difficult to justify current and future IT spending without a more disciplined approach to such investment decisions. Clearly, there are a number of compelling reasons to incorporate a benefits realization approach into any IT implementation project. What Is Benefits Realization? Benefits realization is a comprehensive project approach that focuses on identifying, measuring and ensuring the business benefits achievable through technology. As opposed to business cases and cost-benefit analyses, benefits realization breaks down high-level benefits into manageable chunks, measures benefits after implementation, and utilizes tools to ensure that the true benefits potential of projects are attained. Benefits realization is a comprehensive and integrated approach that focuses on realizing business value, and it combines elements of a cost-benefit analysis, performance metrics, organizational change management and process modeling. In short, benefits realization supplements the technical aspects of an implementation with the business side of the equation to ensure that potential benefits come to fruition. The process of realizing business benefits from an ERP system does not end at go-live, even if the implementation was flawlessly executed. Instead, go-live is merely the first step in the long journey to improving business operations through technology. Before, during and after the go-live, a third-party organization should examine your company to make sure the business processes are going well and reengineer them for improvement where needed. After go-live, a business also should examine the effect the new system has on the organization. Are people using the system effectively? Is the software making the business more efficient? Is it adding value to the organization? Is the ERP system keeping pace with increased sales or expanded markets? An organization also must ensure it has a solid user-support program in place to supplement the technical cutover activities. Although pre-go-live training can mitigate many of the risks that organizations face at the time of cutover, there needs to be additional reinforcement after go-live. As mentioned previously, Core Team members (or super-users) should be leveraged to provide general support and answer simple, process- and system-focused questions. An effective benefits realization approach consists of a number of activities beginning at project inception and continuing through implementation. These activities include the following: Development of Business Case, Corporate Metrics and Benchmarks One of the first activities to occur as part of an IT project is the financial justification of the necessary technology investment. It is important to identify and quantify the potential benefits of the project and compare those to the projected costs associated with the proposed information technology. Organizational Change Management Cultural Assessment Since most enterprise solution implementations involve large-scale change in terms of end-users learning new technologies and processes, it is imperative to assess the companys culture early in the project to identify cultural areas that will need to be addressed. Cultural obstacles can significantly undermine the success of a project, and this area should be addressed early in a project since implementing cultural changes are longterm in nature. (Please refer to Chapter Six for additional information about organizational change management.) Cultural Change Based on the results of the cultural assessment, there may be areas that need improvement to enable the large-scale changes required of the project. Given the challenging nature of cultural change at many companies, it is recommended that managers focus on the largest gaps rather than try to change each and
Page 2 of 14 3773 Cherry Creek North Drive - Suite 720 - Denver, CO 80209 720-515-1377 Panorama-Consulting.com Copyright 2012 Eric Kimberling. All Rights Reserved.
