Engineering Standard

SAES-A-010 Gas Oil Separation Plants (GOSPs) Document Responsibility: Process Engineering Standards Committee 26 February 2013

Saudi Aramco DeskTop Standards


Table of Contents 1 Scope................................................................. 2 2 Conflicts and Deviations..................................... 2 3 References......................................................... 3 4 Definitions........................................................... 4 5 GOSP Product Specification.............................. 7 6 Overall Process Design...................................... 8 7 GOSP Equipment Design Considerations.... 10 7.1 Flowlines/Trunklines 7.2 Production Manifold 7.3 Production Separators 7.4 3-Phase Production Separators 7.5 2-Phase Production Separators 7.6 Charge Pumps 7.7 Crude Oil Dehydration/Desalting 7.8 Booster/Shipping Pumps 7.9 Gas Compression 7.10 Gas Conditioning 8 Auxiliary Systems............................................. 21 8.1 Wash Water Systems 8.2 Chemical systems 8.3 Hot Oil Systems 8.4 Closed Drain System 8.5 Instrument and Plant Air Systems 8.6 In- Plant Piping

Previous Issue: New

Next Planned Update: 26 February 2018 Page 1 of 32

Primary contact: Koleshwar, Vilas Sadashivrao on +966-3-8809478


CopyrightSaudi Aramco 2013. All rights reserved.

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

Table of Contents (contd) 9 GOSP De-Bottlenecking................................... 26 Appendix I Simplified Schematic of Satellite On-Shore GOSP........................... 27 Appendix II Simplified Schematic of Off-Shore GOSP......................................... 28 Appendix III Simplified Schematic of Simple GOSP with Gas Compression. 29 Appendix IV-Simplified Schematic of Complex GOSP with Gas Compression and Crude Stabilization.. 30 Appendix V Simplified Schematic of Hot Oil System............................................ 31

Scope 1.1 1.2 1.3 This Standard provides the minimum mandatory requirement for the design of a grass root Gas Oil Separation Plant (GOSP) with or without crude stabilization. The standard also provides the minimum requirement for debottlenecking an existing GOSP. The crude Oil stabilization, Produced water treatment & disposal and Heat Exchangers are excluded from the scope of this standard. Other support systems that are part of the GOSPs (e.g. Fire water system, Fire & Gas detection, Plant alerting & Alarm system, Safety equipment, Flare system, etc.) are also excluded from this standard. These shall be referenced in the relavant SAESs.

Conflicts and Deviations 2.1 Any conflicts between this standard and other applicable Saudi Aramco Engineering Standards (SAESs), Materials System Specifications (SAMSSs), Standard Drawing (SASDs), or industry standards, codes, and forms shall be resolved in writing by the Company or Buyer's Representative through the Manager, P&CSD of Saudi Aramco, Dhahran.

Page 2 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

2.2

Direct all requests to deviate from this standard in writing to the Company or Buyer's Representative, who shall follow internal company procedure SAEP-302 and forward such requests to the Manager, P&CSD of Saudi Aramco.

References All referenced Specifications, standards, Codes, Forms, Drawings and similar material shall be considered part of this standard and shall be the latest issue (including all revisions, addenda and supplements unless stated otherwise). 3.1 Saudi Aramco References Saudi Aramco Engineering Procedures SAEP-14 SAEP-250 SAEP-302 SAEP-354 SAEP-363 SAEP-364 SAEP-1663 Project Proposal Safety Integrity Level Assignment & Verification Instructions for Obtaining a Waiver of a Mandatory Saudi Aramco Engineering Requirement High Integrity Protective Systems Design Requirements Pipeline Simulation Model Development and Support Process Simulation Model Development and Support Design Guidelines for Gas Oil Separation Plant (GOSP)

Saudi Aramco Engineering Standards SAES-A-020 SAES-A-400 SAES-A-401 SAES-A-403 SAES-B-006 SAES-B-014 SAES-B-062 SAES-D-001 SAES-H-001 Equipment Specific P&ID Templates (ESPT) Industrial Drainage Systems Closed Drain Systems (CDS) Off-Shore Platform Drainage Systems Fireproofing for Plants Safety Requirements for Plants and Operations Support Buildings Onshore Well Site Safety Design Criteria for Pressure Coating Selection and Application Requirements for Industrial Plants and Equipment

Page 3 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

SAES-H-002 SAES-J-005 SAES-J-601 SAES-J-901 SAES-K-402 SAES-L-100 SAES-S-020 SAES-Z-003

Internal and External Coatings for Steel Pipeline and Piping Instrumentation Drawings and Forms Emergency Shutdown and Isolation Systems Instrument Air Supply Systems Centrifugal Compressors Applicable Codes and Standards for Pressure Piping Systems Oily Water Drainage Systems Pipelines Leak Detection Systems

Saudi Aramco Best Practices SABP-A-015 SABP-A-018 SABP-A-036 SABP-K-401 3.2 Chemical Injection Systems GOSP Corrosion Control Corrosion Monitoring Best Practice Site Performance Testing of Centrifugal Compressors

Industry Codes and Standards American Petroleum Institute API SPEC 12J Specification for Oil and Gas Separators

Institute of Electrical and Electronic Engineers (IEEE) IEEE 519 Guide for Harmonic Control and Reactive Compensation of Static Power Converters

Terms and Definitions AC: Alternating Current AC/DC: Alternating Current/Direct Current AFD: Adjustable Frequency Drive APSD: Advanced Process Solutions Division BPD: Barrels Per Day BS&W: Basic (Bottom) Sediments and Water
Page 4 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

