Professional Documents
Culture Documents
Chemical & Process Technology: Simple Method For Compressor Settle Out Using HYSYS
Chemical & Process Technology: Simple Method For Compressor Settle Out Using HYSYS
12/21/12 8:03 PM
CHEM & PROC TECH OIL & GAS TECH HEAT & EXCH TECH GEN TECH
Search
Web
Aspen Hysys
Compressor
Pressure
Calculation
Hot Posts
designed in accordance to any pressure vessel code e.g. ASME, JIS, BS, GB, etc,... How to apply valve equation in HYSYS Depressuring ? High pressure and moderate/low temperature operation are common in oil and gas industry. High pressure system with large vessels will lead to large inventory and it significantly increases hazardous level to personnel
FREE Info
Free Newsletter Free Magazine
Latest Posts
Saturate Dry Gas With Water in HYSYS Using SATURAT... Saturate Dry Gas With Water in HYSYS Enter your email address: Simple but Effective Approach to Hazard Analysis i... Several Strategies To Minimize Relief Capacity in ... CO2 Corrosion Rate Using M-506 Model Common FAQs Related to NACE Standard MR0175 / ISO ... Material Selection... USER Responsibility Error in NACE MR0175 / ISO 15156 Anti-surge Control (ASC) or Capacity Control (CC) ... Guideline on Use of MR0175 / ISO15156
Display problem ? Click HERE Recommended : Subscribe FREE - Processing Magazine Compressor emergency blowdown is commonly initiated after compressor system shutdown. The compressor shutdown will also lead to Compressor System Suction shutdown valve (SDV) and Discharge SDV to shut close and the anti-surge and/or capacity control valve open. Compressor discharge with high pressure and hot, air cooler and downstream high pressure and cold and suction vessel low pressure and cold will be settled-out prior to blowdown. How to estimate the settle out condition ? Settle-out of compressor system can be conducted using HYSYS. The main concept is constant mass and volume before and after settle-out. It is assumed the settle out is carried out adiabatically. Following are some steps can be used to obtain the settle-out condition. Let start with following image.
Subscribe
Links
Chem & Proc tech Oil & Gas tech Heat Exch tech Gen Tech Webworm DC Chemical and Process Engineering Chemical Engineering World Smart Process Design ChEng
Visitors
http://webwormcpt.blogspot.com/2008/11/simple-method-for-compressor-settle-out.html Page 1 of 3
Chemical & Process Technology: Simple Method For Compressor Settle Out Using HYSYS
12/21/12 8:03 PM
Step 1 : Calculate physical volume of Compressor Suction (V1), Compressor Discharge (V2) and Air Cooler Downstream (V3). Step 2 : Setup the system as per above image by correct Compressor Suction, Compressor Discharge and Air Cooler Downstream operating condition and composition. Step 3 : Adjust Compressor Suction, Compressor Discharge and Air Cooler Downstream Mass flow until the respective Actual Volumetric Flow same as V1, V2 and V3. Step 4 : Set Balance (BAL-1) for Mole & Heat Step 5 : Adjust Settle-out Cond stream pressure until the Actual Volumetric Flow same as V1+V2+V3. Thus, the settle out condition can be extracted from the Settle-out Cond stream. Do you aware of other method ? Why not share with us ?
4 users online
Archives
April 2007 May 2007 June 2007 July 2007 August 2007 September 2007 October 2007 November 2007 December 2007 January 2008 February 2008 March 2008 April 2008 May 2008 June 2008 July 2008
Related Topic
Adjusted Method For Compressor Settle Out (with Vapor & Liquid) Using HYSYS Simple Manual Method for Settle Out Condition Estimation Combine Anti-surge control (ASC) & Capacity Control (CC) Functions ? Useful Documentation for HYSYS ... Depressuring - Save Some Time in HYSYS - FLARENET Iteration FAQ Related to Control Valves Useful Documents Related to Control Valve How to apply valve equation in HYSYS Depressuring ?
Process Engineer
Dubai
recruiting for a Process Engineer to join this well... Process Engineers. As the Process Engineer, you will be responsible for the following: - Develop process... OilCareers more jobs Ads by Google
December 2008 January 2009 February 2009 March 2009 April 2009 May 2009 June 2009 July 2009
Recommended Jobs
August 2009 September 2009 October 2009 November 2009 December 2009 January 2010 February 2010
-->
Shipping Container
Security System
Senior Chemist Abu Dhabi Operations Manager - Wireline Abu Dhabi Senior Process Engineer Abu Dhabi
4 Comments:
Anonymous said... Hai, I have used Hysys dynamic depressuring utility to calculate the settle put pressure.
March 2010 April 2010 May 2010 June 2010 July 2010
Go
Regards, Kathiravan. November 12, 2008 9:43 AM Webworm said... Kathiravan, Thanks for your advice.
http://webwormcpt.blogspot.com/2008/11/simple-method-for-compressor-settle-out.html
Page 2 of 3
Chemical & Process Technology: Simple Method For Compressor Settle Out Using HYSYS
12/21/12 8:03 PM
It should be an interesting method. Do you mind to share with us or drop me a note ? E-Add : webwormcpt.wwcpt@gmail.com Webworm November 12, 2008 2:37 PM Anonymous said... Instead of using BALANCE, why not just put a valve between the streams "mixed" and "settle-out cond" as described by Aspentech? KON August 9, 2012 12:07 AM Webworm said... The Settle-out pressure will be higher than the Compressor suction. BALANCE allows higher pressure. November 16, 2012 10:01 PM
Post a Comment
Let us know your opinion !!! You can use some HTML tags, such as <b>, <i>, <a>
Enter your comment...
Comment as:
Publish
Google Account
Preview
Home:
<< Home
http://webwormcpt.blogspot.com/2008/11/simple-method-for-compressor-settle-out.html
Page 3 of 3