METHOD STATEMENT
Grounding Earth Installation
For Signalling System Works
PROJECT
Checked by
Checked by
Approved by
Title
Deputy General
General
Manager
Superintendent
Superintendent
H. Houan / Y.Nonaka
A.H. Desfiansyah
Y. Kameda
SECTION
Written by
Checked by
Name
Nurhalim
T.Ikenaga
Name
Signature
Date
Signature
Date
Contractor
Originator
Document No.
B1/ITC/SIG/0002
Revision:
Page 2 of 21
MITSUBISHI-SUMITOMO JOINT OPERATION
XXXX-XXXXX-XXXXX Rev.0
Revision History
Re
v.
Section
Date
Dec 20th,
2013
Written by
Checked by
Project
Approved
by
Written by
Description:
First Issue
Description:
Description:
Description:
Description:
Description:
Page i
B1/ITC/SIG/0004 Rev.0
Checked by
Approved
by
Table of Contents
Table of Contents..................................................................................................................... i
1Purpose................................................................................................................................. 1
2Coverage.............................................................................................................................. 1
3Document Reference............................................................................................................ 1
4Cable Specification............................................................................................................... 1
4.1.Multiple-Core Cable........................................................................................................... 2
4.2.Tail Cable ......................................................................................................................... 2
4.3.Power Cable...................................................................................................................... 2
5Inspection and Test Procedure (see Flow Chart on Figure 1)...............................................2
List of Figure
Figure 1. Flow Chart of Inspection and Test Procedure.......................................................... 3
List of Attachment
Figure 1. Flow Chart of Inspection and Test Procedure .........................................................4
Figure 1. Flow Chart of Inspection and Test Procedure .........................................................4
Figure 1. Flow Chart of Inspection and Test Procedure .........................................................4
Figure 1. Flow Chart of Inspection and Test Procedure .........................................................4
Figure 1. Flow Chart of Inspection and Test Procedure .........................................................4
Page ii
B1/ITC/SIG/0004 Rev.0
1 Purpose
This document is intended to step by step inspection required for the cable specification
of the Multiple-Core Cable, Tail Cable and Power Cable for the Signalling system of the
Railway Electrification and Double-Double Tracking of Java Main Line Project, Package
B1.
2 Coverage
This procedure covers for Factory testing for Multiple-Core Cable, Tail Cable and Low
Voltage Power Cable. The kind of each cable is as bellow.
A. Low Voltage, XLPE-Insulated Signal (Multiple Core) Cable type will be tested:
- Multiple Core cable 1.5mm x 40 core
- Multiple Core cable 1.5mm x 30 core
- Multiple Core cable 1.5mm x 20 core
B. Low Voltage, XLPE-Insulated Signal (Tail) Cable type will be tested:
- Tail cable 1.5mm x 2 core
- Tail cable 1.5mm x 6 core
- Tail cable 1.5mm x 12 core
C. Low Voltage, XLPE-Insulated Signal (Power) Cable type will be tested:
- Power cable 6mm x 4 core
- Power cable 10mm x 2 core
3 Document Reference
Railway Electrification and Double Double Tracking of Java Main Line Project (1)
Volume 3 Technical Specifications, Section 8 Signalling system Work (Contract No:
0971/DDT/SPP/X/2012, Dated: 10 October 2012
Railway Electrification and Double-Double Tracking of Java Main Line Project (1),
Volume 4 Bill of Quantities (Contract No: 0971/DDT?SPP/X/2012, Dated : 10 October
2012)
Railway Electrification and Double-Double Tracking of Java Main Line Project (1),
Volume 5 Drawings, Section 8 Signalling system Works (Contract No:
0971/DDT/SPP/X/2012, Dated : 10 October 2012)
Material Sample Sheet for Signalling Multiple-Core Cable
Material Sample Sheet for Signalling Tail Cable
Material Sample Sheet for Signalling Power Cable
4 Cable Specification
The cable specification approved by Engineer are as below :
Page 1 of 3
B1/ITC/SIG/0004 Rev.0
Pay
Ite
m&
Cod
e
808
(9),
808
(10)
,
808
(11)
,
808
(12)
,
808
(13)
,
808
(14)
,
808
(15)
,
808
(16)
.
808
(17)
,
Cable
Type
A. Multiple-Core Cable
B. Tail Cable
Proce
dure
and
Test
Rep
ort
For
m
Attach
ment 1
Atta
chm
ent 2
Attach
ment 3
Atta
chm
ent -
Page 2 of 3
B1/ITC/SIG/0004 Rev.0
808
(18)
,
808
(19)
,
808
(20)
,
808
(21)
,
808
(22)
,
808
(23)
,
808
(24)
.
808
(1),
808
(2),
808
(3),
808
(4),
808
(5),
808
(6),
808
(7),
808
(8).
Attach
ment 5
C. Power Cable
Page 3 of 3
B1/ITC/SIG/0004 Rev.0
Atta
chm
ent 6
Page 4 of 3
B1/ITC/SIG/0004 Rev.0
Attachment 1 :
Procedure Factory Accepteance Test for Multiple-Core Cable
A 6 -Page 1 of 1
B1/ITC/SIG/0004 Rev.0
Attachment 2:
Report Form of Factory Accepteance Test for
Multiple-Core Cable
A 6 -Page 1 of 1
B1/ITC/SIG/0004 Rev.0
Attachment 3:
Procedure of Factory Accepteance Test for Tail
Cable
A 6 -Page 1 of 1
B1/ITC/SIG/0004 Rev.0
Attachment 4:
Report Form of Factory Accepteance Test for Tail
Cable
A 6 -Page 1 of 1
B1/ITC/SIG/0004 Rev.0
Attachment 5 :
Procedure of Factory Accepteance Test for Power
Cable
A 6 -Page 1 of 1
B1/ITC/SIG/0004 Rev.0
Attachment 6:
Report Form of Factory Accepteance Test for Power Cable
A 6 -Page 1 of 1
B1/ITC/SIG/0004 Rev.0