LOT - SIZING TECHNIQUES

I.

Lot-for-Lot :

Period
Gross
Requirements
Beginning
Inventory
Net
Requirements
Time Phased
Net
Requirements
Planned Order
Release
Planned
Deliveries
Ending
Inventory

1
2
30 50

3 4
10 20

5
70

6
80

7
20

8
60

9
200

10
50

90 60

10

20

70

80

20

60

200

50

20 70

80 20

60

200

50

20 70

80 20

60

200

50

20

70

80

20

60

200

50

60 10

Total Cost:
Holding Cost = (60 * $0.01) + (10 * $0.01) = $0.6 + $0.1 = $ 0.7
Ordering Cost = (7 orders * $10) = $70
Total Cost = Holding Cost + Ordering Cost = $0.7 + $70 = $70.7

II.

Economic Order Quantity (EOQ) :

Annual Demand (D) = Total demand over 10 weeks * 52 weeks / year


10
= 30+50+10+20+70+80+20+60+200+50 * 52
10
= 590 * 52
10
= 3,068 units / year
Holding Cost (h) per unit = $0.01 / unit / week
= $0.52 / unit / week
Ordering Cost (S) per order = $10 / order
EOQ =

= 343.51

Period

10

Gross
Requirements

30

50

10

20

70

80

20

60

200

50

Beginning
Inventory

90

60

10

324

254

174

154

94

238

Net
Requirements
Time Phased
Net
Requirements
Planned Order
Release

20

200

20

200

344

344

Planned
Deliveries
Ending Inventory

344
60

10

324 254

344
174

154

94

238

188

Holding Cost = (60 * $0.01) + (10 * $0.01) + (324* $0.01) + (254* $0.01) +
(174* $0.01) + (154* $0.01) + (94* $0.01) + (238* $0.01) +
(188* $0.01)
= 0.6 + 0.1+3.24+2.54+1.74+1.54+0.94+2.38+1.88
= $14.96
Ordering Cost = (2 orders * $10) = $20
Total Cost = Holding Cost + Ordering Cost = $14.96 + $20 = $34.96

III.

Silver-Meal-Heuristic :
j
rj

Order for
weeks
1 week, week
4
2week, weeks
4to5
3week, weeks
4to6
4week, weeks
4to7
5week, weeks
4to8
6week, weeks
4to9
7week, weeks
4to10
Total

1
2
3
4
5
6
7
20
70 80 20 60 200 50
Units in the inventory at the end of week H.C
($)
Q 4
5
6
7
8
9
10

Per
O.C Period
($) Cost($)

20

0.00

10

10.0

0.70

10

5.35

90

70

170 150

80

2.30

10

4.10

190 170

100 20

2.90

10

3.23

250 230

160 80

5.30

10

3.06

450 430

360 280 260 200

15.30 10

4.22

500 480

410 330 310 250 50

18.30 10

4.04

60

44.8

Total Cost = Holding Cost + Ordering Cost = $44.8 + $70 = $114.8

70

In Silver-Meal-Heuristic Technique, the periodic cost is decreasing at a


certain point and then increasing. In the above example, the periodic cost is
decreasing till the 5th week and then increasing.
If we compare the period cost of each week, the cost is minimum on the 5th
week.
So it is suggested that we should order together for 5 weeks because the
periodic cost is minimum i.e. $3.06

Cost ($)
12
10
8
6

Cost ($)

4
2

Period (Weeks)

0
0

IV.

Least Unit Cost:


j
rj

Order for
weeks
1 week, week
4
2week, weeks
4to5
3week, weeks
4to6
4week, weeks
4to7
5week, weeks
4to8
6week, weeks
4to9
7week, weeks
4to10
Total

1
2
3
4
5
6
7
20
70 80 20 60 200 50
Units in the inventory at the end of week H.C
($)
Q 4
5
6
7
8
9
10

Per
O.C Period
($) Cost($)

20

0.00

10

0.5

0.70

10

0.118

90

70

170 150

80

2.30

10

0.072

190 170

100 20

2.90

10

0.067

250 230

160 80

5.30

10

0.061

450 430

360 280 260 200

15.30 10

0.0562

500 480

410 330 310 250 50

18.30 10

0.0566

60

44.8

70

Total Cost = Holding Cost + Ordering Cost = $44.8 + $70 = $114.8


If we compare the period cost of each week, the cost is minimum on the 6th
week.
So it is suggested that we should order together for 6 weeks because the
periodic cost is minimum i.e. $0.0562