Excavation Work Permit
Excavation Work Permit
Excavation Work Permit
PERMIT No_______________
EQUIPMENT NO_________
TOOLS/EQUIPMENT REQUIRED:
SITE PREPARATION
DETAILED WORK PROCEDURE SEWERS/DRAINS TO BE CLOSED/PLUGGED WITHIN A RADIUS--- METERS ELIMINATE LEAKS/SPILLS DEPRESSURISE SCAFFOLD ERECTION BARRIER OFF PIPE /VESSEL/EQUIPMENT EMPTY AND PURGED INERT GAS/STEAM PURGED/FLUSHED WATER FLUSHING VALVE ISOLATION AND TAGGING KEEP FOLW IN THE LINE MECHANICAL/ ELECTRICAL ISOLATION
FIRE PRECAUTIONS
FIRE EXTINGUISHER
PERSONAL PROTECTION
PERSONAL H2 S DE TECTOR
REMOVE COMBUSTIBLE MATERIALS FIRE BLANKET FIREMAN NOTIFIED FIRE HOUSE AT WORKSITE PROVIDE FIREWATCH FIREMAN STANDBY CONTINUOUS LEL/UEL TEST H2S TEST-REGULAR INTERVAL OXYGEN TEST GAS TEST FOR
S.C.B.A
OR
C.A.L.B.A
EYE PROTECTION FACESHIELD SPECIAL WELDING PPE SPECIAL GRITBLASTING PPE CHEMICAL HANDLING PPE SAFETY HARNESS / BELT DUST MASK GAS MASK - FILTER FOR
PERFORMING AUTHORITY
ISSUING AUTHORITY
SAFETY
APPROVING AUTHORITY
..
LEL /UEL %
H2S.PPM
..
OXYGEN..%
TESTED BY..
LIST OF PERSONNEL
SIGNATURES FOR REISSUE - NIGHT SHIFT TIME From To Perfoming Authority TIME Issuing Authority PRA From To
DATE
Performing Authority
Issuing Authority
PRA
WORK SUSPENSION
WORK HAS BEEN SUSPENDED BY: ..
WORK RESUMING
TEST REPEATED WORK CAN BE RESUMED . P.R.A SAFETY
WORK COMPLETED
AT..HRS, DATE..
..
AT.HRS, DATE. ATHRS,
..
DATE..
PERFORMING AUTHORITY
P.R.A