By Product Project HSE Management Plan

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 19

HSE Management Plan

Project Title Document Title Document Number Client Date


Prepared by &onald B' Corrale( POSCO E&C Chief HSE Engineer Reviewed & Approved by Mr' )ee *in +on POSCO E&C HSE Manager Noted & Approved by Mr' ,im *ung *u POSCO E&C Site Manager Reviewed & Approved by Mr' ,ung Huang -u FHS Safety Manager

By Product Area Safety Management Plan HSE 001 HS Se!tember 1"# $01%
Signature Signature Signature

Signature

Tab e of Content!
"# $ightning Arre!tor & %rounding Sy!te& '# Site Safety (n!pe)tion & Coordination Meeting *# Safety He &et Co or Code A!!ign&ent +# ,ai y Manpower & Manhour Report -# Month y Safety (n!pe)tion for E.uip&ent & Too ! /# %round 0ater Sy!te& 1# 0a!te Manage&ent 2# Septi) Tan3 0a!te ,i!po!a 4# Firt! Aid Station & Medi)a E&ergen)y Re!pon!e

1. )ig.tning Arre(tor / +rounding Sy(tem. )ig.tning Arre(tor 0n(tallation 1bjecti2e The ob5e)tive of thi! p an i! to de!)ribe the preparation and in!ta ation of $ightning Prote)tion & %rounding Sy!te& for the te&porary !ite offi)e and the pro5e)t !ite to prote)t the !ite offi)e and the pro5e)t !ite in the event of ightning !tri3e# (n )a!e the igthning hit! the !ite offi)e or the pro5e)t !ite it wi preferentia y !tri3e the ightning rod and be )ondu)ted to ground through the wire6 in!tead of pa!!ing through the !tru)ture!6 where it )ou d !tart a fire or )au!e e e)tro)ution#

Preliminarie( The $ightning prote)tion & Earthing !y!te& de ivered and in!ta ed i! to be in a))ordan)e to the re evant !pe)ifi)ation! a! detai ed in the approved te)hni)a !ub&i!!ion# Prior to in!ta ation of ight fitting on the re.uired area!6 a bui der wor3! in) uding the fa !e Earthing &u!t be )o&p eted# The approved or ate!t revi!ion drawing &u!t be provided to the in!ta ation tea&! for the in!ta ation wor3!#

Procedure( $ightning prote)tion !y!te& and earthing &u!t be in the !tandard6 ightning (onif a!h R 7 "'8& $ightning prote)tion !y!te& and earthing &u!t be in the !tandard6 ightning (onif a!h R 7 4-& The !y!te& )onne)tion )ab e 9are Copper )ab e ":18&&' Conne)t the point of air fro& part! to a))e!!orie! )onne)ted u!ing P;C )onduit Po e -& g#i pipe , -8)ab e#

3Plea(e (ee attac.ment 4 1 for reference5

$' Site Safety 0n(!ection / Coordination Meeting HSE Site 0n(!ection 6it. Sub Contractor( Site HSE (n!pe)tion wi be )ondu)ted every Tue!day at 4<88 to "8<88a& wee3 y to &a3e !ure a the HSE re.uire&ent! are being i&p e&ented and to be fo owed with HSE wee3 y )oordination &eeting at "<88 to '<88p& to di!)u!! and to put on &inute! of &eeting to re)ord a the HSE ob!ervation! generated during the HSE in!pe)tion and to do i&&ediate a)tion for !o&e HSE i!!ue! that re.uire! )orre)tive a)tion!# "# '# *# +# -# /# 1# =ob Safety Ana y!i! Per!ona Prote)tive E.uip&ent >PPE?!@ S)affo d! A))e!! A Egre!! Too ! & E.uip&ent! )ondition Toi et! & Re!t Area 0a!te ,i!po!a

Parti)ipant wi !ign in at the attendan)e !heet and &inute! of &eeting wi be di!tributed to a the attendee?! for re)ord#

%' Safety Helmet Color Code A((ignment

Site Engineer?!

EHS Engineer!

0or3er!

