
Metallographic Structure Test
2. Tensile
Strength and Elongation Test
5.
Metallographic Structure Test
4.
Metallographic Structure Test
Hardness test
1.
Hardness Test
2.
Hardness Test
Shot Blasting
2. Dimension Test
(DN200x22.5)
1. Drilling (DN200x22.5)
Hydrostatic Test
1# DN1000-DN1600 2# DN600-DN1200
Hydrostatic Test
3# DN500-DN900 4# DN300-DN500
Hydrostatic Test
5# DN80-DN300
DN500 Hydro-test
Shot Blasting by Hand
1. Packed on
PalletsDN1000x45)
2. Wrapped by
filmDN1200x2000L)
3. K Packed on
PalletsDN1200x90)
4. Packed on
PalletsDN1400)
Products
Coated Fittings
Products
DN2600
Products
Products
Finished Products
Fittings produced according to ANSI / AWWA
Products Produced According to ANSI / AWWA
Loading and Shipping