Construction Schedule For Sewege Treatment Plant

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 22

SEWERAGE SCHEME OF RAHIM YAR KHAN CITY WITH TREATMENT PLANT ZONE I Targets of Balance Work

Sr No. A 1 Description / Scope Balance Qty.


Nov,10 Dec,10 Jan,11 Feb,11 Mar,11 Apr,11 May,11 Jun,11

Remarks

STP,Pattan Minara Brick Lining


i) ii) Arrangement of Material / Labour Lining (daily consumption of Bricks (322807/30=10760 Nos /day)

200 Sq.m/ day

677 m

Interconnection of Ponds
i) ii) Arrangement of Material / Labour Supply of R.C.C pipes 21"i/d = 63 Nos,18" i/d = 36 Nos. 21" i/d 18" i/d iii) iv) v) vi) Excavation / Lean Concrete Steel Fabrication of Inlet / outlet slides Concrete laying of inlet / outlet slides Laying of pipes and concrete pouring

01 Structure / day

36 Nos.

63 Nos. 15 pipes/day 36 Nos. 15 pipes/day 2 Structures/day 1 Structure/day 2 Structures/day 2 Structures/day 100 m / day
4035 m3

Soling / Brick Pavement ( 8433 m)


i) ii) iii) Arrangement of Material / Labour Levelling / Dressing / Compaction of bed Pavement (Cosumption of bricks 1923968/90 = 21377 / day) Arrangement of Material / Labour / Moulds for casting of R.C.C Posts Casting of Concrete Poles (1036/15 = 70 days) Arangement of barbed wire (13 gauge) and eye bolts (10 mm) Installation of Concrete Poles 1036 /20 = 52 days Installation of Barbed Wire (2539 / 30 = 85 days)

150 m / day 423 sq.m


2539 m

Barbed Wire Fencing


i) ii) iii) iv) v) Moulds 5 Nos. Base Plate 15 Nos.

20 Poles / day 30 m / day


1 Job

Distribution Chamber
i) ii) iii) iv) v) Arrangement of material Excavation / Lean concrete Steel Fabrication for Base Slab Concrete Laying in Base Slab Steel Fabrication of Walls

Sr No.

Description / Scope

Balance Qty.

Nov,10

Dec,10

Jan,11

Feb,11

Mar,11

Apr,11

May,11

Jun,11

Remarks

STP,Pattan Minara vi) Concrete pouring in walls


6

Inlet Channel
i) ii) iii) iv) v) vi) Arrangement of material and labour Excavation / Lean concrete Steel Fabrication in Base Slab Concrete laying in base Slab Steel Fabrication for walls Concrete pouring in walls

15 m / day
(535/15 = 53 days)

535 m

Outlet channel
i) ii) iii) iv) v) vi) Arrangement of material and labour Excavation / Lean concrete Steel Fabrication in Base Slab Concrete laying in base Slab Steel Fabrication for walls Concrete pouring in walls

15 m / day
(610/15 = 40 days)

610 m

Area Lighting
i) ii) Arrangement of poles Installation of poles with laying of wires (8 nos. x 3 days = 24 days)

1 pole/ 3 days

1 Job

Plantation
i) ii) iii) Laying of Sweet soil Arrangement of plants Plantation 3421/60 = 57 /day

3421 Nos.

Pattan Minara Disposal 1 Generator Room


i) ii) iii) iv) v) vi) Arrangement of material and labour Excavation and Lean Concrete Steel Fabrication for Columns and Beams Concrete Pouring in columns and Beams Brick Work / Foundation / Cable Trench / Flooring Fabrication for Roof slab

1 Job

vii) Concrete laying in Roof slab viii) Fixing of Windows / Ventilators / Door Shutter ix) x) Plaster Electrification

Sr No. 2

Description / Scope

Balance Qty.
1 Job

Nov,10

Dec,10

Jan,11

Feb,11

Mar,11

Apr,11

May,11

Jun,11

Remarks

Staff Quarter STP,Pattan Minara


i) ii) iii) iv) v) vi) Arrangement of material and labour Excavation and Lean Concrete Brick Work / Flooring / Plaster Fixing of Door / Window / Ventilators Electrification Sanitary Works

Pluging
i) ii) iii) iv) v) Arrangement of material /labour / machinery First layer Second layer Third layer Final Layer / Finishing