CDS: Closed Drain System CFD: Computational Fluid Dynamics CML: Corporate Model Library Crude Types: (Degree API: Typical range for various Saudi Aramco crudes) ASL AXL AL AM AH : Arab Super Light : Arab Extra Light : Arab Light : Arab Medium : Arab Heavy (49-52 API) (37-41 API) (32-36 API) (28-32 API) (26-28 API)

CSD: Consulting Services Department DCS: Distributed Control System Dehydrator: Electrostatic Coalescer for removal of majority of water and salt from Crude Oil. Desalter: Electrostatic Coalescer for removal of residual Water and salt from crude oil. (Identical to dehydrator). DBSP: Design Basis Scoping Paper Disposal Water: Treated produced water for downhole/surface disposal/injection DFD: Dual Frequency Desalter DF-LRC: Dual Frequency-Load Responsive Controller DPD: Dual Polarity Desalter E&P: Exploration and Production EIV: Emergency Isolation Valve EPD: Environmental Protection Department ESD: Emergency Shutdown ESI: Emulsion Separation Index to measure Emulsion Stability ESP: Electrical Submersible Pump FEA: Finite Element Analysis

Page 5 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

FEED: Front End Engineering Development Flowline: Pipelines connected to a single Oil, Gas or water wells for production or Injection. Formation (Produced) Water: Water produced from Reservoir with Oil and Gas production FPD: Facilities Planning Department GOR: Gas Oil Ratio in Standard Cubic Feet of Gas per Barrel of Stock Tank Oil GOSP: Gas Oil Separation Plant GOSP (Satellite): Onshore Gas Oil Separation Plant without oil dehydration/desalting, produced water separation and treatment facilities GOSP (Offshore): Offshore Gas Oil Separation Plant without oil dehydration/desalting, produced water separation and treatment facilities EPD: Environmental Protection Department H2S: Hydrogen Sulfide HP: High Pressure HPPT: High Pressure Production Trap (2 or 3-phase separator) Injection (Power) Water: Treated Sea Water or aquifer water for reservoir pressure support IPPT: Intermediate Pressure Production Trap (2 or 3-phase separator) L/D: Length to Diameter Ratio LPDT: Low Pressure Degassing Tank (2 or 3-phase separator) LPPT: Low Pressure Production Trap (2 or 3-phase separator) MBCD: Thousand Barrels per Calendar Day MBOD: Thousand Barrels per Operating Day MBOD= MBCD/Overall Operating Factor MCC: Mechanical Completion Certificate MOC: Management of Change

Page 6 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

MOV: Motor Operated Valve OOK: Out of Kingdom OSPAS: Oil Supply Planning and Scheduling Department Overall Operating Factor: Factor accounting for shrinkage and downtime (Fraction) PPM: Parts Per Million P&CSD: Process and Control Systems Department P&FDD: Production & Facilities Development Department PFD: Process Flow Diagram P&ID: Piping and Instrumentation Diagram PM&OU: Process Modeling & Optimization Unit Production Manifold: Piping manifold where all incoming Trunklines/Flowlines combine within the GOSP battery limit to feed the production Trap PTB: Pounds of salt per thousand Barrels of Crude oil Remote Production Manifold: Piping Manifold where Trunklines/Flowlines combine into one Trunkline outside the GOSP fence to feed the GOSP Production manifold RMD: Reservoir Management Department RVP: Reid Vapor Pressure Shrinkage: Decrease in oil volume caused by the evaporation of solution gas or by lowering of fluid temperature during storage Stock Tank Oil: Stabilized dry oil as it exists at atmospheric conditions in a stock tank. TDS: Total Dissolved Solids TEG: Tri-Ethylene Glycol Trunkline: Pipeline to which two or more flowlines are connected TT: Temperature Transmitter Turndown: The ratio of normal maximum flow to Minimum controllable flow of the GOSP, expressed in a percentage

Page 7 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

TVP: True Vapor Pressure (@ temperature) VSD: Variable Speed Drive Wash Water: Low salinity water used to wash the crude oil and dilute the formation water in the crude desalting process. Water cut (Percent): Produced water rate*100/(Crude rate+ Produced water Rate) Well-head Piping: Piping system connecting the well head to the flowline first isolation valve WOSEP: Water Oil Separator. Collect and treat separated water mainly from the 3-phase separators and dehydrator to remove the entrained oil before disposal to the reservoir. 5 GOSP Product Specification 5.1 Desalted Dry Crude - Salt-in-Crude to Pipeline: 10 PTB (Max) - BS&W to Pipeline: 5.2 0.2 Vol% (Max)

Stabilized Crude (for GOSPs with Stabilizers) - H2S in Crude: 70 PPM by weight (Max) 30 PPM by weight (Design conditions) 1-60 PPM by weight (Operating Range) 13 psia (Max) at export or storage temperature, (whichever is higher).

- True Vapor pressure 5.3

Disposal Water (for GOSPs with Produced Water Treatment Units) - Target Oil-in-water 100 mg/L (Max), when treated produced water is injected in oil reservoir for pressure maintenance

When treated produced water is injected in tighter disposal reservoir: - Target Oil-in-water
Note:

As stated by RMD,

The 100 mg/L mg/L oil-in-water of disposal water quality is the maximum allowable requirement. The required Disposal water quality is to be specified by Upstream based on the disposal reservoir permeability and the economics of the water disposal over the life Cycle. DBSP shall refer to the final agreed disposal water specification.

- Disposal Header Pressure: Specified by E&P based on Injection well pressure


Page 8 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018 Note:

SAES-A-010 Gas Oil Separation Plants (GOSPs)

Maximum injection pressure is recommended to be below 3000 psig at disposal pump shut off so that 1500# rating disposal piping can be used.

