Site Compeletion Report 0078
Site Compeletion Report 0078
Site ID (Near end): 0078 Site ID (Opposite end): 0390 Site Name: Kamran chowrangi Region: Karachi Project: MW South Submission Date: 26-09-2013
Table of Contents
Link Budget.......................................................................................................................... 4 Board Plan ........................................................................................................................... 5 Media Plan .......................................................................................................................... 5 SW Commissioning ............................................................................................................. 6 HW Installation Pictures ................................................................................................... 08 MW Installation Check list ................................................................................................ 11 Confirmation Check List ...15
1- Link Budget
Designed RSL: -39.24(dBm) Achieved RSL: -41.2(dBm)
3
S-KHI-0078 Elevation (m) Latitude Longitude True azimuth () Vertical angle () Antenna model Antenna height (m) Antenna gain (dBi) Circ. branching loss (dB) Frequency (MHz) Polarization Path length (km) Free space loss (dB) Atmospheric absorption loss (dB) Field margin (dB) Net path loss (dB) Radio model TX power (watts) TX power (dBm) EIRP (dBm) Emission designator TX Channels RX threshold criteria RX threshold level (dBm) RX signal (dBm) Thermal fade margin (dB) XPD fade margin - multipath (dB) Flat fade margin - multipath (dB) Geoclimatic factor Path inclination (mr) Fade occurrence factor (Po) Average annual temperature (C) Worst month - multipath (%) (sec) Annual - multipath (%) (sec) (% - sec) Rain region 0.01% rain rate (mm/hr) XPD fade margin - rain (dB) Flat fade margin - rain (dB) Rain rate (mm/hr) Rain attenuation (dB) Annual rain (%-sec) Annual multipath + rain (%-sec) Tue, Jun 04 2013 S-KHI-0078-S-KHI-0390.pl4 4 Method - ITU-R P.530-12 Reliability Ran - ITU-R P530-7 63.67 24 55 39.10 N 067 07 50.40 E 76.69 -0.16 A15D12HS 25.00 42.60 3.60 15000.00 Vertical 7.12 133.04 0.20 1.00 56.24
S-KHI-0390 46.31 24 56 32.30 N 067 11 57.30 E 256.72 0.12 A15D12HS 25.00 42.60 3.60
56.24
15G_HP_128Q_28M_159M 15G_HP_128Q_28M_159M 0.10 0.10 20.00 20.00 59.00 59.00 28M0D7W 28M0D7W 24B28H 15047.0000H 24B28L 14557.0000H 24B28H 15047.0000V 24B28L 14557.0000V BER 10-6 BER 10-6 -70.00 -70.00 -39.24 33.76 29.07 27.80 1.53E-03 2.44 6.49E-03 26.00 99.99892 28.35 99.99960 127.58 99.99919 - 255.16 ITU Region K 42.00 41.10 33.03 128.25 33.03 99.99964 - 112.06 99.99884 - 367.22 99.99892 28.35 99.99960 127.58 -39.24 33.76 29.07 27.80
41.10
2- Board Plan
Site ID: 0078
PIU10 PIU9 7 CSH FAN11 5IFX2->0390-V 3IFX2->0390-V 18 6IFX2->0390-H 4IFX2->0390-H 2SL1D
3- Media Plan
Route Site ID Rout Site-1 Rout Site-2 Rout Site-3 Warid Tie
E1
4. SW Commissioning pictures
After completion of Hardware installation and Software commissioning following pictures will be required.
IF Attributes (Select IF1A from NE Explorer >> Click IF Attribute>> Radio Working Mode)
TX Power & RSL (Select ODU from NE Explorer >> Click ODU Interface>> Power Attribute)
N/A
Protection (If applicable) (Select NE from NE Explorer >>ExpendNE Configuration >> Click Cross connect Configuration)
N/A
5. MW Installation pictures
Antenna Fixing (Must Cover antenna assembly while capturing) ODU Fixing and waterproof (Must cover both IF Connectors in case of 1+0)
10
Near to tower brases use the mounting bracket bolts in revarce path
11
N/A
N/A
12
13
nformation
Site ID (A) 0078 Site ID (B) 0390 Subcon Symbia
14
Firmly installed (Best suitable place) Software Check (using WEB LCT) RSL Check & Snapshots (using WEB LCT) Attenuation Values & TX Power Check & Snapshots as per Link Budget Check Far end Visibility (NMS) Proper IF Cable Connector & tightness Circuit Breakers of proper rating installed
OK OK OK OK OK OK OK
3- Grounding
Proper thimbles used at Grounding Bus Bar Surge Arrestors properly installed & grounded (If applicable) OK N/A
List
IDU properly grounded 19'' rack properly grounded DDF properly grounded
OK
OK N/A N/A
Not OK
Remarks
Outdoor Installations
15
5- Antenna/Mounting Works
Microwave Dish and Mounting Bracket installed properly Extra IF cable should be twisted to 2 or 3 circles near ODU/Antenna Proper weather proof taping at ODU/ Antenna side Antenna Water drain hole detaches rubber cap and drain hole must be at bottom Antenna height as per the link budget All Nuts and Bolts properly tightened MW Antenna Side Support properly mounted Antenna Pole Fixed Properly Antenna Bracket Fixed in Pole Properly Connectors properly made and securely tightened Rostec properly sealed
OK OK OK OK OK OK OK OK OK OK OK N/A OK OK OK OK OK
NOK
Remarks
6- Grounding
Proper thimbles used ODU properly grounded with scratched paint tower IF Cables grounded with all outdoor bus bars available Not more than one grounding termination on a single point on bus bars
NOK
Remarks
16
8- Tests Performed
Switch over function success Tx/ Rx Mute function success IF loopback success Near-End loop back success Far-End loop back success EOW function success Alarm Generation and Reporting success Hop visible on NMS 24 hours BERT Test Patching of all E1s checked N/A OK OK OK OK N/A OK OK N/A N/A
OK N/A OK OK OK OK OK
NOK
Remarks
Commissioning Documents
Installation Pictures (Indoor/Outdoor) RSL & Configuration Snapshots (tx power, attenuation etc.) Board Inventory Information
17
Equipment Serial #
IDU Site A Site B ODU HYBRID DISH
REMARKS
ATP done
Yes
NO
No
Remarks
Site RFI checked and confirmed to Project Team for equipment delivery, NO DN received before equipment delivery,
Yes
18
YES
Link Budget, Board plan & Media plan was shared before team movement, YES Missing Equipment reported timely
YES
19