HERRENKNECHT AG | UTILITY TUNNELLING | TRAFFIC TUNNELLING

Referenzen: Traffic Tunnelling References: Traffic Tunnelling

Inhalt | Contents

Editorial | Editorial Projektbersicht Overview of Projects Projekte | Projects S-50 S-52 S-54.1 S-54.2 S-56 S-68 S-78 S-82.1 S-82.2 S-85 S-89 S-90 S-96 S-97 S-99 S-103 S-108 S-110 S-114 S-118 S-120.1 S-120.2 S-121 S-122.1 S-122.2 S-127 S-130 S-134 S-135 S-137 Grauholz Mlheim Paris Svres-Achres Lot n 3 Paris Clichy la Briche Lot n 2 Bzberg Essen Les Vignes Metro Cairo Line 2 Metro Cairo Line 2 Duisburg Adlertunnel Pomy Zrich Heinenoord Zrich-Glatt Airport Link Sydney Hamburg Berlin Izmir Berlin Metro Madrid Metro Madrid Murgenthal Metro Madrid Metro Madrid A86 lOuest de Paris Dsseldorf Singapore Lot 706 Singapore Lot 706 Westerschelde

4 6-15 12 46 47 48 48 73 49 71 50 50 51 74 75 84 52 76 53 54 55 16 55 17 17 77 17 17 56 57 18 18 58 S-138 S-139 S-140 S-142.1 S-142.2 S-144 S-148 S-150 S-152 S-153 S-155 S-160 S-162 S-163 S-164 S-165 S-167 S-168 S-169 S-170 S-171 S-173 S-174 S-177 S-178 S-179 S-180 S-181 S-182 S-184 Westerschelde Zrich-Thalwil Lot 3.01 Zrich-Thalwil Lot 2.01 Metro Bangkok Metro Bangkok Botlekspoortunnel Olympic Metro Athens Sophiaspoortunnel Wesertunnel Ile de la Runion Tscharner Metro Oporto Ile de la Runion Srenberg Moscow, Lefortovo Metro Sur Madrid Ltschberg Steg Pannerdensch Kanaal Metro Beijing Line 5 Singapore DTSS T-05 Singapore DTSS T-05 Singapore DTSS T-01 Ltschberg Raron Singapore DTSS T-06 Singapore DTSS T-06 Metro Guangzhou Line 2 Metro Guangzhou Line 2 Metro Guangzhou Line 2 Metro Guangzhou Line 2 Rome 58 82 82 19 19 20 72 59 60 89 85 21 89 78 61 22 86 62 23 24 24 24 86 25 25 26 26 26 26 30

S-185 S-186 S-187 S-188 S-189 S-190 S-192 S-193 S-194 S-195 S-196 S-197 S-198 S-199 S-200 S-201 S-202 S-203 S-204 S-205 S-206 S-207 S-208 S-209 S-210 S-211 S-212 S-214 S-217 S-218 S-219

London Heathrow Metro Caracas Line 4 Metro Caracas Line 4 Metro Athens Minneapolis Metro Nanjing Phase 1 London CTRL Dublin Port Tunnel Dublin Port Tunnel Metro Nanjing Phase 1 Metro New Delhi Metro New Delhi Metro New Delhi Hongkong Kai Tak Transfer Scheme Herrentunnel Guadarrama North Portal Guadarrama South Portal Metro Oporto London CTRL Metro Athens Metro Shenzhen Metro Shenzhen Metro Toulouse Lot 2 Antwerp Gotthard Bodio / Faido Gotthard Bodio / Faido Singapore Marina Line C825 Singapore Marina Line C825 Metro Nanjing Phase 1 Ashgabat Ashgabat

31 32 32 34 35 36 63 83 83 36 45 45 45 64 65 90 91 21 63 34 37 37 38 66 87 87 39 39 36 40 40

S-220 S-221 S-222 S-225 S-226 S-227 S-228 S-229 S-230 S-231 S-232 S-233 S-234 S-235 S-236 S-237 S-238 S-239 S-240 S-241 S-242 S-243 S-244 S-245 S-247 S-248 S-250 S-251 S-252 S-253

Pontebba Metro Barcelona Line 9 Metro Vienna U1/1 Metro Tianjin Metro Tianjin Metro Esfahan Metro Esfahan Gotthard Amsteg Gotthard Amsteg Portland Portland Arrowhead Arrowhead Metro Guangzhou Line 3 Metro Guangzhou Line 3 Metro Guangzhou Line 3 Metro Naples Line 1 Metro Naples Line 2 Metro Guangzhou Line 3 Metro Guangzhou Line 3 Metro Guangzhou Line 3 Metro Guangzhou Line 3 Metro Guangzhou Line 3 Metro Guangzhou Line 3 Metro Caracas Line 3 Metro Caracas Line 3 Moscow, Silberwald Valsugana Kuala Lumpur Kuala Lumpur

79 41 67 42 42 43 43 88 88 68 68 80 80 27 27 27 44 44 28 28 29 29 29 29 33 33 69 81 70 70

Liebe Leserin, lieber Leser,

in mehr als 25 Jahren Unternehmensgeschichte konnten wir gemeinsam mit unseren Kunden eine beachtliche Anzahl von internationalen Referenzprojekten im Traffic Tunnelling ( >4,20 m) aufbauen. So kann Herrenknecht heute die hchste Referenzdichte im maschinellen Grotunnelbau vorweisen. Fr alle Verkehrssysteme, fr alle geologischen Baugrundbedingungen und in einem Durchmesserbereich von 4,20 m bis ber 14 m. Mit Vortriebstechnik von Herrenknecht werden Tunnel exakt da gebaut, wo sie bentigt werden, um bestehende Verkehrswege abzukrzen, zu erweitern oder intelligent zu verknpfen. Inmitten dicht bebauter Metropolen, durch Bergmassive hindurch, unter Meeresarmen oder groen Flssen. Da Platz auf der Erdoberflche eine Mangelware geworden ist, fhrt der Weg neuer, intelligenter Infrastrukturen immer fter unter die Erde. Die technische Weiterentwicklung der Maschinenverfahren und -komponenten wird durch die stets wachsenden Herausforderungen angetrieben. Tunneldurchmesser werden immer grer, Tunnel werden immer lnger, die Lage der Tunnel geht weiter in die Tiefe. Projekte wie die 4. Elbtunnel-Rhre, die Westerschelde-Querung und der Gotthard-Basistunnel weisen die Richtung.

Dies erfordert nicht nur absolut verlssliche und erprobte technische Konzepte. Maximale Sicherheitsanforderungen und umfassendes Risikomanagement spielen fr Bauherren, Bauwirtschaft sowie TBM-Hersteller eine immer grere Bedeutung. Gegenseitiges Vertrauen ist dabei essentiell. Vom geplanten Tunnel bis zu dessen Durchbruch ist es ein langer Weg. Bei Herrenknecht dreht sich alles um die Projekte unserer Kunden. Sie geben das Ziel und die leistungsbezogenen Anforderungen vor. Wir erstellen gemeinsam eine optimale Projektlsung und begleiten den Bau des Tunnelprojekts von Anfang an. Mit Teamwork Tunnelling kommen wir berall durch. Erfahrung schafft Vertrauen. Unsere Erfahrung wollen wir unseren Kunden, den Planern und Bauherren durch die vorliegende Broschre nahelegen. Gemeinsam gestalten wir die Zukunft. Ihr

Dr.-Ing. E.h. Martin Herrenknecht Vorstandsvorsitzender

Dear Readers,

in cooperation with our customers we have succeeded in completing a considerable number of international projects in Traffic Tunnelling ( > 4.20m) in more than 25 years of company history. Today Herrenknecht has the largest number of reference projects in mechanical tunnelling for all sorts of transport systems, for all geological conditions and for all diameters from 4.20m to over 14m. Herrenknecht tunnelling technology allows tunnels to be built right where they are needed, to shorten or extend existing routes as well as creating links between them under densely populated cities, through mountains, under estuaries or large rivers. As available space above ground is constantly decreasing, the way for new intelligent infrastructure leads more and more often underground. The further technical development of machine processes and components is pushed forward by ever-bigger challenges. Traffic tunnel diameters are increasing, tunnel routes are descending further into the depths of the earth and tunnels are becoming ever longer. Projects such as the 4th Tunnel under the River Elbe, the crossing beneath the Westerschelde and the Gotthard Base Tunnel have been leading in this direction.

Such a development requires reliable and proven technical concepts. Enhanced safety requirements and comprehensive risk management play an increasingly important role for the clients, the construction companies and the TBM manufacturer. Mutual trust is essential. It is a long way from planning the tunnel to the breakthrough. For Herrenknecht everything revolves around our customers project. You state your objective and your requirements. Working with you we will develop the best possible project solution. You can count on our support during the construction of the tunnel from start to finish. With Teamwork Tunnelling we can overcome all obstacles. Experience creates trust. With this brochure we would like to share our experience with our customers, planners and clients. Together we will build the future. Your sincerely,

Dr.- Ing. E.h. Martin Herrenknecht Chairman of the Board of Directors

bersicht Referenzen | Overview References


r. o. er eb or eN en gg ract a hin hin r c ft nt as ac M M Au Co kt ct oje oje Pr Pr ion ipt yp escr t n d ine ne ch hi as ac M M

S-50 S-52

Marti AG, Frutiger AG, Wayss & Freytag AG, Schafir + Mugglin AG, Kopp AG Dyckerhoff & Widmann AG, HOCHTIEF AG, Philipp Holzmann AG, Alfred Kunz GmbH & Co., Strabag Bau AG, Thyssen Schachtbau GmbH, Wayss & Freytag AG Chantiers Modernes, Bouygues S.A., GTM, Ballot Chantiers Modernes, Bouygues S.A., GTM, Ballot Rothpletz, Lienhard & Cie. AG, Erne AG, Granella AG, Kistler AG, Locher & Cie. AG, Marti AG, Murer AG, Prader AG HOCHTIEF AG, Bilfinger + Berger Bau AG, Dyckerhoff & Widmann AG, Philipp Holzmann AG, Alfred Kunz GmbH & Co., Strabag Bau AG, Wayss & Freytag AG, Ed. Zblin AG Losinger Fribourg SA, Locher & Cie. AG, Prader AG, Grisoni-Zaugg SA, A. Repond SA Campenon Bernard SGE, Arabcontractors, Bouygues S.A., DTP, Dumez, Fougerolle, GTM, Spie Batignolles HOCHTIEF AG, Ed. Zblin AG, E. Heitkamp GmbH, Walter Bau AG Pitsch AG, Infra 2000 SA, Stamm AG, Wenk AG Marti AG, Marti Tunnel AG, Routes Modernes SA, Kopp AG, Barbonesi SA, COBY Prader AG

Grauholz Schweiz | Switzerland Mlheim Deutschland | Germany Paris Svres-Achres Lot n 3 Frankreich | France Paris Clichy la Briche Lot n 2 Frankreich | France Bzberg Schweiz | Switzerland Essen Deutschland | Germany Les Vignes Schweiz | Switzerland Metro Cairo Line 2 gypten | Egypt Duisburg Deutschland | Germany Adlertunnel Schweiz | Switzerland Pomy Schweiz | Switzerland Zrich Schweiz | Switzerland

Mixschild / Einfachschild-TBM Mixshield / Single Shield TBM Mixschild | Mixshield

S-54.1 S-54.2 S-56 S-68

Mixschild | Mixshield Mixschild | Mixshield Einfachschild-TBM | Single Shield TBM Mixschild | Mixshield

S-78 S-82.1 S-82.2 S-85 S-89 S-90 S-96 S-97 S-99 S-103 S-108 S-110 S-114 S-118 S-120.1 S-120.2

Teilschnittmaschine | Open Face Shield 2 x Mixschild | 2 x Mixshield Mixschild | Mixshield Einfachschild-TBM | Single Shield TBM Einfachschild-TBM | Single Shield TBM Gripper-TBM | Gripper TBM Mixschild | Mixshield Einfachschild-TBM / EPB-Schild Single Shield TBM / EPB-Shield Mixschild | Mixshield Mixschild | Mixshield 2 x Mixschild | 2 x Mixshield EPB-Schild | EPB-Shield 2 x Mixschild | 2 x Mixshield EPB-Schild | EPB-Shield EPB-Schild | EPB-Shield

Ballast Nedam Beton & Waterbouw B.V., Van Hattum & Blankevoort B.V., Heinenoord Hollandsche Beton-en Waterbouw B.V., Wayss & Freytag AG Niederlande | The Netherlands Locher & Cie. AG, Wayss & Freytag AG, Prader AG, Fietz + Leuthold AG Transfield, Bouygues S.A. Bilfinger + Berger Bau AG, Dyckerhoff & Widmann AG, Heitkamp GmbH, HOCHTIEF AG, Philipp Holzmann AG, Wayss & Freytag AG, Ed. Zblin AG HOCHTIEF AG, Bilfinger + Berger Bau AG, Philipp Holzmann AG, Dyckerhoff & Widmann AG Yapi Merkezi Insaat Ve Sanayi A.S., Wayss & Freytag AG HOCHTIEF AG, Bilfinger + Berger Bau AG, Philipp Holzmann AG, Dyckerhoff & Widmann AG Necso, Entrecanales, Cubiertas/Ferrovial Necso, ACS, Ferrovial Zrich-Glatt Schweiz | Switzerland Airport Link Sydney Australien | Australia Hamburg Deutschland | Germany Berlin Deutschland | Germany Izmir Trkei | Turkey Berlin Deutschland | Germany Metro Madrid Spanien | Spain Metro Madrid Spanien | Spain