every aspect of culture that needs to be addressed. Communications To ensure acceptance of the new technologies, it is important to effectively communicate changes to endusers. This should be done through a variety of channels and should be targeted for each audience. Business Process Reengineering While this may seem intuitive to most, it is often not performed adequately or not performed at all. In order to realize the full benefits of technologies, business processes need to be modeled and improved to increase efficiency and to make certain that technology is not merely used to pave the cowpaths. Development of Operational and Departmental Metrics and Benchmarks While most business cases effectively develop high-level projected business benefits for an implementation, it is perhaps even more important to translate those metrics into operational numbers that department managers and other middle managers can be held accountable for. High-level benefits are useless if they are not developed in a way in which individual managers can be measured. Therefore, the business case must be translated to target levels of performance at the departmental level. Organizational Job Design and Planning Just as processes need to be evaluated and changed to enable forthcoming technologies, job descriptions, reporting relationships, and work accountabilities all need to be evaluated and redesigned to support new technologies. Often new IT systems require change such as shifts in workloads or responsibilities and this type of change needs to be identified early in the project. Detailed Process Design Once the high-level process modeling is complete, (which identifies who will do what type of work at a high level and how that work will be completed), it is important to take the process modeling to the next level and develop more detailed models to ensure that individuals are able to clearly understand their roles, responsibilities and individual processes. Many companies effectively model their high-level processes, but they more often than not fail to develop detailed processes to identify and document how individuals will complete their work with the new technologies. Detailed processes also help ensure use cases and other technical activities are closely aligned with the overall business strategy. (Also of note is that because process modeling often is performed independently of key software development activities, detailed process design activities often help direct training courses used during the technology rollout to end-users.) Individual Metrics, Processes and Benchmarks While operational and departmental metrics are useful to hold managers accountable for their contributions to the potential benefits of technology, individual metrics must be used so that employees understand how their personal performance contributes to the success of the project. Organizational Job Design Implementation Once the organization and related jobs have been designed, its time to implement the necessary changes. Simply documenting how jobs and structures will change as a result of new technologies is not enough; those ideas must be implemented and tracked to ensure that the changes become a part of the new organization. End-User Training Using the detailed process models developed above, it is important to then develop end-user training that not only helps end-users understand the new technology but also how to apply it to their new processes and job functions. Many training programs underestimate how much impact the technology has on the daily experience of an end-user.
Page 3 of 14 3773 Cherry Creek North Drive - Suite 720 - Denver, CO 80209 720-515-1377 Panorama-Consulting.com Copyright 2012 Eric Kimberling. All Rights Reserved.
Reward Design and Implementation Unfortunately, designing new processes, establishing metrics and targets to identify potential benefit areas, and conducting traditional change management and end-user training is not enough to ensure that people are motivated to make the project succeed. Companies must also incorporate reward systems to ensure alignment between individual performance and project benefits achievement. Establishing new key performance indicators (KPIs) as part of an annual review process is an effective way of ensuring this level of alignment. Benefits Measurement Here is where the real value of benefits realization comes into play. As mentioned, most companies do not measure actual benefits after implementation, but a comprehensive benefits realization approach does. It is imperative to compare actual results to projected departmental and individual results in order to identify any potential benefits gaps. It also enables managers to understand what they are doing well and ensure that they continue to realize the benefits in these areas. Unfortunately, no matter how well managers have incorporated the activities discussed above into their project plans, there are almost always areas in which full benefits are not initially achieved. Root Cause Analysis of Benefit Gaps Following the post-implementation measurement, it becomes imperative to understand why certain gaps exist. A root cause analysis lends understanding to why people are not becoming more productive with the new technology and helps clarify the reasons for the gaps. A common example of a root cause of less than 100percent benefits realization is that end-users understand how to use the technology but not the importance of doing so, resulting in workarounds and lack of use. Implementation of Corrective Action Once the root cause of benefit gaps have been ascertained, it is then time to implement activities to address the root cause analysis for the problem areas. For instance, in the case of not having a thorough process understanding of how an end-users work contributes to downstream activities, it may be appropriate to develop and conduct follow-up training. Many of these activities are included to some degree as part of overall project plans. Benefits realization in and of itself does not offer any groundbreaking activities that have never been done before. The challenging aspect, however, is ensuring that all of these activities are implemented effectively and in alignment with the technical aspects of the project. The activities prior to implementation are intended to establish a foundation for benefits realization potential, while post-implementation activities are intended to measure and ensure that the benefits come to fruition. The Value of Benefits Realization Why should a company implement this type of benefits realization approach? This chapter identifies some of the challenges organizations face in terms of measuring benefits, which is one primary reason for including this type of approach as part of a project plan. However, there are several other reasons that justify the need for these activities: Reduces Project Risk Benefits realization focuses on ensuring that the full benefits of technologies are achieved, which reduces the risk of the project failing. In addition, pre-implementation activities all focus on establishing the foundation for realizing benefits by addressing process and organizational change management issues that would otherwise undermine a projects success. In short, the approach is focused on achieving quantifiable business value.