4 Jobs

Dry Well
i) ii) iii) iv) v) v) Civil Work Intermediate Slab Stairs / Railing Brick Work Fixing of Girder / Chain Pully Roof Slab

1 Job

Electrical works
i) ii) iii) Manual Change Over Control pannel Motor control centre

1 Job

Installation of Machinary & Yard Piping


i) ii) ii) iii) Construction of Foundation for Pumps M.S Sheet Installation under pumps Fixing of Machinery Yard Piping (suction, delivery with specials)

1 Job

Sr No. 7

Description / Scope

Balance Qty. 5 m / day


182 m

Nov,10

Dec,10

Jan,11

Feb,11

Mar,11

Apr,11

May,11

Jun,11

Remarks

STP,Pattan Minara (182 / 40 = 05 m/ day) Boundary wall


i) ii) iii) iv) North Side East Side West Side South Side

C 1

Lift station Sadiq Branch Generator Room


i) ii) iii) iv) v) vi) Arrangement of material and labour Excavation and Lean Concrete Steel Fabrication for Columns and Beams Concrete Pouring in columns and Beams Brick Work / Foundation / Cable Trench / Flooring Fabrication for Roof slab
1 Job

vii) Concrete laying in Roof slab viii) Fixing of Windows / Ventilators / Door Shutter ix) x) 2 Plaster Electrification
1 Job

Staff Quarter
i) ii) iii) iv) v) vi) Arrangement of material and labour Excavation and Lean Concrete Brick Work / Flooring / Plaster Fixing of Door / Window / Ventilators Electrification Sanitary Works

Sinking
i) ii) iii) Arangement of machinery Dewatering set etc. Excavation under SSWL

4 Jobs

Sr No. 4

Description / Scope

Balance Qty.
4 Jobs

Nov,10

Dec,10

Jan,11

Feb,11

Mar,11

Apr,11

May,11

Jun,11

Remarks

STP,Pattan Minara Pluging


i) ii) iii) iv) v) Arrangement of material /labour / machinery First layer Second layer Third layer Finishing

Dry Well
i) ii) iii) iv) v) v) Civil Work Intermediate Slab Stairs / Railing Brick Work Fixing of Girder / Chain Pully Roof Slab

1 Job

Electrical works
i) ii) iii) Manual Change Over Control pannel Motor control centre

1 Job

Installation of Machinery
i) ii) ii) iii) Construction of Foundatio for Pumps M.S Sheet Installation under pumps Fixing of Machinery Yard Piping (suction, delivery with specials)

1 Job

Screening Chamber
i) ii) iii) iv) Arrangement of Material (Screen / Pen Stock, etc) Intermediate Slab (Shttering / Steel Fabrication / Concrete Pouring Fixing of Screen Fixing of Pen Stock

1 Job

Boundary wall
i) ii) iii) iv) North Side South Side East Side West Side

(182 / 40 = 05 m/ day)

5 m / day

180 m

Sr No. D 1 2 3 4 5 E 1 2

Description / Scope

Balance Qty.

Nov,10

Dec,10

Jan,11

Feb,11

Mar,11

Apr,11

May,11

Jun,11

Remarks

STP,Pattan Minara Sewer Lines


Manufacturing of Pipe Laying of Pipe Line V - X Manufacturing of Pipe Laying of Pipe Line R - V Laying of Pipe Line B - R 72" dia 72" dia 66" dia 66" dia 27" dia / M.H
390 m / 160 Nos. 1072 m 512 m 543 m 30 m Assumption-Stay order vacated in January,11

Other works
Ittefaq colony disposal Missing link to old disposal Line S -T 27" dia i) ii) Manufacturing of pipe Laying of pipe

317 m / 130 Nos. 318 m / 130 Nos.

G - I sewer line
i) ii) Manufacturing of pipe Laying of pipe

48" dia
543 m/ 223 Nos. 543 m/ 223 Nos.

4 5

Line N-H City chowk crossing L-AW - 6a Abdu Zahbi road


i) ii) Manufacturing of pipe Laying of pipe

21" dia 21" dia

192 m /

79 Nos.

287 m / 118 Nos. 287 m / 118 Nos.

L-AW-6a Nazim Line


i) ii) Manufacturing of pipe Laying of pipe

12", 15", 18" dia


1636 m/ 670 Nos. 1636 m / 670 Nos.

U1-V1 Niazi colony missing link, 24" dia


i) ii) Manufacturing of pipe Laying of pipe
390 m/ 160 Nos. 390 m/ 160 Nos.