Overall Process Design 6.1 The GOSP design shall progress through conceptual study, pre-DBSP study, DBSP approval, Project Proposal or FEED followed by Detailed Design and construction. The data required to conduct GOSP process studies during the various phases shall be referred in SAEP-1663. RMD/P&FDD shall provide the required data. The necessary Safety Reviews (HAZOP, SIL, Building Risk Assessment, etc.) shall be conducted per applicable sections of SAEP-14, SAES-J-601, and SAES-B-014 respectively. The Base Case production option and other alternative production Options shall be finalized in discussion with Upstream, P&CSD and FPD. Simulations 6.3.1 Steady State Process simulation shall be based on the latest version of the approved simulation Software package based on SAEP-363 and SAEP-364. The Process simulation software package that will be used in the project shall be concurred by P&CSD. The GOSP simulations shall be carried out for summer and winter conditions at Design Water cut, initial Water cut and intermediate production phase. The Gas compression simulations shall be carried out for summer and winter conditions. The gas compression to be sized on the controlling gas rates based on the simulations. The Process simulation during the FEED and Detailed Design Phase shall be reviewed and approved by P&CSD. The Final Process simulation models shall be included as part of the project deliverable during the FEED and Detailed Design Stage. All final process simulation models, with their documentation, during FEED and Detailed Design stage shall be delivered to P&CSDs CML coordinator through document transmittal. Transient Dynamic process simulation shall be performed for each gas compressor system during the detailed design stage to confirm the functionality of the compressor control system under all start-up, operating and shutdown conditions per SAES-K-402.

6.2 6.3

6.3.2

6.3.3

6.3.4 6.3.5

6.3.6

Page 9 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

6.3.7

Transient Dynamic simulations shall also be performed on parallel gas compression trains to confirm the functionality of the compressor control system during start-up, operating and shutdown conditions of individual or multiple gas compressors. The Transient Dynamic simulations of the Gas compressors individually and combination of parallel trains shall be reviewed and approved by P&CSD/APSD/PM&OU. The final dynamic Simulation Models shall be delivered to P&CSDs CML coordinator as part of the MCC.

6.3.8

6.4

PFDs 6.4.1 Preliminary PFDs showing the heat & material balances for Summer and Winter conditions of the GOSP and the crude stabilizer (if included in the GOSP) for the following conditions shall be developed: 6.4.1.1 6.4.1.2 6.4.1.3 6.4.2 Design Water Cut Initial Water cut Final Water Cut

The Preliminary PFDs showing the Heat & Material Balances for Summer and Winter conditions shall be developed for the Gas compression. Preliminary gas export pipelines pressure shall be available to determine the Gas compression HP requirement. Energy System Optimization Assessment study shall be conducted based on the preliminary PFDs per SAEP-14. The energy optimization shall satisfy all operating conditions for summer, winter and the life cycle of the project per paragraph 6.8.1. The simulations and PFDs to be finalized after completing the Energy system Optimization Assessment Study. Stream Data for Summer, Winter and Design condition shall be provided in the PFDs.

6.4.3

6.4.4 6.4.5 6.5 P&IDs 6.9.1 6.9.2

SAES-A-020 shall be used as a building block to develop the project P&IDs. SAES-J-005 provides the Instrument data to be included in the P&IDs. The following additional instrument data shall be included in the P&IDs: a) Orifices- Orifice Bore and Flow Transmitter Range
Page 10 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

b) c) d)

Control Valves- Tight Shut-Off requirement Level Transmitter- Type of level transmitter, Calibration Range Additionally, the vessel template shall show the various level alarm settings as height from vessel bottom for horizontal vessels and Tan line for Vertical vessels. Level alarm settings shall be shown as actual levels (instead of percentages) in DCS block or display. Level Gauge: Type of Level Gauge, backlighting requirement Temperature Transmitter- Type of TT and Range. Alarm setting on the DCS block or display Temperature Gauge- Range of Temperature Gauge Pressure transmitter/gauge- Range of the pressure transmitter/gauge. Alarm settings on the DCS block. All shutdown switch settings All shutdown Alarms shall be shown connected to the Sequence of Events Recorder.
The above required instrument details can be included in SAES-J-005.

e) f) g) h) i) j)
Note:

6.10

All the GOSP shall be designed for 40% turndown. For GOSPs with crude stabilization, the stabilizer column turndown will be the controlling factor for the GOSP turndown. All GOSPs shall be designed for Wet Sour Service for potential souring of the production field during the life cycle unless RMD recommends otherwise.

6.11

GOSP Equipment Design Considerations 7.1 Flowlines and Trunklines 7.1.1 Flowlines and trunklines sizing shall be based on transient simulations over the full field life including turndown conditions and trunkline scraping. The outcome of the transient analysis shall be applied in the design of GOSP. The selected trunkline size shall satisfy both minimum and maximum velocities at minimum water cut and design water cut including turndown. The flowlines and trunkline network shall be designed to the maximum shut-in pressure of the field including future artificial lift (Gas lift, ESP or multiphase pump).
Page 11 of 32

7.1.2

7.1.3

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018 Note:

SAES-A-010 Gas Oil Separation Plants (GOSPs)

For existing Flowline/Trunkline networks, HIPPS to be evaluated in accordance with SAEP-250 and SAEP-354 if the shut-in well head pressure exceeds the design pressure.

7.1.4 7.2

Slug flow in trunklines shall be avoided and slug mitigation measures to be provided to minimize production trap level and pressure upsets.

Production Manifold/Header 7.2.1 For new GOSPs the Production manifold and the production header to the last block valve to the inlet of the first production Separator (Trap) shall be designed for the maximum shut-in pressure of the field including future artificial lift (Gas lift, ESP or multiphase pump).
Note: For existing GOSPs, HIPPS to be implemented at the subject wellheads that exceeds the design pressure of the production manifold.

