Dear sir, kindly find readings taken during the day and also during the night which

have guided to the final recommedation. These are for your perusal and for your action.

LOCATION
GATE 9/10 DAY TIME READING GATE 9/10 NIGHT READING GATE 12 DAY TIME READING GATE 12 NIGHT READING GATE 18/20 DAY TIME READING GATE 18/20 NIGHT READING MBARAKI SPORTS CLUB DAY TIME READING MBARAKI SPORTS CLUB NIGHT READING

RED PHASE
80 AMPS 97 AMPS 9 AMPS 23 AMPS 20 AMPS 34 AMPS 7 AMPS 49 AMPS

YELLOW PHASE
75 AMPS 45 AMPS 14 AMPS 20 AMPS 27 AMPS 72 AMPS 1.0 AMPS 35 AMPS

BLUE PHASE
72 AMPS 53 AMPS 25 AMPS 30 AMPS 55 AMPS 54 AMPS 41 AMPS 65 AMPS

RECOMMENDATION
ON THE LOWER SIDE 100 KVA GENERATOR SET REQUIRED

ON THE LOWER SIDE 50 KVA GENERATOR SET REQUIRED

ON THE LOWER SIDE 75 KVA GENERATOR SET REQUIRED Considering the flexiblity reason and also considering some load were off . REC.==> on the lower side 350 kva gen set required.

kind regards.

ITEM

DETAILS DOCKYARD

QTY

UNIT

UNIT RATE

COST

Generator Set 350KVA (Without Changeover Switch), Supply, Installation and Commissioning Supply and installation of sub main cable, 185mm sq. PVC SWA 4 core copper cable, 150 metres. Generator House construction, Grilled as per Drawing MBARAKI SPORTS CLUB

EA

2 3

M 1 EA

Generator Set 350KVA Complete with Changeover Switch, Supply, Installation and Commissioning. Supply and installation of sub main cable, 185mm sq. PVC SWA 4 core copper cable, 150 metres. RAS SERAN

EA

Generator Set 25KVA Complete with Changeover Switch, Supply, Installation and Commissioning. Supply and installation of sub main cable, 185mm sq. PVC SWA 4 core copper cable, 150 metres.

EA

M 1 1 LOT EA EA

3 Ventilations Blocks 4 Replace Door with Galvanized. 5 Replace lighting fittings and Socket Outlet GATE 18 GENERATOR 1 Generator Set 75KVA Complete with Changeover Switch, Supply, Installation and Commissioning. Supply and installation of sub main cable, 185mm sq. PVC SWA 4 core copper cable, 150 metres.

EA

M 1 EA

3 Construction of generator Cage to specifications GATE 12 GENERATOR

Generator Set 50KVA Complete with Changeover Switch, Supply, Installation and Commissioning. Supply and installation of sub main cable, 185mm sq. PVC SWA 4 core copper cable, 150 metres.

EA

M 1 EA

3 Construction of generator Cage to specifications GATE 9/10 1 Generator Set 100KVA Complete with Changeover Switch, Supply, Installation and Commissioning. Supply and installation of sub main cable, 185mm sq. PVC SWA 4 core copper cable, 150 metres.

EA

M 1 EA 1 EA

3 Feeder Panel complete with changeover; specs 4 Construction of generator Cage to specifications

10% Contingency VAT