OSFC Report, Maddux Elementary School
OSFC Report, Maddux Elementary School
OSFC Report, Maddux Elementary School
Program Type Setting Assessment Name Assessment Date Cost Set: Building Name Building IRN Building Address Building City Building Zipcode Building Phone Acreage Current Grades: Teaching Stations Number of Floors Student Capacity Current Enrollment Enrollment Date
Expedited Local Partnership Program (ELPP) Suburban Maddux Elementary School (21949) FINAL 2013-08-22 2013 Maddux Elem 21949 943 Rosetree Lane Cincinnati 45230 513-231-0780 20.00 K-6 35 2 417 615 2013-08-20
Enrollment Date is the date in which the current enrollment was taken. Number of Classrooms Historical Register Buildings Principal Building Type 28 NO Mr. Stephen Troehler Elementary/Middle Next Page
Page 1
GENERAL DESCRIPTION 61,662 Total Existing Square Footage 1966,1993 Building Dates K-6 Grades 615 Current Enrollment 35 Teaching Stations 20.00 Site Acreage Maddux Elementary School, which is not on the National Register of Historic Buildings, and originally constructed in 1966, is a 2 story, 61,662 square foot brick school building located in a suburban residential setting. The existing facility features a conventionally partitioned design, and does utilize one modular building. The structure of the overall facility contains a steel frame with brick veneer on a non-load bearing masonry type exterior wall construction, with concrete masonry units, brick, glazed block, metal stud framed partitions with gypsum board, wood framed partitions with wood paneling and operable partition type wall construction in the interior. The base floor system of the overall facility is concrete slab on grade type construction. The floor system of the first floor located under the Gymnasium consists of precast concrete planks with concrete topping type construction. The roof structure of the overall facility, except for over the Gymnasium, is metal form deck on steel joist type construction. The roof structure over the Gymnasium is tectum deck on steel joist type construction. The roofing system over the 1966 Original Construction is a fully adhered EPDM membrane roof that was installed in phases in 1987, 1992, and 1997. The roofing system over the 1993 Addition is a modified asphalt built-up roof with gravel wear coat that was installed in 1993. The ventilation system of the building is inadequate to meet the needs of the users. The Classrooms are inadequately sized in terms of the current standards established by the State of Ohio. Physical Education and Student Dining spaces consist of one Gymnasium and separate Student Dining. The electrical system for the facility is inadequate. The facility is equipped with a non-compliant security system. The building has a compliant manual and automatic fire alarm system. The facility is not equipped with an automated fire suppression system. The building is reported to contain asbestos and other hazardous materials. The overall building is not compliant with ADA accessibility requirements. The school is located on a 20 acre site adjacent to residential properties. The property and playgrounds are partially fenced for security. Access onto the site is unrestricted. Site circulation is fair. There is dedicated space for school buses to load and unload on the site. Parking for staff, visitors and community events is adequate. According to reports from the District, the building was originally designed to have the front facing northwest. The building entry is currently oriented from the southeast.
Page 2
Building Construction Information - Forest Hills Local SD (47340) - Maddux Elem (21949)
Name
Original Construction 1966 no Classroom Addition 1993 yes Previous Page Next Page
Building Construction Information - Forest Hills Local SD (47340) - Maddux Elem (21949)
Page 3
Building Component Information - Forest Hills Local SD (47340) - Maddux Elem (21949)
Auditorium Agricultural Primary Media Vocational Student Indoor Adult Board Outside Auxiliary Fixed Corridors Education Kitchen Natatorium Gymnasium Center Space Dining Tracks Education Offices Agencies Gymnasium Seating Lab 8128 448 0 8,576 0 3,239 1,209 0 2,398 1,386 0 0 0 0 0 0 3239 1209 2398 1386
There are no readily evident site conditions that might significantly affect master planning. An outdoor Classroom is provided on the northwest side of the building, with a covered shelter and metal site furniture. Previous Page Next Page
Building Component Information - Forest Hills Local SD (47340) - Maddux Elem (21949)
Page 4
<Untitled>
Page 5
Main Assessment Menu - Forest Hills Local SD (47340) - Maddux Elem (21949)
Date Prepared: 2013-08-22 Date Revised: 2013-10-29 20.00 35 28 Cover Sheet Section
CEFPI Appraisal Summary Points Possible Points Earned Percentage Rating Category 100 200 100 200 200 200 1000 82 133 68 145 117 124 669 82% 67% 68% 73% 59% 62% 67% Satisfactory Borderline Borderline Satisfactory Borderline Borderline Borderline
Date HA Number of Floors Current Square Feet 1.0 The School Site Original Construction 1966 no 2 57,257 2.0 Structural and Mechanical Features Classroom Addition 1993 yes 1 4,405 3.0 Plant Maintainability Total *HA *Rating = Handicapped Access =1 Satisfactory =2 Needs Repair =3 Needs Replacement *Const P/S = Present/Scheduled Construction FACILITY ASSESSMENT Cost Set: 2013 A. Heating System B. Roofing C. Ventilation / Air Conditioning D. Electrical Systems E. Plumbing and Fixtures F. Windows G. Structure: Foundation H. Structure: Walls and Chimneys I. Structure: Floors and Roofs J. General Finishes K. Interior Lighting L. Security Systems M. Emergency/Egress Lighting N. Fire Alarm O. Handicapped Access P. Site Condition Q. Sewage System R. Water Supply S. Exterior Doors T. Hazardous Material U. Life Safety V. Loose Furnishings W. Technology X. Construction Contingency / Non-Construction Cost Rating 3 3 2 3 2 2 2 2 1 3 3 3 3 2 3 3 1 1 3 3 3 3 3 61,662 4.0 Building Safety and Security 5.0 Educational Adequacy 6.0 Environment for Education LEED Observations Commentary Total
Dollar Enhanced Environmental Hazards Assessment Cost Estimates Assessment C $2,103,907.44 - C=Under Contract $439,820.71 98.14% $35,831.00 - Renovation Cost Factor $10,163,467.08 $1,000,774.26 - Cost to Renovate (Cost Factor applied) $85,400.00 - The Replacement Cost Per SF and the Renovate/Replace ratio are only provided when this summary is $32,889.00 - requested from a Master Plan. $33,897.50 $194,995.25 $0.00 $1,700,220.98 $308,310.00 $144,905.70 $61,662.00 $4,000.00 $339,412.40 $536,237.40 $0.00 $0.00 $22,500.00 $83,326.70 $310,518.40 $184,986.00 $699,209.56 $2,033,286.06 $10,356,090.36 Previous Page
Total
Main Assessment Menu - Forest Hills Local SD (47340) - Maddux Elem (21949)
Page 6
Main Assessment Menu - Forest Hills Local SD (47340) - Maddux Elem (21949)
Date Prepared: 2013-08-22 Date Revised: 2013-10-29 20.00 35 28 Cover Sheet Section
CEFPI Appraisal Summary Points Possible Points Earned Percentage Rating Category 100 200 100 200 200 200 1000 82 133 68 145 117 124 669 82% 67% 68% 73% 59% 62% 67% Satisfactory Borderline Borderline Satisfactory Borderline Borderline Borderline
Date HA Number of Floors Current Square Feet 1.0 The School Site Original Construction 1966 no 2 57,257 2.0 Structural and Mechanical Features Classroom Addition 1993 yes 1 4,405 3.0 Plant Maintainability Total *HA *Rating = Handicapped Access =1 Satisfactory =2 Needs Repair =3 Needs Replacement *Const P/S = Present/Scheduled Construction FACILITY ASSESSMENT Cost Set: 2013 A. Heating System B. Roofing C. Ventilation / Air Conditioning D. Electrical Systems E. Plumbing and Fixtures F. Windows G. Structure: Foundation H. Structure: Walls and Chimneys I. Structure: Floors and Roofs J. General Finishes K. Interior Lighting L. Security Systems M. Emergency/Egress Lighting N. Fire Alarm O. Handicapped Access P. Site Condition Q. Sewage System R. Water Supply S. Exterior Doors T. Hazardous Material U. Life Safety V. Loose Furnishings W. Technology X. Construction Contingency / Non-Construction Cost Rating 3 3 2 3 2 2 2 2 1 3 3 3 3 2 3 3 1 1 3 3 3 3 3 61,662 4.0 Building Safety and Security 5.0 Educational Adequacy 6.0 Environment for Education LEED Observations Commentary Total
Dollar Enhanced Environmental Hazards Assessment Cost Estimates Assessment C $1,953,608.84 - C=Under Contract $406,881.30 98.14% $33,628.50 - Renovation Cost Factor $9,486,984.30 $929,281.11 - Cost to Renovate (Cost Factor applied) $85,400.00 - The Replacement Cost Per SF and the Renovate/Replace ratio are only provided when this summary is $27,151.00 - requested from a Master Plan. $28,560.00 $168,904.25 $0.00 $1,596,101.30 $286,285.00 $134,553.95 $57,257.00 $4,000.00 $338,531.40 $503,457.29 $0.00 $0.00 $14,500.00 $83,282.60 $296,422.40 $171,771.00 $649,259.53 $1,897,950.06 $9,666,786.53
Total
Main Assessment Menu - Forest Hills Local SD (47340) - Maddux Elem (21949)
Page 7
Main Assessment Menu - Forest Hills Local SD (47340) - Maddux Elem (21949)
Date Prepared: 2013-08-22 Date Revised: 2013-10-29 20.00 35 28 Cover Sheet Section
CEFPI Appraisal Summary Points Possible Points Earned Percentage Rating Category 100 200 100 200 200 200 1000 82 133 68 145 117 124 669 82% 67% 68% 73% 59% 62% 67% Satisfactory Borderline Borderline Satisfactory Borderline Borderline Borderline
Date HA Number of Floors Current Square Feet 1.0 The School Site Original Construction 1966 no 2 57,257 2.0 Structural and Mechanical Features Classroom Addition 1993 yes 1 4,405 3.0 Plant Maintainability Total *HA *Rating = Handicapped Access =1 Satisfactory =2 Needs Repair =3 Needs Replacement *Const P/S = Present/Scheduled Construction FACILITY ASSESSMENT Cost Set: 2013 A. Heating System B. Roofing C. Ventilation / Air Conditioning D. Electrical Systems E. Plumbing and Fixtures F. Windows G. Structure: Foundation H. Structure: Walls and Chimneys I. Structure: Floors and Roofs J. General Finishes K. Interior Lighting L. Security Systems M. Emergency/Egress Lighting N. Fire Alarm O. Handicapped Access P. Site Condition Q. Sewage System R. Water Supply S. Exterior Doors T. Hazardous Material U. Life Safety V. Loose Furnishings W. Technology X. Construction Contingency / Non-Construction Cost Rating 3 3 2 3 2 2 2 2 1 3 3 3 3 2 3 3 1 1 3 3 3 3 3 61,662 4.0 Building Safety and Security 5.0 Educational Adequacy 6.0 Environment for Education LEED Observations Commentary Total
Dollar Enhanced Environmental Hazards Assessment Cost Estimates Assessment C $150,298.60 - C=Under Contract $32,939.41 98.14% $2,202.50 - Renovation Cost Factor $676,482.78 $71,493.15 - Cost to Renovate (Cost Factor applied) $0.00 - The Replacement Cost Per SF and the Renovate/Replace ratio are only provided when this summary is $5,738.00 - requested from a Master Plan. $5,337.50 $26,091.00 $0.00 $104,119.68 $22,025.00 $10,351.75 $4,405.00 $0.00 $881.00 $32,780.11 $0.00 $0.00 $8,000.00 $44.10 $14,096.00 $13,215.00 $49,950.03 $135,336.00 $689,303.83
Total
Main Assessment Menu - Forest Hills Local SD (47340) - Maddux Elem (21949)
Page 8
Facility Assessment
A. Heating System
Description:
The existing system for the 1966 Original Construction is a natural gas fired heated water boiler type system, installed in 1966, and is in fair condition. The existing system in the 1993 Addition is an extension of the 1966 Original Construction. The overall facility is a 2-pipe heating only type system, without a capacity for cooling operation, which is not compliant with the OSDM requirements for basic system type. The two (2) flexible watertube boilers, manufactured by Cleaver-Brooks, were installed in 1998 and are in fair condition. Heating water is distributed to terminal units consisting of unit ventilators, cabinet heaters, unit heaters, and air handlers. The terminal equipment is original to each addition and is in fair condition. The system does not appear to comply with the 15 CFM per person fresh air requirements of the Ohio Building Code mechanical code and Ohio School Design Manual. The pneumatic and electric type system temperature controls are original to each addition and are in fair to poor condition. The system does not feature individual temperature controls in all spaces required by the OSDM. The overall system does not feature any central energy recovery systems. The facility is equipped throughout with louvered interior doors to facilitate Corridor utilization as return air plenums. See Items J and O for replacement of doors. The existing system in the Gymnasium of the 1966 Original Construction is ducted, but the ductwork cannot be integrated into a possible future system due to arrangement, air volume, and routing of existing ductwork. The existing systems in the remainder of the 1966 Original Construction and in the 1993 Addition are not ducted, and floor to structural deck heights will accommodate the installation of properly sized ductwork for a future Ohio School Design Manual approved system. The overall heating system is evaluated as not being in safe and efficient working order, and long term life expectancy of the existing system is not anticipated. The structure is not equipped with central air conditioning. The site does not contain underground fuel tanks. 3 Needs Replacement Provide new overall heating, ventilating, and air conditioning system to achieve compliance with Ohio Building Code and Ohio School Design Manual standards. Replace existing ductwork in the Gymnasium of the 1966 Original Construction to facilitate efficient exchange of conditioned air. Convert the remainder of the 1966 Original Construction and the 1993 Addition to ducted systems to facilitate efficient exchange of conditioned air. Unit Whole Building Original Classroom Construction (1966) Addition (1993) 57,257 ft! 4,405 ft! Required Required Required Required Sum Comments
Rating: Recommendations:
Item
Cost
$1,610,611.44(includes demo of existing system and reconfiguration of piping layout and new controls, air conditioning) $493,296.00(includes cost for vert. & horz. chases, cut openings, soffits, etc. Must be used in addition to HVAC System Replacement if the existing HVAC system is non-ducted)
$2,103,907.44 $1,953,608.84
$150,298.60
Facility Assessment
Page 9
Facility Assessment
B. Roofing
Description:
The roof over the 1966 Original Construction is a fully adhered EPDM Carlisle membrane system that was installed in phases in 1987, 1992, and 1997, and is in good condition. The roof over the 1993 Addition is a modified asphalt built-up system with gravel wear coat that was installed in 1993, and is in fair condition. There are no District reports of current leaking. No signs of past leaking were observed during the physical assessment. Access to the roof was gained by an extension ladder. Fall safety protection cages are not required and are not provided. There were observations of standing water on the roof. Metal cap flashings and copings are in good condition. Roof storm drainage is addressed through a system of roof drains, which are properly located, and in good to fair condition. The roof is not equipped with overflow roof drains, except over the 1993 Addition, though they are not required on this building. No problems requiring attention were encountered with any roof penetrations. There are no covered walkways attached to this structure. 3 Needs Replacement The roof over the overall facility requires replacement to meet Ohio School Design Manual guidelines for age of system. New flashing is included in roof replacement. Provide new roof access hatch in the Loading Dock area to facilitate access to all levels of low slope roof surfaces. Provide tapered Insulation to facilitate positive drainage to the roof drains. Cost Unit Whole Building Original Construction (1966) 57,257 ft! 48,190 Required 1,000 Required 1 Required $439,820.71 $406,881.30 $32,939.41 Classroom Addition (1993) 4,405 ft! 3,983 Required Sum Comments
Rating: Recommendations:
Item
Membrane (all types): Roof Insulation: Roof Access, Ladder & Fall Protection Cage: Sum:
$431,470.71(unless under 10,000 sq.ft.) $4,500.00(tapered insulation for limited area use to correct ponding) $3,850.00(provide when no roof access currently exists)
Typical Roof Over the 1966 Original Construction Back to Assessment Summary
Facility Assessment
Page 10
Facility Assessment
Rating: Recommendations:
Item
Unit Ventilators
Facility Assessment
Page 11
Facility Assessment
D. Electrical Systems
Description:
The electrical system provided to the 1966 Original Construction is a 120/208 volts, 1,600 amp, 3 phase, 4 wire system installed in 1966, and is in fair condition. The system in the 1993 Addition is an extension of that found in the 1966 Original Construction. Power is provided to the school by a single utility owned, pad-mounted transformer located outside the Mechanical Room, and in fair condition. The panel system, installed in 1966, with upgrades in 1993, is in fair condition, but cannot be expanded to add additional capacity. The Classrooms are not equipped with adequate electrical outlets. The typical Classroom contains five (5) general purpose outlets, zero (0) dedicated outlets for each Classroom computer, and zero (0) dedicated outlets for each Classroom television. Some Classrooms are equipped with as many as six (6) general purpose outlets, while others are equipped with as few as three (3) general purpose outlets. There are not any spaces that have no electrical outlets. The Corridors are equipped with adequate electrical outlets for servicing. Adequate GFI protected exterior outlets are not provided around the perimeter of the building. The facility is not equipped with an emergency generator. Adequate lightning protection safeguards are not provided. Stage lighting power system including control panel, breakers, and dimmers is inadequately provided, in fair condition and does not meet OSDM requirements. The overall electrical system does not meet Ohio School Design Manual requirements in supporting the current needs of the school, and will be inadequate to meet the facilitys future needs. 3 Needs Replacement The entire electrical system requires replacement to meet Ohio School Design Manual guidelines due to condition and age, lack of OSDM-required features, and to accommodate the addition of an air conditioning system. Provide an emergency generator, with funding included in the electrical system replacement. Provide adequate lightning protection safeguards in the overall facility, including associated grounding system, with funding included in the electrical system replacement. Provide control panel, dimmers, and breakers to support the Stage lighting system. Original Construction (1966) 57,257 ft! Required Classroom Sum Addition (1993) 4,405 ft! Required Comments
Rating: Recommendations:
Item
Cost
$16.23sq.ft.
$1,000,774.26(Includes demo of existing system. Includes generator for life safety systems. Does not include telephone or data or equipment) (Use items below ONLY when the entire system is NOT being replaced)
$1,000,774.26 $929,281.11
$71,493.15
Facility Assessment
Page 12
Facility Assessment
Rating: Recommendations:
Item
Electric water cooler: Replace faucets and flush valves HIGH BAY/INDUSTRIAL SPACE - LAB TYPES 5,6,7 - Safety Shower/Eyewash - New Installation HIGH BAY/INDUSTRIAL SPACE - LAB TYPES 5,6,7 - Utility Sink HIGH BAY/INDUSTRIAL SPACE - LAB TYPES 5,6,7 Compressed Air Connections HIGH BAY/INDUSTRIAL SPACE - LAB TYPES 5,6,7 - Grease Trap or Oil Interceptor Sum:
Facility Assessment
Page 13
Typical Classroom Lavatory with Sink Mounted Drinking Fountain Back to Assessment Summary
Facility Assessment
Page 14
Facility Assessment
F. Windows
Description:
The overall facility is equipped with thermally broken aluminum frame windows with double glazed insulated glazing type window system, which was installed in 2002, and is in good condition. The window system features operable windows throughout the building, and operable windows are equipped with opening limiters in good condition and insect screens in good to fair condition. Window system seals are in good condition, with no air and water infiltration being experienced. Window system hardware is in good condition. The window system features surface mounted shades and blinds, which are in good to fair condition. This facility is not equipped with any curtain wall systems. This facility does not feature any glass block windows. The exterior doors in the 1966 Original Construction are equipped with thermally broken aluminum and hollow metal frame sidelights and transoms with tempered single pane and double glazed insulated glazing, in good to fair condition. Exterior door vision panels in the 1966 Original Construction are tempered single pane and double glazed insulated glazing, in good to fair condition. The exterior doors in the 1993 Addition are equipped with hollow metal frame transoms with insulated metal panels, in good to fair condition. Exterior door vision panels in the 1993 Addition are tempered double glazed insulated glazing. The school does not contain skylights. The school does not contain clerestories. Interior glass is not OSDM-compliant due to non-compliance with current Ohio Building Codes. Window security grilles are not provided for ground floor windows. There is not a Greenhouse associated with this school. 2 Needs Repair Replace window transoms and sidelights at exterior doors of the overall facility. Replace single pane vision panels at exterior doors as required in the 1966 Original Construction. Replace surface mounted blinds and shades in the overall facility. Replace damaged or missing insect screens as required in the overall facility. Replace non-compliant interior glazing. Cost Unit Whole Building Original Construction (1966) 57,257 ft! 486 Required 159 Required 121 Required Classroom Sum Addition (1993) 4,405 ft! 90 Required 14 Required 63 Required Comments
Rating: Recommendations:
Item
Other: Replace Damaged $8.00sq.ft. Insect Screens (Qty) Other: Replace Interior $25.00sq.ft. Glazing (Qty) Other: Replace Single $28.00sq.ft. Glazed Transoms and (Qty) Sidelights Other: Replace Single Pane $28.00sq.ft. Exterior Door Vision Panels (Qty) Other: Replace Surface $8.00sq.ft. Mounted Blinds and Shades (Qty) Sum:
$4,608.00Replace damaged or missing insect screens as required in the overall facility. $4,325.00Replace non-compliant interior glazing. $5,152.00Replace window transoms and sidelights at exterior doors of the overall facility. $364.00Replace single pane vision panels at exterior doors as required in the 1966 Original Construction. Replace surface mounted blinds and shades in the overall facility. $18,440.00Replace surface mounted blinds and shades.