Page 4 of 14 3773 Cherry Creek North Drive - Suite 720 - Denver, CO 80209 720-515-1377 Panorama-Consulting.com Copyright 2012 Eric Kimberling. All Rights Reserved.
Creates Close Alignment Between Business and Technical Activities This approach ensures that processes, jobs, metrics and organizational structures are designed to support the technical aspects of the project and vice versa. More often than not, business and technical activities are done in isolation of one another and are significantly misaligned. Business activities such as organizational change management and process reengineering are often disconnected when instead they should be very closely aligned. The most successful projects have a core group of individuals that perform all of the benefits realization activities discussed above with involvement from other subject matter experts as needed. Proactively Identifies and Addresses Obstacles to Realizing Benefits Since this approach focuses on measuring actual results and addressing benefit gaps, it inherently ensures that potential obstacles are identified and addressed early in the post-implementation project life cycle. Provides More Thorough Understanding of Lessons Learned Since a benefits realization approach measures results, identifies benefits gaps, and implements corrective action to address the gaps, it serves as a wealth of knowledge for future IT projects in terms of what the project struggled with, what went well, and what should be improved in the future. Provides Better Justification for Future IT Project Approvals IT managers are far more likely to gain funding for future projects when they can point to the actual financial results of previous projects. CFOs and other financial managers who approve such expenditures are much more likely to give the green light when they can analyze and compare the exact costs and benefits of previous projects. This apparent knowledge and financial discipline also lends a great deal of credibility to key decisionmakers. Clearly, there are a number of ways that an effective benefits realization approach can create value for IT managers and companies in general. Given the above discussion of current IT challenges, it is clear that there is a need to ensure that companies more fully realize the potential benefits of technology. Investing millions of dollars in new technology without a compelling justification and validation of this justification is simply not acceptable anymore. By understanding and integrating a comprehensive benefits realization approach into IT implementations, managers will ensure that their projects are rolled out successfully and that they turn out to be wise investment decisions for the company. ERP Software End-Users Can't Get No Satisfaction One of the more interesting metrics buried in our 2010 ERP Report (available online at panoramaconsulting.com) relates to end-user and executive satisfaction. Among companies that have recently implemented enterprise software initiatives, we found that an underwhelming number are at least somewhat satisfied with the end result. According to the study, 32-percent of executives are dissatisfied with their ERP software. Perhaps not surprisingly, end-users are even more dissatisfied (39-percent) with their enterprise software solutions. Because companies invest such large amounts of time and money in their ERP software, it is quite interesting that there is only a two out of three chance that they'll like what they end up with. This data underscores some of the key contributors to ERP software satisfaction and ROI: 1. Companies too often pick the wrong software. Many companies in the study underestimated the need for a thorough ERP software selection process. As a result of this misstep, organizations often choose and implement solutions that are not good fits for their unique business requirements. It is
Page 5 of 14 3773 Cherry Creek North Drive - Suite 720 - Denver, CO 80209 720-515-1377 Panorama-Consulting.com Copyright 2012 Eric Kimberling. All Rights Reserved.
