Slip Form
Slip Form
PREPARED BY:
NISHANT VYAS(3204)
4
CONTENTS
1 LOCATION
2 INTRODUCTION OF SITE
4
LOCATION OF SITE
Gujarat
GIPCL POWER
PLANT
Kim
Surat
KEY PLAN OF SITE
INTRODUCTION OF SITE
Type of project : Thermal power plant (Coal based)
Name of the Project : Gujarat Industrial Power Corporation Ltd.
Client : GIPCL
Main Consultant : TCE Consulting Engineers Ltd.
Main Contractor : JMC Projects India Ltd.
104,Sapath-4,Opp. Karnavati club,
S.G.Road, Ahmedabad-380051
Approximate Cost : 60 crores (Under JMC Projects India Ltd.)
22 crores (Under GAMMON India Ltd.)
13 crores (Under Sunil Hi Tech Ltd.)
(Here all costs for civil work only considered.)
Type of Contract : Fixed Rate Contract
Objective of the Project : GIPCL has decided to install (125 x2) MW Captive
Power Plant to meet their captive requirement of 500MW.
Project duration: 27 months
Date of starting: 15/11/2006
Date of completion: 14/01/2009
JOB LAYOUT OF SITE
Slip form system
1 LOCATION MAP
3 PROGRESS
6 PROBLEMS
LOCATION MAP
BASIC INTRODUCTION TO STRUCTURE
TOP SHELL
THICKNESS:
350MM
BOTTOM SHELL
THICKNESS:
400MM
SHELL
RAFT
PROGRESS
SLIP FORM SYSTEM
SLIP FORM SYSTEM
SLIP FORM SYSTEM
SLIPFORM ELEMENTS
SLIP FORM SYSTEM
SLIP FORM SYSTEM
SLIP FORM SYSTEM
YOKE INNER
YOKE OUTER
YOKE BEAM
JACK -1
JACK -2
RADIUS SCREW
SHELL THICKNESS SCREW
CENTER WALER POST
CORNER WALER POST
WALER
MASSON JHULA(OUTER)
MASSON JHULA (INNER)
MASSON JHULA (LVL 2)
COVER BLOCK
JACK ROD & SLEEVE
HYDRAULIC SYSTEM
LOAD TRANSFER MECHANISM
EXPLANATION TO JACK 1 OPERATION
MOVE GRIPPED
GRIPPED
HAND UPWARDS GRIPPED
POSITION BODY POSITION LINE @ 4
TOTAL DISPLACEMENT
1 2 3 4
JACK 1 OPERATION
JACK 2 OPERATION
CONSTRUCTION TOLERANCE
Cement 415 kg
Water 187 Ltr.
Sand (B) 474 kg
Sand (W) 237 kg
Agg(10D) 284 kg
Agg(25D) 900 kg
Admixer 0.8 %
Slump 100 to 125 mm
SLIP FORM TIME CYCLE
1 CONCRETING
BRINGING MATERIALS 84
LOADING OF MATERIALS 10
MIXING TIME 85
UNLODING MIX TO TROLLEY 18
TROLLEY REACHING TO BUCKET 38
RECHING TIME AT TOP DECK 45
UNLOADING IN THETHE BUCKET 30
LOADING THE WHEEL BARROWS 15
PROCESS OF POURING CONCRETE 15
VIBRATION TIME 45
BUCKET REACHING THE BASE 15
1 VERTICALITY 1 HOUR 12
2 INSIDE DIAMETER 1METER 3
3 OUT SIDE DIAMETER 1METER 3
4 TOP OF LVL OF DECK - -
5 TOP OF LVL OF JACKS 4 TO 5 LIFT 12
6 TOP LVL OF FORM PANELS EVERY 5OO MM 5
7 TWISTING OF SLIPFORM 1 HOUR -
8 JACK LVL WITH WATER LVL 10 MINUTES 72
EQUIPMENT
UNDER
SR.NO EQUIPMENT USED STAND BY SPECIFICATION
3 WELDING MACHINES 3 1 -
1 TILTING PROBLEM
4 RAINFALL
5 FINISHING
SLIP FORM
REINFORCEMENT DETAILS
REINFORCEMENT DETAILS
SCHOOL OF BUILDING SCIENCE & TECHNOLOGY,
CEPT UNIVERSITY