13 Required
Facility Assessment
Page 15
Facility Assessment
G. Structure: Foundation
Description:
The overall facility is equipped with concrete grade beam foundation walls on concrete caissons, which displayed no current locations of significant differential settlement, cracking, or leaking, and are in good to fair condition. The District reported that past settlement issues at two exterior wall locations in the east Classroom wing have been addressed and no new issues have occurred. Areas of minor cracking and spalling were observed through the overall facility. The District reports that there has been no past leaking. Minor grading or site drainage deficiencies were noted around the perimeter of the structure that could contribute to foundation deterioration. There are several areas where adjacent yard areas drain towards the building instead of away from the building. 2 Needs Repair Repair areas of cracking and spalling through the overall facility. Rework yard areas as required to provide positive drainage away from the building. Cost Unit Whole Building Original Construction (1966) 57,257 ft! 2,856 Required 1,904 Required $33,897.50 $28,560.00 Classroom Addition Sum Comments (1993) 4,405 ft! 610 Required $17,330.00Rework yard areas as required to provide positive drainage away from the building. 305 Required $16,567.50Repair areas of cracking and spalling through the overall facility. $5,337.50
Rating: Recommendations:
Item
Other: Regrade Site to Provide Positive Drainage Other: Repair Minor Cracks and Spalled Areas Sum:
Facility Assessment
Page 16
Facility Assessment
Rating: Recommendations:
Item
Tuckpointing: Exterior Masonry Cleaning: Exterior Masonry Sealing: Exterior Caulking: Other: Boiler Room Railing Replacement Other: Chimney Masonry Repairs Other: Loading Dock Repairs Other: Masonry Infill Other: Masonry Repairs Other: Prep and Paint Canopy Other: Prep and Paint Steel Lintels
$5.25sq.ft. (Qty) $1.50sq.ft. (Qty) $1.00sq.ft. (Qty) $5.50ln.ft. $110.00ln.ft. $12.75sq.ft. (Qty) $15.00sq.ft. (Qty) $35.00sq.ft. (Qty) $12.75sq.ft. (Qty) $8.00sq.ft. (Qty) $8.00ln.ft.
$28,943.25(wall surface) $35,823.00(wall surface) $23,882.00(wall surface) $29,529.50(removing and replacing) $8,800.00Replace non code compliant metal railings at the Boiler Room well. $1,300.50Repair masonry chimney as required in the 1966 Original Construction. $750.00Repair loading dock concrete. $8,365.00Provide masonry infill as required through the overall facility. $42,177.00Provide masonry repairs as required through the overall facility. $4,800.00Prep and paint canopy at the 1966 Original Construction main entry. $832.00Prep and paint exposed steel lintels through the overall facility. $5,060.00Replace non code compliant metal railings at lower level ramp. $528.00Recaulk existing control joints. $3,672.00Repair and paint plaster soffits. $225.00Replace loading dock bumpers and timber rail. $308.00Repoint stone window sills through the 1993 Addition.
Other: Ramp Railing Replacement $110.00ln.ft. Other: Recaulk Exterior Control Joints Other: Repair and Paint Exterior Plaster Soffits Other: Replace Dock Bumpers Other: Repoint Stone Sills Sum: $5.50ln.ft. $8.00sq.ft. (Qty) $75.00each $5.50ln.ft.
Facility Assessment
Page 17
Entry Canopy
Facility Assessment
Page 18
Facility Assessment
Rating: Recommendations:
Item CostUnitWhole BuildingOriginal Construction (1966)Classroom Addition (1993)SumComments 57,257 ft! 4,405 ft! Sum: $0.00 $0.00 $0.00
Floor Cracking in Corridors of the 1966 Original Construction Back to Assessment Summary
Facility Assessment
Page 19
Facility Assessment
J. General Finishes
Description:
The overall facility features conventionally partitioned Classrooms with VAT or VCT type flooring, acoustical tile type ceilings, as well as painted block type wall finishes, and they are in fair condition. The overall facility has Corridors with terrazzo type flooring, acoustical tile type ceilings, as well as brick, glazed block, and painted block type wall finishes, and they are in fair condition. The overall facility has Restrooms with quarry tile type flooring, acoustical tile type ceilings, as well as painted block type wall finishes, and they are in fair condition. Toilet partitions are painted steel or plastic, and are in fair condition. Classroom casework in the overall facility is wood type construction with plastic laminate tops, is adequately provided, and in fair to poor condition. The typical Classroom contains 12 lineal feet of casework, and Classroom casework provided ranges from 10 to 20 feet. Classrooms are provided adequate chalkboards, markerboards, and tackboards which are in good condition. The Classroom Storage Closets, located in the Classrooms, are adequately provided, and in fair condition. The Art program is equipped with a kiln in good condition, and existing kiln ventilation is inadequate. The 1966 Original Construction is equipped with wood louvered interior doors that are recessed with proper clearances, but without proper ADA hardware, and in fair condition. The 1993 Classroom Addition is equipped with wood non-louvered interior doors that are flush mounted with proper ADA hardware and clearances, and in fair condition. The Gymnasium space has a rubber type flooring, exposed steel frame type ceilings, as well as painted block type wall finishes, and they are in fair condition. Stands are not provided in the Gymnasium. Gymnasium basketball backboards are a fixed type, and are in good condition. The Media Center has carpet type flooring, acoustical tile type ceilings, as well as painted block type wall finishes, and they are in fair condition. Student Dining, has VCT type flooring, vented metal type ceilings, as well as painted block type wall finishes, and they are in fair condition. OSDM-required fixed equipment for Stage is adequately provided, and in fair condition. Existing Gymnasium, Student Dining, Media Center, and Music spaces are not provided with appropriate sound attenuation acoustical surface treatments. The existing Kitchen is full service, is undersized based on current enrollment, and the existing Kitchen equipment, installed in 1966, with incremental upgrades, is in fair condition. The Kitchen hood is in fair condition, and is equipped with the required UL 300 compliant wet chemical fire suppression system. The required 6 overhang on all three exposed sides of the cooking equipment is provided by the hood. Kitchen hood exhaust ductwork is of proper construction and material and is installed as required by the OSDM and OBCMC. A walk-in cooler and freezer are located within the Kitchen spaces, and are in fair to poor condition. 3 Needs Replacement Provide complete replacement of finishes and casework due to installation of systems outlined in Items A, C, D, E, K, L, M, T, U, W, and due to condition. Provide for the replacement of interior doors due to condition and work in Item O. Provide for repairs to terrazzo flooring due to condition. Provide for the replacement of Kitchen equipment due to age and condition. Provide for the replacement of Kitchen hood due to age and condition. Provide for the replacement of walk-in coolers and freezers in kitchen. Provide for the replacement of toilet partitions and accessories due to age and condition. Provide for the replacement of Stage equipment due to condition. Provide sound attenuation treatment in the Gymnasium, Student Dining, Media Center, and Music spaces. Provide for additional exterior wall insulation due to observations in Item H. Provide for the replacement of Laboratory tables due to work in Item T. Cost Unit Whole Building Original Construction (1966) 57,257 ft! 13 Required Required 103 Required 279 Required Classroom Sum Addition (1993) 4,405 ft! Comments
Rating: Recommendations:
Item
Toilet Partitions: Toilet Accessory Replacement Door, Frame, and Hardware: Terrazzo Floor Repair Additional Wall Insulation Laboratory Table / Countertop Replacement Walk-in Coolers/Freezers: Kitchen Exhaust Hood: Total Kitchen Equipment Replacement:
$1,000.00per stall $0.20sq.ft. $1,300.00each $25.00sq.ft. (Qty) $6.00sq.ft. (Qty) $150.00ln.ft. $29,818.00per unit $56,000.00per unit $190.00sq.ft. (Qty)
$13,000.00(removing and replacing) $12,332.40(per building area) $145,600.00(non-ADA) $7,500.00(floor area affected; max. area to be 300 sf)
20,164 Required 3,718 Required $143,292.00(includes the furring out of the existing walls, insulation and abuse resistant GWB) 2 Required $300.00(Hazardous Material Replacement Cost - See T.) 2 Required 1 Required 1,386 Required $59,636.00 $56,000.00(includes fans, exhaust & ductwork) $263,340.00(square footage based upon only existing area of food preparation, serving, kitchen storage areas and walk-ins. Includes demolition and removal of existing kitchen equipment) 7,822 Required $23,466.00Provide sound attenuation treatment in the Gymnasium, Student Dining, Media Center, and Music spaces. 49,242 Required 3,789 Required $827,283.60(elementary, per building area, with removal of existing)
Other: Complete Replacement of Finishes and Casework Elementary School Other: Complete Replacement of $15.58sq.ft. Finishes and Casework Middle (Qty) School Other: Stage Equipment $14,000.00allowance Sum:
8,015 Required
616 Required
Facility Assessment
Page 20
Facility Assessment
Page 21
Facility Assessment
K. Interior Lighting
Description:
The typical Classrooms in the overall facility are equipped with T-8 1x4 surface mount and 2x4 lay-in direct fluorescent fixtures with single level switching. Classroom fixtures are in fair condition, providing an average illumination of 40 FC, which is less than the 50 FC recommended by the OSDM. The typical Corridors in the overall facility are equipped with T-8 1x4 surface mount direct fluorescent fixtures with single level switching. Corridor fixtures are in fair condition, providing an average illumination of 50 FC, thus complying with the 20 FC recommended by the OSDM. The Gymnasium spaces are equipped with T-8 2x4 suspended fluorescent fixture type lighting, in fair condition, providing an average illumination of 40 FC, which is less than the 50 FC recommended by the OSDM. The Media Center is equipped with T-8 1x4 surface mount direct fluorescent fixture type lighting in fair condition, providing an average illumination of 61 FC, thus complying with the 50 FC recommended by the OSDM. The Student Dining spaces are equipped with T-8 1x4 suspended direct fluorescent fixture type lighting with single level switching. Student Dining fixtures are in fair condition, providing an average illumination of 56 FC, thus complying with the 50 FC recommended by the OSDM. The Kitchen spaces are equipped with T-8 1x4 surface mount fluorescent fixture type lighting with single level switching. Kitchen fixtures are in fair condition, providing an average illumination of 50 FC, which is less than the 75-80 FC recommended by the OSDM. The Service Areas in the overall facility are equipped with pendant incandescent and T-8 1x4 surface mount fluorescent fixture type lighting in fair to poor condition. The typical Administrative spaces in the overall facility are equipped with T-8 2x4 lay-in direct fluorescent fixture type lighting in fair condition, providing adequate illumination based on OSDM requirements. The overall lighting systems of the facility are not compliant with Ohio School Design Manual requirements due to age and condition, inadequate lighting levels, utilization of incandescent lighting, and lack of multi-level switching. 3 Needs Replacement Provide complete replacement of lighting system due to age and condition, inadequate lighting levels, lack of multilevel switching, utilization of incandescent lighting, and installation of systems outlined in Items A, C, J, and U.