L-AW-2a Rescue/Hospital Road 21"dia


i) ii) Manufacturing of pipe Laying of pipe
852 m/ 350 Nos. 852 m/ 350 Nos.

Sr No. 9

Description / Scope

Balance Qty.

Nov,10

Dec,10

Jan,11

Feb,11

Mar,11

Apr,11

May,11

Jun,11

Remarks

STP,Pattan Minara A1-C Shahi road


i) ii) Manufacturing of pipe Laying of pipe

12", 15" dia


649 m/ 266 Nos. 649 m/ 266 Nos.

10

A2-C-B Shahi road


i) ii) Manufacturing of pipe Laying of pipe

15",18" dia
791 m/ 324 Nos.

791 m/ 324 Nos. 1 Job 35 m 1 Job

11 12 13 14

Collection Chamber Dari sangi "Q" Point Q-J Crossing of Fauji Chowk 24" dia

Collection Cahmber Ittefaq Town "U" Point Q-J Zarai College (additional)
i) ii) Manufacturing of pipe Laying of pipe

18" dia
65 m / 65 m / 27 Nos. 27 Nos.

15

Syphon Line Y-Z


i) ii) iii) iv) v) vi) Arrangement of material / Labour Diversion of seepage drain Excavation / Lean Concrete Steel Fabrication for Base Slab Concrete Laying in Base Slab Steel Fabrication / Shuttering of Walls

72" dia

1 Job

vii) Concrete Pouring viii) Construction of Manholes ix) x) xi) Laying of pipe 72"i/d Steel Fabrication & Shuttering for R.C.C Conduit Concrete Pouring

xii) Backfill / Dressing / Stone Pitching / Finishing 16

Ventilating Shaft
i) ii) Arrangement of material (Poles, etc) / labour Fixing of Poles

35 Nos.

Sr No. 17

Description / Scope

Balance Qty.
10 m

Nov,10

Dec,10

Jan,11

Feb,11

Mar,11

Apr,11

May,11

Jun,11

Remarks

STP,Pattan U-V MissingMinara Link


i) ii) Manufacturing of pipe Laying of pipe

33" dia

18

U-V Crossing
i) ii) Manufacturing of pipe Laying of pipe

18" dia
24 m / 9 Nos. 24 m / 9 Nos.

19 20 21

D-E-F-H Missing link/M.H Line I-R Missing Manhole A.C Force main Dari Sangi
i) ii) iii) Arrangement of A.C pipe Laying of pipe Testing of Pipe

21", 24" dia 54" dia 4" dia

44 m 1 No.

715 m 715 m

22 23 F 1

Fixing of machinery Lift Station Dari Sangi Fixing of machinery Lift Station chak 111/P Gharbi. G.R.P PIPE (Forcemain)
Ittefaq colony Arrangement of pipe Laying of pipe 20" 20" 20" 20" 36" 36" 36" 36" 36" 36"

1 Job 1 Job

176 m

Basti Amanat Ali

Arrangement of pipe Laying of pipe

285 m

Basti Kahur

Arrangement of pipe Laying of pipe

560 m

Chak 111/East/West Arrangement of pipe Laying of pipe

253 m

Pattan Minara

Arrangement of pipe Laying of pipe

120 m

SEWERAGE SCHEME OF RAHIM YAR KHAN CITY WITH TREATMENT PLANT ZONE II Targets of Balance Work
Sr. No. Description Balance Qty.
Nov,10 Dec,10 Jan,11 Feb,11 Mar,11 Apr,11 May,11

A Lift station Moye Mubark P.IV 1 Sinking of well i) ii) iii) i) ii) iii) iv) v) i) ii) iii) iv) v) vi) i) ii) iii) iv) v) vi) vii) viii) ix) x) i) ii) iii) iv) Arangement of machinery Dewatering set etc. Excavation under SSWL

4 Jobs

2 Pluging Arrangement of material / labour / machinery First layer Second layer Third layer Finishing

4 Jobs

3 Dry well Civil Work Intermediate Slab Stairs / Railing Brick work Fixing of Girder/ Chain Pully Roof Slab

1 Job

4 Generator room Arrangement of material / labour / machinery Excavation and lean concrete Steel fabrication for columns and beams Concrete pouring in columns and beams Brick work / Foundation / cable trench / flooring Fabricatio for Roof Slab Concrete laying in Roof Slab Fixing of Windows/ Ventilators/ Door Shutters Plaster Electrification

1 Job

5 Installation of Machinery & Yard Piping Constructio of foundations for pumps M.S Sheet Installation under pumps Fixing of machinery Yard piping (suction / delivery with specials)

1 Job

Sr. No.

