GETCO / E / 4S - 118 / BOQ / R0 Dt. 13.01.

2012

SCADA BOQ (for SCADA & CRP Package) of 400 KV Asoj Sub Station Sr. No.
A

Particulars of Item
Supply, Erection, Testing and Commissioning of SCADA equipments and materials as per respective technical specifications and relevant special conditions and suitable for Two Main and Transfer Bus system on 220kV side and Two Main Bus on 66KV side Bay Control Unit / RTU for Substation Auxiliaries # Bay Control Unit for PLCC ** HMI Server computer with required softwares $ DR workstation PC $ Gateway for remote control with software $ Gateway for RTU Data with software $ SCADA software (For Local end only) $ Ethernet Fiber Switches* Line Interface unit - 2 Cable entry, 12 ports Line Interface unit - 8 Cable entry, 32 ports(To be provided in 220 kV Bus Bar Panel in Control Room. OPGW Terminal equipments (FOTE) with required hardware and software for remote connectivity Armoured Fibre Optic approach cable with HDPE duct for connecting OPGW to FOTE Laser Jet colour Printer Laser Jet Printer 3KVA UPS with battery (12V, 26AH X 30 Nos, SMF Battery)$ 3KVA UPS without battery $ Modem for RTU Data Armoured Fibre Optic Cable with HDPE duct Yard Kiosk for 220KV Switchyard Internal Dimensions - 5000 (L) X 3500 (W) X 3300 (H) mm Yard Kiosk for 66KV Switchyard Internal Dimensions - 6000 (L) X 3500 (W) X 3300 (H) mm Panel for mounting SCADA equipments Panel for mounting Station Auxiliaries BCU/RTU Integration of bays (under scope of this tender) with Existing SCADA System.[ Make & Type of SCADA shall be given during detailed engineering.] Spares for SCADA and Protection Bay Control Unit Line Interface Unit - 8 Cable entry, 32 ports Ethernet fiber switch Busbar Protection Peripheral Unit

Unit

Erection Supply Qty Qty

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

Nos Nos Nos No. No No No Nos Nos Nos Set MTR. Nos Nos Nos Nos Nos MTR. Nos Nos Nos Nos Job

1 0 0 0 0 0 0 3 5 1 0 0 1 1 0 0 0 1250 2 1 0 0

1 0 0 0 0 0 0 3 5 1 0 0 1 1 0 0 0 1250 2 1 0 0

1 Nos Nos Nos Nos 1 1 1 1

0 1 1 1 1

1 2 3 4

Note: 1) Any material/equipment accessories which are not listed in BOQ or in scope of supply but required to complete the job shall be included and shown in technical bid. 2)*Ethernet switches shall have as many spare ports as utilized ports. 3) ** PLCC BCU shall have sufficient I/Os as per given list. 4) # BCU for station Auxiliary shall have sufficient I/Os as per list or otherwise suitable RTU shall be provided. 5) $ SCADA system to be provided by PGCIL. 400 kv Extension will be used for this Project (220/66 Extension) also. 6) $ EFS in Control Room shall be a part of PGCIL SCADA System.