7' Daily Man!o6er &e!ort ,ai y Manpower report are in) uded on the ,ai y EHS (n!pe)tion Report6 to &onitor the nu&ber of POSCO E&C Pro5e)t E&p oyee?!6 Engineer?!6 Supervi!or! and 0or3er! of ea)h Sub Contra)tor! in order to re)ord the nu&ber of hour! for the Safety Stati!ti)! needed for the " &i ion &anhour! without $o!t Ti&e Ca!e &i e!tone# Safety Stati) report wi a !o be in) uded on the Site Manager every a!t Friday of the &onth# Pro5e)t Safety Stati!ti) 9oard

8' Mont.ly Safety 0n(!ection for Tool( / E9ui!ment A e.uip&ent & too ! uti iBed for thi! pro5e)t wi be in good )ondition and be !uitab e for u!e# Prior to Mobili:ation to Site A Sub Contra)tor! are re.uired to !ub&it i!t of too ! & e.uip&ent! prior to &obi iBation and to be fo owed with the a)tua in!pe)tion of the Too ! & E.uip&ent# Site E e)tri)a Engineer & EHS Engineer wi do the in!pe)tion and on)e a the too ! & euip&ent pa!!ed the in!pe)tion the EHS Engineer wi prepare the do)u&ent! for re)ord and the (n!pe)tion !ti)3er wi be affi:ed on ea)h too ! & e.uip&ent to &a3e !ure that a the too ! & euip&ent! are in good )ondition#

Note < Thi! wi be repeated y done every end of the &onth to &a3e !ure that a the too ! & e.uip&ent! are !afe to u!e#

P ea!e !ee be ow the Month y Too ! & E.uip&ent (n!pe)tion Co or Code Tab e & the Month y Too ! & E.uip&ent Month y (n!pe)tion Sti)3er#

Tool( / E9ui!ment Mont.ly 0n(!ection Color Code C.art

Project ; By Product Area

Mont.

Color Code
RE, 9$CE DE$$O0 %REEN RE, 9$CE

*anuary ebruary Marc. A!ril May *une

*uly Augu(t Se!tember 1ctober No2ember December


4 )&

DE$$O0 %REEN RE, 9$CE DE$$O0 %REEN

T11)S / E<=0PMENT M1NTH)- 0NSPECT01N (NSPECTE, 9D ,ATE COMMENTS Na&e & Signature
Mont.ly Tool( / E9ui!ment 0n(!ection Stic@er

- )&

>' +round ?ater Drilling for Site 1ffice Con(um!tion POSCO E&C are p anning to )ondu)t the %round 0ater ,ri ing with the per&i!!ion fro& the C ient >FHS@ and the $o)a Environ&ent ,ept# Pro)edure< POSCO E&C wi !ub&it Method State&ent6 i!t of e.uip&ent and i!t of &ateria ! for %round 0ater ,ri ing to the ) ient to get the per&i!!ion and approva # On)e the Method State&ent and other do)u&ent!wa! been approved by the ) ient6 POSCO E&C wi re.ue!t a referra etter fro& the ) ient to !erve a! the initia do)u&ent for the app i)ation of the per&it to the $o)a Environ&ent ,ept#

ollo6ing are (ome @ey( to being a good ground6ater or 6ater 6ell (te6ard'
+round6ater !rotection

Fir!t6 proper y !tore6 u!e6 and di!po!e of haBardou! !ub!tan)e!# The!e in) ude6 but are not i&ited to petro eu& produ)t!E paint! and paint thinner!E ferti iBer!E weed 3i er!E