7.2.2 7.2.3

Flowline/Trunkline connections to the Production Manifold shall be from the Top for new facilities. As per RMD/P&FDD requirements, spare connections with blinds shall be provided on the production manifold for connecting future trunklines. To avoid dead legs, the active trunklines to be connected at the ends of the production manifold with the spare connections in the middle. Each crude increment shall have its own production manifold and all trunklines shall be connected to the individual increment production manifolds. This will enable selecting the trunklines to the desired increment for uniform distribution of the field production to the individual crude increments. Two parallel production separators (HPPTs) can be connected to one production manifold with symmetrical piping arrangement downstream of the T dividing the flow to the two production separators. However, the inlet to the T shall be from below the horizontal. Long Radius elbows (5D) shall be provided on the production header downstream of the inlet ESD valve to the first Production Separator. The inlet header from the production manifold to the first production separator shall be sized to avoid mist/spray flow.

7.2.4

7.2.5

7.2.6 7.2.7 7.3

Production Separators 7.3.1 The number of Flashing stages and Flash pressures in the GOSP for the crude production shall be determined by Upstream in consultation with
Page 12 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

P&CSD and FPD based on life cycle economics during the initial field development study. 7.3.2 The flash stage pressures shall be based on Flowing well head Pressures, Individual stage GORs, reservoir production strategy over the field life and crude type to optimize production cost during the field life and maximize reservoir recovery.
Note: The number of flash stages increases at higher GOR and higher Flowing Well Head pressures to optimize the gas compression cost.

7.3.3 7.3.4

The number of flash stages and flash pressures shall be specified in the DBSP along with the flash stage descriptions. The following requirements shall be met in all production Separators: The bottom of the feed inlet nozzle shall be at least 6 above the HH liquid level shutdown Perforated (not Slotted) Anti-Wave baffles shall be provided. Any internals for optimum separation efficiency shall be selected based on the results of the Computational Fluid Dynamic Model. The low low liquid level alarms and shutdowns shall be minimum 12 above the bottom of the vessels. Vortex breakers shall be provided in all liquid outlet nozzles of production separators Non-Slam type check valve shall be provided on the common Gas outlet All gas relief valves shall be installed directly above the vessel with minimum pipe length.

7.3.5 7.3.6

Crude oil heat exchanger shall not be located between the production manifold and the first production separator. The first Production Separator receiving the well production fluids from the production manifold shall be equipped with suitable inlet device (Vane type, impingement plate or cyclonic device). The inlet device shall be designed to withstand the forces over the full operating range based on transient simulation of the flowline/trunkline network.
Note: Finite Element Analysis (FEA) of the inlet device support structure is recommended.

7.3.7

Mist eliminators shall be provided in production separator vessels to

Page 13 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

minimize liquid carry over in the Gas. Liquid carry over in gas shall be less than 1 gal/MMSCF. 7.3.8 7.4 The design pressure of Tanks in low pressure production separation service shall be minimum 10 psig.

GOSP Three Phase Production Separators 7.4.1 7.4.2 7.4.3 7.4.4 7.4.5 The 3-phase Production Separator shall be designed for the design water cut or minimum 30% water cut whichever is higher. Typical liquid retention (Holdup) time for water-oil separation shall comply with API standard, i.e., API Spec 12J. The minimum seam-seam to Vessel Diameter ratio (L/D) shall be 7 for the horizontal 3-phase production separator vessel. The water weir for the 3-phase production separator vessel shall be located at least one vessel diameter from the vessel tan line. The normal oil level in the 3-phase production separator vessel shall be at least 6above the Weir top. The High-High Interface level alarm setting shall be at least 6 below the weir top. Following are the minimum surge times between different level settings for the 3-phase production separator vessels based on design flow rates: 7.4.7 Between High High oil level shutdown and High oil Level alarm: 1 Minute Between High oil Level alarm and Low Oil level alarm: 3 minutes Between High High interface level alarm and high interface level alarm: 2 Minutes or 6 height Between High interface and Low interface alarms: 5 minutes or 1 height Between Low interface and Low Low interface shutdown: 3 minutes or 1 height

7.4.6

The nozzles for the interface level instruments shall be located close to the water weir. The nozzles for the interface level instruments shall be taken from the side of the vessel. The selected 3-phase separator sizing shall be approved by P&CSD.

7.4.8

Page 14 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

7.5

Two Phase Production Separators 7.5.1 7.5.2 7.5.3 7.5.4 The 2-phase production separator upstream of the crude oil dehydration/desalting train shall be sized for 30% water cut. The minimum seam-seam to Vessel Diameter ratio (L/D) shall be 7 for the horizontal 2-phase production separator vessel. The typical retention time (Hold up) for Gas-oil separation for 2-phase vessels are given in API SPEC 12J. Following are the minimum surge time between the oil-level settings based on design flow rates: 7.5.5 Between High High Oil level shutdown and High Oil level alarm: 2 Minutes Between High Oil level alarm and Lo Oil level alarm: 2 Minutes Between Lo Oil level alarm and Lo Lo oil level shutdown: 1 minute

The selected 2-phase separator sizing shall be approved by P&CSD.

7.6

Charge Pumps 7.6.1 7.6.2 Minimum 3 x 50% capacity charge pumps shall be provided for pumping the wet crude through the crude desalting train. The charge pumps shall be Vertical Can type. Gas supply connection shall be provided to pressurize the pump can to displace the wet crude to the suction vessel. The charge pump isolating MOVs (EIVs) shall be located outside the fire hazard zone as defined by SAES-B-006 to avoid the need of fireproofing The charge pump discharge pressure at pump shut-off shall not exceed the design pressure of the dehydrator and desalter vessels. The charge pump seals shall be flushed by dry crude oil or other suitable buffer fluid.

