Budget Report as of Fri 04-10-13

Project1(Ajay)
ID

Task Name

12
19
17
18
36
15
13
21
22
3
14
10
23
4
8
9
6
5
25
26
27
28
29
30
31
32
33
34
37
38
39
40
42
43
45
47

Fixed Cost

Steel Binding & PCC


Rs 0.00
External Br Wk on Ground Beams
Rs 0.00
Binding of steel for Ground Beams
Rs 0.00
PCC for plinth level
Rs 0.00
Parapet Bk Wk
Rs 0.00
Rs 0.00
Keeping the Reinf. Of footing / column in position
Rs 0.00
Binding of steel for footing / column
Rs 0.00
Column Shuttering & concreting (
Murrum filling & ramming
Rs 0.00
Reading the drawings
Rs 10,000.00
Plain Cement Concrete
Rs 0.00
Septic Tank
Rs 0.00
PL Beams(binding & concreting)
Rs 0.00
Rs 0.00
Planning for material & labour on site
Soft Murrum
Rs 0.00
Hard Murrum
Rs 0.00
Rs 0.00
Lineout,boundary & excavation marking
Borring & water connections
Rs 0.00
Rs 0.00
RCC columns upto 1st slab with binding
Rs 0.00
Scaffolding & Shuttering of 1st Slab
Rs 0.00
Binding of steel (1st Slab) & Slab beams
Concreting of 1st Slab
Rs 0.00
Curing of Slab
Rs 0.00
RCC Columns upto 2nd Slab(binding
Rs 0.00
Rs 0.00
Scaffolding & Shuttering of 2nd Slab
Rs 0.00
Binding of Steel (2nd Slab) & Slab Beams
Concreting of 2nd Slab
Rs 0.00
Curing of Slab
Rs 0.00
Rs 0.00
Bk Wk of Ground Floor (Internal &
Rs 0.00
Bk Wk of Second Floor(Internal &
Bk Wk of Septic Tank
Rs 0.00
Bk work completed
Rs 0.00
Lintels at 7Ft level (GF)
Rs 0.00
Lintels at 7 ft level (FF)
Rs 0.00
Fixing of MS Grills & Door frames
Rs 0.00
External Plastering complete
Rs 0.00

Fixed Cost Accrual

Total Cost

Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated

Page 1

Rs 41,550.00
Rs 34,800.00
Rs 26,030.00
Rs 24,650.00
Rs 24,650.00
Rs 22,450.00
Rs 18,000.00
Rs 16,600.00
Rs 14,100.00
Rs 10,000.00
Rs 4,800.00
Rs 3,000.00
Rs 3,000.00
Rs 2,100.00
Rs 2,000.00
Rs 2,000.00
Rs 900.00
Rs 40.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00

Baseline

Rs 41,550.00
Rs 34,800.00
Rs 26,030.00
Rs 23,150.00
Rs 24,650.00
Rs 44,900.00
Rs 18,000.00
Rs 16,600.00
Rs 10,600.00
Rs 10,000.00
Rs 4,800.00
Rs 3,000.00
Rs 0.00
Rs 1,400.00
Rs 2,000.00
Rs 2,000.00
Rs 900.00
Rs 40.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00

Variance

Rs 0.00
Rs 0.00
Rs 0.00
Rs 1,500.00
Rs 0.00
(Rs 22,450.00)
Rs 0.00
Rs 0.00
Rs 3,500.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 3,000.00
Rs 700.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00

Actual

Rs 41,550.00
Rs 34,800.00
Rs 0.00
Rs 24,650.00
Rs 0.00
Rs 22,450.00
Rs 18,000.00
Rs 0.00
Rs 14,100.00
Rs 10,000.00
Rs 4,800.00
Rs 3,000.00
Rs 3,000.00
Rs 2,100.00
Rs 2,000.00
Rs 2,000.00
Rs 900.00
Rs 40.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00

Budget Report as of Fri 04-10-13


Project1(Ajay)
ID

Task Name

48
49
51
52
54
56
57
58
60
62
64
66
67
69
70
72

Fixed Cost

Internal Neeru Plaster


Rs 0.00
Plastering for Septic Tank
Rs 0.00
Rs 0.00
Internal Plumbing for WC/Bath/Kitchen
External Plumbing with WC basin fixing
Rs 0.00
Fixing of Kitchen Otta
Rs 0.00
Rs 0.00
Fixing of Glazed Tiles ( Kit / WC / Bath
Vetrified Flooring for rooms
Rs 0.00
Rs 0.00
sills
Flooring for WC/Bath & Fixing of Granite Window
Electrification
Rs 0.00
Rs 0.00
Fixing of Allum.Powdercoated windows
Rs 0.00
Waterproof Ghotai for Terrace(Material
Rs 0.00
Fixing of Taps & flush tanks(Kit/ Bath
Fixing of Door Shutters
Rs 0.00
External Apex colour painting
Rs 0.00
Rs 0.00
Internal Distemper finish & door colouring
External (levelling & cleaning) of site
Rs 0.00

Fixed Cost Accrual

Total Cost

Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated
Prorated

Rs 10,000.00

Page 2

Baseline

Variance

Actual

Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00

Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00

Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00

Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00

Rs 250,670.00

Rs 264,420.00

(Rs 13,750.00)

Rs 183,390.00

Budget Report as of Fri 04-10-13


Project1(Ajay)
Remaining

Rs 0.00
Rs 0.00
Rs 26,030.00
Rs 0.00
Rs 24,650.00
Rs 0.00
Rs 0.00
Rs 16,600.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00

Page 3

Budget Report as of Fri 04-10-13


Project1(Ajay)
Remaining

Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 0.00
Rs 67,280.00