pe!ti)ide! and ) eaning produ)t!# Proper u!e &ean! a way! fo owing the &anufa)turer?! in!tru)tion!# ,o not overFapp y produ)t!# Store haBardou! !ub!tan)e! in !ea ed )ontainer! in a !e)ure p a)e# ,o not du&p the& on the ground6 or pour the& down the drain or toi et# (n!tead6 )onta)t o)a wa!te authoritie! about proper di!po!a # Se)ond6 if you have a !epti) !y!te&6 have it )he)3ed regu ar y by a .ua ified !epti) !y!te& )ontra)tor# A fai ing !epti) !y!te& &ay pre!ent a )onta&ination threat to the groundwater# +round6ater con(er2ation Tip! for )on!erving water in) ude< "# '# +# -# Never pour water down the drain when there &ay be another u!e for it Repair dripping fau)et! and toi et!E one drop per !e)ond wa!te! '6188 ga on! a year Choo!e app ian)e! that are waterF andAor energyFeffi)ient6 !u)h a! water e!! urina ! ,onGt run a fau)et when not u!ing the water6 !u)h a! whi e bru!hing teeh

Pro!er 6ell location and con(truction (dea y6 a we ?! o)ation !hou d be deter&ined to prevent water )onta&ination

A' ?a(te Management 12er2ie6 Thi! Con!tru)tion 0a!te Manage&ent P an i! de!igned by POSCO E&C to &eet the C ient and the ;ietna& Environ&ent Standard# Thi! p an wi be adhered to by a !ub)onta)tor!6 a ong with POSCO E&C and other 5ob!ite per!onne during the )on!tru)tion of thi! pro5e)t# POSCO E&C wi i&p e&ent6 di!)u!! goa ! and i!!ue! a! part of !ub)ontra)tor )oordination &eeting!6 and do)u&ent thi! p an through the )our!e of )on!tru)tion a)tivitie!# EHS ,ept6 wi en!ure onF!ite e:e)ution of thi! p an# Project +oal( The goa for thi! pro5e)t i! to !egregate a the re)y) ab e wa!te &ateria ! and to &ini&iBe wa!te being brought to the andfi area# (n order to he p a)hieve the!e goa ! POSCO E&C wi provide wa!te !taging where wa!te &ateria ! )an be !egragated to prevent it fro& di!po!ing at the andfi # Cardboard C ean di&en!iona wood 9everage and food )ontainer! Ferrou! and nonFferrou! &eta ! Re)y) ab e P a!ti) C!ed e.uip&ent oi

A other wa!te &ateria !6 not i!ted above6 wi be hand ed a! genera refu!e and di!po!ed of at a i)en!ed and per&itted andfi # 0m!lementation Thi! wa!te &anage&ent p an wi be di!tributed to a !ub)ontra)tor! wor3ing on thi! pro5e)t# POSCO E&C wi di!)u!! goa ! and hand ing pro)edure! of the wa!te generated with it! !ub)ontra)tor! during )oordination &eeting!# The pro5e)tG! fir!t )oordination &eeting wi provide a orientation di!)u!!ion of the Con!tru)tion 0a!te Manage&ent P an# (te&! that wi be di!)u!!ed at thi! orientation wi be a! fo ow!<

P an re.uire&ent! A review of wa!te hand ing pro)edure! $o)ation of du&p!ter!Abin! 0a!te !egregation re.uire&ent! ,i!)u!!ion regarding )ro!! )onta&ination of wa!te ,i!)u!!ion regarding re!pon!ibi ity of &oving wa!te fro& the !ite to wa!te !taging area# Enfor)e&ent re.uire&ent! Open di!)u!!ion for !ugge!tion!A)o&&ent! regarding effe)tivene!! of p an#

,uring the !)hedu ed wee3 y )oordination &eeting!6 the HSE ,ept !taff wi deter&ine what type of wa!te wi &o!t i3e y be generated and in!tru)t the !ub)onta)tor! a! to where it !ha be p a)ed for re)y) e6 !a vaged6 or to be di!po!ed# A wa!te &anage&ent og wi be &aintained &onth y to put on re)ord a the &ateria ! that wa! been )o e)ted by the Environt&enta Servi)e! authoriBed by the o)a Environ&ent ,ept# Material Handling Procedure( The wa!te &ateria generated wi be !eparated a))ording to the above i!t for re)y) ing and 3ept in the wa!te !taging area unti it i! ready to be )o e)ted by the authoriBed !)rap buyer for re)y) ing# The wa!te &ateria ! !ha be prote)ted fro& )onta&ination of haBardou! &ateria ! that &ay 3eep the& fro& being re)y) ed proper y#

