Download as pdf
Download as pdf
You are on page 1of 166
HGE/O&MA2 OPERATION AND MAINTENANCE INSTRUCTIONS FOR (4X 11 MW, 11 KY, 333.33 RPM VERTICAL HYDROGENERATORS) FOR CHUTAK HYDRO ELECTRIC PROJECT (NHPC) BHARAT HEAVY ELECTRICALS LIMITED a) | 50 | HYDRO GENERATOR ENGINEERING DIVISION | 2 wae BHOPAL — 462022 (INDIA HGE/O&M/92 OPERATION AND MAINTENANCE INSTRUCTIONS FOR (4X 11 MW, 11 KV, 333.33 RPM VERTICAL HYDROGENERATORS) FOR CHUTAK HYDRO ELECTRIC PROJECT (NHPC) PREPARED. BY CHECKED BY APPROVED BY BIRAJAP. SWAIN P.CHAUDHURI a BHATI ENGINEER (HGE) AGM (HGE) GM (EM-ENGG.) Otteecan Dy.MGR (HGE) DATE OF ISSUE : 02/08/2011 HYDRO GENERATOR ENGINEERING DIVISION BHARAT HEAVY ELECTRICALS LIMITED BHOPAL - 462022 (INDIA BHARAT HEAVY FLECTRICALS LTD. BHOPAL (HYDROGENERATOR ENGINEERING DEVISON) | > SEWACIELEP, OPERATION AND MAINTENANCE INSTRUCTIONS: ca ey yer CONTENTS 1 SECTION NO. DESCRIPTION PAGE NO. | 1 DESCRIPTION OF GENERATOR 1-12 2 TECHNICAL DATA 1H17 3 STORAGE AND HANDLING INSTRUCTIONS 18-31 4 OPERATION 32-43 + 5 MAINTENANCE 44-61 6 ‘SCHEDULE OF MAINTENANCE 62-74 | 2. ANNEXURE NO. DESCRIPTION PAGENO. | 1 SCHEDULE OF H.V. TESTS 18-71 2 INSULATION RESISTANCE TESTING & DRYOUT | 7g. g9 OF GENERATOR e INSTRUCTIONS FOR ASSEMBLY AND acias a REPLACEMENTOF STATOR WINDING BARS : 7 INSTRUCTIONS FOR ASSEMBLY AND 106-108 | REMOVAL OF FIELD COILS 4 | CLEANING OF STATOR WINDING, FIELD | 5 WINDING, STATOR CORE, BRUSHGEAR, ROTOR | 109-111 LEADS, D.C, CONNECTION, BTC. 6 OPERATION AND MAINTENANCE ial : INSTRUCTIONS FOR AIR COOLERS - 7 OPERATION AND MAINTENANCE rene INSTRUCTIONS FOR PLUG-IN OIL COOLERS 8 PRESERVATION FOR PROLONGED SHUT-DOWN | _ 133-137 9 CARE OF BEARING OIL 138-148 10 LIST OF SPARES AND ERECTION TOOLS 149-153 | ~ [LIST OF GENERATOR DRAWINGS & See ut DOCUMENTS ae aie Page | of

You might also like