simply not possible to be satisfied with software that doesn't fit your needs. 2. Executive expectations are often misaligned with ERP implementations. The fact that executives are too often dissatisfied with their enterprise software investments, even though they typically are infrequent users of the system, suggests that their desires for more visibility and transparency in their organizations are not being addressed. Reporting and business intelligence, which are usually afterthoughts delayed until the last weeks of an implementation, often determine executive satisfaction. 3. ERP implementations too often go over-budget and miss milestones. When an executive sees that his or her organization has just sunk an average of 6.9-percent of annual revenue in their ERP software, it better be worth it. Implementations generally take longer and cost more than expected, and executives will only be satisfied when they see clear and tangible paybacks on those investments. 4. Employees are often left behind. Best-in-class enterprise software initiatives include effective organizational change management activities to ensure employees are comfortable, efficient and productive in the new system. However, companies that neglect this important activity are more likely to have dissatisfied employees. This issue is even more pronounced in today's climate of uncertainty, layoffs and declining employee morale. One of the biggest problems in ERP software benefits realization is that software vendors and their customers do not adequately define or understand what it means to go live with an ERP system that delivers measurable business benefits. Instead, they often focus on how fast and/or cheap their solution can be implemented, thereby undermining the benefits potential of the ERP system. As we have found in our research and experience, companies narrowly define their go-live as the moment the new core, basic system is up and running. This includes leveraging core functionality of the system, preconfigured industry best practices, and other features to get their new ERP systems active more quickly than otherwise possible. However, this is just the first phase of a successful ERP implementation. The core system may get an organization 30- to 50-percent of the potential business benefits (at best) with pre-configured industry best practices. Most organizations fail to achieve expected business benefits, partially because they rely to heavily on standard out-of-the-box functionality that fails to set them apart from competitors. Most companies are not in business to be just like their industry peers and competitors they are in business to be better, closer to their customers, and ultimately more profitable than their competitors. Merely getting to this first phase of ERP implementation does not accomplish these goals, which explains why 72-percent of organizations never get past this stage. Instead, companies need to concentrate on moving the finish line to include two more important phases. The next phase of an ERP implementation should involve leveraging more sophisticated ERP modules, such as advanced forecasting, planning, supply chain management, or mobile workforce management. Even companies that purchase and go-live with these advanced modules during the first phase of implementation rarely leverage the full functionality right away because they haven't adequately defined their corresponding business processes or sufficiently trained their employees to use the improved workflows. In addition, this second phase entails identifying third-party bolt-ons, customizing where appropriate, clarifying reporting, and improving business processes to further integrate the core ERP system into the organization. This phase dramatically increases competitive edge and delivers measurable business results. The third and final stage is to fine-tune business processes and develop an operational model that relies on superior analysis and the ability to achieve more transparent business information and business processes. While most ERP systems provide more functionality, workflows, and reports than companies know what to do
Page 6 of 14 3773 Cherry Creek North Drive - Suite 720 - Denver, CO 80209 720-515-1377 Panorama-Consulting.com Copyright 2012 Eric Kimberling. All Rights Reserved.
with, the most successful companies figure out how to sort through these complexities to focus on what will give them a competitive edge and ROI. Our research shows that only 28-percent of organizations achieve the second or third phase of ERP competitive edge, and these are often the leaders in their respective industries. The second and third phases of a successful implementation begin to shift the focus away from software and its functionality and more toward business process reengineering and organizational change management. By this point in the process, relatively little of ERP's success is related to the software itself, but is instead related to how jobs are designed, how processes are defined and how performance is measured. It is worth noting that the truly successful ERP implementation teams incorporate all phases into their first phase and focus on these key areas concurrently. Other companies focus on the second and third only after realizing that the first phase did not deliver the expected results. ERP software is a tool and enabler of competitive advantage and ROI but simply going live with the software will not deliver these results. Executives are at times overly concerned about risk and focus too much on getting the system up and running quickly and inexpensively rather than delivering measurable results. Only by following through with the second and third phases of an ERP implementation will an organization achieve the true business benefits and competitive edge it is seeking. These second and third phases have very little to do with the software itself they are more about building and leveraging business processes and workflows that allow companies to analyze information and execute more effectively. When planning for an ERP implementation, it is important to align expectations accordingly and incorporate these activities into the project plan. Benefits Realization Tools While benefits realization focuses on an integrated set of activities, it also entails a number of tools that can be used to effectively perform the tasks: Business Case and Metrics Traditional financial and cost-benefit analysis is a useful tool for outlining and documenting the high-level benefits to be achieved by the proposed technology. In addition, it is useful to examine industry benchmarks to gain a more accurate understanding of the potential benefits of technologies. Consulting and benchmarking firms are often invaluable sources of data regarding the impact of IT on actual performance and metrics. Organizational Change Management Tools In order to measure a companys cultural gaps, it is helpful to conduct an Organizational Change Impact Assessment, which identifies the actual impacts of the change on different functional areas and enables these areas to be addressed as part of the IT project. If the large gaps continue after go-live, there will be significant end-user resistance to the associated changes. Process Modeling Tools There are a number of approaches that can be used to model and document processes, but the most effective approach used by Panoramas clients has been to use a best-of-breed model as a starting point and then tailor it to fit a companys unique operating conditions. This approach is both more accelerated and more time- and cost-effective than undergoing complete business process reengineering from scratch. Skills Gap Matrices As part of the job and organizational design activities, it is helpful to develop a matrix that identifies the required skill set for each major job type as a result of the new technologies and processes. This matrix can then be used to compare required skills to actual skills, which can subsequently act as a catalyst for developing training requirements. It is important to capture both technical skills as well as business process
Page 7 of 14 3773 Cherry Creek North Drive - Suite 720 - Denver, CO 80209 720-515-1377 Panorama-Consulting.com Copyright 2012 Eric Kimberling. All Rights Reserved.