) m) (m m) ) e ( ngth (m (mm g n le ell el d- ld hil ie nn nn Sc Sh Tu Tu

t g un en nd loym e rw p Ve Em

gie gy olo olo Ge Ge

ng ru fe ery e i sl liv Au De

ite ge Se Pa

11600 6900

5500 2400

Bahn | Railway U-Bahn | Subway

Sand, Kies, Molasse | sand, gravel, molasse Sandstein, Tonstein | sandstone, claystone

1989 1989

46 47

4050 4050 11800 8300

3600 3000 2 x 3200 2 x 2100

Wasser | Water Wasser | Water Strae | Road U-Bahn | Subway

Sand, Ton | sand, clay Sand, Mergel, grober Kies | sand, marl, coarse gravel Molasse, Kalkstein, Mergel | molasse, limestone, marl Mergel, Sand | marl, sand

1989 1990 1989/90 1992

48 48 73 49

11770 9400 6570 12535 11660 3000 8550 5290 10710 14200 8930 6520 8930 9330 9330

2 x 1900 1800 1800 + 1500 2 x 1000 2 x 2040 4100 2 x 2700 1200, 950 2000 2 x 940 2900 2400 5570 2560 2 x 570 + 2 x 700 2800 2 x 570 + 2 x 700 11000 3300

Strae | Road U-Bahn | Subway U-Bahn | Subway Bahn | Railway Strae | Road Wasser | Water Strae | Road Wasser | Water U-Bahn | Subway Strae | Road Bahn | Railway U-Bahn | Subway Bahn | Railway U-Bahn | Subway U-Bahn | Subway

Morne, Molasse | moraine, molasse Sand | sand Kreide, Schluff, Sand, Kies, Ton | chalk, silt, sand, gravel, clay Bunte Mergel, Gipskeuper | coloured marl, gypsum keuper Molasse | molasse Molasse | molasse Sand, Ton | sand, clay Molasse, Lockergestein | molasse, unconsolidated material Ton, Sandstein | clay, sandstone Sand, Geschiebemergel, Schluff und Kies, Findlinge sand, glacial drift, silt and gravel, boulders Sand, Ton | sand, clay Ton, Sand | clay, sand Sand, Ton | sand, clay Lehm, Sand, Ton | loam, sand, clay Lehm, Sand, Ton | loam, sand, clay

1993 1994 1994 1995 1994 1995 1996 1995 1996 1997 1997 1997 1997 1997 1997

71 50 51 74 75 84 52 76 53 54 55 16 55 17 17

bersicht Referenzen | Overview References


r. o. er eb or eN en gg ract a hin hin r c ft nt as ac M M Au Co kt ct oje oje Pr Pr ion ipt yp escr t n d ine ne ch hi as ac M M

S-121 S-122.1 S-122.2 S-127 S-130 S-134 S-135 S-137 S-138 S-139 S-140 S-142.1 S-142.2 S-144

Locher & Cie. AG, Murer AG, Prader AG, Rothpletz, Lienhard & Cie. AG, Conrad Zschokke S.A., Ad. Schfer & Cie. AG Necso, Entrecanales, Cubiertas/O C P ACS Campenon Bernard SGE, Jean Lefebvre, Dumez GTM, GTM Construction, Fougerolle, Colas Wayss & Freytag AG, Bilfinger + Berger Bau AG, HOCHTIEF AG, Philipp Holzmann AG, Bouygues S.A. Ed. Zblin AG Ed. Zblin AG BAM Infrabouw B.V., Franki N.V., Heijmanns N.V., Philipp Holzmann AG, Voormolen Bouw B.V., Wayss & Freytag AG Zschokke Locher AG, Murer AG, Prader AG, Wayss & Freytag AG, CSC, J. Scheifele AG, Specogna & Co. Zschokke Locher AG, Murer AG, Prader AG, Wayss & Freytag AG, CSC, J. Scheifele AG, Specogna & Co. Bilfinger + Berger Bau AG, CH Karnchang Public Co. Ltd., Kumagai Gumi Co. Ltd., Tokyu Construction Co. Ltd. Ballast Nedam Beton en Waterbouw B.V., Hollandsche Beton- en Waterbouw B.V., Strukton Betonbouw B.V., Van Hattum en Blankevoort B.V., Wayss & Freytag AG Sogea, Campenon Bernard SGE Koninklijke Boskalis Westminster N.V., Heijmans N.V., HOCHTIEF AG, Philipp Holzmann AG, NBM-Amstelland N.V. HOCHTIEF AG, Philipp Holzmann AG, Ludwig Freytag GmbH & Co. KG, Henrich Hecker GmbH & Co. KG, Martin Oetken GmbH & Co. KG Spie Batignolles, Razel, Pico Marti AG Impregilo S.p.A., Soares da Costa, Somague Spie Batignolles, Bouygues S.A., Razel, Pico STRABAG AG, Cogeis S.p.A., A. Specogna S.A., Scheifele AG AO Corporation Transstroy

Murgenthal Schweiz | Switzerland Metro Madrid Spanien | Spain Metro Madrid Spanien | Spain A86 lOuest de Paris Frankreich | France Dsseldorf Deutschland | Germany Singapore Lot 706 Singapur | Singapore Singapore Lot 706 Singapur | Singapore Westerschelde Niederlande | The Netherlands Zrich-Thalwil Lot 3.01 Schweiz | Switzerland Zrich-Thalwil Lot 2.01 Schweiz | Switzerland Metro Bangkok Thailand | Thailand Botlekspoortunnel Niederlande | The Netherlands Olympic Metro Athens Griechenland | Greece Sophiaspoortunnel Niederlande | The Netherlands Wesertunnel Deutschland | Germany Ile de la Runion La Runion | La Runion Tscharner Schweiz | Switzerland Metro Oporto Portugal | Portugal Ile de la Runion La Runion | La Runion Srenberg Schweiz | Switzerland Moscow, Lefortovo Russland | Russia

Einfachschild-TBM | Single Shield TBM EPB-Schild | EPB-Shield EPB-Schild | EPB-Shield Mixschild | Mixshield Mixschild | Mixshield EPB-Schild | EPB-Shield EPB-Schild | EPB-Shield 2 x Mixschild | 2 x Mixshield Einfachschild-TBM | Single Shield TBM Mixschild / Einfachschild-TBM Mixshield / Single Shield TBM 2 x EPB-Schild | 2 x EPB-Shield EPB-Schild | EPB-Shield

S-148 S-150 S-152 S-153 S-155 S-160 S-162 S-163 S-164

Teilschnittmaschine | Open Face Shield Mixschild, kontinuierlicher Vortrieb Mixshield, continuous advance Mixschild | Mixshield Doppelschild-TBM | Double Shield TBM Gripper-TBM | Gripper TBM EPB-Schild | EPB-Shield Doppelschild-TBM | Double Shield TBM Einfachschild-TBM | Single Shield TBM Mixschild | Mixshield

) m) (m m) ) e ( ngth (m (mm g n le ell el d- ld hil ie nn nn Sc Sh Tu Tu

t g un en nd loym e rw p Ve Em

gie gy olo olo Ge Ge

ng ru fe ery e i sl liv Au De

ite ge Se Pa

11980 9330 9330 11565 9430 6550 6550 11340 12280 12360 6460 9755

4260 6780 7600 4500 + 5500 904 2 x 920 2 x 750 6600 6600 5570 2620 4110 4140 2 x 1835

Bahn | Railway U-Bahn | Subway U-Bahn | Subway Strae | Road U-Bahn | Subway U-Bahn | Subway U-Bahn | Subway Strae | Road Bahn | Railway Bahn | Railway U-Bahn | Subway Bahn | Railway

Molasse: Mergel, Sandstein | marl and sandstone from the molasse Lehm, Sand, Ton | loam, sand, clay Lehm, Sand, Ton | loam, sand, clay Kalkstein, Sand, Ton, Mergel, Kreide | limestone, sand, clay, marl, chalk Feinsand, sandiger Kies, Mittel- u. Grobsand, Auffllung, Steine, Blcke fine sands, sandy gravel, sand, fill, stones, boulders Alluvium, Ton | alluvium, clay Sandstein, Tonstein | sandstone, claystone Sand, Ton | sand, clay Molasse | molasse Molasse, Sihlschotter | molasse, sihl ballast rubble Sand, Ton | sand, clay Ton, grobe und kiesige Sande | clay, coarse and pebbly sands

1997 1997 1997 2000 1998 1998 1998 1999 1998 1998 1998 1998

77 17 17 56 57 18 18 58 82 82 19 20

9495 9785 11670 3865 9530 8700 3865 4520 14200

1911 2 x 4241 2 x 1600 9512 2322 5700 8050 5300 2222

U-Bahn | Subway Bahn | Railway Strae | Road Wasser | Water Materialtransport Material transport U-Bahn | Subway Wasser | Water Gasleitung Gas pipeline Strae | Road

Alluvium, Schiefer, Kalkstein, Mergel, Sandstein, Lavagestein alluvium, slate, limestone, marl, sandstone, extrusive rocks Ton, Sand, Schluff | clay, sand, silt Klei, Sand, Torf, Geschiebemergel, Schluff, Ton loam, sand, peat, glacial drift, silt, clay Vulkanisches Gestein | volcanic rock Kalk, Mergel, Ton | lime, marl, clay Lockergestein, Granit | unconsolidated material, granite Vulkanisches Gestein | volcanic rock Ton- und Mergelschiefer, Flysch | clay and marl slate, flysch Fein- bis Grobsand, Ton, Kalkstein (mittelfest, teils stark geklftet) fine to coarse sand, clay, limestone (medium strength, partially very fissured)

1998 1999 1999 1998 1999 1999 1999 2000 2001

72 59 60 89 85 21 89 78 61

bersicht Referenzen | Overview References


r. o. er eb or eN en gg ract a hin hin r c ft nt as ac M M Au Co kt ct oje oje Pr Pr ion ipt yp escr t n d ine ne ch hi as ac M M

S-165 S-167 S-168 S-169 S-170 S-171 S-173 S-174 S-177 S-178 S-179 S-180 S-181 S-182 S-184 S-185 S-186 S-187 S-188 S-189 S-190 S-192 S-193 S-194 S-195 S-196

Ferrovial-Agroman S.A. Marti AG, Walter Gruppe (Walter Bau AG merged with Dywidag, Ed. Zblin AG), Porr Asdag Tunnelbau GmbH, Balfour Beatty Ltd. VINCI, C.F.E., TBI Beton- en Waterbouw, Welling Beijing Urban Construction Group Co. Ltd. Philipp Holzmann AG Woh Hup Pte. Ltd., Shanghai Tunnel Engineering Co. Marti AG, Walter Gruppe (Walter Bau AG merged with Dywidag, Ed. Zblin AG), Porr Asdag Tunnelbau GmbH, Balfour Beatty Ltd. Ed. Zblin AG Tunnel Engineering Bureau (TEB No. 1) Guangzhou Municipal Dunjian Underground Construction Engineering Co. Ltd. ASTALDI S.p.A., Impregilo S.p.A. Miller, Dumez GTM Construtora Norberto Odebrecht S.A. AEGEK General Construction Company, AKTOR, SELI Obayashi / Johnson Bros. Shanghai Mechanised Construction Company (SMCC) HOCHTIEF AG, J. Murphy & Sons Limited Nishimatsu, Mowlem, Irishenco Nishimatsu, Mowlem, Irishenco China Railway Tunnel Group International Metro Civil Contractors

Metro Sur Madrid Spanien | Spain Ltschberg Steg Schweiz | Switzerland Pannerdensch Kanaal Niederlande | The Netherlands Metro Beijing Line 5 China | China Singapore DTSS T-05 Singapur | Singapore Singapore DTSS T-01 Singapur | Singapore Ltschberg Raron Schweiz | Switzerland Singapore DTSS T-06 Singapur | Singapore Metro Guangzhou Line 2 China | China Metro Guangzhou Line 2 China | China Rome Italien | Italy London Heathrow England | England Metro Caracas Line 4 Venezuela | Venezuela Metro Athens Griechenland | Greece Minneapolis USA | USA Metro Nanjing Phase 1 China | China London CTRL England | England Dublin Port Tunnel Irland | Ireland Dublin Port Tunnel Irland | Ireland Metro Nanjing Phase 1 China | China Metro New Delhi Indien | India

EPB-Schild | EPB-Shield Gripper-TBM | Gripper TBM Mixschild | Mixshield EPB-Schild | EPB-Shield 2 x EPB-Schild | 2 x EPB-Shield EPB-Schild | EPB-Shield Gripper-TBM | Gripper TBM 2 x EPB-Schild | 2 x EPB-Shield 2 x EPB-Schild | 2 x EPB-Shield 2 x EPB-Schild | 2 x EPB-Shield EPB-Schild | EPB-Shield EPB-Schild | EPB-Shield 2 x EPB-Schild | 2 x EPB-Shield EPB-Schild | EPB-Shield EPB-Schild | EPB-Shield EPB-Schild | EPB-Shield Mixschild | Mixshield Einfachschild-TBM | Single Shield TBM 2 x Teilschnittmaschine 2 x Open Face Shield EPB-Schild | EPB-Shield Einfachschild-TBM / EPB-Schild Single Shield TBM / EPB-Shield

10

) m) (m m) ) e ( ngth (m (mm g n le ell el d- ld hil ie nn nn Sc Sh Tu Tu

t g un en nd loym e rw p Ve Em

gie gy olo olo Ge Ge

ng ru fe ery e i sl liv Au De

ite ge Se Pa

9330 9430 9795 6190 4880 7200 9430 4450 6250 6250 7970 9160 5850 9460 6460 6390 8160 11825 11770 6390 6450

6840 8925 2 x 1600 2500 8081 4535 5800 10300 4018 5580 1760 1820 2060 2000 2400 2 x 1240 3650 3650 3500 2 x 2255 2 x 600 2 x 700 2500 2 x 2246 318 + 310 2 x 2280 900