Rating: Recommendations:
Item
Cost Unit Whole BuildingOriginal Construction (1966)Classroom Addition (1993)Sum Comments 57,257 ft! 4,405 ft! Complete Building Lighting Replacement$5.00sq.ft. Required Required $308,310.00Includes demo of existing fixtures Sum: $308,310.00 $286,285.00 $22,025.00
Facility Assessment
Page 22
Facility Assessment
L. Security Systems
Description:
The overall facility contains a GE NetworX NX-8 motion detector and door contact type security system in fair condition. Motion detectors are adequately provided in main entries, central gathering areas, Offices, main Corridors, and spaces where 6 or more computers are located. Exterior doors are equipped with door contacts. An automatic visitor control system is provided. 8 compliant color CCTV exterior cameras are provided at main entry areas and parking lots. No interior CCTV cameras are provided. CCTV is monitored in Administrative Area with the use of a television monitor and Speco Technologies computer based hard disk recording device and multiplexer, which are in good condition. A compliant computer controlled access control system integrating alarms and video signals, with appropriate UPS backup, is provided. The system is not equipped with card or biometric readers, but is equipped with a KeriSystems key pad door access control system. The security system is not adequately provided throughout, and the system is not compliant with Ohio School Design Manual guidelines. The playground fencing requires attention as the it is not fully compliant with OSDM requirements, since the playground is not fully fenced for security. The exterior site lighting system is equipped with surface mounted HID metal halide, LED and incandescent entry lights in good to fair condition. Pedestrian walkways are illuminated with surface mounted HID metal halide fixtures in fair to poor condition. Parking and bus pick-up / drop off areas are illuminated by pole mounted HID metal halide fixtures in fair to poor condition. The exterior site lighting system provides inadequate illumination due to insufficient fixture capacity and sparse placement of fixtures. 3 Needs Replacement Provide complete replacement of security system to meet Ohio School Design Manual guidelines. Provide partial replacement and enhancement of exterior site lighting system, consisting of additional lighting fixtures and replacement of incandescent lighting, to meet Ohio School Design Manual guidelines. Provide additional playground fencing, funding included in complete replacement of security system. Cost Unit Whole Building $1.85sq.ft. $0.50sq.ft. Original Construction (1966) 57,257 ft! Required Required Classroom Addition (1993) 4,405 ft! Required Required $10,351.75 Sum Comments
Rating: Recommendations:
Item
$114,074.70(complete, area of building) $30,831.00Provide partial replacement and enhancement of exterior site lighting system.
$144,905.70 $134,553.95
Facility Assessment
Page 23
Facility Assessment
M. Emergency/Egress Lighting
Description:
The overall facility is equipped with an emergency egress lighting system consisting of non compliant red lettered, LED, plastic construction illuminated exit signs, and the system is in fair condition. The facility is equipped with emergency egress floodlighting, and the system is in fair condition. The system is provided with appropriate battery backup. The system is adequately provided throughout, meets Ohio Building Code requirements, but does not meet Ohio School Design Manual requirements. 3 Needs Replacement Provide complete replacement of emergency / egress lighting system to meet Ohio School Design Manual and Ohio Building Code guidelines.
Rating: Recommendations:
Item
Cost Unit Whole BuildingOriginal Construction (1966)Classroom Addition (1993)Sum Comments 57,257 ft! 4,405 ft! Emergency/Egress Lighting:$1.00sq.ft. Required Required $61,662.00(complete, area of building) Sum: $61,662.00 $57,257.00 $4,405.00
Facility Assessment
Page 24
Facility Assessment
N. Fire Alarm
Description:
The overall facility is equipped with a Simplex 4010 addressable type fire alarm system, installed in 2010, and in good condition, consisting of manual pull stations, horn and strobe indicating devices, smoke detectors, and heat sensors. The system is automatic and is monitored by a third party. The system is equipped with sufficient audible horns, strobe indicating, smoke detectors and heat sensors. The system is not equipped with any flow switches and tamper switches. The system thus will not support future fire suppression systems without flow and tamper switches. The system is adequately provided throughout, and does have additional zone capabilities. The system is compliant with Ohio Building Code, NFPA, and Ohio School Design Manual requirements. 2 Needs Repair Provide flow and tamper switches for a future sprinkler system.
Rating: Recommendations:
Item
Cost
Unit
Whole Building
Sum
Comments
$4,000.00Provide flow and tamper switches for a future sprinkler system. $0.00
Typical Manual Pull Stations With Horn And Strobe Indicating Devices Back to Assessment Summary
Facility Assessment
Page 25
Facility Assessment
O. Handicapped Access
Description:
At the site, there is an accessible route provided from the public right-of-way, the accessible parking areas, and from the passenger unloading zone to the main entrance of the school. There is an accessible route connecting all or most areas of the site. The exterior entrances are mostly ADA accessible. Access from the parking / drop-off area to the building entries is not compromised by steps or steep ramps. Adequate handicap parking is provided. Exterior doors are equipped with ADA hardware. Building entrances should be equipped with 1 ADA power assist door, and none are provided. Playground layout and equipment are mostly compliant. On the interior of the building, space allowances and reach ranges are mostly compliant. There is not an accessible route through the building, which does not include protruding objects. Ground and floor surfaces are compliant. Ramps and stairs do not meet all ADA requirements, and are insufficient due to non-compliant guards and handrails. Exterior ramp at the Main Entrance does not meet all ADA requirements due to lack of handrails and intermediate landing between runs. Elevation changes within the overall facility are facilitated by 1 non-compliant stair tower in good condition, 3 non-compliant steps in good to fair condition, 2 non-compliant exterior steps in fair condition, and 2 non-compliant exterior ramps in fair condition. This multistory building has a non-compliant single passenger elevator that accesses every floor. Access to the Stage is facilitated by a Corridor at Stage level. Interior doors are recessed, are provided adequate clearances, and are not provided with ADA-compliant hardware in the 1966 Original Construction. Interior doors are not recessed, are provided adequate clearances, and are provided with ADA-compliant hardware in the 1993 Addition. 18 ADA-compliant toilets are required, and 4 are currently provided. 18 ADA-compliant Restroom lavatories are required, and 2 are currently provided. 1 ADA-compliant Science Classroom lab sink is required, and none are currently provided. 4 ADA-compliant urinals are required, and none are currently provided. 0 ADA-compliant showers are required, and none are currently provided. 4 ADA-compliant electric water coolers are required, and 4 are currently provided. Toilet partitions are metal and plastic, and do not provide appropriate ADA clearances, except for the 2 Large Group Restrooms and 2 Single Restrooms next to the Main Entrance. ADA-compliant accessories are not adequately provided and mounted in the 1966 Original Construction, except for the 2 Large Group Restrooms and 2 Single Restrooms next to the Main Entrance. Mirrors meet ADA requirements for mounting heights. Science Classrooms are not compliant with ADA requirements due to non-compliant ADA lab sinks and base cabinets. Art Classrooms are not compliant with ADA requirements due to non-compliant ADA sinks and base cabinets. Staff, Special Education Classroom, Kindergarten Classroom, and Health Clinic Restrooms are not compliant with ADA requirements due to lack of ADA-compliant accessories and appropriate ADA clearances. ADA signage is not provided on the interior or the exterior of the building. 3 Needs Replacement Provide ADA-compliant signage, 1 power assist door opener, 1 elevator, 13 toilet partitions, 3 toilets, 5 sinks, 4 urinals, and 24 doors and frames in the overall facility to facilitate the schools meeting of ADA requirements. Replace handrails at steps to the Stage with ADA compliant handrails. Enlarge and reconfigure new single ADA Toilet Rooms for 1 Staff, 2 Special Education Classrooms, 2 Kindergarten Classrooms, and 2 Health Clinic Toilet Rooms, including 7 toilets, 7 sinks and 7 sets of ADA accessories in the 1966 Original Construction. Add 1 new single ADA Toilet Room for the Kitchen, including 1 toilet, 1 sink, and 1 set of ADA accessories. Replace non-compliant exterior ramp at the Main Entrance. ADA electric water coolers are corrected in Item E. ADA compliant sink base casework in the Classrooms is corrected in Item J. For interior doors that are not being replaced under this Item, door hardware to be replaced with funding provided in Item J. Stair tower is corrected in Item U. Cost Unit Whole Building Original Construction (1966) 57,257 ft! Required 275 Required 2 Required 12 Required 13 Required 1 Required 16 Required 8 Required Classroom Sum Addition (1993) 4,405 ft! Required Comments
Rating: Recommendations:
Item
Signage: Ramps: Elevators: Toilet/Urinals/Sinks: Toilet Partitions: ADA Assist Door & Frame: Replace Doors: Replace Doors:
$12,332.40(per building area) $11,000.00(per ramp/interior-exterior complete) $84,000.00(per stop, $84,000 minimum) $18,000.00(replacement ADA) $13,000.00(ADA - grab bars, accessories included) $7,500.00(openers, electrical, patching, etc) $80,000.00(rework narrow opening to provide 3070 wood door, HM frame, door/light, includes hardware) $40,000.00(rework opening and corridor wall to accommodate ADA standards when door opening is set back from edge of corridor and cannot accommodate a wheelchair.) $40,000.00Add Toilet Room to meet ADA requirements (includes fixtures, walls, door and hardware, floor drain, and supply lines from nearby existing Restroom). $480.00Add ADA compliant handrails at the Stage steps. $2,600.00Add ADA compliant handrails at the ramps. $30,000.00Enlarge and reconfigure existing Toilet Room to meet ADA requirements (includes fixtures, walls, door and hardware, floor drain, and supply lines from existing Restroom). $500.00Remove existing exterior ramp at the Main Entrance.