skills in these matrices. It is also important to evaluate every major job area that will be impacted by the upcoming changes. Process and Organizational Change Implementation Plans While organizational design and process models are nice to conceptualize and document at a high level, the work must not end there. It is equally if not more important to identify the changes that are necessary to arrive at the to be process and organizational states and to develop corresponding change implementation plans to make the changes actually happen. For example, how might you change the role of customer service representatives to ensure they use the new technologies? Will you need to work with HR and/or labor unions to implement the job changes? How will you introduce the new rewards and measurements aligned with the project? These are the types of questions that need to be answered and addressed with specific timelines and ownership for each task. Benefits Realization Scorecards Once projected organizational and individual target performance metrics have been identified, it is useful to develop scorecards to track actual benefits performance after go- live. These scorecards serve as an effective communication vehicle to disseminate performance results throughout a company. ERP Post-Implementation Audits Its easy to forget that successful ERP implementations dont end at go-live. If anything, it is the experiences after the system is implemented that achieves or derails the success of the system. However, most companies fail to conduct a post-implementation audit to see how their ERP systems are fitting in with the business. Inevitably, there will be ongoing changes and adjustments to optimize the way the system is operating and to improve the way it supports your business so conducting a post-go-live audit is very important. Post-Implementation Audit Focus Areas Baseline and post-implementation performance measures. Every ERP project should have a solid business case well before the system is selected or implemented. However, the only way to understand the level of ERP business benefits is to measure performance before and after go-live. It is important to establish baseline performance levels and compare those to the performance levels after go-live. This will help identify areas of under-performance and opportunities for ongoing improvement. Identify additional training opportunities. No matter how well youve prepared and trained your employees, there will be a decrease in productivity immediately after go-live. The key is to minimize this drop and help employees to eventually be more productive than they were before the ERP implementation. Post-implementation audits should explore areas where employees are under-trained or could benefit from ongoing training. This will help optimize the business benefits of the ERP system in the longer-term. Identify opportunities to improve business processes. Just because you have implemented ERP doesnt mean that your business processes are going to be perfect. There are always going to be process inefficiencies and breakdowns that can be improved. By working with employees to identify process pain points and following this up with root cause analyses, you will identify opportunities to improve your processes and make them more efficient and effective.
Page 8 of 14 3773 Cherry Creek North Drive - Suite 720 - Denver, CO 80209 720-515-1377 Panorama-Consulting.com Copyright 2012 Eric Kimberling. All Rights Reserved.