U-Bahn | Subway Bahn | Railway Bahn | Railway U-Bahn | Subway Abwasser | Sewage Abwasser | Sewage Bahn | Railway Abwasser | Sewage U-Bahn | Subway U-Bahn | Subway Bahn | Railway Strae | Road U-Bahn | Subway U-Bahn | Subway U-Bahn | Subway U-Bahn | Subway Bahn | Railway Strae | Road Strae | Road U-Bahn | Subway U-Bahn | Subway

Kristallisierter Gips mit Ton und Schluffstein crystallized gypsum with clay and siltstone Altkristalliner Gneis, Granit, Granodiorit old crystalline gneiss, granite, granodiorite Sand, Ton | sand, clay Ton, schluff. Sand, Mittelsand, kies. Sand, Steinschicht mit Feinsand, Schluff clay, silty sand, medium sand, gravely sand, stone bed with fine sand, silt Frischer Granit, verwitterter Granit, Erde | fresh granite, weathered granite, soil Alluvium | alluvium Altkristalliner Gneis, Granit, Granodiorit old crystalline gneiss, granite, granodiorite Frischer und verwitterter Granit, Alluvium | fresh and weathered granite, alluvium Konglomerat und kiesiger Sandstein, Schluffstein, Ton, Schluff conglomerate and gravely sandstone, siltstone, clay, silt Konglomerat und kiesiger Sandstein, Schluffstein, Ton, Schluff conglomerate and gravely sandstone, siltstone, clay, silt Tuff, Schluff, Ton, Kies | tuff, silt, clay, gravel London Clay | London clay Ton, Sand, Fels | clay, sand, rock Schluff, Ton, Athener Schiefer | silt, clay, Athens schist Groballuvium, Kalkstein, Sandstein, Alluvium, Feines Alluvium coarse alluvium, limestone, sandstone, alluvium, fine alluvium Sand, Ton, Schluff | sand, clay, silt Alluvium, Kreide, Flintstein | alluvium, chalk, flintstone Kalkstein, Schiefer | limstone, slate Geschiebemergel | glacial drift Schluff, Ton | silt, clay Quarzite | quartzite

2000 2000 2001 2000 2000 2000 2001 2001 2000 2001 2001 2001 2001 2001 2001 2001 2002 2001 2002 2001 2002

22 86 62 23 24 24 86 25 26 26 30 31 32 34 35 36 63 83 83 36 45

11

bersicht Referenzen | Overview References


r. o. er eb or eN en gg ract a hin hin r c ft nt as ac M M Au Co kt ct oje oje Pr Pr ion ipt yp escr t n d ine ne ch hi as ac M M

S-197 S-198 S-199 S-200 S-201 S-202 S-203 S-204 S-205 S-206 S-207 S-208 S-209 S-210 S-211 S-212 S-214 S-217 S-218 S-219 S-220 S-221 S-222 S-225 S-226 S-227 S-228

International Metro Civil Contractors China Harbour Transfield JV HOCHTIEF AG, Bilfinger Berger AG ACS, FCC, Ferrovial Comsa, Dragados, Necso, Ohl, Sacyr Impregilo S.p.A., Soares da Costa, Somague HOCHTIEF AG, J. Murphy & Sons Limited Wayss & Freytag AG, Alpine Bau GmbH, Atticut 16th Bureau under the Ministry of Railway Campenon Bernard Eiffage TP T.H.V. ASDAM C/o MBG-CFE N.V. Zschokke Locher AG, HOCHTIEF AG, Alpine Mayreder Bau GmbH, CSC Impresa Costruzioni SA, Impregilo S.p.A. Zschokke Locher AG, HOCHTIEF AG, Alpine Mayreder Bau GmbH, CSC Impresa Costruzioni SA, Impregilo S.p.A. Woh Hup, STEC, NCC China Railway Engineering Corp. / China Railway Tunnel Group Construction Association "Interbudmontazh" (CAI) Consorzio S.B.T. Dragados, NECSO, ACS, Comsa, Sorigue Bilfinger Berger AG Shanghai Tunnel Engineering Co. Esfahan Urban Railway Organisation

Metro New Delhi Indien | India Hongkong Kai Tak Hongkong | Hongkong Herrentunnel Deutschland | Germany Guadarrama North Portal Spanien | Spain Guadarrama South Portal Spanien | Spain Metro Oporto Portugal | Portugal London CTRL England | England Metro Athens Griechenland | Greece Metro Shenzhen China | China Metro Toulouse Lot 2 Frankreich | France Antwerp Belgien | Belgium Gotthard Bodio / Faido Schweiz | Switzerland Gotthard Bodio / Faido Schweiz | Switzerland Singapore Marina Line C825 China | China Metro Nanjing Phase 1 China | China Ashgabat Turkmenistan | Turkmenistan Pontebba Italien | Italy Metro Barcelona Line 9 Spanien | Spain Metro Vienna U1/1 sterreich | Austria Metro Tianjin China | China Metro Esfahan Iran | Iran

2 x EPB-Schild | 2 x EPB-Shield Mixschild | Mixshield Mixschild | Mixshield Doppelschild-TBM | Double Shield TBM Doppelschild-TBM | Double Shield TBM EPB-Schild | EPB-Shield Mixschild | Mixshield Teilschnittmaschine | Open Face Shield 2 x EPB-Schild | 2 x EPB-Shield EPB-Schild | EPB-Shield Mixschild | Mixshield Gripper-TBM | Gripper TBM Gripper-TBM | Gripper TBM 2 x EPB-Schild | 2 x EPB-Shield EPB-Schild | EPB-Shield 2 x EPB-Schild | 2 x EPB-Shield Einfachschild-TBM | Single Shield TBM EPB-Schild | EPB-Shield Mixschild | Mixshield 2 x EPB-Schild | 2 x EPB-Shield 2 x EPB-Schild | 2 x EPB-Shield

12

) m) (m m) ) e ( ngth (m (mm g n le ell el d- ld hil ie nn nn Sc Sh Tu Tu

t g un en nd loym e rw p Ve Em

gie gy olo olo Ge Ge

ng ru fe ery e i sl liv Au De

ite ge Se Pa

6450 5150 11670 9510 9510 8900 8160 9495 6250 7745 8270 8830 9330 8830 9330 6580 6390 6250 4520 12060 6800 6390 6890

3020 2120 + 900 1150 2 x 760 14500 14500 4000 2500 9480 1740 1740 5050 2 x 1230 13955 + 11581 14795 + 12220 1258 2 x 1457 8000 5000 1800 8500 2 x 420 1000 1000 2 x 4324

U-Bahn | Subway Abwasser | Sewage Strae | Road Bahn | Railway Bahn | Railway U-Bahn | Subway Bahn | Railway U-Bahn | Subway U-Bahn | Subway U-Bahn | Subway Bahn | Railway Bahn | Railway Bahn | Railway U-Bahn | Subway U-Bahn | Subway Wasser | Water Gasleitung Gas pipeline U-Bahn | Subway U-Bahn | Subway U-Bahn | Subway U-Bahn | Subway

Schluff, Sand, Ton | silt, sand, clay Frischer und verwitterter Granit, Alluvium fresh and weathered granite, alluvium Sand, Schluff, Morne | sand, silt, till Granit | granite Granit | granite Frischer und verwitterter Granit | fresh and weathered granite Alluvium, Kreide, Flintstein | alluvium, chalk, flintstone Brauner und schwarzer Schiefer, Sand, Ton | brown and black slate, sand, clay Sand, Ton, Schluff, verwitterter Granit | sand, clay, silt, weathered granite Molasse, sandige Molasse, Sandstein | molasse, sandy molasse, sandstone Feiner Sand | fine sand Gneis, Granit, Schiefer | gneiss, granite, slate Gneis, Granit, Schiefer | gneiss, granite, slate S 3 Findlinge, Ton, Alluvium | S 3 boulder, clay, alluvium Schluff, Ton | silt, clay Sand, Schluff, Ton | sand, silt, clay Kalkstein, Dolomit | limestone, dolomite Granodiorit, Sand, Ton, Kies, Findlinge granodiorite, sand, clay, gravel, boulders Sandiger Schluff, Kies, Sand | sandy silt, gravel, sand Sand, Schluff, Ton | sand, silt, clay Sand, Schluff, Ton | sand, silt, clay

2002 2002 2002 2002 2002 2002 2002 2002 2002 2002 2002 2002 2002 2002 2002 2002 2002 2002 2003 2002 2003

45 64 65 90 91 21 63 34 37 38 66 87 87 39 36 40 79 41 67 42 43

13

bersicht Referenzen | Overview References


r. o. er eb or eN en gg ract a hin hin r c ft nt as ac M M Au Co kt ct oje oje Pr Pr ion ipt yp escr t n d ine ne ch hi as ac M M

S-229 S-230 S-231 S-232 S-233 S-234 S-235 S-236 S-237 S-238 S-239 S-240 S-241 S-242 S-243 S-244 S-245 S-247 S-248 S-250 S-251 S-252 S-253

Murer AG, Strabag AG Impregilo S.p.A., S.A. Healy Joint Venture JF Shea and Kenny China Railway First Group Co., Ltd. China Railway First Group Co., Ltd. Della Morte Costruzioni, Impregilo S.p.A. China Railway Erju Co., Ltd Guangzhou Municipal Dunjian Underground Construction Engineering Co. Ltd. Guangzhou Municipal Dunjian Underground Construction Engineering Co. Ltd. Construtora Norberto Odebrecht S.A. AO Corporation Transstroy TOTO Costruzioni Generali Wayss & Freytag AG Gamuda

Gotthard Amsteg Schweiz | Switzerland Portland USA | USA Arrowhead USA | USA Metro Guangzhou Line 3 China | China Metro Guangzhou Line 3 China | China Metro Naples Line 1 and 2 Italien | Italy Metro Guangzhou Line 3 China | China Metro Guangzhou Line 3 China | China Metro Guangzhou Line 3 China | China Metro Caracas Line 3 Venezuela | Venezuela Moscow, Silberwald Russland | Russia Valsugana Italien | Italy Kuala Lumpur Malaysia | Malaysia Kuala Lumpur Malaysia | Malaysia

2 x Gripper-TBM | 2 x Gripper TBM 2 x Mixschild | 2 x Mixshield

2 x Einfachschild-TBM | 2 x Single Shield TBM EPB-Schild | EPB-Shield 2 x EPB-Schild | 2 x EPB-Shield 2 x EPB-Schild | 2 x EPB-Shield 2 x EPB-Schild | 2 x EPB-Shield 2 x EPB-Schild | 2 x EPB-Shield 2 x EPB-Schild | 2 x EPB-Shield 2 x EPB-Schild | 2 x EPB-Shield Mixschild | Mixshield Einfachschild-TBM | Single Shield TBM Mixschild | Mixshield Mixschild | Mixshield

14

) m) (m m) ) e ( ngth (m (mm g n le ell el d- ld hil ie nn nn Sc Sh Tu Tu

t g un en nd loym e rw p Ve Em

gie gy olo olo Ge Ge

ng ru fe ery e i sl liv Au De

ite ge Se Pa

9580 5050 5140 5760 6250 6250 6740 6250 6250 6250 5850 14200 12055 13210 13210

11350 11350 4350 1350 6100 6800 3000 2677 4340 4340 2520 2522 4785 4731 3110 3110 4300 4300 2 x 2220 2 x 2780 5400 4050

Bahn | Railway Abwasser | Sewage Wasser | Water U-Bahn | Subway U-Bahn | Subway U-Bahn | Subway U-Bahn | Subway U-Bahn | Subway U-Bahn | Subway U-Bahn | Subway Strae | Road Strae | Road Strae + Wasser Road + Water Strae + Wasser Road + Water

Granit | granite Sand, Kies, Alluvium | sand, gravel, alluvium Gneis | gneiss Verwitterter Fels, Verwitterungston, Alluvium | weathered rock, residual clay, alluvium Verwitterter Fels, Verwitterungston | weathered rock, residual clay Ton, Tuff | clay, tuff Ton, verwitterter Sandstein | clay, weathered sandstone Verwitterter Fels, Verwitterungston | weathered rock, residual clay Verwitterter Fels, Verwitterungston | weathered rock, residual clay Ton, Sand, Fels | clay, sand, rock Kreideablagerungen, Steinkohleablagerungen, Lehm | chalk, hard coal, loam Kalkgestein mit Lehm und sandigen Zonen | limestone with loamy and sandy zones Kalkstein, Sand, Marmor | limestone, sand, marble Kalkstein, Sand, Marmor | limestone, sand, marble

2003 2003 2003 2003 2003 2003 2003 2003 2002 2004 2003 2003 2003 2004

88 68 80 27 27 44 28 29 29 33 69 81 70 70

15

EPB-Schild | EPB-Shield

Izmir
S-114
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor Ton, Sand | clay, sand Yapi Merkezi Insaat Ve Sanayi A.S., Wayss & Freytag AG 6520 mm 2800 m 800 kW
100 80 60 40 20 1998 | 08 09 10 11 68,4 70,8 51,6 42,0 55,2 Umbau / Werkzeugwechsel 110,4 103,2 74,4

10,8

12 13 14 15 16 17

wchentl. Vortriebsleistung [m] weekly production [m]

Boden top soil

Schluff silt

Sand-Kies sand-gravel

Ton clay

Sand sand

16

EPB-Schild | EPB-Shield

Metro Madrid
S-120.1 / S-120.2 / S-122.1 / S-122.2
Schilddurchmesser | shield diameter Tunnellnge S-120.1 | tunnel length S-120.1 Tunnellnge S-120.2 | tunnel length S-120.2 Tunnellnge S-122.1 | tunnel length S-122.1 Tunnellnge S-122.2 | tunnel length S-122.2 Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber S-120.1 | contractor S-120.1 Auftraggeber S-120.2 | contractor S-120.2 Auftraggeber S-122.1 | contractor S-122.1 Auftraggeber S-122.2 | contractor S-122.2 Lehm, Sand, Ton | loam, sand, clay Necso, Entrecanales, Cubiertas/Ferrovial Necso, ACS, Ferrovial Necso, Entrecanales, Cubiertas/O C P ACS
133,5 140 126 120 105 100 80 60 40 20 141 117 135 129