7.6.3

7.6.4 7.6.5 7.7

Crude Oil Dehydration and Desalting (Production Field) 7.7.1 For GOSPs processing AXL and AL crude grades, minimum two stage dehydration/desalting shall be provided to minimize instances of offspec crude to the crude stabilizer/pipeline during electrostatic grid upsets

Page 15 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

or crude production interruptions during maintenance of one stage. 7.7.2 For GOSPs processing AM and AH crude grades minimum 3 stage dehydration/desalting shall be provided.
Notes: Two stage dehydration/desalting can be considered in AH and AM crude production with new technology internals provided the Vendor is guaranteeing the desalted crude specification with single stage operation at minimum 60% dry crude throughput. The two-stage desalting in AH and AM crude service shall be concurred by both P&CSD and Operations. For ASL crude grade and Khuff gas condensate processing, the need of crude desalting to be evaluated based on the formation water TDS and Emulsion stability Index to meet the specification to the pipeline.

7.7.3

The dehydrator and desalter piping configuration shall be designed to operate with the any one vessel bypassed at a time. The bypass capability shall be provided for both vessels. Where reservoir pressure support is provided by power water injection, the crude dehydration and desalting trains shall be designed for 30% water cut. Reduced trims to be installed on control valves for better controllability during the initial production phase where the water cut is low. The dry crude viscosity in all desalting vessels shall be below 10 cP and preferably below 5cP. The feed to the dehydrator/desalter shall be heated to achieve the desired viscosity. The operating pressure of the last stage desalting vessel shall be at least 25 psig above the vapor pressure of the crude at the operating temperature. Power to the electrical grids shall be switched off after a time delay of 20 sec if the last stage desalter pressure drops to 10 psig above the crude vapor pressure. The system shall be designed to allow for a 20 sec delay for 10 psi below vapour pressure. The crude export to pipeline shall be stopped if the power is not restored to the electrical grids within 5 minutes. Recommended Desalting technologies: - AC Field Desalting: Double volt; Tri-Volt; 0-30% Water cut
Note: AC Field Bi-electric designs with emulsion feed distributed between the grids shall not be used in the production field. Bi-electric desalting designs shall be limited to refinery applications.

7.7.4

7.7.5

7.7.6

7.7.7

- Dual Polarity Desalting: AC/DC field 0-10% water cut

Page 16 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

- Dual Frequency Desalting: Upgrade of Dual Polarity Desalting technology with Frequency modulation and Arc control. 0-30% water cut 7.7.8 Minimum two levels of charged grids (double volted) shall be provided for the AC field dehydrator/desalter in the production field. Single Volted Electrical grid configuration (Bottom grids charged and Upper Grid Grounded) shall not be used in the production field. The electrostatic grids of AC field and DPD shall be charged by 3 single phase step-up transformers. The preferred primary supply voltage to the AC field and DPD technology transformers is 4160 Volts. The transformers shall be equipped with external tap changers to adjust the secondary voltage for the required voltage level. The electrostatic grids of the DFD desalters shall be charged by 3 power units. The primary supply to the Power units shall be 480 volts, 3 Phase, 60 Hz. The DFD power unit harmonics level shall be below the TIF values identified within IEEE 519. If necessary a filtering system shall be used to meet the criteria. The AC field desalters shall be equipped with Carbon Steel rod type electrostatic grids. The rods shall run parallel to the length of the desalters and not across the cross-section. At least 6 clearance shall be provided between the rod ends and the vessel dished end to prevent arcing to the vessel wall. Carbon Steel Plate electrostatic grids shall be provided for DPD and DFD technology desalters. The DPD desalters are limited to 0-10% water cut due to the lack of arc control which could potentially damage the carbon steel plates. The DFD desalters are equipped with arc control and additionally will drop out majority of the water before it reaches the grids. Composite plates are not recommended due to the short service life. Oil immersed High pressure entrance bushings rated above the maximum secondary voltage of the transformer shall be provided to connect the transformer secondary to the vessel internal grids. High pressure bushing is also recommended at the transformer secondary. Vessel nozzle size for the entrance bushing shall be minimum 6, 300# rating. A spacer with vent connection between the vessel nozzle and the entrance bushing standpipe shall be provided to eliminate vapor. The spacer vent shall be connected to the oil outlet pipe.

7.7.9

7.7.10

7.7.11

7.7.12

7.7.13

7.7.14

Page 17 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

7.7.15

The entrance bushing standpipe shall be equipped with a transparent type level gauge and a sampling point for periodic sampling of the standpipe oil for analysis of di-electric constant on a quarterly basis as a minimum. Emulsion Feed distributors shall be designed based on CFD modeling for uniform distribution of the feed over the electrical grid area and prevent channeling/ recirculation. The distance between the top of the feed distributor and bottom of the charged grids shall be minimum 3.3 feet (1 meter). Electrical grid loading for the AC field desalting systems in the production field shall be the following: AXL crude service: 150 BPD/Square Feet of grid area AL crude service: 150 BPD/Square Feet of grid area AM crude service: 110 BPD/Square Feet of grid area AH crude service: 80 BPD/square Feet of Grid area
The above grid loading is field proven with the minimum life cycle operating costs for the AC field systems.

7.7.16

7.7.17

Note:

7.7.18

Internal Interface skimming header and water (sand) jetting header shall be provided. Interface sampling valves to collect interface samples shall be provided. All internal piping below the center line of the vessel shall be internally and externally coated. Minimum 2 out of the following 3 types of interface measuring devices shall be provided to control the interface level: Nucleonic type- Top mounted Microwave type (2 probes)- Side mounted External displacer type directly mounted on vessel nozzles

7.7.19 7.7.20

Flexibility shall be provided to select any one of the interface measuring instruments to control the interface level.
Note: Nozzles shall be provided for installing all three types of instruments. Adequate clearance and space shall be provided to measure the various interfaces including solids at the bottom of the vessel. The probes shall be retrievable type for on-line maintenance.