Establishing ERP and IT Performance Measures To truly realize the benefits of ERP, organizations must develop performance measures at an operational level. Most business cases include high-level corporate performance measures that define potential areas of an IT or ERP projects business benefits (e.g., reduced inventory, reduced sales order processing time, reduced headcount, etc.). The problem with these high-level measures is that the associated benefits do not transpire unless the metrics are pushed from the executive down to the operational levels of the organization. Performance measures at an operational level help drive accountability and visibility to achieve the benefits outlined in the business case. They also help drive overall ERP benefits realization. Lets use sales order processing time as an example. Perhaps it was determined that an ERP system could potentially reduce sales order processing by 30-percent and create an annual savings of $1 million via reduced headcount company-wide. This is a tangible benefit, but it means nothing to the mid-level operational managers of a global conglomerate that need to contribute to this benefit. So if you have a Director of Sales and Marketing in charge of Europe, that person should be given a specific target to contribute to this $1 million savings so that he or she is held partially accountable for the projects overall ROI. The same should be done for the directors in charge of other areas of the business until the full $1 million savings target is assigned to the appropriate people. Obviously, this process is easier said than done. In order for a performance management approach to succeed, effective communication is crucial. Ideally, the operational managers that will ultimately be accountable for project results on the business side should be involved in helping define the business case and potential savings of an ERP system. In addition, they also should be given support to help identify root causes of anticipated benefits that are not realized. This will help ensure buy-in to the established targets, which is the centerpiece of an effective ERP benefits realization program. In short, the only way to achieve the ROI defined in a business case is to cascade target improvements and accountability out of the boardroom and down to the lower levels of your organization. ERP Performance Measures and KPIs: Finding the Right Balance With that being said, in our experience most companies dont adequately address performance measurement, post-implementation audits or benefits realization as part of their ERP projects. The only problem with performance management programs is that most companies fail to implement them correctly. Most business cases for large investments such as IT projects or mergers focus only on high-level measures, which can be difficult to track against and drive employee accountability. For example, a business case for a large IT project may indicate that headcount can be reduced by 10-percent across the company because of increased efficiencies enabled by an ERP system. This may very well be an accurate quantification of the benefits, but the benefits will not be realized unless they are brought to a more operational level that will drive accountability and visibility to the benefits. This requires a more detailed analysis of processes to understand with more accuracy where exactly the process inefficiencies lie and where the benefits will be achieved. On the other end of the spectrum, many performance measurement and management programs fail because of their complexity and cost. The advent of Six Sigma and Activity Based Management has encouraged many companies to go overboard with expensive and time-consuming data collection efforts that are not costjustified and lack focus. While performance management is extremely beneficial, there is a point of diminishing returns when organizations go too far in their efforts. In light of todays pressures to reduce short-term costs
Page 9 of 14 3773 Cherry Creek North Drive - Suite 720 - Denver, CO 80209 720-515-1377 Panorama-Consulting.com Copyright 2012 Eric Kimberling. All Rights Reserved.
and headcounts, it is far more cost-effective to focus performance measurement efforts on the areas that will produce the most significant results; managers need not measure and overanalyze every minute aspect of their operations to achieve significant improvements. To be successful in their performance management pursuits, managers need to maintain a balance between operationalizing performance measures and keeping the approach simple. This balanced approach will ensure a proper focus on business areas that can provide measurable improvements without spreading costs and resources too thin. This ultimately helps lead to effective ERP benefits realization and a healthy ROI. Does ERP Really Lead to Labor Cost Savings? Weve all seen the business cases related to how ERP will save X Corporation $X millions of labor costs in just a few short years. But how real are labor cost savings in ERP implementations? The answer is, It depends. Most companies fail to go back and measure their post-implementation business results, so its likely that these companies are not realizing the benefits that they projected in their business cases. After all, if it isnt measured, people probably arent being held accountable for the results. Labor savings is one of the toughest costs to realize. Even if and when ERP improves business processes and makes employees jobs more efficient, the dollar savings dont just magically appear. To realize the savings, organizations have to reduce full-time staff and do more work with less people. This is the hard part. FTE reductions and the correlating cost savings dont necessarily require mass layoffs. Companies with aging workforces typically have a high number of employees eligible for retirement. Many companies have significant turnover due to employee attrition. Some organizations have opportunities for employees to fill