9330 mm 11000 m 3300 m 6780 m 7600 m 2000 kW

140 120 100 80 60 40 20

120 103,5 70,5 48 82,5 67,5 97,5

144 136,5 126

1998 | 15 16 17 18 19 20

21

22 23 24

wchentl. Vortriebsleistung [m] S-120.1 weekly production [m]

117

110 100,5

1998 | 14 15 16 17 18 19 20

21

22 23

wchentl. Vortriebsleistung [m] S-122.1 weekly production [m]

17

EPB-Schild | EPB-Shield

Singapore Lot 706


S-134 / S-135
Schilddurchmesser | shield diameter Tunnellnge S-134 | tunnel length S-134 Tunnellnge S-135 | tunnel length S-135 Bohrkopfleistung | cutterhead power Geologie S-134 | geology S-134 Geologie S-135| geology S-135 Auftraggeber | contractor Alluvium, Ton | alluvium, clay Sandstein, Tonstein | sandstone, claystone Ed. Zblin AG 6550 mm 2 x 920 m 2 x 750 m 945 kW
120 100 80 60 40 20 19,5 41 42 43 44 45 73,5 61,5 123 106,5 85,5 51 108 82,5 101

1999 | 36 37 38 39 40

wchentl. Vortriebsleistung [m] S-134 weekly production [m]

100 80 60 40 20 26 53 53 61,5

103,5 99 79,5 75 72

34,5

1999 | 43 44 45 46 47 48 49 50

51

52

wchentl. Vortriebsleistung [m] S-135 weekly production [m]

18

EPB-Schild | EPB-Shield

Metro Bangkok
S-142.1 / S-142.2
Schilddurchmesser | shield diameter Tunnellnge S-142.1 | tunnel length S-142.1 Tunnellnge S-142.2 | tunnel length S-142.2 Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor Sand, Ton | sand, clay Bilfinger + Berger Bau AG, CH Karnchang Public Co. Ltd., Kumagai Gumi Co. Ltd., Tokyu Construction Co. Ltd. 6460 mm 4110 m 4140 m 640 kW
180 160 140 120 100 80 60 40 20 180 179 187 119 118 82,8 52,8 12 51 126 98,4

2000 | 42 43 44 45 46 47 48 49 50

wchentl. Vortriebsleistung [m] S-142.1 weekly production [m]

19

EPB-Schild | EPB-Shield

Botlekspoortunnel
S-144
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor 9755 mm 2 x 1835 m 2400 kW Ton, grobe und kiesige Sande | clay, coarse and pebbly sands Ballast Nedam Beton en Waterbouw B.V., Hollandsche Beton- en Waterbouw B.V., Strukton Betonbouw B.V., Van Hattum en Blankevoort B.V., Wayss & Freytag AG
108 100 80 60 40 20 2000 | 40 41 30 19,5 58,5 94,5 81 70,5 65 70,5 59

42 43 44 45 46 47 48 49

wchentl. Vortriebsleistung [m] weekly production [m]

120
Oude Maas

117

127,5 108 79,5 63 46,5 18 41 24 78 69

100 80 60 40

Sand schluffig mit dnnen Tonschichten sand silty with thin layers of clay Sand fein fine sand Torf / Ton, schluffig und/oder sandig peat / clay, silty and/or sandy Ton, sandig und schluffig clay, sandy and silty Sand, mittel-grob, oft kiesig sand, middle to coarse, mainly gravel Sand, fein mit dnnen Tonschichten sand fine with thin layers of clay

Hauptschlich Sand mainly sand Torf peat Ton schluffig mit Sandschichten clay silty with layers of sand Ton mit dnnen Sandschichten clay with thin layers of sand Ton, rtlich Schluff, sandig bis Sand, tonig clay, locally silt, sandy to sand, clayey Ton, mit Humus und/oder Torfstcken clay, with humus and/or peat

20

2000 | 35 36 37 38 39 40

42 43 44

wchentl. Vortriebsleistung [m] weekly production [m]

20

EPB-Schild | EPB-Shield

Metro Oporto
S-160 / S-203
Schilddurchmesser S-160 | shield diameter S-160 Schilddurchmesser S-203 | shield diameter S-203 Tunnellnge S-160 | tunnel length S-160 Tunnellnge S-203 | tunnel length S-203 Bohrkopfleistung | cutterhead power Geologie S-160 | geology S-160 Geologie S-203 | geology S-203 Auftraggeber | contractor Lockergestein, Granit | unconsolidated material, granite Frischer und verwitterter Granit fresh and weathered granite Impregilo S.p.A., Soares da Costa, Somague
74,2 70 60 50 40 30 20 10 51,8 42 56 53,2 57,4 59 56 56 78,4

8700 mm 8900 mm 5700 m 4000 m 2400 kW

70 60 50 40 30 20 10

53,2 39 37,8 42 26,6 22,4 44,8

51,8

19,6

2002 | 32 33 34 35 36 37 38 39 40

41

wchentl. Vortriebsleistung [m] S-160 weekly production [m]

47,6

Boden, Alluvium soil, alluvium D1 Granit (W6) D1 granite (W6)

B Granit B granite A2 Granit (W1-3) A2 granite (W1-3)

C1 + C2 Granit (W5) C1 + C2 granite (W5)

2003 | 29 30

31

32 33 34 35 36 37 38

wchentl. Vortriebsleistung [m] S-203 weekly production [m]

21

EPB-Schild | EPB-Shield

Metro Sur Madrid


S-165
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power techn. Besonderheiten | techn. features 9330 mm 6840 m 2800 kW 12 Hochdruckdsen am Schneidrad injizieren Wasser mit 300bar in die Tunnelbrust. | 12 high pressure nozzles on the cutterhead inject water with 300 bar into the tunnel face. Kristallisierter Gips mit Ton und Schluffstein crystallized gypsum with clay and siltstone Ferrovial-Agroman S.A.
160 140 120 100 80 60 40 20 157,5 129 120 109,5 85,5 87 178,5 163,5 112,5

96

2001 | 19 20

21

22 23 24 25 26 27 28

Geologie | geology Auftraggeber | contractor

wchentl. Vortriebsleistung [m] weekly production [m]

22

EPB-Schild | EPB-Shield

Metro Beijing Line 5


S-169
73,2

Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology

6190 mm 2500 m 630 kW Schluffiger Sand, Mittelsand, kiesiger Sand, Steinschicht mit Feinsand, Schluff, Ton silty sand, medium sand, gravely sand, stone bed with fine sand, silt, clay Beijing Urban Construction Group Co. Ltd.

70 60 54 52,8 50 39,6 40 34,8 30 20 10 2001 | 48 49 50 51 52

19,2 10,8

22,8 24 2,4

01

02

03 04 05 | 2002

Auftraggeber | contractor

wchentl. Vortriebsleistung [m] weekly production [m]

Auffllungen fill Tonige Schluffschicht clayey silt layer Steinschicht cobble layer

Schluffige Schicht silty sand layer Schluffiger Sand mit Steinen silty sand with cobbles

Toniger und sandiger Schluff clayey silt and sandy silt Mittelsand Schicht medium sand layer

Schluffiger Ton und tonige Schluffschicht silty clay and clayey silt layer

23

EPB-Schild | EPB-Shield

Singapore DTSS T-05 and T-01


S-170 / S-171 / S-173
Schilddurchmesser S-170 / S-171 | shield diameter S-170 / S-171 Schilddurchmesser S-173 | shield diameter S-173 Tunnellnge S-170 | tunnel length S-170 Tunnellnge S-171 | tunnel length S-171 Tunnellnge S-173 | tunnel length S-173 Bohrkopfleistung S-170 / S-171 | cutterhead power S-170 / S-171 Bohrkopfleistung S-173 | cutterhead power S-173 Geologie S-170 / S-171 | geology S-170 / S-171 Geologie S-173 | geology S-173 Auftraggeber S-170 / S-171 contractor S-170 / S-171 Auftraggeber S-173 | contractor S-173 4880 mm 7200 mm 8081 m 4535 m 5800 m 1500 kW 1200 kW
100 80 60 40 20 2003 | 04 05 06 07 08 09 10 11 12 13 54,6 39,2 98 81,2 77 77 78,478,4 99,4103,6

Frischer Granit, verwitterter Granit, Erde fresh granite, weathered granite, soil Alluvium | alluvium Philipp Holzmann AG Woh Hup Pte. Ltd., Shanghai Tunnel Engineering Co.
120 100 80 60 40 20

wchentl. Vortriebsleistung [m] S-170 weekly production [m]

133

78,4 82,6 80 78,4 49 46 47,6 25,2 51,8

2003 | 46 47 48 49 50

51

52

01

02

03 | 2004

wchentl. Vortriebsleistung [m] S-171 weekly production [m]

Auffllung fill Fluviale kohsionslose Bden (Kallang Formation) cohesionless (fluvial) soils (kallang formation) Mariner Ton marine clay Vollstndig verwitterter Alluvialboden (angeschwemmter Boden) completely weathered old alluvium

Bindige (fluviale) Bden (Kallang Formation) cohesive (fluvial) soils (kallang formation) Ton estuarine clay Stark verwitterter Alluvialboden highly weathered old alluvium Teilweise verwitterter Alluvialboden partially weathered old alluvium

133,5 126 118,5 120 109,5 102 98 100,5 100 94,5 80 60 40 20 2002 | 23 24 25 26 27 28 29 30

99 84

31

32

wchentl. Vortriebsleistung [m] S-173 weekly production [m]

24

EPB-Schild | EPB-Shield

Singapore DTSS T-06


S-177 / S-178
Schilddurchmesser S-177 / S-178 | shield diameter S-177 / S-178 Tunnellnge S-177 | tunnel length S-177 Tunnellnge S-178 | tunnel length S-178 Bohrkopfleistung S-177 / S-178 | cutterhead power S-177 / S-178 4450 mm 4018 m 5580 m 1250 kW
180 159,9 160 140 117 114,4 120 91 100 80 68,9 61,1 53,3 60 40 18,2 20 2002 | 47 48 49 50 51 52 01 02 183,3

92,3

Geologie S-177 / S-178 | geology S-177 / S-178 Frischer und verwitterter Granit, Alluvium fresh and weathered granite, alluvium Auftraggeber S-177 / S-178 contractor S-177 / S-178 Ed. Zblin AG

03 04 | 2003

wchentl. Vortriebsleistung [m] S-177 weekly production [m]

115,5 100 80 60 40 20 45 87 96 79,5 72 39 81

36 31,5

Auffllung fill Flussmndungssediment estuarine deposit Verwitterungsboden aus Granit residual soil of granite Vollstndig verwitterter Granit completely weathered granite Verwitterungsboden aus Alluvialboden residual soil of old alluvium

Fluvialer Sand fluvial sand Fluvialer Ton fluvial clay

Mariner Ton marine clay Verwitterter Alluvialboden old alluvium

2003 | 47 48 49 50

51

52

01

02

03 04 | 2004

Stark verwitterter Granit highly fractured granite Frischer bis leicht verwitterter Granit fresh to slightly weathered granite Vollstndig bis leicht verwitterter Alluvialboden completely to slightly weathered old alluvium

wchentl. Vortriebsleistung [m] S-178 weekly production [m]

25

EPB-Schild | EPB-Shield

Metro Guangzhou Line 2


S-179 / S-180 / S-181 / S-182
Schilddurchmesser S-179 / S-180 / S-181 / S-182 shield diameter S-179 / S-180 / S-181 / S-182 Tunnellnge S-179 | tunnel length S-179 Tunnellnge S-180 | tunnel length S-180 Tunnellnge S-181 | tunnel length S-181 Tunnellnge S-182 | tunnel length S-182 Bohrkopfleistung S-179 / S-180 / S-181 / S-182 cutterhead power S-179 / S-180 / S-181 / S-182 Geologie S-179 / S-180 / S-181 / S-182 geology S-179 / S-180 / S-181 / S-182 Auftraggeber S-179 / S-180 contractor S-179 / S-180 Auftraggeber S-181 / S-182 contractor S-181 / S-182 6250 mm 1760 m 1820 m 2060 m 2000 m 945 kW
100 80 60 40 20 2001 | 47 48 49 50 51 52 01 02 03 04 | 2002 45 87 96 79,5 72 39 81 115,5

36 31,5

wchentl. Vortriebsleistung [m] S-179 weekly production [m]

Konglomerat und kiesiger Sandstein, Schluffstein, Ton, Schluff | conglomerate and gravely sandstone, siltstone, clay, silt Tunnel Engineering Bureau (TEB No. 1) Guangzhou Municipal Dunjian Underground Construction Engineering Co. Ltd.
100 80 60 40 20 2002 | 49 50 51 52 40,5 28,5 19,5 79,5 91,5

108

115,5 93 88,5 85,5

01

02

03 04 05 06 | 2003

wchentl. Vortriebsleistung [m] S-180 weekly production [m]

Knstlicher Auffllung artifrical fill Schlickboden mud and mud soil

Schlick und schlammiger Sand mud and muddy sand Alluvium-Waschsand alluvium-proluvial wash sand

Alluvium Wasch-Schlickboden alluvium-proluvial wash mud soil Tonrckstnde residual clay

100 80 70,5 60 40 20 7,5 79,5 43,5

99 88,5 75

100,5 94,5

Verwitterte Felszone well-weathered rock zone Stark verwitterte Felszone strongly-weathered rock zone