12

B' Se!tic Tan@ ?a(te Di(!o(al De(cri!tion and Pur!o(e Proper !anitary and !epti) wa!te &anage&ent prevent the di!)harge of po utant! to !tor&water fro& !anitary and !epti) wa!te by providing )onvenient6 we F&aintained fa)i itie!6 and arranging for regu ar !ervi)e and di!po!a authoriBed by the C ient & $o)a Environ&ent ,ept# Suitable A!!lication( Sanitary !epti) wa!te &anage&ent pra)ti)e! are !uitab e for u!e at a )on!tru)tion !ite! that u!e te&porary or portab e !anitary and !epti) wa!te !y!te&!# 0m!lementation Sanitary or !epti) wa!te! !hou d be treated or di!po!ed of in a))ordan)e with C ient & $o)a Environ&ent ,ept re.uire&ent!# POSCO E&C wi !ign a )ontra)t with the o)a Enviro&ent Servi)e! to &a3e !ure !anitary wa!te! are proper y di!po!ed# )ocation and Di(!o(al Procedure( Te&porary !anitary fa)i itie! !hou d be o)ated away fro& drainage fa)i itie!6 water)our!e!6 and fro& traffi) )ir)u ation# 0a!tewater !hou d not be di!)harged or buried within the pro5e)t !ite# Sanitary and !epti) !y!te&! that di!)harge dire)t y into !anitary !ewer !y!te&!6 where per&i!!ib e6 !hou d )o&p y with the o)a hea th agen)y6 &uni)ipa or !ewer di!tri)t re.uire&ent!# On y reputab e6 i)en!ed and authoriBed !anitary and !epti) wa!te hau er! !hou d be u!ed# Sanitary fa)i itie! !hou d be o)ated in a )onvenient o)ation# Cntreated raw wa!tewater !hou d never be di!)harged or buried# Te&porary !anitary fa)i itie! that di!)harge to the !anitary !ewer !y!te& !hou d be proper y )onne)ted to avoid i i)it di!)harge!# ,edi)ated wor3er! wi be a!!igned to &aintain the toi et!# 0a!te wi be )o e)ted regu ar y by i)en!ed and authoriBed !anitary and !epti) wa!te hau er! to prevent fro& overf owing#

13

Education Edu)ate e&p oyee!6 !ub)ontra)tor!6 and !upp ier! on !anitary and !epti) wa!te !torage and di!po!a pro)edure!# Edu)ate e&p oyee! and !ub)ontra)tor! of potentia danger! to hu&an! and the environ&ent fro& !anitary and !epti) wa!te!# (n!tru)t e&p oyee!6 !ub)ontra)tor!6 and !upp ier! in identifi)ation of !anitary and !epti) wa!te# ,i!po!a pro)edure! wi be in)orporate on the regu ar wee3 y !afety &eeting with !ub )ontra)tor to di!!i&inate the infor&ation#

0n(!ection and Maintenance in!pe)t wee3 y during the rainy !ea!on and of twoFwee3 interva ! in the nonF rainy !ea!on to prevent fro& overf owing# Arrange for regu ar wa!te )o e)tion# (f high wind! are e:pe)ted6 portab e !anitary fa)i itie! &u!t be !e)ured with !pi3e! or weighed down to prevent over turning#

14

"'

irt( Aid Station / Emergency Medical &e(!on(e Pur!o(e / Sco!e a@ Thi! written p an and po i)y6 a ong with a))o&panying &ateria !6 !ha be uti iBed by Pro5e)t Nur!e6 Engineer6 Pro5e)t Staff and Sub Contra)tor! to en!ure that &edi)a !ervi)e! and fir!t aid are avai ab e at the pro5e)t !ite# b@ Thi! po i)y app ie! to a e&p oyee! and !ub)ontra)tor! at wor3 o)ation! that are )ontro ed by POSCO E&C#