$10,000.00each
4 Required
Other: ADA Step Handrails Other: Ramp Handrails Other: Reconfigure Toilet Rooms for ADA Accessibility Other: Removal of Non-Compliant Ramp Sum:
$2.00sq.ft. (Qty)
Facility Assessment
Page 26
Facility Assessment
Page 27
Facility Assessment
P. Site Condition
Description:
The 20 acre flat site is located in a suburban residential setting with moderate tree, shrub, and floral type landscaping. Outbuildings include two gazebos. There are no apparent problems with erosion or ponding, however it has been reported that ponding has occurred in adjacent residential properties. The site is bordered by lightly traveled city streets. A single entrance onto the site facilitates proper separation of bus and other vehicular traffic, and one-way bus traffic is provided. A dedicated bus loop is provided for student loading and unloading, which is separated from other vehicular traffic. Staff and visitor parking is facilitated by an asphalt parking lot in fair to poor condition, containing 85 parking places, which provides adequate parking for staff members, visitors, and the disabled. The site and parking lot drainage design, consisting of catch basins, storm sewers, and sheet drainage provides adequate evacuation of storm water, and no problems with parking lot ponding were observed. Concrete curbs in poor condition are appropriately placed. Concrete sidewalks are properly sloped, are located to provide a logical flow of pedestrian traffic, and are in fair condition. Trash pick-up and service drive pavement is heavy duty and is in poor condition, and is not equipped with a concrete pad area for dumpsters. Exterior concrete steps and steel hand rails are provided at the main entrance and loading dock and are in fair to poor condition. An exterior concrete ramp without a guardrail is provided at the main entrance and is in fair condition. Playgrounds are partially fenced, not separated from vehicular traffic, and are in good condition. The playground equipment is primarily constructed of coated steel and high density plastic, and is in fair condition. Generally playground equipment is placed to provide compliant fall zones, and on a compliant wood fiber mulch of sufficient depth. Hard surfaces with a basketball court and painted surfaces are provided on an asphalt surface. The site and playground area is equipped with sufficient tables and benches in fair condition. The athletic facilities are comprised of two baseball diamonds and a soccer field, and are in fair condition. Site features are suitable for outdoor instruction, which is enhanced through the addition of two gazebos. There are no readily evident site conditions that might significantly affect master planning. 3 Needs Replacement Provide for replacement of exterior steps due to condition. Replace exterior handrail/guardrails due to condition. Provide a new concrete dumpster pad. Provide for the replacement of existing asphalt paving due to condition. Replace concrete sidewalks as required due to condition. Replace concrete curbs as required due to condition. Playground fencing issues are corrected in Item L. Provide site contingency allowances for unforeseen conditions. Cost Unit Whole Building Original Construction (1966) 57,257 ft! 4,572 Required 7,711 Required 223 Required 37 Required 111 Required 25 Required Required Classroom Sum Addition (1993) 4,405 ft! 345 Required 540 Required 17 Required 3 Required 9 Required Comments
Rating: Recommendations:
Item
Replace Existing Asphalt Paving (heavy duty): Replace Existing Asphalt Paving (light duty): Concrete Curb: Concrete Sidewalk: Exterior Hand / Guard Rails: Replace Concrete Steps: Base Sitework Allowance for Unforeseen Circumstances Sitework Allowance for Unforeseen Circumstances for buildings between 0 SF and 100,000 SF Other: Provide dumpster pads. Sum:
$30.00sq. yard $28.00sq. yard $17.87ln.ft. $4.69sq.ft. (Qty) $42.75ln.ft. $32.00sq.ft. (Qty) $50,000.00allowance
$147,510.00(including drainage / tear out for heavy duty asphalt) $231,028.00(including drainage / tear out for light duty asphalt) $4,288.80(new) $187.60(5 inch exterior slab) $5,130.00 $800.00 $50,000.00Include this and one of the next two. (Applies for whole building, so only one addition should have this item) $92,493.00Include this one or the next. (Each addition should have this item) $4,800.00(for three dumpsters)
$1.50sq.ft.
Required
Required
$2,400.00each
$32,780.11
Facility Assessment
Page 28
Playground Equipment
Facility Assessment
Page 29
Facility Assessment
Q. Sewage System
Description: Rating: Recommendations:
The sanitary sewer system is tied in to the municipal system, and is in good condition. No significant system deficiencies were reported by the school district or noted during the physical assessment. 1 Satisfactory Existing conditions require no renovation or replacement at the present time.
Item CostUnitWhole BuildingOriginal Construction (1966)Classroom Addition (1993)SumComments 57,257 ft! 4,405 ft! Sum: $0.00 $0.00 $0.00
Sanitary Manhole
Facility Assessment
Page 30
Facility Assessment
R. Water Supply
Description:
The domestic water supply system is tied in to the municipal system, features 4" service and 4" water meter, which is located in a vault near the street, and is assumed to be in good to fair condition. The District was not able to provide water supply flow test data. The existing domestic water service appears to meet the facilitys current needs. The facility is not equipped with an automated fire suppression system, and the existing water supply will not provide adequate support for a future system. The domestic water service is not equipped with a water booster pump, and none was required. The system does not provide adequate pressure and capacity for the future needs of the school. 1 Satisfactory Provide a new city water supply line of adequate capacity to support the existing needs of the facility, as well as a future automated fire suppression system. Funding provided in Item U.
Rating: Recommendations:
Item CostUnitWhole BuildingOriginal Construction (1966)Classroom Addition (1993)SumComments 57,257 ft! 4,405 ft! Sum: $0.00 $0.00 $0.00
Facility Assessment
Page 31
Facility Assessment
S. Exterior Doors
Description:
Typical exterior doors in the 1966 Original Construction are aluminum and hollow metal type construction, installed on aluminum and hollow metal frames. Aluminum doors and frames are in good condition. Hollow metal doors and frames are in fair condition. Exterior doors feature single glazed tempered glass or no vision panels. All aluminum replacement doors are equipped with appropriate hardware. Original hollow metal doors are equipped with inappropriate hardware. Typical exterior doors in the 1993 Addition are hollow metal type construction, installed on hollow metal frames. Hollow metal doors and frames are in good to fair condition. Exterior doors feature double glazed tempered glass vision panels. Hollow metal doors are equipped with inappropriate hardware. Entrance doors in the overall facility are aluminum type construction, installed on aluminum frames, and in good to fair condition. The main entrance doors feature single glazed tempered glass vision panels, transoms, sidelights, and appropriate hardware. The facility is not equipped with roof access doors. There is one overhead steel coiling door in fair to poor condition. 3 Needs Replacement Replace hollow metal exterior doors as required through the overall facility, due to poor condition. Replace overhead door, due to poor condition. Replacement of single glazed door vision panels, transoms and sidelights is addressed in Item F. Cost Unit
Rating: Recommendations:
Item
Whole BuildingOriginal Construction (1966)Classroom Addition (1993)Sum Comments 57,257 ft! 4,405 ft! Door Leaf/Frame and Hardware:$2,000.00per leaf 6 Required 4 Required $20,000.00(includes removal of existing) Overhead doors and hardware: $2,500.00per leaf 1 Required $2,500.00(8 x 10 sectional, manual operation) Sum: $22,500.00 $14,500.00 $8,000.00
Facility Assessment
Page 32
Facility Assessment
T. Hazardous Material
Description:
The School District provided the AHERA three year reinspection reports, prepared by M.A.C. Paran Consulting Services, Inc., and dated January 30, 2009, documenting known and assumed locations of asbestos and other hazardous materials. The AHERA Reports referenced only assumed asbestos containing materials. An Enhanced Environmental Hazards Assessment (EEHA) will need to be conducted in order to establish abatement budgets. Vinyl asbestos floor tile and mastic, tank breeching, transite window panels, laboratory tables, and possibly tartan flooring containing hazardous materials are located in the 1966 Original Construction in fair condition. These materials were described in the report and open to observation and found to be in non-friable condition with light damage. There are no underground storage tanks on the site. Due to the construction date, there is a potential for lead based paint. Fluorescent lighting will require special disposal. 3 Needs Replacement Remove all hazardous materials, inclusive of asbestos-containing materials in the 1966 Original Construction, as noted in the attached Environmental Hazards Assessment. Provide for the testing of paint that has the potential of being lead-based. Provide for disposal of fluorescent lighting. Cost Unit Whole Building Original Construction (1966) 57,257 ft! EHA Form 42 Required 5,000 Required 5,000 Required 5,426 Required 2 Required 24,040 Required $83,326.70 $83,282.60 Classroom Addition (1993) 4,405 ft! EHA Form 0 Required 0 Required 0 Required 441 Required 0 Required 0 Required $44.10 Sum Comments
Rating: Recommendations:
Item
Environmental Hazards Form Breeching Insulation Removal Estimated Cost For Abatement Contractor to Perform Lead Mock-Ups Special Engineering Fees for LBP Mock-Ups Fluorescent Lamps & Ballasts Recycling/Incineration Laboratory Table/Counter Top Removal Resilient Flooring Removal, Including Mastic Sum:
$10.00sq.ft. (Qty) $1.00per unit $1.00per unit $0.10sq.ft. (Qty) $100.00each $3.00sq.ft. (Qty)
Facility Assessment
Page 33
Facility Assessment
U. Life Safety
Description:
The overall facility is not equipped with an automated fire suppression system. Exit Corridors are situated such that dead-end Corridors are not present. The facility features 1 interior stair tower, which is not protected by a two hour fire enclosure. The facility features 2 exterior concrete ramps providing egress from intermediate floors, which are in fair condition. Guardrails are constructed with vertical bars, do not meet the 4 ball test, and do not extend past the top and bottom stair risers as required by the Ohio Building Code. The Kitchen hood is in fair condition, and is equipped with the required UL 300 compliant wet chemical fire suppression system. The required 6 overhang of the cooking equipment is provided by the hood. Kitchen hood exhaust ductwork is of proper construction, material, insulation, and installed as required by the OSDM and OBCMC. The cooking equipment is interlocked to shut down in the event of discharge of the fire suppression system. Fire extinguishers are provided in sufficient quantity. Existing fire extinguishers are adequately spaced. The facility is not equipped with an emergency generator. The existing water supply is provided by a tie-in to the municipal system, and is insufficient to meet the future fire suppression needs of the school. Rooms with a capacity greater than 50 occupants are equipped with adequate egress. Combustible wood construction is used as infill for masonry openings in the 1966 Original Construction. 3 Needs Replacement Provide new automated fire suppression system to meet Ohio School Design Manual guidelines. Provide increased water service of a capacity sufficient to support the fire suppression system, funding included in fire suppression funding. Provide new emergency generator, with funding provided via complete replacement of electrical system in Item D. Provide new handrails to meet the requirements of the Ohio Building Code. Rework existing non-compliant stair tower. Provide 2 exterior stair enclosures. Replace 2 existing exterior concrete ramps due to age and condition. Provide fire-rated enclosure around existing stair tower. Remove combustible wood construction in the 1966 Original Construction with non-combustible wall construction. Cost Unit Whole Building Original Construction Classroom Addition Sum Comments (1966) (1993) 57,257 ft! 4,405 ft! 57,257 Required 4,405 Required $197,318.40(includes increase of service piping, if required) 1 Required 2 Required 2 Required 350 Required 200 Required $310,518.40 $296,422.40 $14,096.00 $5,000.00(includes associated doors, door frames and hardware) $85,000.00(all inclusive) $10,000.00 $11,200.00Replace 2 existing exterior concrete ramps due to age and condition. $2,000.00Replace combustible wood wall construction with non-combustible wall construction.
Rating: Recommendations:
Item
Sprinkler / Fire Suppression System: Interior Stairwell Closure: New Exterior Stair Enclosure Handrails: Other: Exterior Ramp Other: Remove and Replace Combustible Wall Construction Sum:
$3.20sq.ft. (Qty) $5,000.00per level $42,500.00per level $5,000.00level $32.00sq.ft. (Qty) $10.00sq.ft. (Qty)
Facility Assessment
Page 34
Facility Assessment
V. Loose Furnishings
Description:
The typical Classroom furniture is generally mismatched, and in generally poor to fair condition, consisting of student desks & chairs, teacher desks & chairs, desk height file cabinets, reading tables, computer workstations, bookcases, wastebaskets, cubical partitions, and equipment carts. The facilitys furniture and loose equipment were evaluated in item 6.17 in the CEFPI section of this report, and on a scale of 1 to 10 the overall facility received a rating of 6 due to observed conditions, and due to the fact that it lacks some of the Design Manual required elements. 3 Needs Replacement Provide for replacement of outdated or inadequate furnishings.