Mittelverwitterte Felszone medium-weathered rock zone Leicht verwitterte Felszone Slight-weathered rock zone

31,5

2001 | 44 45 46 47 48 49 50

51

52

01 | 2002

wchentl. Vortriebsleistung [m] S-181 weekly production [m]

105 100 80 60 40 20 2002 | 11 12 13 14 15 16 17 18 19 20 81 66 51 39 27 88,5 73,5 48 91,5

wchentl. Vortriebsleistung [m] S-182 weekly production [m]

26

EPB-Schild | EPB-Shield

Metro Guangzhou Line 3


S-235 / S-236 / S-237
Schilddurchmesser S-235 / S-236 / S-237 shield diameter S-235 / S-236 / S-237 Tunnellnge S-235 | tunnel length S-235 Tunnellnge S-236 / S-237 | tunnel length S-236 / S-237 Bohrkopfleistung S-235 / S-236 / S-237 cutterhead power S-235 / S-236 / S-237 Geologie S-235 geology S-235 Geologie S-236 / S-237 geology S-236 / S-237 Auftraggeber S-235 / S-236 / S-237 contractor S-235 / S-236 / S-237 6250 mm 3000 m 2677 m 945 kW Verwitterter Fels, Verwitterungston, Alluvium weathered rock, residual clay, alluvium Verwitterter Fels, Verwitterungston weathered rock, residual clay China Railway First Group Co., Ltd.
120 100 80 60 40 20 2003 | 40 41 42 43 44 45 46 47 48 49 42 100 80 60 40 22,5 20 2002 | 38 39 40 41 42 43 44 45 46 47 76,5 66,0 58,558,5 49,5 97,5 100,5 78 99

wchentl. Vortriebsleistung [m] S-235 weekly production [m]

133,5 106,5 108 87 70,5 45 100,5 105 90

wchentl. Vortriebsleistung [m] S-236 weekly production [m]

140 120 100 80 60 40 20

140 146 123 99 61,5 34,5 37,5 99 94,5 110

2003 | 46 47 48 49 50

51

52 53 54 55

wchentl. Vortriebsleistung [m] S-237 weekly production [m]

27

EPB-Schild | EPB-Shield

Metro Guangzhou Line 3


S-240 / S-241
Schilddurchmesser S-240 / S-241 | shield diameter S-240 / S-241 Tunnellnge S-240 | tunnel length S-240 Tunnellnge S-241 | tunnel length S-241 Bohrkopfleistung S-240 / S-241 | cutterhead power S-240 / S-241 Geologie S-240 / S-241 geology S-240 / S-241 Auftraggeber S-240 / S-241 contractor S-240 / S-241 Ton, verwitterter Sandstein clay, weathered sandstone China Railway Erju Co., Ltd 6250 mm 2520 m 2522 m 945 kW
90 80 70 60 50 40 30 20 10 75 64,5 55,5 39 39 34,5 33 39 40,5 94,5

2003 | 46 47 48 49 50

51

52

01

02

03 | 2004

wchentl. Vortriebsleistung [m] S-240 weekly production [m]

108 100 80 60 49,5 57 40 20 12 41 42 43 28,5 31,5 31,5 46,5 84 93

2003 | 34 35 36 37 38 39 40

wchentl. Vortriebsleistung [m] S-241 weekly production [m]

28

EPB-Schild | EPB-Shield

Metro Guangzhou Line 3


S-242 / S-243 / S-244 / S-245
Schilddurchmesser S-242 / S-243 / S-244 / S-245 shield diameter S-242 / S-243 / S-244 / S-245 Tunnellnge S-242 | tunnel length S-242 Tunnellnge S-243 | tunnel length S-243 Tunnellnge S-244 / S-245 | tunnel length S-244 / S-245 Bohrkopfleistung S-242 / S-243 / S-244 / S-245 cutterhead power S-242 / S-243 / S-244 / S-245 Geologie S-242 / S-243 / S-244 / S-245 geology S-242 / S-243 / S-244 / S-245 Auftraggeber S-242 / S-243 / S-244 / S-245 contractor S-242 / S-243 / S-244 / S-245 Verwitterter Fels, Verwitterungston weathered rock, residual clay Guangzhou Municipal Dunjian Underground Construction Engineering Co. Ltd. 6250 mm 4785 m 4731 m 2 x 3110 m 945 kW

29

EPB-Schild | EPB-Shield

Rome
S-184
109,5

Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor

7970 mm 2400 m 2000 kW Tuff, Schluff, Ton, Kies | tuff, silt, clay, gravel ASTALDI S.p.A., Impregilo S.p.A.

100 80 60 40 20 15 10 11 42 45 79,5 67,5 57 36 66

90

2002 | 08 09

12 13 14 15 16 17

wchentl. Vortriebsleistung [m] weekly production [m]

30

EPB-Schild | EPB-Shield

London Heathrow
S-185
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology techn. Besonderheiten | techn. features London Clay | London clay Hinter der Frderschnecke wurde ein zustzliches Ausschleusesystem installiert. Eine Dickstoffpumpe verdichtet das Abbaumetarial und schliet das System luftdicht ab. | Behind the screw conveyor a discharge system is attached to the screw. The system consists of a distribution pipe and a piston pump, which compresses the excavated material and prevents withdrawal of the compressed air supporting the tunnel face. Miller, Dumez GTM 9160 mm 2 x 1240 m 2800 kW
120 100 80 60 40 20 2002 | 39 40 41 42 43 44 45 46 47 48 68 100 97 92 97 76,5 66,3 76,5 136 117,3

wchentl. Vortriebsleistung [m] weekly production [m]

Auftraggeber | contractor

31

EPB-Schild | EPB-Shield

Metro Caracas Line 4


S-186 / S-187
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor Ton, Sand, Fels | clay, sand, rock Construtora Norberto Odebrecht S.A. 5850 mm 2 x 3650 m 945 kW
80 70 60 50 40 30 20 10 88,2 65,8 49 49 49 62 62 65,8

14

16,8

2002 | 08 09

10

11

12 13 14 15 16 17

wchentl. Vortriebsleistung [m] S-186 weekly production [m]

72,8 70 60 50 40 30 20 10 56 56 47,6 35 35

67 69 69 67

2002 | 26 27 28 29 30

31

32 33 34 35

wchentl. Vortriebsleistung [m] S-187 weekly production [m]

32

EPB-Schild | EPB-Shield

Metro Caracas Line 3


S-247 / S-248
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor Ton, Sand, Fels | clay, sand, rock Construtora Norberto Odebrecht S.A. 5850 mm 2 x 4300 m 945 kW

33

EPB-Schild / Teilschnittmaschine | EPB-Shield / Open Face Shield

Metro Athens
S-188 / S-205
Schilddurchmesser S-188 | shield diameter S-188 Schilddurchmesser S-205 | shield diameter S-205 Tunnellnge S-188 | tunnel length S-188 Tunnellnge S-205 | tunnel length S-205 Bohrkopfleistung S-188 | cutterhead power S-188 Bohrkopfleistung S-205 | cutterhead power S-205 Geologie S-188 geology S-188 Geologie S-205 geology S-205 Auftraggeber S-188 | contractor S-188 Auftraggeber S-205 | contractor S-205 Schluff, Ton, Athener Schiefer silt, clay, Athens schist Brauner und schwarzer Schiefer, Sand, Ton brown and black slate, sand, clay AEGEK General Construction Company, AKTOR, SELI Wayss & Freytag AG, Alpine Bau GmbH, Atticut
45 40 30 25 20 15 10 5 45 45 33 18 30

9460 mm 9495 mm 3500 m 9480 m 2400 kW 300 kW

100 82,5 80 60 40 20 2002 | 50 51 52 01 37,5 63 48

107 102 101

92

97,5

105

02

03 04 05 06

07 | 2003

wchentl. Vortriebsleistung [m] S-188 weekly production [m]

49,5 45 37,5

49,5 42

2002 | 38 39 40

41

42 43 44 45 46 47

wchentl. Vortriebsleistung [m] S-205 weekly production [m]

34

EPB-Schild | EPB-Shield

Minneapolis
S-189
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology 6460 mm 2 x 2255 m 945 kW Groballuvium, Kalkstein, Sandstein, Alluvium, Feines Alluvium | coarse alluvium, limestone, sandstone, alluvium, fine alluvium Obayashi / Johnson Bros.
180 160 143 145 139 148 140 136 120 100 80 60 40 20 2002 | 29 30 31 186 177 172 125 107

Auftraggeber | contractor

32 33 34 35 36 37 38

wchentl. Vortriebsleistung [m] weekly production [m]

35

EPB-Schild | EPB-Shield

Metro Nanjing Phase 1


S-190 / S-195 / S-217
Schilddurchmesser S-190 / S-195 / S-217 | shield diameter S-190 / S-195 / S-217 Tunnellnge S-190 | tunnel length S-190 Tunnellnge S-195 | tunnel length S-195 Tunnellnge S-217 | tunnel length S-217 Bohrkopfleistung S-190 / S-195 / S-217 | cutterhead power S-190 / S-195 / S-217 Geologie S-190 | geology S-190 Sand, Ton, Schluff | sand, clay, silt 6390 mm
100 80 60 40 20 0 2002 | 44 45 46 47 48 49 50 51 52 61,2 39,6 7,2 01 | 2003 98,4 86,4 114 114 106 93,6

2 x 600, 2 x 700 m 2 x 2280 m 2 x 1457 m 630 kW

Geologie S-195 / S-217 | geology S-195 / S-217 Schluff, Ton | silt, clay Auftraggeber S-190 | contractor S-190 Auftraggeber S-195 | contractor S-195 Auftraggeber S-217 | contractor S-217 Shanghai Mechanised Construction Company (SMCC) China Railway Tunnel Group China Railway Engineering Corp. / China Railway Tunnel Group

wchentl. Vortriebsleistung [m] S-190 weekly production [m]

126 120 100 80 60 40 20 2003 | 17 18 19 20 21 22 23 24 25 26 98,4 75,6 62,4 62 50,4 59 54 98,4 107

Schluffiger Ton Schluffiger Sand silty clay silty sand Schluffiger Sand mit Feinsand silty sand with fine sand

Schluffige Erde silty soil

Ton (hart-plastisch) Diverse Erdauffllungen clay (hard-plastic) micsellanous filles soil Flach bebaute Erde (leicht plastisch) plain filled soil (soft plastic) Stark verwitterter Gabbro & Diorit Porphyrit highly weathered gabbro & Diorite-porphyrite

wchentl. Vortriebsleistung [m] S-195 weekly production [m]

Leicht verwitterter Gabbro & Diorit Porphyrit medium weathered gabbro & Diorite-porphyrite Schluff & schluffiger Boden (flssig-plastisch) silt & silty filled soil (fluid-plastic)

36

EPB-Schild | EPB-Shield

Metro Shenzhen
S-206 / S-207
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor 6250 mm 2 x 1740 m 945 kW Sand, Ton, Schluff, verwitterter Granit | sand, clay, silt, weathered granite 16th Bureau under the Ministry of Railway
140 120 100 80 60 40 20 119 79,5 75 49,5 9 41 129 114 151,4 119 120

2002 | 32 33 34 35 36 37 38 39 40

wchentl. Vortriebsleistung [m] S-206 weekly production [m]

178,5 160 140 120 100 80 60 40 20 163,5 150 143 138 117 102 81 60 72

2003 | 35 36 37 38 39 40

41

42 43 44

wchentl. Vortriebsleistung [m] S-207 weekly production [m]

37

EPB-Schild | EPB-Shield

Metro Toulouse Lot 2


S-208
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor 7745 mm 5050 m 2000 kW Molasse, sandige Molasse, Sandstein | molasse, sandy molasse, sandstone Campenon Bernard Eiffage TP
120 100 80 60 40 20 2003 | 11 0 12 13 14 15 16 17 18 19 20 98 79,8 60,2 131,6 119 103,6 78,4 67 67

wchentl. Vortriebsleistung [m] weekly production [m]

38

EPB-Schild | EPB-Shield

Singapore Marina Line C825


S-212 / S-214
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie geology Auftraggeber | contractor S 3 Findlinge, Ton, Alluvium S 3 boulder, clay, alluvium Woh Hup, STEC, NCC 6580 mm 1258 m 945 kW
120 100 80 60 40 20 9,8 9,8 9,8 1,4 12 13 14 15 16 17 18 19 20 36,4 37,8 39,2 67,2 72,8 63

2003 | 11

wchentl. Vortriebsleistung [m] S-212 weekly production [m]

64,4 60 50 40 30 20 10 2003 | 43 44 45 46 47 48 49 50 51 52 28 19,6 14 16,8 26,6 44,8 57,4 44,8 56

wchentl. Vortriebsleistung [m] S-214 weekly production [m]

39

EPB-Schild | EPB-Shield

Ashgabat
S-218 / S-219
Schilddurchmesser | shield diameter Tunnellnge S-218 | tunnel length S-218 Tunnellnge S-219 | tunnel length S-219 Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor Sand, Schluff, Ton | sand, silt, clay Construction Association Interbudmontazh (CAI) 6250 mm 8000 m 5000 m 630 kW
70 60 50 40 30 20 10 70,8 62,4 42 42 43,2 66 50,4 60 54 54

2003 | 29 30

31

32 33 34 35 36 37 38

wchentl. Vortriebsleistung [m] weekly production [m]

40

EPB-Schild | EPB-Shield

Metro Barcelona Line 9


S-221
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor 12060 mm 8500 m 4000 kW Granodiorit, Sand, Ton, Kies, Findlinge granodiorite, sand, clay, gravel, boulders Dragados, NECSO, ACS, Comsa, Sorigue
106,2 100 80 60 40 20 14,4 2004 | 02 12,6 03 04 05 06 07 08 09 10 11 79,2 52,2 95,4 77 75,6 65 75,0

wchentl. Vortriebsleistung [m] weekly production [m]