+eneral &e9uirement( a@ POSCO E&C wi en!ure the avai abi ity of &edi)a per!onne for advi)e and )on!u tation on &atter! of o))upationa hea th# b@ Provi!ion! !ha be &ade prior to )o&&en)e&ent of the pro5e)t for pro&pt &edi)a attention in )a!e of !eriou! in5ury# )@ (n the ab!en)e of ) ini)6 ho!pita 6 or phy!i)ian6 that i! rea!onab y a))e!!ib e in ter&! of ti&e and di!tan)e to the wor3!ite6 whi)h i! avai ab e for the treat&ent of in5ured e&p oyee!6 a per!on who ha! a va id )ertifi)ate in fir!t aid training fro& Red Cro!! or e.uiva ent AuthoriBed Fir!t Aid Training Center by the ,ept of Hea th of ;ietna& that )an be verified by do)u&entary eviden)e6 !ha be avai ab e at the wor3!ite to render fir!t aid# d@ Fir!t aid !upp ie! !ha be ea!i y a))e!!ib e when re.uired# e@ The )ontent! of the fir!t aid 3it !ha be p a)ed in a weatherproof )abinet with individua !ea ed pa)3age! for ea)h type of ite&6 and !ha be )he)3ed by the Pro5e)t Nur!e wee3 y to en!ure that the )on!u&ed ite&! are rep a)ed# ir(t Aid / Emergency Medical &e(!on(e a@ Proper e.uip&ent for pro&pt tran!portation of the in5ured per!on to a phy!i)ian or ho!pita 6 or a )o&&uni)ation !y!te& for )onta)ting ne)e!!ary a&bu an)e !ervi)e6 !ha be provided# The EHS Engineer & the Pro5e)t Nur!e !ha be re!pon!ib e for )onfir&ing the avai abi ity of e&ergen)y &edi)a !ervi)e! a!!i!tan)e !hou d they be needed6 and )onfir&ing that arrange&ent! are in p a)e for tran!porting in5ured per!on! to a phy!i)ian or ho!pita # b@ (n &o!t !ituation! )o&&uni)ation to obtain e&ergen)y &edi)a a!!i!tan)e wi be provided by andF ine te ephone or )e u ar te ephone#
15

The EHS Engineer !ha en!ure that !u)h )o&&uni)ation! )apabi itie! are avai ab e at the 5ob!ite prior to )o&&en)ing wor3# )@ The initia re!pon!ibi ity for fir!t aid re!t! with the fir!t per!on>!@ at the !)ene6 who !hou d rea)t .ui)3 y but in a )a & and rea!!uring &anner# d@ The per!on a!!u&ing re!pon!ibi ity !hou d i&&ediate y !u&&on &edi)a he p >be e:p i)it in reporting !u!pe)ted type! of in5ury or i ne!!6 o)ation of vi)ti&6 and type of a!!i!tan)e re.uired@# e@ Send peop e to &eet the e&ergen)y &edi)a !ervi)e! >EMS@ per!onne at highway inter!e)tion!6 entran)e roadway! or a! needed to he p dire)t the& to the !)ene# The in5ured per!on !hou d not be &oved e:)ept where ne)e!!ary to prevent further in5ury# f@ The i!t of the na&e! & )onta)t nu&ber of the trained per!one ! in CPR & Fir!t Aid wi be po!ted in pro&inent p a)e!# g@ The nu&ber to )a for &edi)a e&ergen)ie! >""-@ !ha a !o be po!ted in !afety bu etin board!# h@ A fir!t aid and &edi)a e&ergen)ie! !ha be reported to the EHS Engineer or Pro5e)t Nur!e !o that i&&ediate re!pon!e )an be &ade and proper a))ident reporting pro)edure! fo owed# +eneral ir(t Aid for Minor 0njurie( a@ For purpo!e! of thi! po i)y6 genera fir!t aid i! defined a! any oneFti&e treat&ent and any fo ow up vi!it for the purpo!e of ob!ervation6 treat&ent of &inor !)rat)he!6 )ut!6 burn!6 !p inter!6 and !o forth6 whi)h do not ordinari y re.uire &edi)a )are# b@ Minor in5urie! !hou d be initia y treated with !e fFad&ini!tered fir!t aid un e!! a!!i!tan)e of another per!on i! re.uired# Thi! i&it! the e:po!ure of other per!on! to potentia pathogen! in the b ood6 body f uid! and ti!!ue! of the in5ured per!on# )@ Minor in5urie! re.uiring genera fir!t aid !hou d a way! be reported to EHS Engineer or the Pro5e)t Nur!e and re)orded on the Fir!t Aid Report $og Sheet &aintained at pro5e)t !ite fir!t aid !tation#Thi! i! i&portant be)au!e a &inor in5ury &ay indi)ate a haBardou! !ituation that !hou d be )orre)ted to prevent a !eriou! future in5ury# (t i! a !o i&portant to do)u&ent a &inor in5ury a! having been Hwor3 re atedH if the in5ury ater ead! to !eriou! )o&p i)ation!6 !u)h a! fro& an infe)ted )ut# Per(onal Protection During ir(t Aid a@ OSHA re.uire! adheren)e to HCniver!a Pre)aution!H when e&p oyee! re!pond to e&ergen)ie! whi)h provide potentia e:po!ure to b ood and
16