Rating: Recommendations:
Item
Cost Unit Whole BuildingOriginal Construction (1966)Classroom Addition (1993)Sum Comments 57,257 ft! 4,405 ft! CEFPI Rating 6$3.00sq.ft. Required Required $184,986.00 Sum: $184,986.00 $171,771.00 $13,215.00
Facility Assessment
Page 35
Facility Assessment
W. Technology
Description:
The typical Classroom is equipped with one data port for teacher use, one cable port and monitor, and a 2-way PA system that can be initiated by either party to meet Ohio School Design Manual requirements. The typical Classroom is not equipped with the required four technology data ports for student use and one voice port with a digitally based phone system to meet Ohio School Design Manual requirements. The facility is equipped with an unreliable centralized clock system, and battery operated clocks are used when they are replaced. Specialized electrical and sound system requirements of Gymnasium and Stage are inadequately provided, and in poor condition. Specialized electrical and sound system requirements of the Student Dining and Music spaces are not provided. OSDM-compliant computer network infrastructure is not provided. Wireless connection to the internet is provided throughout the facility. The facility does not contain a media distribution center, and does not provide Computer Labs for use by students, but provides for 6 mobile Computer Labs on secured laptop charging carts. Elevator is equipped with a telephone. 3 Needs Replacement Provide complete replacement of technology systems to meet Ohio School Design Manual requirements.
Rating: Recommendations:
Item
Whole BuildingOriginal Construction (1966)Classroom Addition (1993)Sum Comments 57,257 ft! 4,405 ft! ES portion of building with total SF 50,000 to 69,360$11.51sq.ft. (Qty) 49,250 Required 3,789 Required $610,478.89 MS portion of building with total SF < 67,950 $10.29sq.ft. (Qty) 8,007 Required 616 Required $88,730.67 Sum: $699,209.56 $649,259.53 $49,950.03
Cost
Unit
Facility Assessment
Page 36
Facility Assessment
Total Project
Non-Construction Costs Breakdown Land Survey Soil Borings / Phase I Envir. Report Agency Approval Fees (Bldg. Code) Construction Testing Printing - Bid Documents Advertising for Bids Builders Risk Insurance Design Professionals Compensation CM Compensation Commissioning Non-Construction Contingency (includes partnering and mediation services) Total Non-Construction Costs Back to Assessment Summary 0.03% 0.10% 0.25% 0.40% 0.15% 0.02% 0.12% 7.50% 6.00% 0.60% 1.12% 16.29% $2,671.62 $8,905.40 $22,263.50 $35,621.60 $13,358.10 $1,781.08 $10,686.48 $667,905.05 $534,324.04 $53,432.40 $99,740.49 $1,450,689.76
Facility Assessment
Page 37
Name of Appraiser Building Name Street Address City/Town, State, Zip Code Telephone Number(s) School District
Julie Apt Maddux Elem 943 Rosetree Lane Cincinnati, OH 45230 513-231-0780 Forest Hills Local SD
Date of Appraisal
2013-08-22
Setting: Site-Acreage Grades Housed Number of Teaching Stations Student Enrollment Dates of Construction Energy Sources: Air Conditioning: Heating:
Suburban 20.00 K-6 35 615 1966,1993 Fuel Oil Roof Top Central Hot Water Gas Windows Units Roof Top Steam Floor Construction Wood Joists Steel Joists Slab on grade Structural slab Electric Central Individual Unit Solar Room Units Forced Air Building Square Footage Student Capacity Number of Floors 61,662 417 2
Type of Construction Load bearing masonry Steel frame Concrete frame Wood Steel Joists
Page 38
Points Allocated
Points
1.1
Site is large enough to meet educational needs as defined by state and local requirements The site is 20 acres compared to 17 acres required by the OSDM.
25
25
1.2
Site is easily accessible and conveniently located for the present and future population The School is centrally located within the School District, and is easily accessible.
20
16
1.3
Location is removed from undesirable business, industry, traffic, and natural hazards The site is adjacent to residential uses, and there are no undesirable features adjacent to the School site.
10
1.4
10
The site is moderately landscaped with mature shade trees, ornamental trees, and shrubs which define the property and emphasize the building entrance.
1.5
ES MS HS
Well equipped playgrounds are separated from streets and parking areas Well equipped athletic and intermural areas are separated from streets and parking Well equipped athletic areas are adequate with sufficient solid-surface parking
10
Playground areas consist of metal or high density plastic type play equipment, which is in fair condition, and is located on wood fiber mulch which is an approved soft surface material. Playground fencing is partially provided and does not separate the playground from vehicular traffic.
1.6
Topography is varied enough to provide desirable appearance and without steep inclines
The site is gently sloped to provide positive drainage across the site. A flat area is provided to accommodate buildings, perimeter walks, vehicular circulation, parking areas, outdoor play areas, and physical education spaces, and is desirable.
1.7
Site has stable, well drained soil free of erosion Soils appear to be stable and well drained, and no erosion was observed.
1.8
The site has been developed to accommodate outdoor learning, including benches, gazebos, and picnic tables to facilitate instruction.
1.9
Pedestrian services include adequate sidewalk with designated crosswalks, curb cuts, and correct slopes
Sidewalks are adequately provided to accommodate safe pedestrian circulation including designated crosswalks, curb cuts, and correct slopes.
1.10
ES/MS HS
Sufficient on-site, solid surface parking for faculty and staff is provided Sufficient on-site, solid surface parking is provided for faculty, students, staff and community
Adequate parking is provided for faculty, staff, and community, and is located on asphalt pavement in fair to poor condition.
100
82
Page 39
Structural
Points Allocated
Points
2.1
Structure meets all barrier-free requirements both externally and internally Entire building is not ADA-compliant.
15
10
2.2
Roofs appear sound, have positive drainage, and are weather tight
15
10
The roofs over the 1966 Original Construction are in good condition but require replacement due to age of systems. The roofs over the 1993 Addition are in fair condition but require replacement due to age of systems.
2.3
Foundations are strong and stable with no observable cracks Foundations are in good to fair condition with minor areas of cracks and spalling.
10
2.4
Exterior and interior walls have sufficient expansion joints and are free of deterioration Exterior and interior walls are in good to fair condition, requiring some maintenance and repairs.
10
2.5
Entrances and exits are located so as to permit efficient student traffic flow Exits are properly located to allow safe egress from the building.
10
10
2.6
Building envelope generally provides for energy conservation (see criteria) Building envelope does not meet minimum energy conservation requirements.
10
2.7
Structure is free of friable asbestos and toxic materials The building was constructed in 1966 and is reported to contain non-friable asbestos and other hazerdous materials.
10
2.8
Interior walls permit sufficient flexibility for a variety of class sizes Flexible partition walls have been provided between Classrooms and allow for a variety of class sizes.
10
Mechanical/Electrical
Points Allocated
Points
2.9
Adequate light sources are well maintained, and properly placed and are not subject to overheating
15
Light sources are improperly placed and provide inadequate lighting in some areas. Fixtures are well maintained in most areas. Light fixtures do not appear to be subject to overheating.
2.10
Internal water supply is adequate with sufficient pressure to meet health and safety requirements Internal water supply will not support a future fire suppresssion system, but is adequate for current requirements.
15
2.11
Each teaching/learning area has adequate convenient wall outlets, phone and computer cabling for technology applications Classrooms have an inadequate number of outlets and data jacks for technology applications.
15
Page 40
2.12
Electrical controls are safely protected with disconnect switches easily accessible Disconnect switches are adequately provided in required easily accessible locations to allow for safe servicing of equipment.
10
2.13
Drinking fountains are adequate in number and placement, and are properly maintained including provisions for the disabled
10
Drinking fountains are not adequate in number and placement, and do not meet ADA requirements. Drinking fountains are properly maintained.
2.14
10
The OBC requires that Restrooms be located on every floor and that the maximum travel distance shall not exceed 500 feet. The facility meets the requirement.
2.15
Drainage systems are properly maintained and meet requirements Adequate drainage systems are provided throughout the facility. Drainage systems are well maintained.
10
10
2.16
Fire alarms, smoke detectors, and sprinkler systems are properly maintained and meet requirements
10
The facility is not sprinkled. Fire alarm systems are provided with required devices with the exception of flow and tamper switches. Smoke detectors are adequately provided.
2.17
Intercommunication system consists of a central unit that allows dependable two-way communication between the office and instructional areas
10
The central intercommunication system provides reliable communication between the Administration area and all teaching/learning areas, but is outdated.
2.18
Exterior water supply is sufficient and available for normal usage Exterior wall hydrants are adequately provided around the exterior of the facility.
200
133
Page 41
Points Allocated
Points
3.1
Windows, doors, and walls are of material and finish requiring minimum maintenance Exterior materials and finishes for doors, windows and walls are durable and require minimal maintenance.
15
12
3.2
15
Flooring throughout the facility consists of VCT, VAT, terrazzo, sealed concrete, rubber, and quarry tile, which is well maintained throughout the facility.
3.3
Ceilings and walls throughout the building, including service areas, are easily cleaned and resistant to stain
10
Lay-in type ceilings are not easily cleaned or resistant to stain. Brick and painted block type wall finishes are easily cleaned and resistant to stain
3.4
Built-in equipment is designed and constructed for ease of maintenance Casework consists of wood type construction with plastic laminate tops in fair to poor condition.
10
3.5
Finishes and hardware, with compatible keying system, are of durable quality Door hardware varies throughout the facility, and does not meet ADA requirements.
10
3.6
Restroom fixtures are wall mounted and of quality finish Fixtures are wall mounted and are of good quality.
10
3.7
Adequate custodial storage space with water and drain is accessible throughout the building Custodial storage space is adequately located throughout the facility, including provisions for water and drains.
10
3.8
Adequate electrical outlets and power, to permit routine cleaning, are available in every area Electrical outlets are adequately provided in Corridors and allow for convenient routine cleaning.
10
3.9
Outdoor light fixtures, electrical outlets, equipment, and other fixtures are accessible for repair and replacement
10
Outdoor light fixtures are inadequately provided, but are accessible for repair and replacement. Electrical outlets are inadequately provided around the exterior of the facility.
100
68
Page 42
Site Safety
Points Allocated
Points
4.1
Student loading areas are segregated from other vehicular traffic and pedestrian walkways Student loading is separated from vehicular traffic and pedestrian walkways.
15
12
4.2
Walkways, both on and offsite, are available for safety of pedestrians Walkways are adequately provided both on and off-site for pedestrian safety.