Description

Balance Qty.
1 Job

Nov,10

Dec,10

Jan,11

Feb,11

Mar,11

Apr,11

May,11

Lift stationChamber Moye Mubark P.IV 6 Screening


i) ii) iii) iv) i) ii) iii) Arrangement of material (Screen/Penstock.etc) Intermediate Slab (Shuttering/Steel Fabrication/Concrete Pouring) Fixing of Screen Fixing of Pen Stock 3 m / day

7 Boundary wall North Side East Side West Side

200 m

iv) South 8 GRP Pipe 40" dia i) ii) iii) i) ii) Arrangement of GRP Pipe Laying of Pipe Testing of pipe

290 m

9 Electrical works Manual Change Over Control Panel

1 Job

iii) Motor control Centre 10 Ventilating Shaft i) ii) Arrangement of material (Poles, etc) Fixing of Poles

4 Nos

B Package III,V 1 LAW6-b 18" i/d i) ii) i) ii) i) ii) i) Manufacturing of pipes Laying of pipes Arrangement of material / labour / machinery Laying of pipe
2 MH 219 m / 90 Nos. 15 m/ (4 MH)

2 Under water sewer(KLM 30")

3 L4a 21" i/d Arrangement of material / labour / machinery Laying of pipe

4 LAW1-b 15" i/d Arrangement of material / labour / machinery

112 Mtr

Sr. No.

Description

Balance Qty.

Nov,10

Dec,10

Jan,11

Feb,11

Mar,11

Apr,11

May,11

Lift station ii) Laying of Moye pipe Mubark P.IV


5 Under water sewer(KLM 36") i) ii) iii) i) ii) i) ii) i) ii) iii) i) ii) Shifting of Poles Arrangement of material / labour / machinery Laying of pipe Manufacturing of pipe Laying of pipe Manufacturing of pipe Laying of pipe Arrangement of GRP Pipe Laying of pipe Testing of Pipe
115 Mtr 18 Mtr (1 MH)

6 L5a 12" i/d 677 Mtr 677 Mtr


279 Nos. 279 Nos.

7 LAW3-b 15" i/d


60 Mtr/ 25 Nos

60 Mtr

3 M.H 901 Mtr

8 Forcemain 12" dia Basti Shahidan

9 L4b 12" i/d Arrangement of material / labour / machinery Laying of pipe

10 Remaining connections in Package III,V i) ii) Arrangement of material/ labour/ machinery Laying of pipe

50 Mtr

C Package IX Part I

Lift station Chak 111/P


1 Generator Room i) ii) iii) iv) v) vi) vii) ix) Arrangement of material/ labour/ machinery Excavation and lean concrete Steel Fabrication for columns and beams Concrete pouring in columns and beams Brick work/ Foundation/ Cable Trench/ Flooring Fabrication for Roof slab Concrete laying in Roof slab Plaster / Finishing
1 Job

viii) Fixing of Windows/ Ventilators/ Door Shutter

Sr. No.

Description

Balance Qty.

Nov,10

Dec,10

Jan,11

Feb,11

Mar,11

Apr,11

May,11

Lift station Moye Mubark P.IV x) Electrification


2 Dry well i) ii) iii) iv) v) vi) Civil Work Intermediate Slab Stairs / Railing Brick work Fixing of girder / Chain pully Roof slab
1 Job 1 Job

3 Installation of Machinery i) ii) iii) iv) Construction of foundation for pumps M.S Sheet Installation under pumps Fixing of machinery Yar piping (Suction / Delivery with specials)

4 Electrical works i) ii) iii) Manual Change Over Control pannel Motor control centre

1 Job

Lift station Nore wali/ Kacha sadiq abad road


1 Electrical works i) ii) iii) Manual Change Over Control pannel Motor control centre
15 Mtr 1 Job

2 yard piping (Suction / Delivery with specials) D Package IX Part II

Lift station J1 Point Water works


1 yard piping (Suction / Delivery with specials) 2 Boundary wall i) ii) iii) North Side East Side West Side
1 Job 63 Mtr

Sr. No.