41

EPB-Schild | EPB-Shield

Metro Tianjin
S-225 / S-226
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor Sand, Schluff, Ton | sand, silt, clay Shanghai Tunnel Engineering Co. 6390 mm 2 x 1000 m 630 kW
50 40 30 20 10 2003 | 46 47 48 49 50 51 52 01 02 03 | 2004 17 11 18 13 55 46 45 40 47 36

wchentl. Vortriebsleistung [m] S-225 weekly production [m]

80 70 60 50 40 30 20 10

81 62 52 66 63 69 53 56 54 57

2003 | 46 47 48 49 50

51

52

01

02

03 | 2004

wchentl. Vortriebsleistung [m] S-226 weekly production [m]

42

EPB-Schild | EPB-Shield

Metro Esfahan
S-227 / S-228
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor Sand, Schluff, Ton | sand, silt, clay Esfahan Urban Railway Organisation 6890 mm 2 x 4324 m 945 kW

43

EPB-Schild | EPB-Shield

Metro Naples Line 1 and 2


S-238 / S-239
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor Ton, Tuff | clay, tuff Della Morte Costruzioni, Impregilo S.p.A. 6740 mm 2 x 4340 m 1200 kW

44

EPB-Schild | EPB-Shield / Einfachschild-TBM | Single Shield TBM

Metro New Delhi


S-196 / S-197 / S-198
Schilddurchmesser S-196 / S-197 / S-198 shield diameter S-196 / S-197 / S-198 Tunnellnge S-196 | tunnel length S-196 Tunnellnge S-197 | tunnel length S-197 Tunnellnge S-198 | tunnel length S-198 Bohrkopfleistung S-196 | cutterhead power S-196 Bohrkopfleistung S-197 / S-198 | cutterhead power S-197 / S-198 Geologie S-196 geology S-196 Geologie S-197 / S-198 geology S-197 / S-198 Auftraggeber | contractor Quarzite | quartzite Schluff, Sand, Ton | silt, sand, clay International Metro Civil Contractors 6450 mm 900 m 3020 m 2120 + 900 m 945 kW 640 kW

45

Mixschild / Einfachschild-TBM | Mixshield / Single Shield TBM

Grauholz
S-50
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power techn. Besonderheiten techn. features 11600 mm 5500 m 1250 kW Zwei Betriebsarten: Tunnelbohrmaschine (TBM) im Schild (Bandaustrag) oder Mixschild. Separation auf dem Nachlufer. Two operating modes: Shielded TBM with belt conveyor or Mixshield. Separation plant on the back-up. Sand, Kies, Molasse | sand, gravel, molasse Marti AG, Frutiger AG, Wayss & Freytag AG, Schafir + Mugglin AG, Kopp AG
450 400 353 337 326 350 277 300 250 200 115 150 113 101 69 100 38 50 1991 | 05 06 07 08 09 10 11 12 01 02 | 1992 466

monatliche Vortriebsleistung [m] monthly production [m]

Geologie | geology Auftraggeber | contractor

46

Mixschild | Mixshield

Mlheim
S-52
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power techn. Besonderheiten | techn. features 6900 mm 2400 m 1250 kW TBM vom Typ Mixschild, mit Hartgesteinbohrkopf und flssigkeitsgesttzter Ortsbrust. TBM of the type Mixshield with the combination of hard rock cutterhead and slurry supported tunnel face. Sandstein, Tonstein | sandstone, claystone Dyckerhoff & Widmann AG, HOCHTIEF AG, Philipp Holzmann AG, Alfred Kunz GmbH & Co., Strabag Bau AG, Thyssen Schachtbau GmbH, Wayss & Freytag AG
60 50 40 30 20 10 1990 | 23 24 25 26 27 28 29 30 31 32 60 58,8 63,6 45,6 37,2 44,4 32,4 36

42

40,8

Geologie | geology Auftraggeber | contractor

wchentl. Vortriebsleistung [m] weekly production [m]

47

Mixschild | Mixshield

Paris
S-54.1 / S-54.2
Schilddurchmesser | shield diameter Tunnellnge S-54.1 | tunnel length S-54.1 Tunnellnge S-54.2 | tunnel length S-54.2 Bohrkopfleistung | cutterhead power Geologie S-54.1 | geology S-54.1 Geologie S-54.2 geology S-54.2 Auftraggeber | contractor Sand, Ton | sand, clay Sand, Mergel, grober Kies sand, marl, coarse gravel Chantiers Modernes, Bouygues S.A., GTM, Ballot
1994 | 10 11 12 13 14 15 16 17 18 19 113,5

4050 mm 3600 m 3000 m 270 kW

100 80 60 40 20 56 82,5

97 84 71,5 83,5 78

99 83,5

wchentl. Vortriebsleistung [m] S-54.2 weekly production [m]

48

Mixschild | Mixshield

Essen
S-68
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power techn. Besonderheiten | techn. features 8300 mm 2 x 2100 m 800 kW Aktiver Zentrumsschneider, Brustverbauplatten und Steinbrecher. | Active center cutter, face support plates and stone crusher. Mergel, Sand | marl, sand HOCHTIEF AG, Bilfinger + Berger Bau AG, Dyckerhoff & Widmann AG, Philipp Holzmann AG, Alfred Kunz GmbH & Co., Strabag Bau AG, Wayss & Freytag AG, Ed. Zblin AG
70 60 50 40 30 20 10 79,5 57 60 45 34,5 33 48 39 64,5 57

1994 | 06

07

08 09

10

11

12 13 14 15

Geologie | geology Auftraggeber | contractor

wchentl. Vortriebsleistung [m] weekly production [m]

49

Mixschild | Mixshield

Metro Cairo Line 2


S-82.1 / S-82.2
Schilddurchmesser | shield diameter Tunnellnge S-82.1 | tunnel length S-82.1 Tunnellnge S-82.2 | tunnel length S-82.2 Bohrkopfleistung | cutterhead power techn. Besonderheiten | techn. features 9400 mm 1800 m 1800 + 1500 m 945 kW Agitatoren, Mglichkeit Injektionen durch den Schildschwanz zu realisieren, Vakuumerektor, automatisiertes Programm des Frderkreislaufs. Agitators. Possibility to realize injections through the tailskin. Vacuum erector. Automatic program for slurry circuit. Sand | sand Campenon Bernard SGE, Arabcontractors, Bouygues S.A., DTP, Dumez, Fougerolle, GTM, Spie Batignolles
100 80 60 40 20 12 41 40,5 48 54 66 67,5 100,5 99 91,5 78

1994 | 32 33 34 35 36 37 38 39 40

wchentl. Vortriebsleistung [m] S-82.1 weekly production [m]


144 140 120 100 80 60 40 20 117 97,5 66 36 57 30 129 148,5 138

Geologie | geology Auftraggeber | contractor

1995 | 14 15 16 17 18 19 20

21

22 23

wchentl. Vortriebsleistung [m] S-82.2 weekly production [m]

50

Mixschild | Mixshield

Duisburg
S-85
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power techn. Besonderheiten | techn. features 6570 mm 2 x 1000, 2 x 2040 m 945 kW Konvertierbarer Schild von Mixschild- auf EPB-Modus. | Convertible TBM from Mixshield to EPB mode. Kreide, Schluff, Sand, Kies, Ton | chalk, silt, sand, gravel, clay HOCHTIEF AG, Ed. Zblin AG, E. Heitkamp GmbH, Walter Bau AG
80 70 60 50 40 30 20 10 75 67,5 57 48 48 73,5 81 84 75 72

1997 | 03 04 05 06

07

08 09

10

11

12

Geologie | geology Auftraggeber | contractor

wchentl. Vortriebsleistung [m] weekly production [m]

Anschttung made ground Aulehm loam

Quartre Kiese u. Sande quarternary gravels and sands Walsumer Feinsand walsumer fine sand

Hamborner Feinsand hamborner fine sand Hamborner (Ratinger) Ton hamborner (Ratinger) clay Kreide, zumeist schluffige Feinsande chalk, mainly silty finesands

Kreide, Schluff, tonig, sandig chalk, silt, clayey, sandy Kreide, zumeist Schluff mit Sandschichten chalk, mainly silt with layers of sand

51

Mixschild | Mixshield

Heinenoord
S-97
72

Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor Sand, Ton | sand, clay

8550 mm 2 x 940 m 750 kW

Ballast Nedam Beton & Waterbouw B.V., Van Hattum & Blankevoort B.V., Hollandsche Beton- en Waterbouw B.V., Wayss & Freytag AG

70 60 51 54 50 40 31,5 30 18 20 12 10 1991 | 11

57

61,5 45

16,5

12 13 14 15 16 17 18 19 20

wchentl. Vortriebsleistung [m] 1. Strecke weekly production [m] 1st Drive


97,5 90 80 70,5 70 57 60 48 50 42 40 28,5 30 15 20 10 1998 | 19 20 21 76,5 66 64,5

Oude Maas

Hauptschlich Ton mainly clay Ton, schluffig clay, silty Sand mit Tonschichten sand with layers of clay Sand mit Tonlagen sand with layers of clay Ton mit dnnen Sandschichten clay with thin layers of sand

Sand, rtlich manche Tonschichten Sand sand, locally with layers of clay sand Ton, rtlich sandig und/oder mit Sandschichten Moor clay, locally sandy and/or with sand layers moor Ton, schluffig, rtlich mit dnnen Sandschichten Ton clay, silty, locally with thin layers of sand clay Mittlerer bis grober Sand Ton, sandig bis Sand, schluffig middle to coarse sand clay, sandy to sand, silty Sand, rtlich mit dnnen Tonschichten sand, locally with thin layers of clay

22 23 24 25 26 27 28

wchentl. Vortriebsleistung [m] 2. Strecke weekly production [m] 2nd Drive

52

Mixschild | Mixshield

Airport Link Sydney


S-103
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power techn. Besonderheiten techn. features Geologie | geology Auftraggeber | contractor Agitatoren und Walzenbrecher. Agitators and rotary crusher. Ton, Sandstein | clay, sandstone Transfield, Bouygues S.A. 10710 mm 5570 m 2400 kW
80 72 70 61,2 60 50 39,6 40 30 20 10 1997 | 30 31 82,8 66,6 52,2 79,2 72 64,8 84,6

32 33 34 35 36 37 38 39

wchentl. Vortriebsleistung [m] 1. Strecke weekly production [m] 1st Drive


130 120 100 80 60 57,6 54 40 20 1999 | 03 04 05 06 07 08 09 10 11 12 72 83 47 86,5

122 108 95,4

wchentl. Vortriebsleistung [m] 2. Strecke weekly production [m] 2nd Drive

53

Mixschild | Mixshield

Hamburg
S-108
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power techn. Besonderheiten | techn. features 14200 mm 2560 m 3200 + 200 kW Unter atmosphrischen Bedingungen begehbare Hauptspeichen des Schneidrades. Zentrumsschneidrad mit eigenem Frderkreislauf. SSP System (Vorauserkundungssystem). Ringformer | Accessible main spokes under atmospheric pressure. Center cutter with own slurry circuit. SSP System. Ring former. Sand, Geschiebemergel, Schluff und Kies, Findlinge | sand, glacial drift, silt and gravel, boulders Bilfinger + Berger Bau AG, Dyckerhoff & Widmann AG, Heitkamp GmbH, HOCHTIEF AG, Philipp Holzmann AG, Wayss & Freytag AG, Ed. Zblin AG
50 40 30 20 10 2000 | 51 52 01 02 03 04 05 06 07 08 50 34 24 52 44 52 50 46 40 32

wchentl. Vortriebsleistung [m] weekly production [m]

Geologie | geology

Auftraggeber | contractor

Elbe

River Elbe

Kiese, Steine, Blcke gravel, stones, blocks Sand sand

Auffllung, Sand backfilling, sand Geschiebemergel glacial drift

Beckenschluff basin silt Glimmerschluff und -ton mica silt and mica clay

54

Mixschild | Mixshield

Berlin
S-110 / S-118
Schilddurchmesser | shield diameter Tunnellnge S-110 | tunnel length S-110 Tunnellnge S-118 | tunnel length S-118 Bohrkopfleistung | cutterhead power techn. Besonderheiten techn. features Geologie | geology Auftraggeber | contractor 8930 mm 2 x 570, 2 x 700 m 2 x 570, 2 x 700 m 1000 + 75 kW Aktiver Zentrumsschneider, Steinbrecher active center cutter, stone crusher Sand, Ton | sand, clay HOCHTIEF AG, Bilfinger + Berger Bau AG, Philipp Holzmann AG, Dyckerhoff & Widmann AG
100 80 63 60 40 20 21 6 21 22 23 24 25 55,5 80 70 60 50 40 30 20 10 81 73,5 52,5 45 24 58,5 40,5 64,5 57 88,5

1998 | 03 04 05 06

07

08 09

10

11

12

wchentl. Vortriebsleistung [m] S-110 weekly production [m]


108 90 76,5 55,5 78 114

1999 | 16 17 18 19 20

wchentl. Vortriebsleistung [m] S-118 weekly production [m]

55

Mixschild | Mixshield

A86 lOuest de Paris


S-127
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power techn. Besonderheiten | techn. features 11565 mm 4500 + 5500 m 4000 kW Untertage umbaubar von Mixschildbetrieb auf EPB-Betrieb und offener Betrieb. | Convertible TBM in the tunnel from Mixshield to EPB and open mode. Kalkstein, Sand, Ton, Mergel, Kreide | limestone, sand, clay, marl, chalk Campenon Bernard SGE, Jean Lefebvre, Dumez GTM, GTM Construction, Fougerolle, Colas
90 80 70 60 50 40 30 20 10 84 68 50 26 68 86 64 54 92 78

2002 | 30

31

32 33 34 35 36 37 38 39

Geologie | geology Auftraggeber | contractor

wchentl. Vortriebsleistung [m] weekly production [m]

Sandbden in Fontaineblau sandy ground in fontainebleau Sandbden in Beauchamp sandy ground in beauchamp Austernmergel oystermarl Mergel und Schotter marl and crushed stone Sandbden in Auteuil sandy ground in auteuil

Plastische Tonbden plastic clay Falsche Letten false poller's clay Kalkstein und grne Tonbden limestone and green clay Kreide chalk Mergel in Meudon marl in meudon

Kalkstein in Champigny limestone in champigny Massenkalkstein mass limestone Supragipsmergel supra gypsum marl

56

Mixschild | Mixshield

Dsseldorf
S-130
109 109 96 70 60 56 70 94 88

Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology

9430 mm 904 m 1000 kW Feinsand, sandiger Kies, Mittel- u. Grobsand, Auffllung, Steine, Blcke | fine sands, sandy gravel, sand, fill, stones, boulders Wayss & Freytag AG, Bilfinger + Berger Bau AG, HOCHTIEF AG, Philipp Holzmann AG, Bouygues S.A.