other potentia y infe)tiou! &ateria !# HCniver!a Pre)aution!H !tre!!e! that a patient! !hou d be a!!u&ed to be infe)tiou! for H(; and other b oodborne pathogen!# b@ Per!on! re!ponding to a &edi)a e&ergen)y !hou d be prote)ted fro& e:po!ure to b ood and other potentia y infe)tiou! &ateria !# Prote)tion )an be a)hieved through adheren)e to wor3 pra)ti)e! de!igned to &ini&iBe or e i&inate e:po!ure and through the u!e of per!ona prote)tive e.uip&ent >i#e#6 g ove!6&a!3!6 and prote)tive ) othing@6 whi)h provide a barrier between the wor3er and the e:po!ure !our)e# )@ Per!on! re!ponding to a &edi)a e&ergen)y !hou d be prote)ted fro& e:po!ure to b ood and other potentia y infe)tiou! &ateria !# Prote)tion )an be a)hieved through adheren)e to wor3 pra)ti)e! de!igned to &ini&iBe or e i&inate e:po!ure and through the u!e of per!ona prote)tive e.uip&ent >i#e#6 g ove!6 &a!3!6 and prote)tive ) othing@6 whi)h provide a barrier between the wor3er and the e:po!ure !our)e# d@ For &o!t !ituation! in whi)h fir!t aid i! given6 the fo owing guide ine! !hou d be ade.uate For b eeding )ontro with &ini&a b eeding and for hand ing and ) eaning in!tru&ent! with &i)robia )onta&ination6 di!po!ab e g ove! a one !hou d be !uffi)ient# For b eeding )ontro with !purting b ood6 di!po!ab e g ove!6 a gown6 a &a!36 and prote)tive eye wear are re)o&&ended# For &ea!uring te&perature or &ea!uring b ood pre!!ure6 no prote)tion i! re.uired#

e@ After e&ergen)y )are ha! been ad&ini!tered6 hand! and other !3in !urfa)e! !hou d be wa!hed i&&ediate y and thorough y with war& water and !oap if )onta&inated with b ood6 other body f uid! to whi)h univer!a pre)aution! app y6 or potentia y )onta&inated arti) e!# Hand! !hou d a way! be wa!hed after g ove! are re&oved6 even if the g ove! appear to be inta)t# &e9uirement to &e!ort ?or@C&elated 0njurie( / 0llne((e( A 0or3 Re ated (n5urie! and ( ne!e! Sha be Reported and Treated A! Soon A! Po!!ib e After O))uren)e (f an e&p oyee of POSCO E&C & Sub Contra)tor! be)o&e! in5ured or i due to a wor3Fre ated in5ury or i ne!! and i! in need of i&&ediate &edi)a a!!i!tan)e6 thi! !ha be reported to the EHS Engineer or Pro5e)t Nur!e Fai ure to report &inor in5urie! or to re)eive &edi)a treat&ent &ay re!u t in
17