10
4.3
Access streets have sufficient signals and signs to permit safe entrance to and exit from school area School signs and signals are located as required on adjacent access streets.
4.4
Vehicular entrances and exits permit safe traffic flow A single entrance onto the site facilitates proper separation of bus and other vehicular traffic, and one-way bus traffic is provided.
4.5
ES MS HS
Playground equipment is free from hazard Location and types of intramural equipment are free from hazard Athletic field equipment is properly located and is free from hazard
Playground equipment consists of plastic coated steel or high density plastic type equipment in fair condition, appears to be free from hazard, and is located on an approved soft surface material to a sufficient depth.
Building Safety
Points Allocated
Points
4.6
20
10
Heating boilers are located in rooms that are not accessible by students. Unit ventilators are located in the Classrooms and other learning areas.
4.7
15
10
The building has 1 stair tower, which is not enclosed, and is not ADA and OBC compliant due to lack of compliant handrails and guards.
4.8
Exterior doors open outward and are equipped with panic hardware
10
Exterior doors open in the direction of travel and are equipped with panic hardware. Some doors are equipped with inappropriate hardware.
4.9
Emergency lighting is provided throughout the entire building with exit signs on separate electrical circuits Emergency light fixtures and exit signs are not on separate circuits, powered by battery, and are adequately provided.
10
4.10
10
In the 1966 Original Construction, Classroom doors are adequately recessed with proper ADA clearances, and open outward. In the 1993 Addition, Classroom doors are not adequately recessed, have proper ADA clearances, and open outward.
Page 43
4.11
Building security systems are provided to assure uninterrupted operation of the educational program Security systems are inadequately provided and are in fair condition.
10
4.12
Flooring (including ramps and stairways) is maintained in a non-slip condition VCT, VAT, terrazzo, sealed concrete, rubber, and quarry tile flooring has been well maintained throughout the facility.
4.13
Stair risers (interior and exterior) do not exceed 6 1/2 inches and range in number from 3 - 16 Stair treads and risers are properly designed and meet requirements.
4.14
Glass is properly located and protected with wire or safety material to prevent accidental student injury Glass at exterior door transoms and sidelights is tempered for safety. Interior glazing is not code compliant.
4.15
Fixed Projections in the traffic areas do not extend more than eight inches from the corridor wall
Electric water coolers have not been recessed in the Corridor wall, but meet ADA requirements and do not impede traffic flow in the Corridors.
4.16
Exits are properly located to allow safe egress from the building. Stairways empty to the exterior, or adjacent to a Corridor leading to the exterior.
Emergency Safety
Points Allocated
Points
4.17
Adequate fire safety equipment is properly located The facility is not sprinkled. Fire alarm devices are provided adequately. Fire extinguishers are adequately provided.
15
10
4.18
There are at least two independent exits from any point in the building Multiple exits are provided from Corridors throughout the facility.
15
12
4.19
15
12
The overall facility has a steel frame with brick veneer on a non-load bearing masonry exterior wall system, which displayed locations of minor deterioration, and is in good to fair condition. Interior walls are concrete masonry units, brick, glazed block, metal stud framed partitions with gypsum board, wood framed partitions with wood paneling and operable partition walls, and are in good to fair condition.
4.20
Automatic and manual emergency alarm system with a distinctive sound and flashing light is provided
15
13
The fire alarm is provided with manual and automatic actuation, and is provided with horn and visual indicating devices in all required areas.
200
145
Page 44
Points Allocated
Points
5.1
25
15
The average Classroom in the 1966 Original Construction is 864 and 807 SF compared to 900 SF required by the OSDM. The average Classroom in the 1993 Addition is 806 SF compared to 900 SF required by the OSDM.
5.2
15
Undersized Classrooms do not allow sufficient space for effective small group activities. Small group activity is located in Common space outside the Classrooms
5.3
Location of academic learning areas is near related educational activities and away from disruptive noise
10
The Gymnasium is properly isolated from the academic learning areas to reduce distractions. The Music Room is located adjacent to academic learning areas, which can be distracting.
5.4
Personal space in the classroom away from group instruction allows privacy time for individual students Undersized Classrooms do not permit privacy time for individual students.
10
5.5
Storage for student materials is adequate Storage cubbies, located in the Classroom, are adequately provided for student storage.
10
5.6
Storage for teacher materials is adequate Casework is adequately provided for storage of teacher materials.
10
Points Allocated
Points
5.7
Size of special learning area(s) meets standards The Special Education Classroom is 1788 SF compared to 900 SF recommended in the OSDM.
15
15
5.8
Design of specialized learning area(s) is compatible with instructional need Special Education spaces are properly designed to meet instructional needs.
10
10
5.9
10
The Media Center is 1,209 SF compared to 2,153 SF recommended in the OSDM. The Library is not visually appealing and does not provide natural light.
5.10
Gymnasium (or covered P.E. area) adequately serves physical education instruction The Gymnasium is 3,239 SF compared to 3,500-5,000 SF recommended in the OSDM.
5.11
ES MS/HS
Pre-kindergarten and kindergarten space is appropriate for age of students and nature of instruction Science program is provided sufficient space and equipment
10
Pre-K and Kindergarten spaces are undersized, and do not provide adequate instruction space.
Page 45
5.12
Music Program is provided adequate sound treated space The Music Room is 977 SF compared to 1,800-3,000 recommended in the OSDM.
5.13
Space for art is appropriate for special instruction, supplies, and equipment
The Art Room is 906 SF compared to 1,200 SF recommended in the OSDM. The Art Room is undersized and does not provide sufficient space for storage of supplies and equipment.
Points Allocated
Points
5.14
The facility is not provided with Computer Labs for student use, provides six mobile Computer Labs on secured carts, but does not meet OSFC requirements for technology.
5.15
Space for small groups and remedial instruction is provided adjacent to classrooms Common areas are provided in the Corridor outside the Classrooms for small groups and remedial instruction.
5.16
Storage for student and teacher material is adequate Casework and storage cubbies have been adequately provided for storage of teacher and student materials.
Support Space
Points Allocated
Points
5.17
Teachers lounge and work areas reflect teachers as professionals The Teachers Lounge is 386 SF compared to 450-900 SF, for 8-24 staff, recommended in the OSDM.
10
5.18
Cafeteria/Kitchen is attractive with sufficient space for seating/dining, delivery, storage, and food preparation
10
The Student Dining space is 2,398 SF compared to 3,000 SF recommended in the OSDM, and is attractive with adequate space for seating. The Kitchen space is 1,386 SF compared to 2,153 SF recommended in the OSDM.
5.19
Administrative offices provided are consistent in appearance and function with the maturity of the students served Administrative Offices are not adequately provided for Elementary and Middle School students.
5.20
The Counselors Office is 218 SF compared to 120 SF, 85 SF of storage is provided compared to 100 SF, and there is no Conference room compared to the 200 SF, recommended in the OSDM.
5.21
The Clinic is 62 SF compared to 370 SF recommended in the OSDM. The Clinic is located within the Administrative Offices and lacks required equipment.
5.22
Suitable reception space is available for students, teachers, and visitors Reception space consists of approximately 263 SF compared to 200-400 SF recommended by the OSDM.
5.23
The Administrative area consists of approximately 1,311 SF for the principal, assistant principal, secretary, Conference Room, Storage, Copy Room, and Restroom, compared to 2,600 SF recommended by the OSDM.
Page 46
200
117
Page 47
Exterior Environment
Points Allocated
Points
6.1
Overall design is aesthetically pleasing to age of students The building is a utilitarian design with typical detailing, which is aesthetically acceptable.
15
12
6.2
10
The site is moderately landscaped with mature shade trees, ornamental trees, and shrubs which define the property and emphasize the building entrance.
6.3
Exterior noise and poor environment do not disrupt learning The site is adjacent to residential uses, and there are no undesirable features adjacent to the school site.
10
6.4
Entrances and walkways are sheltered from sun and inclement weather The main entrance to the School is completely sheltered.
10
6.5
Building materials provide attractive color and texture Exterior building materials consist of brick and concrete, which provides an acceptable color and texture.
Interior Environment
Points Allocated
Points
6.6
20
16
The color palette is comprised of a warm base with accent color of more saturated hues. School colors are reflected in the Gymnasium. The use of repeated colors and materials gives the building some unity and a sense of consistency.
6.7
Year around comfortable temperature and humidity are provided throughout the building The facility is not air conditioned to provide year-round temperature and humidity control.
15
6.8
Ventilating system provides adequate quiet circulation of clean air and meets 15cfm VBC requirement
15
The ventilating systems do not provide an adequate quantity of ventilation air to the spaces. Ventilation systems introduce minimal noise into the teaching and learning areas.
6.9
15
The lighting system does not provide proper intensity in some areas. Location of lighting fixtures provides uneven distribution of illumination. Diffusion of illumination is adequately provided by the light fixture lenses in some areas.
6.10
15
12
The OBC requires one drinking fountain per 100 occupants. The building capacity requires 7 drinking fountains. The existing facility has 4 drinking fountains. ADA requires that 50 percent of drinking fountains be accessible. 4 of the drinking fountains are accessible. Classrooms are provided with drinking fountains.
6.11
10
There are areas for students to gather in the Student Dining area and Gymnasium, as well as a small gathering area at the entrance to the school.
Page 48
6.12
Traffic flow is aided by appropriate foyers and corridors Corridors and Foyers are adequately designed for efficient traffic flow.
10
6.13
10
There are areas for students to gather in the Student Dining area, Gymnasium, as well as a small gathering areas at exterior yard areas.
6.14
Large group areas are designed for effective management of students The Gymnasium is adequately designed to manage large groups of students.
10
6.15
Acoustical treatment of ceilings, walls, and floors provides effective sound control No acoustical treatment has been provided.
10
6.16
Window design contributes to a pleasant environment The windows are fairly well designed to contribute to a pleasant environment.
10
6.17
Furniture and equipment provide a pleasing atmosphere Classroom furniture is mismatched and in fair to poor condition.
10
200
124
Page 49
<Untitled>
Page 50
Building features that clearly exceed criteria: 1. 2. 3. 4. 5. 6. Building features that are non-existent or very inadequate: 1. 2. 3. 4. 5. 6. Back to Assessment Summary This facility is not ADA accessible. This facility does not have a fire suppression system. This facility has an unprotected stair tower. This facility is reported to contain asbestos and other hazardous materials. This facility does not provide for Locker Rooms and Science Labs for the 6th Grade. An Outdoor Classroom is provided at this facility on the northwest side of the building. WIFI technology is provided throughout the building.
