S.No. 1 Activities TB tightness & cleaning done for GRP panel GENERATOR PROTECTION RELAY MICOM 343 P343 checked for differential protection with o/p relays operation.86U master relay tripping also checked. P343 Checked for Voltage controlled O/c protection at both Normal & undervoltage(<33% V) with o/p relays operation.86G master relay tripping also checked. P343 Checked for under frequency operation with o/p relays operation. P127 (voltage controlled o/current protection) operation & alarm checked Rotor E/F protection relays operation & tripping checked 64B tripping checked Generator transformer differential KBCH (87GT) operation & tripping checked with o/p relays operation 64ST relay operation & tripping checked with o/p relays operation 49AX & 49TX relay operation & tripping checked with o/p contacts 63AX,63TX,26AX &26TX relay operation & tripping checked with o/p contacts 86U &86 G relay operation & tripping checked From GPR(P343) 30A,30B,30C &30D relay operation & tripping checked From GPR(P343) 30E &30F relay operation & tripping checked 30G,30H,30J,30K auxillary relay operation & tripping checked From GPR(P343) Reverse Power protection relay 32 and auxillary 32 X operation
Date:Remarks
3 4 5
7 8 9 10 11 12 13 14 15
16 B/U Impedance protection relay 21 and Auxillary 21x 17 Overload protection relay 51 .1 and auxillary 51.1x
S.No 1 2 3 4
CT
Generator Differential (Ct-4,5,6,7,8,9) Reverse Power Protection (Ct-1,2,3) Generator Transformer Differential (16,17,18) Stator Earth fault protection( Ct-19) 3000/1 3000/1 3000/1 3000/1
CT Ratio
PROTECTION
RELAY
SETTING
PROTECTION CHECKING
DT
Operating voltage : Operating time: Operation checked: Operating voltage : Operating time: Operation checked: Operating current: Time delay : Operating checked :-
30B :Inject voltage after isolating Prot. PT with links in PT circuit Check the Output at DVR panel also
V>1 Voltage Set : 121 V V>1 Time Delay : 0.3s V>2 Function : DT
30T :86G :Inject voltage after isolating Prot. PT with links in PT circuit
MICOM 343
V>2 Voltage Set : 132.0 V V>2 Time Delay : 2.000 s I set : 0.7 In
P 127 (51G)
V Dep OC I> Set : 800 mA 4 Over current (Voltage controlled) MICOM 343 V Dep OC TMS : 0.3
Current inj (2xIs) OP Time (Nor Vol): OP Time (Red Vol): Operation checked: Operating current : Operating time: Operating current : Operating time: Operation checked:
30R : 86G :-
Inject current in CT terminalsR1 TB-1 5,6,7,8 Time shall be 1.5sec Time shall be 0.64sec
V Dep OC V<1 Set 35 V V Dep OC k Set : 0.4 Ue> 5.5V 5 Back up eart fault (Open Delta) P 125 (64B) Time delay : 1.0sec I2> : Current Set 60mA 6 Negative phase sequence protection (Alarm) MICOM 343 I2>1 Time Delay : 10.0s
I2>2 Current Set 80.00mA I2>2 k Setting 7 Negative phase sequence protection (Trip) MICOM 343 I2>2 kRESET I2>2 tMAX I2>2 tMIN 9.000 s 9.000 s 500.0 s 3.000 s Operating current : Operating time: Operation checked: 86G :30H :Inject 3 phase current with reverse phase sequence
Checked on :
10
11
Checked on :
47.50 Hz
Checked on :
Operation checked:
49T X:86U:-
Operation checked:
26AX :-
Operation checked:
26TX:86U:-
63AX:-
63TX:86U:-
63PX:86U:-
63OLX:-
Operation to be checked from TR. Marshalling box Check operation by shorting R2 TB2- 30,31 Check operation by shorting R2 TB2- 32,33 Check operation by shorting R2 TB2- 13,14
32
MARK -V TRIP
MVAAM 11
Operation checked:
30AX1:86U:-
33
MVAAM 11
Operation checked:
30AX2: 86U:
34
MVAAM 11
Operation checked:
86G :
TESTED BY :