Page 18 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

7.7.21

Two Transparent type interface monitoring sight glasses with backlighting shall be provided. The sight glasses shall be located at both ends of the vessel and directly connected to vessel nozzles taken from the side. Level switch shall be installed and connected to permissive circuit to ensure the vessel is filed with liquid before applying the power. Internal floats shall be provided to ground the grids in case the crude oil level drops for AC field and DPD technology. For DFD technology, external level switch to be connected to the ESD system to switch-off power in case of falling oil level.
Note: For DFD technology internal floats to ground the grids is not recommended due to concern on life expectancy of the electronics.

7.7.22 7.7.23

7.7.24

For AC field and DPD technology desalters a local panel shall be provided with a power switch, transformers secondary voltage indication, current indication, green/red pilot lights for each secondary phase and a local panel light. The transformer secondary voltage shall also be indicated in the DCS. For the DFD technology desalters all feed-back signals and control signals that are displayed in the DF-LRC II panel shall be interfaced to the DCS system. GOSPs with crude desalting shall be designed to start on wet crude. GOSPs shall be designed for recycling off-spec dry crude. Online BS&W analyzers shall be provided at the outlet of the desalter. Insertion type sample take off installed on vertical main pipe to be provided for representative stream.
Note: Online salt-in-crude analyzer (without using chemicals) to be tested to prove the accuracy and repeatability.

7.7.25

7.7.26 7.7.27

7.7.28 7.8

The Dehydrator/Desalters shall be designed to withstand the shut-off head of the charge pump with the design margin per SAES-D-001.

Booster and Shipping Pumps 7.8.1 7.8.2 Variable speed drives shall be evaluated for crude oil shipping pumps without booster pumps. The Booster pumps and Shipping Pumps isolating MOVs (EIVs) shall be located outside the fire hazard zone as defined by SAES-B-006 to avoid the need of fireproofing.
Page 19 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

7.9

Gas Compression 7.9.1 Each GOSP gas compressor shall be provided with its own suction drum, after cooler and compressor discharge KO drum.
Notes: Individual Compressor discharge drum can be deleted in lean gas compression where negligible liquids are formed after cooling.

7.9.2

Compressor suction drum shall be equipped with mist eliminator to remove 99.99% liquid droplets of 6 microns and larger. Fiber Glass or other synthetic coalescing packing shall not be used in the compressor suction drums. Large capacity HP gas compressors suction drums in the GOSPs shall be equipped with V type mist eliminator. CFD shall be performed on the gas compressor suction drum to confirm the liquid removal efficiency over the full operating range of the compressor. The compressor discharge temperature under normal operating conditions shall not exceed 320F. For higher compressor discharge temperatures, the materials selected, specially the O rings for H2S service shall be approved by CSD. Variable Speed drives shall be evaluated for all gas compressors based on SAES-K-401 and SAES-K-402. However, the GOSP gas compressor energy consumption over the life cycle shall take into consideration the crude production forecast, fluctuations in crude production rate and energy loss due to compressor recycling. The life cycle economics of compressor driver selection report shall be submitted to CSD, P&CSD/UPED and P&CSD/Energy division for review. The number of gas compressors shall be determined based on the production forecast over the life cycle of the project to minimize compressor recycling. Spare gas compressor shall be provided to eliminate gas flaring. Reduction of crude rate and operating on one gas compressor is acceptable.
Note: The deletion of spare gas compressor shall be concurred by Operating organization, P&CSD/UPED and EPD.

7.9.3

7.9.4

7.9.5

7.9.6

7.9.7

7.9.8

Besides the normal operating point, 3 other operating points for summer, winter and 105% of the normal gas rate shall be specified in the compressor data sheet. The rated point of the compressor shall be selected by the manufacturer based on these conditions per SAES-K-402.

Page 20 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

7.9.9

Fixed speed motors of Spheroid and LP gas compressor shall be sized to start the compressor at normal operating pressure. Refer SAES-K-402 for start-up capability requirements of fixed speed motors for low suction pressure gas compressors. Field performance testing shall be conducted on all new process gas compressors within 6 months of start-up or immediately after overhaul to establish the baseline performance per SABP-K-401. Compressor performance testing to repeated on a 3-6 years interval in GOSPs. All compressor performance records shall be maintained by the respective plant engineering Unit. The maximum approach temperature of after cooler (Air) is 15F based on summer design dry bulb temperature @ 1%.

7.9.10

7.9.11 7.10

Gas Dehydration and Hydrocarbon Dew Point Control 7.10.1 Gas dehydration and hydrocarbon dew point control shall be provided in the following applications: Lift Gas for producing wells Sub-sea gas pipelines transporting compressed associated gas to on-shore. On-shore gas pipelines transporting compressed associated gas through populated area as defined by SAES-B-062.
In dense phase gas injection systems, only gas dehydration is required to remove the water.

Note:

7.10.2

A knock out drum shall be installed upstream of the Gas dehydration unit coalescing filter to knock out liquid droplets carried over in the flashed gas from the production traps. The knock out drum shall be equipped with mist eliminator to remove 99.99% of liquid droplets 6 microns and larger. Compressor discharge drums located upstream of the dehydration unit coalescing filter shall be equipped with mist eliminators to remove 99.99% of liquid droplets 6 microns and larger. The water content of dehydrated gas shall not exceed 7 lb/MMSCF. Hydrocarbon dew point control units shall be designed to eliminate liquid dropout in the gas transfer lines. The design TEG circulation rate for the TEG based gas dehydration systems in the production facilities shall not exceed 3 GPM per pound of water removal.
Page 21 of 32

7.10.3 7.10.4 7.10.5

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

7.10.6

Gas Dehydration standard is under development by P&CSD / UPED / GPU.