!eriou! infe)tion! or )o&p i)ation! to the hea th of the e&p oyee# The Fir!t Aid Station i! o)ated at the pro5e)t !ite te&porary fa)i ity# Fir!t Aid Station wi be provided with ' bed!6 ' !tret)her!6 " offi)e tab e6 )hair! and !to)3ed with ba!i) !upp ie! !pe)ified be ow# Ea)h Fir!t Aid Station wi a !o )ontain Fir!t Aid Report $og Sheet# 0hen fir!t aid i! rendered6 the Pro5e)t Nur!e wi note treat&ent on the Fir!t Aid Report $og Sheet# (n the event the e&p oyee REFCSES fir!t aid andAor e:a&ination by a do)tor6 thi! wi be noted in the Fir!t Aid Report# (MPORTANT< (f an e&p oyee de) ine! fir!t aid andAor &edi)a treat&ent for a reported onFtheF5ob in5ury after the Site Supervi!or or EHS Engineer re)o&&end! it6 the e&p oyee wi NOT be a owed to )ontinue wor3# Site Supervi!or! wi di!)u!! ea)h !u)h !ituation with the EHS Engineer or the Pro5e)t Ad&in ,ept# 9EFORE a owing the e&p oyee to return to duty# The Pro5e)t Nur!e wi be re!pon!ib e for )he)3ing and &aintaining the Fir!t Aid Station at the wor3 o)ation# The Pro5e)t Nur!e wi ta3e a regu ar inventory of !upp ie! and &a3e !ure that the !tation or 3it re&ain! ade.uate y !to)3ed# The fo owing fir!t aid !upp ie! )he)3 i!t !ha be u!ed a! a guide to en!ure proper !to)3ing of the !tation#

Fir!t Aid Supp ie! Che)3 i!t


The Fir!t Aid Station or Fir!t Aid Iit !hou d )ontain< (te& Prote)tive Rubber % ove! >Surgi)a Type@ Prote)tive CPR Ma!3 wAOneF0ay ;a ve Anti!epti) Soap Ab!orbent gauBe6 '+H : 1'H Spoo of ab!orbent gauBe $arge adhe!ive bandage!6 "H S&a adhe!ive bandage!6 "A'H 9andage )o&pre!!e!6 +H6 " per p3g# Eye dre!!ing 9andage !)i!!or! TweeBer! Triangu ar bandage!6 " per p3g# 18 Juantity ' pair " ea)h " ea)h " p3g# " !poo " p3g# " p3g# " p3g# " p3g# " pair " pair * p3g# Needed KKKKKKKK KKKKKKKK KKKKKKKK KKKKKKKK KKKKKKKK KKKKKKKK KKKKKKKK KKKKKKKK KKKKKKKK KKKKKKKK KKKKKKKK KKKKKKKK

Anti!epti) pad!6 * per p3g# Medi)a adhe!ive tape Se fFa)tivating )oo pa)3! 9urn oint&ent Steri e eye wa!h6 in bott e HeavyFduty !ea ab e p a!ti) bag! ,i!po!ab e !p int! Approved bioFhaBard bag!6 red in )o or Fir!t Aid Iit (nventory Che)3 i!t for&! Fir!t Aid Report $og Sheet ,ate of order< KKKKKKKKKKKK 9y< KKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKK

' p3g# " ro ' ea)h + p3g# " ea)h * ea)h " !et + ea)h

KKKKKKKK KKKKKKKK KKKKKKKK KKKKKKKK KKKKKKKK KKKKKKKK KKKKKKKK KKKKKKKK KKKKKKKK KKKKKKKK

Project Emergency Number


,- ANH MED0CA) H1SP0TA) AMB=)ANCE P1)0CE 0&E Note; POSCO E&C wi !ign a )ontra)t with Iy Anh ,i!tri)t Ho!pita to hand e &edi)a )a!e! that re.uire! &edi)a a!!i!tan)e in )a!e of &a5or a))ident!# 0%"%>077AA 118 11% 117

19

You might also like