100 90 80 60 40 20 1999 | 01 02

03 04 05 06

07

08 09

10

Auftraggeber | contractor

wchentl. Vortriebsleistung [m] weekly production [m]

57

Mixschild | Mixshield

Westerschelde
S-137 / S-138
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power techn. Besonderheiten | techn. features 11340 mm 2 x 6600 m 2400 + 160 kW Aufgrund der zu erwartenden hohen Arbeitsdrcke von bis zu 8,5 bar werden spezielle Anforderungen bezglich der Dichtung an das Hauptlager und die Schildschwanzdichtung gestellt. Zentrumsschneider, Walzenbrecher, Agitatoren. | Special requirements regarding the sealing at the main drive and the tailskin sealing due to high working pressures of up to 8.5 bar. Center cutter, rotary crusher, agitators. Sand, Ton | sand, clay BAM Infrabouw B.V., Franki N.V., Heijmanns N.V., Philipp Holzmann AG, Voormolen Bouw B.V., Wayss & Freytag AG
180 140 100 60 20 6 51 52 01 02 03 04 05 06 | 2002 92 132 148 146 152 128 106 134 188

2001 | 49 50

wchentl. Vortriebsleistung [m] S-137 weekly production [m]


148 112 114 88 70 98

Geologie | geology Auftraggeber | contractor

140 120 100 80 60 40 20

136 120 94 106

2001 | 42 43 44 45 46 47 48 49 50

51

wchentl. Vortriebsleistung [m] S-138 weekly production [m]

Junger Meersand recent sea sand

Toniger Sand clayey sand

Sand sand

Glauconithaltige Sande sands containing glauconite

Ton clay

58

Mixschild, kontinuierlicher Vortrieb | Mixshield, continuous advance

Sophiaspoortunnel
S-150
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor Ton, Sand, Schluff | clay, sand, silt Koninklijke Boskalis Westminster N.V., Heijmans N.V., HOCHTIEF AG, Philipp Holzmann AG, NBM-Amstelland N.V. 9785 mm 2 x 4241 m 1100 kW
160 140 120 100 80 60 40 20 144 147 120 117 156 166,5 139,5 142,5

54 28,5

2001 | 02

03 04 05 06

07

08 09

10

11

wchentl. Vortriebsleistung [m] weekly production [m]

59

Mixschild | Mixshield

Wesertunnel
S-152
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power techn. Besonderheiten techn. features Geologie geology Auftraggeber | contractor 11670 mm 2 x 1600 m 1320 + 220 kW Aktiver Zentrumsschneider, Steinbrecher, abgeschottetes Sohlsegment. | active center cutter, stone crusher, isolated invert. Klei, Sand, Torf, Geschiebemergel, Schluff, Ton loam, sand, peat, glacial drift, silt, clay HOCHTIEF AG, Philipp Holzmann AG, Ludwig Freytag GmbH & Co. KG, Henrich Hecker GmbH & Co. KG, Martin Oetken GmbH & Co. KG
80 70 60 50 40 30 20 10 87 78 57 49,5 39 27 28,5 22,5 36 43,5

2000 | 34 35 36 37 38 39 40

41

42 43

wchentl. Vortriebsleistung [m] weekly production [m]

Klei mit Sandlagen loam with sand layers Torf, Klei, Humus peat, loam, humus Wattsand mit dnnen Klei- und Tonlagen sand with loam layers and clay layers Weserniederterassensand terrace sand layers

sandige Fazies / Lauenburger Schichten sandy facies / lauenburger layers schluffige, tonige Fazies / Lauenburger Schichten silty, clayey facies / lauenburger layers Geschiebemergel glacial drift Kaolinsand mit dnnen Schluff- und Tonlagen kaolinsand with silt layers and clay layers

60

Mixschild | Mixshield

Moscow, Lefortovo
S-164
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power techn. Besonderheiten | techn. features 14200 mm 2222 m 3200 + 315 kW Unter atmosphrischen Bedingungen begehbare Hauptspeichen des Schneidrades. Zentrumsschneidrad mit eigenem Frderkreislauf. SSP System (Vorauserkundungssystem). Ringformer | Accessible main spokes under atmospheric pressure. Center cutter with own slurry circuit. SSP System. Ring former. Fein- bis Grobsand, Ton, Kalkstein (mittelfest, teils stark geklftet) | fine to coarse sand, clay, limestone (medium strength, partially very fissured) AO Corporation Transstroy
62 70 60 50 40 30 20 10 50 44 42 36 54 60 64 58 54

2002 | 48 49 50

51

52

01

02

03 04 05 | 2003

wchentl. Vortriebsleistung [m] weekly production [m]

Geologie | geology

Auftraggeber | contractor

Aufschttung filling Schluff, schluffiger Ton silt, silty clay

Sand sand Ton clay

Kalkstein limestone

61

Mixschild | Mixshield

Pannerdensch Kanaal
S-168
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor Sand, Ton | sand, clay
50

9795 mm 2 x 1600 m 1000 kW

200 186 150 100

203,4 174,6 135 131,4 111,6 59,4 72

186

171

VINCI, C.F.E., TBI Beton- en Waterbouw, Welling


2002 | 40 41 42 43 44 45 46 47 48 49

wchentl. Vortriebsleistung [m] weekly production [m]

62

Mixschild | Mixshield

London CTRL
S-192 / S-204
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie geology Auftraggeber | contractor Alluvium, Kreide, Flintstein alluvium, chalk, flintstone HOCHTIEF AG, J. Murphy & Sons Limited 8160 mm 2 x 2500 m 1100 kW
120 100 80 60 40 20 2002 | 41 42 43 44 45 46 47 48 49 50 90 91,5 72 54 85,5 107 113 104 105 138

wchentl. Vortriebsleistung [m] S-192 weekly production [m]


171 160 140 136 136 129 120 100 80 60 40 20 129 141 120 105 117 150

Anschttungen made ground Alluvium alluvium

Torf peat Kies gravel

Kreide chalk

2003 | 21

22 23 24 25 26 27 28 29 30

wchentl. Vortriebsleistung [m] S-204 weekly production [m]

63

Mixschild | Mixshield

Honkong Kai Tak


S-199
63,6

Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor

5150 mm 1150 m 640 kW Frischer und verwitterter Granit, Alluvium fresh and weathered granite, alluvium China Harbour Transfield JV

60 50 40 30 22,8 20 10 2003 | 17 18 19 20 38,4 31,2 31,2

50,4 31,2 33,6

46,8

50,4

21

22 23 24 25 26

wchentl. Vortriebsleistung [m] weekly production [m]

Auffllungen fill

Alluvium alluvium

Vllig verfaulter Granit completely decomposed granite

Leicht verfaulter Granit slightly / moderately decomposed granite

64

Mixschild | Mixshield

Herrentunnel
S-200
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power techn. Besonderheiten techn. features Geologie | geology Auftraggeber | contractor 11670 mm 2 x 760 m 1540 kW Aktiver Zentrumsschneider, Steinbrecher, abgeschottetes Sohlsegment. | active center cutter, stone crusher, isolated invert. Sand, Schluff, Morne | sand, silt, till HOCHTIEF AG, Bilfinger Berger AG

65

Mixschild | Mixshield

Antwerp
S-209
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor Feiner Sand | fine sand T.H.V. ASDAM C/o MBG-CFE N.V. 8270 mm 2 x 1230 m 750 kW
123 120 100 80 60 40 20 0 2003 | 19 20 21 22 23 24 25 26 27 28 28 75 64 86 111 106 106 108

wchentl. Vortriebsleistung [m] weekly production [m]

66

Mixschild | Mixshield

Metro Vienna U1/1


S-222
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie geology Auftraggeber | contractor Sandiger Schluff, Kies, Sand sandy silt, gravel, sand Bilfinger Berger AG 6800 mm 2 x 420 m 480 kW
76,7 80 70 60 49,4 50 40 29,9 24,7 30 14,3 20 13 9,1 10 2003 | 25 26 27 28 29 30 31 88,4 81,9

18,2

32 33 34

wchentl. Vortriebsleistung [m] weekly production [m]

67

Mixschild | Mixshield

Portland
S-231 / S-232
Schilddurchmesser S-231 | shield diameter S-231 Schilddurchmesser S-232 | shield diameter S-232 Tunnellnge S-231 | tunnel length S-231 Tunnellnge S-232 | tunnel length S-232 Bohrkopfleistung S-231| cutterhead power S-231 Bohrkopfleistung S-232| cutterhead power S-232 Geologie | geology Auftraggeber | contractor 5050 mm 5140 mm 4350 m 1350 m 500 kW 330 kW

Sand, Kies, Alluvium | sand, gravel, alluvium Impregilo S.p.A., S.A. Healy

Affllung fill Sand/Schluff sand/silt Kies gravel

Sandiger Tonstein sandy river mudstone Kies in sandigem Schluff/Tonmatrix gravel in sandy silt/clay matrix

Sand/Schluff sand/silt Basalt basalt

68

Mixschild | Mixshield

Moscow, Silberwald
S-250
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power techn. Besonderheiten | techn. features 14200 mm 2 x 2220 m 3200 + 315 kW Unter atmosphrischen Bedingungen begehbare Hauptspeichen des Schneidrades. Zentrumsschneidrad mit eigenem Frderkreislauf. SSP System (Vorauserkundungssystem). Ringformer | Accessible main spokes under atmospheric pressure. Center cutter with own slurry circuit. SSP System. Ring former. Kreideablagerungen, Steinkohleablagerungen, Lehm | chalk, hard coal, loam AO Corporation Transstroy

Geologie | geology Auftraggeber | contractor

69

Mixschild | Mixshield

Kuala Lumpur
S-252 / S-253
Schilddurchmesser | shield diameter Tunnellnge S-252 | tunnel length S-252 Tunnellnge S-253 | tunnel length S-253 Bohrkopfleistung | cutterhead power techn. Besonderheiten | techn. features Geologie geology Auftraggeber S-252 | contractor S-252 Auftraggeber S-253 | contractor S-253 13210 mm 5400 m 4050 m 4000 kW Steinbrecher, Agitatoren | stone crusher, agitators Kalkstein, Sand, Marmor limestone, sand, marble Wayss & Freytag AG Gamuda

70

Teilschnittmachine | Open Face Shield

Les Vignes
S-78
64 69 60 62 60 57

Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor Morne, Molasse | moraine, molasse

11770 mm 2 x 1900 m 400 kW

60 50 40 30 20 10

57 57 54 51

Losinger Fribourg SA, Locher & Cie. AG, Prader AG, Grisoni-Zaugg SA, A. Repond SA

1993 | 41

42 43 44 45 46 47 48 49 50

wchentl. Vortriebsleistung [m] 1. Strecke weekly production [m] 1st drive

127,5 120 100 80 60 46,5 40 27 20 1995 | 20 21 79,5 61,5 57 58,5 66 79,5

16,5 22 23 24 25 26 27 28 29

wchentl. Vortriebsleistung [m] 2. Strecke weekly production [m] 2nd drive

71

Teilschnittmaschine | Open Face Shield

Olympic Metro Athens


S-148
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology 9495 mm 1911 m 300 kW Alluviale Ablagerungen, Schiefer, Kalkstein, Mergel, Sandstein, Lavagestein | alluvium, slate, limestone, marl, sandstone, extrusive rocks Sogea, Campenon Bernard SGE
80 70 60 50 40 30 20 10 87 79 65 64 43 41 45 42 39 43

Auftraggeber | contractor

1999 | 01

02

03 04 05 06

07

08 09

10

wchentl. Vortriebsleistung [m] weekly production [m]

72

Einfachschild-TBM | Single Shield TBM

Bzberg
S-56
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor 11800 mm 2 x 3200 m 3200 kW Molasse, Kalkstein, Mergel | molasse, limestone, marl Rothpletz, Lienhard & Cie. AG, Erne AG, Granella AG, Kistler AG, Locher & Cie. AG, Marti AG, Murer AG, Prader AG
350 322 316 303 283 282 300 290 263 250 200 173 150 100 50 1990 | 11 12 01 02 03 04 05 06 07 08 | 1991 385 376

wchentl. Vortriebsleistung [m] weekly production [m]

73

Einfachschild-TBM | Single Shield TBM

Adlertunnel
S-89
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor 12535 mm 4100 m 3600 kW Bunte Mergel, Gipskeuper | coloured marl, gypsum keuper Pitsch AG, Infra 2000 SA, Stamm AG, Wenk AG
440 450 400 328 350 307 280 300 230 250 200 150 100 50 1997 | 05 06 07 08 09 10 496 410 274 184 184