Note: The requirements for gas dehydration included in this standard are in addition to the Gas dehydration standard.

Auxiliary Systems 8.1 Wash Water Systems for Crude Oil Desalting 8.1.1 The design TDS of the Wash water used in crude oil desalting depends on factors such as type of crude oil, formation water TDS, BS&W at the inlet of the final stage desalter, BS&W and salt-in-crude specification of the desalted crude, wash water rate and mixing efficiency. Water treatment systems to reduce TDS of the wash water, if required, shall be provided. Wash water injection points shall be upstream dehydrator and desalter. The design mixing efficiency shall exceed 50%. High efficiency Mixing control valves shall be used for mixing wash water with the crude at the inlet of the final stage desalter. Mixing pressure drop range is 7 -25 psid. Wash water systems for aquifer water shall be designed for minimum 4% of the dry crude rate. Three, 50% capacity wash water pumps shall be provided. Provide recycle line for wash water pumps to allow for low wash water rates at low crude rates. Wash water rate for Low TDS wash water from Flash evaporation shall be minimum 1.25% of the dry crude rate. Recycle pumps shall be provided to provide internal recycle under flow control to the inlet of the desalter to optimize wash water (Low TDS) consumption and maintain the minimum required wash water rate. A gas blanketed surge drum shall be provided to receive the wash water from its source. The wash water shall be pumped from the Wash Water surge drum by the Wash Water pumps to the desalting facility. Wash water shall be controlled by flow control to provide steady required wash water rate to crude oil desalting. Wash water supply shall not be based on level control of the surge drum. Water jetting header take off shall be upstream of the wash water flow orifice for aquifer water based wash water systems. For low TDS wash water systems, the desalter recycle pump discharge water to be used for water jetting.
Page 22 of 32

8.1.2

8.1.3

8.1.4

8.1.5

8.1.6

8.1.7

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

8.1.8 8.2

Sand/sludge recovery system shall be provided on the water jetting effluents from the dehydrator/desalter.

Chemical Systems 8.2.1 All GOSPs shall be provided with facilities for bulk storage (tanks) and injection of Demulsifier, corrosion inhibitor and Scale inhibitor.
Note: The need of chemical systems for Biocide, Oxygen Scavenger and Methanol injection need to be evaluated on a case by case basis.

8.2.2

All chemical storage tanks and injection skids shall be preferably located at one location. Large chemical storage tanks shall be accessible for road tankers. The chemical dosing pumps shall be positive displacement, metering type capable of adjusting the dosage rates both locally and remotely from the control system. Pump rate shall be confirmed by graduated cylinder installed on the pump suction. Refer to SABP-A-015. Each chemical dosage point shall have its own dedicated pump or pumps discharge manifold for dedicating the pump to one injection point. Each chemical dosage point shall be provided with a flow meter to monitor the chemical dosage rate and Low flow alarm. Strainers shall be provided upstream of the chemical dosing points. Two parallel strainers with isolation valve shall be provided if chemical dosing cannot be interrupted. With the exception of Demulsifier and methanol, all other chemical dosage rates and injection locations shall be finalized in consultation with CSD and Plant Corrosion control. Refer to SABP-A-018 and SABP-A-036. On line corrosion monitoring system (MICROCOR or equivalent) shall be provided in the GOSP to monitor corrosion. The locations for on-line corrosion monitoring shall be reviewed with CSD and Plant corrosion control. Refer to SABP-A-018 and SABP-A-036.
Note: Recommended locations for on-line corrosion monitoring are: Production Manifold, Wash water supply, HPPT water Out, LPPT Oil out, Dehydrator water out, Disposal Water out to disposal Line, GOSP crude to pipeline and Gas to pipeline.

8.2.3

8.2.4

8.2.5

8.2.6

8.2.7

8.2.8

Corrosion monitoring coupon locations shall be finalized in consultation with Plant Corrosion Control. Required space shall be provided for on-line coupon retrieval and installation tools. Refer to
Page 23 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

SABP-A-018 and SABP-A-036. 8.2.9 Anode Monitoring System (AMS) shall be provided on all vessels (HPPT, IPPT, LPPT, Dehydrator, desalter, WOSEP) that handle wet crude and are installed with anodes for cathodic protection. Corrosion inhibitor injection of the GOSP and crude Pipelines shall not be combined at one injection point at the production manifold. Separate corrosion Inhibitor injection (Pump, flow meter and Injection tubing) for the crude oil leaving the GOSP to the crude Oil pipeline shall be provided. The Flow meter of corrosion inhibitor injection to the crude pipeline shall be connected to OSPAS. This is applicable to all GOSPs existing and new. Refer to SABP-A-015, SABP-A-018 and SABP-A-036.
Note: To ensure good mixing the pipeline corrosion inhibitor injection point can be upstream of the crude tie-line control Valve or suction of the shipping pump.

8.2.10

8.2.11

The demulsifier injection points shall be provided at the production manifold and at the inlet of the dehydrator. For multiple desalting trains the demulsifier injection point to be located downstream of the common Charge pump discharge header. Mixing devices to mix the injected demulsifier with the wet crude shall be provided.
Note: 3-phase demulsifier mixing device will be tested at the production manifold. Approved mixing valve at the dehydrator inlet is available.

8.2.12

Minimum three 100% capacity demulsifier dosing pumps shall be provided for demulsifier injection.
Note: Refer SAEP-1663 for typical demulsifier dosage rates for different crude grades.

8.2.13

The Demulsifier injection rate shall be automated to optimize the demulsifier consumption.
Note: P&CSD/Plant Engineering to be consulted for finalizing the Algorithms for demulsifier automation.