jobs in other departments. When building the business case, it is important to identify how labor cost savings will be realized. Will staff be reduced by reassigning them to job vacancies or simply by not replacing employees as they resign? Or, will the organization be more aggressive and institute layoffs? Whichever approach the company takes, it is important to clearly understand how it will realize labor cost savings. This requires tough decisions, as well as a thorough analysis of where the exact cost savings will be achieved. In addition to identifying and realizing the reductions in staff, it is important to identify how remaining employees jobs will change. How will their workloads change? What are the expectations in their new environment? Why are the job reductions necessary? These are all questions that should be addressed as part of an effective organizational change management program. Ensuring that remaining employees are clear on their roles and expectations is even more important than the cost savings realized from reduced staff. Achieving Benefits the Wrong Way: Things to Consider Before You Cancel Your Annual Maintenance Contract ERP software companies make their money charging their customers maintenance fees. This is their cash cow. This is where theyll fight the hardest. Sure, theyll give you a huge discount on the list price of the software when they sell it to you, but just try to negotiate the price of maintenance. Good luck getting any discount whatsoever. They simply do not budge on annual maintenance fees. Companies typically spend 15- to 20-percent of their software license fees on maintenance and support each year. In fact, according to a recent survey on Panoramas website, 69-percent of companies spend at least 15Page 10 of 14 3773 Cherry Creek North Drive - Suite 720 - Denver, CO 80209 720-515-1377 Panorama-Consulting.com Copyright 2012 Eric Kimberling. All Rights Reserved.
percent per year for ERP support and maintenance. On the other hand, eight-percent indicate that they are no longer paying support for their systems. Given the ten- to 15-year average lifespan of ERP investments, license costs are often eclipsed by maintenance costs in the long-term. So it's understandable that companies would want to reduce these costs. However, there are some risks to consider before canceling your ERP software maintenance contract. Here are three reasons to think carefully: 1. Inability to upgrade your software. Once you cancel your maintenance contract, your organization generally will be ineligible for automatic upgrades. ERP vendors spend significant sums of money on R&D to improve their software functionality incorporating best practices from their client bases, so there may be opportunity costs and lost business benefits associated with canceling a maintenance contract. 2. Business operations become frozen in time. Because upgrades and support stop when the maintenance contract is canceled, it becomes very unlikely that an organization will be able to change the system to keep up with its own evolution. As a result, business needs are likely to become misaligned with the functionality of the software. This misalignment may accelerate the need to completely replace your ERP system, which can be more costly than the savings achieved from the cancellation. 3. Proliferation of workarounds. Because of the first two reasons, users are more likely to become frustrated with the system and start adopting their own business processes outside the ERP system. This will generally decrease user satisfaction with the system and undermine business benefits. Canceling maintenance may seem like a cost savings but expect the ERP vendor to play hardball with you should you need any upgrades, fixes or regulatory updates. You will no longer have any access to these things and your ERP vendor will not be sympathetic in any way. Youve affectively chosen to severe all ties with the vendor and you need to realize the vendor will view it as such. What about third-party providers? Sure, theyre relatively cheap, provide a lot of services and have customer support analysts and developers to make modifications and troubleshoot, but third-party vendors do not have access to the ERP vendors proprietary source code, knowledge base or system architects. Should you find a bug in your ERP system after contract cancellation that only the vendors developers can fix, youll find your ERP vendor no longer cares about fixing it for you. The provider may be able to code a workaround, but if you have more than a handful of these, they can get very difficult to maintain over time. Code becomes out of date and difficult to manage and sometimes it takes reworking a large chunk of the proprietary code to make it right. If you go with a third-party provider, remember that the must find a reputable and forthright third-party provider and make sure you follow the rules of your license agreement. Panoramas recommendation comes down to this: If you cancel maintenance, do so knowing that youll be on your own. Your ERP vendor will simply not respond to your requests for help. If this is acceptable to you, then go for it. Panorama experts strongly suggest that you do this only if your system is completely stable, you dont plan to upgrade in the future and you have no regulatory changes to be made. And dont expect your vendor to welcome you back into the fold once you leave. (And, if they do, expect to see that 18-percent fee structure become 25-percent or more.) The key to this question is risk. Can you assume all the risks that are associated with having no maintenance and no parachute to fall back on should something happen? You may be the corporate hero when the savings appear, but you will also be the fall guy when your ERP software is unable to ship, invoice or even run a report. Take some time to sit for a minute, clean the moss off your server, and think hard about coming up with another option for cutting costs. This one is not nearly as good as it seems.
