CONSTRUCTION OF AREA ENGINEER OFFICE AT ELLIE-HOUSE RESERVOIR PREMISES Consultancy Fee for Consultancy Services for Structural and

building services Design works ENGINEERS ESTIMATE RATE Rs Cts ALLOCATION Qty Amount Rs. Cts

ITEM A 1.0

DESCRIPTION Remuneration - Design Phase Preliminary works Geo technical investigation Civil Works Senior Structural Engineer Senior Structural/Quality Assurance Engineer Structural Engineer 1 Structural Engineer 2 Senior Draughtsman Draughtsman 1 Water Supply, Sewerage & Drainage Senior Engineer Fee Engineer Draughtsman Air conditioning, Fire protection & Elevator Senior Engineer Fee Mechanical Engineer Draughtsman Electricity supply & lighting protection Senior Engineer Fee Electrical Engineer Draughtsman Intercom, IT network, PA system Senior Engineer Fee IT Engineer Draughtsman BOQ preparation Senior Quantity Surveyor Fee Quantity surveyor Clerk Out of Pocket Expenses

UNIT

lump.Sum

500,000.00

500,000.00

2.0 2.1 2.1 2.1 2.1 2.1 2.1 3.0 3.1 3.2 3.3 4.0 4.1 4.2 4.3 5.0 5.1 5.2 5.3 6.0 6.1 6.2 6.3 7.0 7.1 7.2 7.3 8.0

Man Months Man Months Man Months Man Months Man Months Man Months

300,000.00 300,000.00 225,000.00 225,000.00 110,000.00 75,000.00

0.00 0.00 0.00 0.00 0.00 0.00

Man Months Man Months Man Months

300,000.00 225,000.00 75,000.00

0.00 0.00 0.00

Man Months Man Months Man Months

300,000.00 225,000.00 75,000.00

0.00 0.00 0.00

Man Months Man Months Man Months

300,000.00 225,000.00 75,000.00

0.00 0.00 0.00

Man Months Man Months Man Months

300,000.00 225,000.00 75,000.00

0.00 0.00 0.00

Man Months Man Months Man Months

300,000.00 225,000.00 75,000.00

0.00 0.00 0.00

8.1 9.0 9.1 9.2 10.0 10.1 10.2

Transport to office staff( 1 /4vehical for a month) Head Office Charges Design Office(1/2 months) Telephone(1/2months) Miscellaneous (Printing and Consumables) Tender Drawings Preparation of Tender Documents Other Documents Sub Total For Design phase

months

200,000.00

0.00

months months

1,000,000.00 60,000.00

0.00 0.00

lump sum lump sum lump sum

150,000.00 20,000.00 100,000.00

150,000.00 20,000.00 100,000.00 500,000.00

B 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 2.0 2.1 2.2 2.3 3.0 3.1

Remuneration - Construction Phase HO inputs -Civil R/F Detailing , Design Modifications, Site visits Senior Structural Engineer Senior Structural/Quality Assurance Engineer Structural Engineer 1 Structural Engineer 2 Senior Draughtsman Draughtsman 1 Head Office Charges Design Office Transport services Telephone Miscellaneous (Printing and Consumables) Construction Drawings

Man Months Man Months Man Months Man Months Man Months Man Months

300,000.00 300,000.00 225,000.00 225,000.00 110,000.00 75,000.00

0.00 0.00 0.00 0.00 0.00 0.00

months months months

1,000,000.00 200,000.00 60,000.00

0.00 0.00 0.00

lump sum

500,000.00

500,000.00

Sub Total For Construction Phase Grand Total For Design Phase & Construction Phase

0.00

500,000.00