Professional Documents
Culture Documents
2014 Budget Summary City of Portage La Prairie
2014 Budget Summary City of Portage La Prairie
2014 Budget Summary City of Portage La Prairie
As of:
12/17/2013 N.N.
APPROVAL STATUS PROPOSED APPROVED APPROVED APPROVED DISCR DESCRIPTION ITEMS DISCR ITEMS NEW/ADDN SERV CAPITAL ITEMS
INCREASE
0.69%
GENERAL FUND
G=Grant D=Debenture R=Reserve
R R G
By-Law Enforcement Officer Centennial Park design - Recreation architect Community Bike Path Project Fisher Ave Rail path lighting Grant Crescent Lake Aquatic Weed study Crescent Lake Aquatic Weed study
60,000 General Reserve General Reserve Bike Path Cttee Crescent Lake Environmental 60,000 10,000 100,000 30,000 14,000 20,000 80,000 45,000 60,000 359,000
R R R
R
Sask Ave Downtown improvements (results from 2 General Reserve Accommodation Tax - m PRED - establishment and Operating 0 0
R R
PCCI Capital - roof PCCI Capital - roof Glesby Centre PCCI Capital - furnace Glesby Centre Portage Community Revitalization - graffiti program Hometown MB Fort La Reine Museum - Grant Increase Discontinue Canad Inn Curling Classic Grant Discontinue Pond Hockey Grant Discontinue Portage Learning Centre Grant Reduce Misc. Grants 0
25,000 14,000 16,000 5,000 10,000 3,300 -1,500 -1,800 -7,800 -2,500 59,700
CITY MANAGER/ADMINISTRATION
Regional Heritage Archive supplies for 3 years City Hall Parking Lease - request for increase Salary Survey Impact
SUB-TOTAL
CITY OF PORTAGE LA PRAIRIE DISCRETIONARY, CAPITAL AND NEW/ADDITIONAL SERVICES 2014 BUDGET
As of:
12/17/2013 N.N.
APPROVAL STATUS PROPOSED APPROVED APPROVED APPROVED DISCR DESCRIPTION ITEMS DISCR ITEMS NEW/ADDN SERV CAPITAL ITEMS
R R
City wide computer and related purchases Additional Storage Area Network Device
Computer Computer
58,325 12,000
-30,000 -30,000
70,325
PROTECTIVE SERVICES
RCMP Member reduction - shift to Admin staff Increase in 911 cost by $.30pp
SUB-TOTAL
R R
Portage International Committee Grant New Logo roll out New Logo roll out
SUB-TOTAL
SUB-TOTAL
OPERATIONS Non-discretionary
R R
Flooring for Engineering Office 2,475 2,475 Bridge Repairs General Reserve GIS development - data collection staff Land Drainage Sewer Renewal (Prince Ave.) Survey equipment replacement (Total Station) (50%General Reserve Lane drainage fix - 7th St to 8th St NW Prelim Eng-Cresc Lake Bridge/Causeway constr. Fuel Tax
CITY OF PORTAGE LA PRAIRIE DISCRETIONARY, CAPITAL AND NEW/ADDITIONAL SERVICES 2014 BUDGET
As of:
12/17/2013 N.N.
APPROVAL STATUS PROPOSED APPROVED APPROVED APPROVED DISCR DESCRIPTION ITEMS DISCR ITEMS NEW/ADDN SERV CAPITAL ITEMS
G R R G
Bridge Grant Park Drive - Gravel Road, Drainage, Gravel SidewaLand Development Park Drive - Paved Road Land Development Park Drive Local Improvement LED drawing display (50%)
Public Works R
Sweeper Land drainage system maintenence Sask Ave W ped rail crossing - additional funds 1 1/2 ton truck - 3rd purchase cottonwood maintenance Sidewalk Sask Ave 17th to 20th Sidewalk Sask Ave 17th to 20th Banners Crackfiller barrel mixer Christmas Lighting on Sask Ave
Parks & Facilities
3,500
R R R
R R R
Larviciding - additional nuisance Cemetery Mower Cemetery Mower Skid steer snow blower (cemetery) RCMP wall repairs, paint, lighting Replace culvert from Duck pond to Deer Pen 50HP Tractor Flail Mower Tandem Axle Trailer
1,500 13,700 1,000 5,000 10,000 8,000 40,000 8,000 5,000 3,000
Additional 2 weeks Fall Yard Waste Collection Barkman concrete garbage containers Litter, garbage and recycling collection staff Offset - trfr to Env Reserve Solid Waste Grant increases of $42,500 net
SUB-TOTAL
3400 Environmental
36,875
10,875
11,500 1,506,700
CITY OF PORTAGE LA PRAIRIE DISCRETIONARY, CAPITAL AND NEW/ADDITIONAL SERVICES 2014 BUDGET
As of:
12/17/2013 N.N.