Page 11 of 14 3773 Cherry Creek North Drive - Suite 720 - Denver, CO 80209 720-515-1377 Panorama-Consulting.com Copyright 2012 Eric Kimberling. All Rights Reserved.
after the go-live. However, the team also understood that the only way it was going to actually realize the benefits and improvements was to measure and make adjustments where needed. The initial results were discouraging: three months after the go-live of the first module (work management), Upstate only had realized approximately 20-percent of its projected benefits. However, the good news was that corporate leadership knew it had a long way to go and was prepared to keep pushing. The companys next step was to conduct a series of focus groups and work sessions to identify the root causes for why the other 80-percent of benefits were not being realized. It quickly found that users did not fully understand how to use the system and were reverting back to their manual processes. It also found that markups of work drawings from the field were not being sent back to the office for updates in the system, which was a key process breakdown that the system itself couldnt fix. As a result, Upstate implemented corrective action to improve its performance. First, it provided refresher training and additional online documentation for employees to make them more comfortable with the system. Second, it redefined the business process for field drawing markups to ensure that office staff received them quickly. These two activities alone had an immediate impact on business benefits and within three months, Upstate was realizing over 60-percent of its projected improvements to its business. Within another three months, that figure was close to 85-percent. Additional Lessons Learned from the Front Lines of ERP Projects While the above case study highlights just a few of the key aspects of Upstate Gas and Electrics ERP benefits realization program, the project also resulted in a host of additional lessons learned. Organizations should be realistic in projecting ERP benefits. Upstate made the common mistake of being too aggressive in defining improvements they expected to see, which made them very difficult to achieve. Benefit projections should be challenging but not impossible. Ensure involvement and representation from all key areas of the business. Too often, companies try to implement ERP without involving key stakeholders and employees in the decision-making and implementation process. Upstate learned early in its project that it needed to involve employees to begin changing its rigid cultural history. Link the business case to the operational metrics. Often times there is a disconnect between the dollar savings quantified in ERP business cases and the operational metrics and targets. While it is easier said than done, it is important that there is an apples-to-apples linkage between the two. Dont get too caught up in as-is processes. While there is value in defining and documenting current state processes, the real focus should be on future state processes. Many ERP project teams have found it useful to begin the analysis with high-level current state documentation to better understand pain points and benefit opportunities, then spend a majority of time on how the processes will look in the future in the new environment.
Given the nature and risk of ERP projects, it is clear that there is a need to ensure that companies more fully realize the benefits of this rewarding technology. Unfortunately, investing millions of dollars in technology without a compelling justification and validation is just not acceptable. By understanding and integrating a comprehensive benefits realization approach into ERP implementations, managers will ensure that their projects are rolled out successfully and that the projects translate to wise investment decisions for the company.
Page 13 of 14 3773 Cherry Creek North Drive - Suite 720 - Denver, CO 80209 720-515-1377 Panorama-Consulting.com Copyright 2012 Eric Kimberling. All Rights Reserved.
Page 14 of 14 3773 Cherry Creek North Drive - Suite 720 - Denver, CO 80209 720-515-1377 Panorama-Consulting.com Copyright 2012 Eric Kimberling. All Rights Reserved.