11

12

01

02 | 1998

monatliche Vortriebsleistung [m] monthly production [m]

Schwemmlehm floating loam Sackung settlement Muschelkalk shelly limestone

Niederterrassenschotter low terrace brash Knstliche Auffllung artificial backfilling Anhydritgruppe anhydrite group

Opalinuston opaline clay Lias lias Hochterrassenschotter high terrace brash

Bunte Mergel coloured marl Gipskeuper gypsum keuper Karsterscheinung carstic formation

74

Einfachschild-TBM | Single Shield TBM

Pomy
S-90
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor Molasse | molasse Marti AG, Marti Tunnel AG, Routes Modernes SA, Kopp AG, Barbonesi SA, COBY 11660 mm 2 x 2700 m 1500 kW
80 70 60 50 40 30 20 10 85 70 85 81 76 68 76 77 76 77

1997 | 03 04 05 06

07

08 09

10

11

12

wchentl. Vortriebsleistung [m] weekly production [m]

75

Einfachschild-TBM / EPB-Schild | Single Shield TBM / EPB-Shield

Zrich-Glatt
S-99
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power techn. Besonderheiten | techn. features 5290 mm 2900 + 2400 m 945 kW Umbaubar von Einfachschild-TBM auf EPB-Schild. | Convertible from Single Shield TBM to EPB-Shield. Molasse, Lockergestein molasse, unconsolidated material Locher & Cie. AG, Wayss & Freytag AG, Prader AG, Fietz + Leuthold AG
106 100 80 60 40 20 1996 | 26 27 28 29 30 31 32 33 34 35 42 83 72 64 58 106 112 115 118

Geologie geology Auftraggeber | contractor

wchentl. Vortriebsleistung [m] weekly production [m]

Knstliche Auffllung artificial backfilling Seeablagerungen siltig-sandig (locker) lake deposits silty sandy (loose) Seeablagerungen siltig-sandig (dicht) lake deposits silty sandy (dense) Seeablagerungen siltig-tonig (locker) lake deposits silty clayey (loose) Seeablagerungen siltig-tonic (dicht) lake deposits silty clayey (dense)

Schotter/verschwemmte Morne (locker) crushed stone/aquiferous moraine (loose) Schotter/verschwemmte Morne (dicht) crushed stone/aquiferous moraine (dense) Schotter crushed stone Morne (dicht) moraine (dense) Molassefels molasse

76

Einfachschild-TBM | Single Shield TBM

Murgenthal
S-121
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power techn. Besonderheiten | techn. features 11980 mm 4260 m 3200 kW Radiale Rumer (mechanisch verstellbar, um den Materialfluss zu steuern). | Radial buckets which can be opened and closed mechanically. Molasse: Mergel, Sandstein | marl and sandstone from the molasse Locher & Cie. AG, Murer AG, Prader AG, Rothpletz, Lienhard & Cie. AG, Conrad Zschokke S.A., Ad. Schfer & Cie. AG
123 120 100 80 60 40 20 1998 | 05 06 07 08 09 10 11 12 13 14 99 74 90 126 102 104 117 120 105

Geologie | geology Auftraggeber | contractor

wchentl. Vortriebsleistung [m] weekly production [m]

Boden, Lockergestein soil and soil-like materials Verwitterter Fels weathered rock

Mergel und Sandstein in der unteren Swassermolasse marl and sandstone from the molasse

77

Einfachschild-TBM | Single Shield TBM

Srenberg
S-163
228

Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie geology Auftraggeber | contractor Ton- und Mergelschiefer, Flysch clay and marl slate, flysch

4520 mm 5300 m 900 kW

200 150 100 50 113 114

179 176 179

181,5

167 165

100,5

STRABAG AG, Cogeis S.p.A., A. Specogna S.A., Scheifele AG

2000 | 36 37 38 39 40

41

42 43 44 45

wchentl. Vortriebsleistung [m] weekly production [m]

78

Einfachschild-TBM | Single Shield TBM

Pontebba
S-220
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor Kalkstein, Dolomit | limestone, dolomite Consorzio S.B.T. 4520 mm 1800 m 900 kW

79

Einfachschild-TBM | Single Shield TBM

Arrowhead
S-233 / S-234
360

Schilddurchmesser | shield diameter Tunnellnge S-233 | tunnel length S-233 Tunnellnge S-234 | tunnel length S-234 Bohrkopfleistung | cutterhead power techn. Besonderheiten | techn. features

5760 mm 6100 m 6800 m 2000 kW Aufwndige Mglichkeiten zur vorauseilenden Bodenverbesserung. | Extensive pre-excavation grouting. Gneis | gneiss Joint Venture JF Shea and Kenny

350 300 250 200 155 150 100 100 50

310 220 155 250 205 200

0 51

2003 | 42 43 44 45 46 47 48 49 50

Geologie | geology Auftraggeber | contractor

wchentl. Vortriebsleistung [Fu] S-233 weekly production [ft]

80

Einfachschild-TBM | Single Shield TBM

Valsugana
S-251
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor 12055 mm 2 x 2780 m 3600 kW Kalkgestein mit Lehm und sandigen Zonen limestone with loam and sandy zones TOTO Costruzioni Generali

81

Einfachschild-TBM | Single Shield TBM

Zrich-Thalwil Lot 3.01 and Lot 2.01


S-139 / S-140
Schilddurchmesser S-139 | shield diameter S-139 Schilddurchmesser S-140 | shield diameter S-140 Tunnellnge S-139 | tunnel length S-139 Tunnellnge S-140 | tunnel length S-140 Bohrkopfleistung S-139 | cutterhead power S-139 Bohrkopfleistung S-140 | cutterhead power S-140 techn. Besonderheiten S-140 techn. features S-140 Geologie S-139 | geology S-139 Geologie S-140 | geology S-140 Auftraggeber | contractor 12280 mm 12360 mm 5570 m 2620 m 1540 kW 2000 kW
160 145 143 140 120 100 80 60 40 20 160 165 150 147 136 163 170 162

1999 | 36 37 38 39 40

41

42 43 44 45

Umbaubar im Tunnel von Mixschildbetrieb auf Hartgesteinmodus. | Convertible TBM in the tunnel from Mixshield to hard rock mode. Molasse | molasse Molasse, Sihlschotter | molasse, sihl ballast rubble Zschokke Locher AG, Murer AG, Prader AG, Wayss & Freytag AG, CSC, J. Scheifele AG, Specogna & Co.

wchentl. Vortriebsleistung [m] S-139 weekly production [m]

90 85 85 85 85 85 80 70 60 50 39,1 40 30 20 10 2000 | 06 07 08 09 10 11

95,2 97 90,1 94

12 13 14 15

wchentl. Vortriebsleistung [m] S-140 weekly production [m]

82

Einfachschild-TBM / Teilschnittmaschine | Single Shield TBM / Open Face Shield

Dublin Port Tunnel


S-193 / S-194
Schilddurchmesser S-193 | shield diameter S-193 Schilddurchmesser S-194 | shield diameter S-194 Tunnellnge S-193 | tunnel length S-193 Tunnellnge S-194 | tunnel length S-194 Bohrkopfleistung | cutterhead power Geologie S-193 | geology S-193 Geologie S-194 | geology S-194 Auftraggeber | contractor Kalkstein, Schiefer | limstone, slate Geschiebemergel | glacial drift Nishimatsu, Mowlem, Irishenco 11825 mm 11770 mm 2 x 2246 m 318 + 310 m 3200 kW
76,5 80 70 59,5 60 51 49,3 50 40,8 40 30 20 10 2003 | 02 03 04 05 06 07 85 76,5 64,6 72 69,7

08 09

10

11

wchentl. Vortriebsleistung [m] S-193 weekly production [m]

34 30,6 30 25 20 15 10 5 2003 | 37 38 39 40 41 15,3 20,4 26 30,6 29

32,3 26 26

42 43 44 45 46

wchentl. Vortriebsleistung [m] S-194 weekly production [m]

83

Gripper-TBM | Gripper TBM

Zrich
S-96
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor Molasse | molasse Prader AG 3000 mm 1200 + 950 + 2000 m 640 kW
80 70 60 50 40 30 20 10 68 59 50 31 24 86 89 79 80 78

1996 | 02

03 04 05 06

07

08 09

10

11

wchentl. Vortriebsleistung [m] weekly production [m]

84

Gripper-TBM | Gripper TBM

Tscharner
S-155
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor Kalk, Mergel, Ton | lime, marl, clay Marti AG 9530 mm 2322 m 2100 kW
80 70 60 50 40 30 20 10 2000 | 40 85 78 68 70,5 43 63 63 63 66,5 77,5

41

42 43 44 45 46 47 48 49

wchentl. Vortriebsleistung im Einschichtbetrieb [m] weekly production in single shift operation [m]

85

Gripper-TBM | Gripper TBM

Ltschberg Steg/Raron
S-167 / S-174
Schilddurchmesser | shield diameter Tunnellnge S-167 | tunnel length S-167 Tunnellnge S-174 | tunnel length S-174 Bohrkopfleistung | cutterhead power Geologie geology Auftraggeber | contractor 9430 mm 8925 m 10300 m 3500 kW
50 200 150 128 100 150 124 204 166 207 186 166 173 167

Altkristalliner Gneis, Granit, Granodiorit old crystalline gneiss, granite, granodiorite Marti AG, Walter Gruppe (Walter Bau AG merged with Dywidag, Ed. Zblin AG), Porr Asdag Tunnelbau GmbH, Balfour Beatty Ltd.

2002 | 20

21

22 23 24 25 26 27 28 29

wchentl. Vortriebsleistung [m] S-167 weekly production [m]

189 172 180 160 144 140 135 111 120 95 100 80 60 40 20 2002 | 17 18 19 20 21 139 156 154 146

22 23 24 25 26

wchentl. Vortriebsleistung [m] S-174 weekly production [m]

86

Gripper-TBM | Gripper TBM

Gotthard Bodio/Faido
S-210 / S-211
Schilddurchmesser | shield diameter Tunnellnge S-210 | tunnel length S-210 Tunnellnge S-211 | tunnel length S-211 Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor 8830 mm / 9330 mm 13955 + 11581 m 14795 + 12220 m 3500 kW Gneis, Granit, Schiefer | gneiss, granite, slate Zschokke Locher AG, HOCHTIEF AG, Alpine Mayreder Bau GmbH, CSC Impresa Costruzioni SA, Impregilo S.p.A.
108,5 100 82 81 80 78,5 60 40 20 2003 | 41 42 43 44 45 46 47 48 49 50 81,6 92 99,4 89 75,2 88,2

wchentl. Vortriebsleistung [m] S-210 weekly production [m]

110 113 100 80 60 40 20 2003 | 39 40 41 42 43 44 45 46 47 48 92 84,4 92,2 80,5 64,0 88,1 93 92,4

Aar Massiv aar Massif Tavetscher Zwischenmassiv tavetsch Intermediate Massif

Pioramulde piora zone Ursenen Gravera Zone urseren-Garvera zone

Ursenen Gravera Zone gotthard Massif Penninsche Gneiss-Zone pennine Gneiss zone

wchentl. Vortriebsleistung [m] S-211 weekly production [m]

87

Gripper-TBM | Gripper TBM

Gotthard Amsteg
S-229 / S-230
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor Granit | granite Murer AG, Strabag AG 9580 mm 2 x 11350 m 3500 kW
120 100 80 60 40 20 2003 | 41 42 43 44 45 46 47 48 49 50 59,6 67,8 38,6 81,8 84 72,9 51,3 110 105 121

wchentl. Vortriebsleistung [m] weekly production [m]

88

Doppelschild-TBM | Double Shield TBM

Ile de la Runion
S-153 / S-162
Schilddurchmesser | shield diameter Tunnellnge S-153 | tunnel length S-153 Tunnellnge S-162 | tunnel length S-162 Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber S-153 | contractor S-153 Auftraggeber S-162 | contractor S-162 Vulkanisches Gestein | volcanic rock Spie Batignolles, Razel, Pico Spie Batignolles, Bouygues S.A., Razel, Pico 3865 mm 9512 m 8050 m 1000 kW
140 120 105 97,5 100 87,5 80 67,5 60 40 20 2000 | 19 20 21 150 130 110 92,5 50 100

22 23 24 25 26 27 28

wchentl. Vortriebsleistung [m] S-153 weekly production [m]

89

Doppelschild-TBM | Double Shield TBM

Guadarrama North Portal


S-201
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor 9510 mm 14500 m 4200 kW
100 219,2 200 182 150 160 166 158 126,4 106 83,2 22,4 0 51 52 01 02 03 04 05 | 2004

Granit, verwitterter Granit | granite, weathered granite ACS, FCC, Ferrovial

50 2003 | 48 49 50

wchentl. Vortriebsleistung [m] weekly production [m]

90

Doppelschild-TBM | Double Shield TBM

Guadarrama South Portal


S-202
Schilddurchmesser | shield diameter Tunnellnge | tunnel length Bohrkopfleistung | cutterhead power Geologie | geology Auftraggeber | contractor 9510 mm 14500 m 4200 kW Granit, verwitterter Granit | granite, weathered granite Comsa, Dragados, Necso, Ohl, Sacyr
160 140 120 100 80 60 40 20 166,4 176 158 139 97,6 155 131 147 163

85

2003 | 14 15 16 17 18 19 20

21

22 23

wchentl. Vortriebsleistung [m] weekly production [m]

91

Herrenknecht ist berall auf der Welt. Auch direkt bei Ihnen: www.herrenknecht.de

Herrenknecht AG D-77963 Schwanau Tel. +49 (7824) 302 0 Fax +49 (7824) 34 03 info@herrenknecht.de www.herrenknecht.de