8.2.14 8.3

Minimum one month storage capacity shall be provided for the demulsifier.

Hot Oil Systems 8.3.1 Specialized Hot Oil fluids including and Diesel can be used for heating the crude Oil in the GOSP. The selection of hot oil fluids is based on the auto ignition temperature, chemical degradation potential, scale and
Page 24 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

coke build up tendencies besides process heating requirements. Auto ignition temperature of the heating media shall be at least 50C above the max operating temperature. 8.3.2 8.3.3 Hot Oil Expansion vessel shall be provided. The Hot oil Expansion vessel shall be provided with inert gas blanket. The Hot oil return shall flow into the Hot Oil Expansion vessel. The Hot oil circulating pumps shall take suction from the Hot oil expansion vessel. Minimum 3 x 50% capacity Hot Oil circulation pumps shall be provided. The hot oil pump suction temperature shall be connected to the DCS. The wet crude shall be flowing through the tube side and the hot oil through the shell side of the hot oil heat exchanger. The Hot Oil fluid pressure shall be at least 50 psig higher than the cold process fluid (wet Crude) pressure in the hot oil heat exchanger to avoid chances of process fluids leaking into the hot oil system.

8.3.4

8.3.5 8.3.6

8.4

Drain Systems 8.4.1 All on-Shore GOSPs shall be provided with Closed Drain System per SAES-A-400/SAES-A-401 and Oily Water Drain Systems per SAES-S-020. All off-shore GOSPs, Well Platforms shall be provided with Closed Drain Systems per SAES-A-400/SAES-A-403 and Oily Water Drain System per SAES-S-020.
Note: For all new GOSPs, the term Closed Drain System (CDS) shall be used instead of Pressure Sewer System and Oily Water Drainage System(OWDS) Instead of Gravity Sewer System ( consistent terminology). For existing GOSPs a Master Plan is ongoing to convert existing Pressure sewer and Gravity sewer systems into CDS and OWDS.

8.4.2

8.4.3

The closed drain header from the production manifold shall be run separately to the CDS drum and shall not be combined with other low pressure closed drain headers. Lined Pit shall be provided outside the GOSP Fence to collect emergency drains.

8.4.4

Page 25 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

8.5

Instrument Air/ Plant Air systems 8.5.1 8.5.2 8.5.3 8.5.4 The Instrument Air system shall be designed in accordance with SAES-J-901. The reciprocating Instrument air compressors at on-shore GOSPs shall be water-cooled. Plant air connection shall be provided at all utility stations besides nitrogen, LP steam and water connections. All Instrument Air Surge drums shall be internally prepared and coated with heat cured phenolic coating APCS-100 in accordance with SAES-H-002.

8.6

GOSP In-Plant Piping 8.6.1 8.6.2 8.6.3 The GOSP piping system shall be designed based on SAES-L-100. The Spec breaks between two piping codes shall be connected by flanges. A spectacle plate shall be provided at the spec break flange. Non-slam type Check valves shall be installed at the following locations: 8.6.4 Gas outlets of all Production Separators( HPPT, IPPT, LPPT, LPDT) Gas slug catchers, receiving gas from satellite GOSPs Crude Charge Pumps, Booster Pumps and Shipping Pumps discharge Bypass lines of Booster and Shipping Pumps Crude oil stabilizer gas outlet Crude oil, Gas export lines and Water disposal line exiting the GOSP.

Pipe Line Leak Detection System (LDS) shall be installed on the crude Oil and Gas export lines of the GOSP per SAES-Z-003. The leak detection signal shall close the export ESD valve to the pipeline from the GOSP. The Plant ESD system will activate the plant shutdown on high trap levels on crude oil pipeline LDS. On Gas pipeline Leak Detection, the export ESD valve shall close resulting in GOSP Gas flaring. All wet crude, formation water and Wasia water piping shall be coated as per SAES-H-001 and SAES-H-002.
Page 26 of 32

8.6.5

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

8.6.6 8.6.7

All bypass lines of control valves, ESD valves, Relief valves and other similar applications shall be sloped for self-draining on both sides. The design velocities in the low pressure piping from the Low pressure degassing Tanks/vessels to the Spheroid compressor shall not exceed 40 feet/sec. The selected line size shall ensure that the minimum velocity criteria shall be met at turn-down.

GOSP De-Bottlenecking 9.1 A flare and Relief system study shall be conducted to establish the maximum crude capacity of the GOSP at the operating and future projected GORs of the field. The plant capacity to be estimated based on the Relief and Flare system capacity at the operating GOR. A process study shall be conducted to establish the equipment or pipelines limitation at the plant capacity established by the flare and relief system capacity. A Plant test shall be conducted with concurrence from P&CSD/UPED/OPU and P&CSD/DPED/F&RSU to confirm the equipment limitations. A Management of Change (MOC) process shall be completed for any changes to facilities including the Design Capacity of the plant.

9.2 9.3

9.4 9.5

26 February 2013

Revision Summary New Saudi Aramco Engineering Standard.

Page 27 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

Appendix I Simplified Schematic of Satellite On-Shore GOSP

Page 28 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

Appendix II Simplified Schematic of Off-Shore GOSP

Page 29 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

Appendix III Simplified Schematic of Simple GOSP with Gas Compression

Page 30 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

Appendix IV Simplified Schematic of Complex GOSP with Gas Compression and Crude Stabilization

Page 31 of 32

Document Responsibility: Process Engineering Standards Committee Issue Date: 26 February 2013 Next Planned Update: 26 February 2018

SAES-A-010 Gas Oil Separation Plants (GOSPs)

Appendix V Simplified Schematic of Hot Oil System

Page 32 of 32