Description

Balance Qty.

Nov,10

Dec,10

Jan,11

Feb,11

Mar,11

Apr,11

May,11

Lift station Moye Mubark P.IV iv) South Side Lift station Basti Nayian 1 Forcemain(C.I)
i) ii) Arrangement of Pipe / Labour / machinery Laying of pipe
157805 Cum 32 Mtr

E STP,Moye Mubarak P.VIII 1 Earth Work i) Excavation / Filling for Ponds 1520 cu.m/day
220 Sq.m / Day 3521 Cum.

2 Lining of Anaerobic ponds i) ii) Arrangement of material / labour Lining (daily consumption of bricks 2537159 / 215 = 11800 Nos/ day)

3 Lining of Facultative Ponds i) ii) Arrangement of material / labour Lining (daily consumption of bricks 1893929 / 205 = 9240 Nos/ day)

172 Sq.m / Day

3972 Cum

4 Lining of Maturation ponds i) ii) Arrangement of material / labour Lining (daily consumption of bricks 648952 / 200 = 3245 Nos/ day)

61 Sq.m / Day

1361 Cum

5 Distribution Chamber i) ii) iii) iv) v) vi) Arrangement of material Excavation / Lean concrete Steel Fabrication for Base Slab Concrete Laying in Base Slab Steel Fabrication of Walls Concrete pouring in walls 7 m/ day

1 Job

6 Inlet Channel i) ii) iii) iv) Arrangement of material and labour Excavation / Lean concrete Steel Fabrication in Base Slab Concrete laying in base Slab

497 Mtr

Sr. No.

Description

Balance Qty.

Nov,10

Dec,10

Jan,11

Feb,11

Mar,11

Apr,11

May,11

Lift station Moye Mubark v) Steel Fabrication for walls P.IV


vi) Concrete pouring in walls
1 Job

7 Interconnection i) Arrangement of Material / Labour Casting of R.C.C pipes ii) 21"i/d = 56 Nos,18" i/d = 32 Nos. iii) Excavation / Lean Concrete iv) Steel Fabrication of Inlet / outlet slides Concrete laying of inlet / outlet slides v) vi) Laying of pipes and concrete pouring 8 Outlet Channel i) ii) iii) iv) v) vi) Arrangement of material and labour Excavation / Lean concrete Steel Fabrication in Base Slab Concrete laying in base Slab Steel Fabrication for walls Concrete pouring in walls

10 pipes/day 10 pipes/day 1 Structures/day 1 Structure/day 1 Structures/day 1 Structures/day 8 m / day

549 Mtr

9 Soling / Brick Pavement ( 1204 m) i) Arrangement of Material / Labour ii) Levelling / Dressing / Compaction of bed Pavement (Cosumption of bricks iii) 2431148/75 = 32415 Nos./ day) 10 Area Lighting i) Arrangement of poles Installation of poles with laying of wires (8 nos. x 3 days = 24 days)

16 m / day 50 m / day

5098.67 Cu.m

1 pole/ 3 days

1 Job

ii) 11 Plantation i) Laying of Sweet soil ii) Arrangement of plants iii) Plantation 3090/30 = 103 Plants /day 12 Barbed Wire Fence i) Arrangement of Material / Labour / Moulds for casting of R.C.C Posts ii) Casting of Concrete Poles (1051/15 = 70 days) iii) Arangement of barbed wire (13 gauge) and eye bolts (10 mm) iv) Installation of Concrete Poles 1051 /20 = 53 days

3090 Nos

2575 Mtr Moulds 5 Nos. Base Plate 15 Nos.

20 Poles / day

Sr. No.

Description Installation of Barbed Wire P.IV v) Lift station Moye Mubark (2575 / 150 = 18 days)

Balance Qty.

Nov,10

Dec,10

Jan,11

Feb,11

Mar,11

Apr,11

May,11

150 m / day

YAR KHAN CITY WITH TREATMENT PLANT ZONE II of Balance Work


Jun,11

Remarks M/S Friends Engineering Co.

Jun,11

Remarks

Azhar Construction Co.

Jun,11

Remarks

Nadeem Construction

Jun,11

Remarks

Sadaqat Builders

work is in progress

Jun,11

Remarks

M/S Nisar Ahmed & Company work is in progress

Further time extention may be required after June 2011

Jun,11

Remarks

Jun,11

Remarks