Page 51
Scope remains unchanged after cost updates. Building Addition 1966 Original Construction 1993 Classroom Addition Total Total with Regional Cost Factor (98.14%) Regional Total with Soft Costs & Contingency Addition Area (sf) Total of Environmental Hazards Assessment Cost Estimates Renovation Demolition 57,257 $83,282.60 $73,282.60 4,405 $44.10 $44.10 61,662 $83,326.70 $73,326.70 $81,776.82 $71,962.82 $101,755.15 $89,543.56
<Untitled>
Page 52
Environmental Hazards - Forest Hills Local SD (47340) - Maddux Elem (21949) - Original Construction Environmental Hazards - Forest Hills Local SD (47340) - Maddux Elem (21949) - Original Construction
A. Asbestos Containing Material (ACM) ACM Found 1. Boiler/Furnace Insulation Removal 2. Breeching Insulation Removal 3. Tank Insulation Removal 4. Duct Insulation Removal 5. Pipe Insulation Removal 6. Pipe Fitting Insulation Removal 7. Pipe Insulation Removal (Crawlspace/Tunnel) 8. Pipe Fitting Insulation Removal (Crawlspace/Tunnel) 9. Pipe Insulation Removal (Hidden in Walls/Ceilings) 10. Dismantling of Boiler/Furnace/Incinerator 11. Flexible Duct Connection Removal 12. Acoustical Plaster Removal 13. Fireproofing Removal 14. Hard Plaster Removal 15. Gypsum Board Removal 16. Acoustical Panel/Tile Ceiling Removal 17. Laboratory Table/Counter Top Removal 18. Cement Board Removal 19. Electric Cord Insulation Removal 20. Light (Reflector) Fixture Removal 21. Sheet Flooring with Friable Backer Removal 22. Fire Door Removal 23. Door and Window Panel Removal 24. Decontamination of Crawlspace/Chase/Tunnel 25. Soil Removal 26. Non-ACM Ceiling/Wall Removal (for access) 27. Window Component (Compound, Tape, or Caulk) - Reno & Demo 28. Window Component (Compound, Tape, or Caulk) - Reno Only 29. Resilient Flooring Removal, Including Mastic 30. Carpet Mastic Removal 31. Carpet Removal (over RFC) 32. Acoustical Tile Mastic Removal 33. Sink Undercoating Removal 34. Roofing Removal 35. (Sum of Lines 1-34) 36. (Sum of Lines 1-12, 14-34) B. Removal Of Underground Storage Tanks Tank No. 1. (Sum of Lines 1-0) Location Age
AFM=Asbestos Free Material Status Quantity Unit Cost Estimated Cost Not Present 0 $10.00 $0.00 Reported Asbestos-Containing Material 42 $10.00 $420.00 Not Present 0 $8.00 $0.00 Not Present 0 $8.00 $0.00 Not Present 0 $10.00 $0.00 Not Present 0 $20.00 $0.00 Not Present 0 $12.00 $0.00 Not Present 0 $30.00 $0.00 Not Present 0 $15.00 $0.00 Not Present 0 $2,000.00 $0.00 Not Present 0 $100.00 $0.00 Not Present 0 $7.00 $0.00 Not Present 0 $25.00 $0.00 Not Present 0 $7.00 $0.00 Not Present 0 $6.00 $0.00 Not Present 0 $3.00 $0.00 Reported Asbestos-Containing Material 2 $100.00 $200.00 Not Present 0 $5.00 $0.00 Not Present 0 $1.00 $0.00 Not Present 0 $50.00 $0.00 Not Present 0 $4.00 $0.00 Not Present 0 $100.00 $0.00 Not Present 0 $100.00 $0.00 Not Present 0 $3.00 $0.00 Not Present 0 $150.00 $0.00 Not Present 0 $2.00 $0.00 Not Present 0 $300.00 $0.00 Not Present 0 $300.00 $0.00 Reported Asbestos-Containing Material 24040 $3.00 $72,120.00 Not Present 0 $2.00 $0.00 Not Present 0 $1.00 $0.00 Not Present 0 $3.00 $0.00 Not Present 0 $100.00 $0.00 Not Present 0 $2.00 $0.00 Total Asb. Hazard Abatement Cost for Renovation Work $72,740.00 Total Asb. Hazard Abatement Cost for Demolition Work $72,740.00 None Reported Product Stored Size Total Cost For Removal Of Underground Storage Tanks Est.Rem.Cost $0.00
C. Lead-Based Paint (LBP) - Renovation Only 1. Estimated Cost For Abatement Contractor to Perform Lead Mock-Ups 2. Special Engineering Fees for LBP Mock-Ups 3. (Sum of Lines 1-2) D. Fluorescent Lamps & Ballasts Recycling/Incineration Area Of Building Addition 1. 57257 5426 E. Other Environmental Hazards/Remarks 1. (Sum of Lines 1-0) 2. (Sum of Lines 1-0)
Addition Constructed after 1980 $5,000.00 $5,000.00 Total Cost for Lead-Based Paint Mock-Ups $10,000.00 Not Applicable Total Cost $542.60 None Reported Cost Estimate $0.00 $0.00
Description Total Cost for Other Environmental Hazards - Renovation Total Cost for Other Environmental Hazards - Demolition
F. Environmental Hazards Assessment Cost Estimate Summaries 1. A35, B1, C3, D1, and E1 2. A36, B1, D1, and E2 * INSPECTION ASSUMPTIONS for Reported/Assumed Asbestos-Free Materials (Rep/Asm AFM): a. b.
Total Cost for Env. Hazards Work - Renovation Total Cost for Env. Hazards Work - Demolition
$83,282.60 $73,282.60
Unless reported otherwise by the District, materials installed after 1980 are assumed to be asbestos-free. Unless reported otherwise by the District, small quantities (less than 1,000 square feet) of the following materials are assumed to be asbestos free: hard plaster, acoustical plaster and gypsum board systems; acoustical panels and tiles; fireproofing; 12""12" floor tile and mastic. Unless reported otherwise by the District, all roofing materials are assumed to be asbestos-free.
c.
THESE MATERIALS SHOULD BE PROPERLY SAMPLED AND ANALYZED FOR ASBESTOS PRIOR TO DISTURBING THEM.
<Untitled>
Page 53
Environmental Hazards - Forest Hills Local SD (47340) - Maddux Elem (21949) - Classroom Addition Environmental Hazards - Forest Hills Local SD (47340) - Maddux Elem (21949) - Classroom Addition
21949 Classroom Addition MAC Paran AFM=Asbestos Free Material Estimated Cost $10.00 $0.00 $10.00 $0.00 $8.00 $0.00 $8.00 $0.00 $10.00 $0.00 $20.00 $0.00 $12.00 $0.00 $30.00 $0.00 $15.00 $0.00 $2,000.00 $0.00 $100.00 $0.00 $7.00 $0.00 $25.00 $0.00 $7.00 $0.00 $6.00 $0.00 $3.00 $0.00 $100.00 $0.00 $5.00 $0.00 $1.00 $0.00 $50.00 $0.00 $4.00 $0.00 $100.00 $0.00 $100.00 $0.00 $3.00 $0.00 $150.00 $0.00 $2.00 $0.00 $300.00 $0.00 $300.00 $0.00 $3.00 $0.00 $2.00 $0.00 $1.00 $0.00 $3.00 $0.00 $100.00 $0.00 $2.00 $0.00 $0.00 $0.00 None Reported
A. Asbestos Containing Material (ACM) ACM Found 1. Boiler/Furnace Insulation Removal 2. Breeching Insulation Removal 3. Tank Insulation Removal 4. Duct Insulation Removal 5. Pipe Insulation Removal 6. Pipe Fitting Insulation Removal 7. Pipe Insulation Removal (Crawlspace/Tunnel) 8. Pipe Fitting Insulation Removal (Crawlspace/Tunnel) 9. Pipe Insulation Removal (Hidden in Walls/Ceilings) 10. Dismantling of Boiler/Furnace/Incinerator 11. Flexible Duct Connection Removal 12. Acoustical Plaster Removal 13. Fireproofing Removal 14. Hard Plaster Removal 15. Gypsum Board Removal 16. Acoustical Panel/Tile Ceiling Removal 17. Laboratory Table/Counter Top Removal 18. Cement Board Removal 19. Electric Cord Insulation Removal 20. Light (Reflector) Fixture Removal 21. Sheet Flooring with Friable Backer Removal 22. Fire Door Removal 23. Door and Window Panel Removal 24. Decontamination of Crawlspace/Chase/Tunnel 25. Soil Removal 26. Non-ACM Ceiling/Wall Removal (for access) 27. Window Component (Compound, Tape, or Caulk) - Reno & Demo 28. Window Component (Compound, Tape, or Caulk) - Reno Only 29. Resilient Flooring Removal, Including Mastic 30. Carpet Mastic Removal 31. Carpet Removal (over RFC) 32. Acoustical Tile Mastic Removal 33. Sink Undercoating Removal 34. Roofing Removal 35. (Sum of Lines 1-34) 36. (Sum of Lines 1-12, 14-34) B. Removal Of Underground Storage Tanks Tank No. 1. (Sum of Lines 1-0) Location Age
Status Quantity Unit Cost Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Not Present 0 Total Asb. Hazard Abatement Cost for Renovation Work Total Asb. Hazard Abatement Cost for Demolition Work
Product Stored Size Total Cost For Removal Of Underground Storage Tanks
Est.Rem.Cost $0.00
C. Lead-Based Paint (LBP) - Renovation Only 1. Estimated Cost For Abatement Contractor to Perform Lead Mock-Ups 2. Special Engineering Fees for LBP Mock-Ups 3. (Sum of Lines 1-2) D. Fluorescent Lamps & Ballasts Recycling/Incineration Area Of Building Addition 1. 4405 441 E. Other Environmental Hazards/Remarks 1. (Sum of Lines 1-0) 2. (Sum of Lines 1-0) Description Total Cost for Other Environmental Hazards - Renovation Total Cost for Other Environmental Hazards - Demolition
Addition Constructed after 1980 $0.00 $0.00 Total Cost for Lead-Based Paint Mock-Ups $0.00 Not Applicable Total Cost $44.10 None Reported Cost Estimate $0.00 $0.00
F. Environmental Hazards Assessment Cost Estimate Summaries 1. A35, B1, C3, D1, and E1 2. A36, B1, D1, and E2 * INSPECTION ASSUMPTIONS for Reported/Assumed Asbestos-Free Materials (Rep/Asm AFM): a. b.
Total Cost for Env. Hazards Work - Renovation Total Cost for Env. Hazards Work - Demolition
$44.10 $44.10
Unless reported otherwise by the District, materials installed after 1980 are assumed to be asbestos-free. Unless reported otherwise by the District, small quantities (less than 1,000 square feet) of the following materials are assumed to be asbestos free: hard plaster, acoustical plaster and gypsum board systems; acoustical panels and tiles; fireproofing; 12""12" floor tile and mastic. Unless reported otherwise by the District, all roofing materials are assumed to be asbestos-free.
c.
THESE MATERIALS SHOULD BE PROPERLY SAMPLED AND ANALYZED FOR ASBESTOS PRIOR TO DISTURBING THEM.
<Untitled>
Page 54