APPROVAL STATUS PROPOSED APPROVED APPROVED APPROVED DISCR DESCRIPTION CARRYOVERS ITEMS DISCR ITEMS NEW/ADDN SERV CAPITAL ITEMS
Sidewalk
18,500
SUBTOTAL
0 36,875
0 10,875
18,500
TOTAL
NET TOTAL
36,875
10,875
600
138,000
UTILITY FUND
G=Grants D=Debenture R=Reserve
Council Requests & Strategic Plan (Section 5.8) Wastewater Nutrient Reduction Project R G Nutrient Removal Engineering Provincial Grant
Utility MWSB
Utility MWSB
500,000 500,000
Utility
250,000
Administration
Volunteer Vaccination Program Utility Superintendent or Asst City Engineer (incl bfts)
1,525 82,500
Engineering - Utility
Flooring for Engineering Office Water Distribution Renewal and Upgrading Projects R Water Distribution Renewal and Upgrading Projects
2,475 Utility
CITY OF PORTAGE LA PRAIRIE DISCRETIONARY, CAPITAL AND NEW/ADDITIONAL SERVICES 2014 BUDGET
As of:
12/17/2013 N.N.
APPROVAL STATUS PROPOSED APPROVED APPROVED APPROVED DISCR DESCRIPTION R R R Bridge Road Watermain Renewal, B257 Caithness to Meighen ITEMS DISCR ITEMS NEW/ADDN SERV CAPITAL ITEMS
Utility Bridge Road Watermain Looping Meighen Ave. to Rennick St Utility GIS Implementation - SW, HW, training, data collection, set-up Utility Survey equipment replacement (Total Station) (50% utility) Utility
Additional Seasonal Staff - GIS GIS Tech pool truck GIS Software - (CITYWORKS)
428,000 203,000 20,000 11,000 11,500 26,000 40,000 100,000 5,000 1,500 2,000
Utility
LED drawing display (50%) Tablets for Utility Reference Drawings (4) Pressure data loggers PW Utility
Vacuum Truck Line locator Sewer Pipe jetting contractor (4 weeks)
1,500 2,000
WTP
Potassium Permanganate pump Wire feed welder Sewer mag flow meter
R R
Anthracite media for sand filters Lime Sludge removal Raw Water Intake Pump Rebuild of hydrocyclones and valves replacement of ozone monitoring units on destruct unit
4,800 3,500 3,500 80,000 1,400,000 15,000 20,000 17,000 10,000 24,000 20,000 2,175,000 225,000 5,000 10,000 40,000 50,000 50,000
R R
Utility Utility
Water Meter Replacement Program Curb stop replacement allowance Reservoir ventilation interlock and switch Raw water check valves (3) Ozone automatic feed controls
Utility Utility
Utility
CITY OF PORTAGE LA PRAIRIE DISCRETIONARY, CAPITAL AND NEW/ADDITIONAL SERVICES 2014 BUDGET
As of:
12/17/2013 N.N.
APPROVAL STATUS PROPOSED APPROVED APPROVED APPROVED DISCR DESCRIPTION ITEMS DISCR ITEMS NEW/ADDN SERV CAPITAL ITEMS
Filter/membrane study
50,000
Wastewater
Repair/replacement of Communication Lines Digester Clean out
R
SBR Recirc pumps Basket for boom truck Tie offs/ grating at lift stations Tie offs at WPCF UV Doors Odour control Door Cube van renovations Broadband communication Dust Control Men's washroom upgrades Window blinds
Utility
40,000 100,000 80,000 7,000 5,000 5,000 5,000 5,000 9,000 2,000 3,000 3,000
SUB-TOTAL
25,775
25,775
165,525 6,902,500
18,032
LATE ITEMS:
CARRYOVERS:
0 25,775
0 25,775
18,032
183,557 6,902,500
NET TOTAL
CITY OF PORTAGE LA PRAIRIE DISCRETIONARY, CAPITAL AND NEW/ADDITIONAL SERVICES 2014 BUDGET
As of:
12/17/2013 N.N.
APPROVAL STATUS PROPOSED APPROVED APPROVED APPROVED DISCR DESCRIPTION ITEMS DISCR ITEMS NEW/ADDN SERV CAPITAL ITEMS
*Note: Carryovers from 2013 will be added prior to the offical financial plan to be released in March/April 2014.
TOTAL SPENDING BUDGET* General Operating Fund Utility Operating Fund Reserve Withdrawals Spending from Capital Grants Spending from Debentures