Project category Requested Completed Pending Pending due to # of Expansion sites 3 1 2 Media not available # of Rollout sites 2 1 1 Media

not available # of Swap sites -

CMPak OMCR Daily Report_Day


Project Category: Expansion
S No. Site ID-Site Name 1514 1055 1126 S000_440 S000-660 HYDBSC20 Current Configuration S000_444 Proposed Configuration S200_666 BSC E1 requirement met No No Yes

1 2 3 4 5

HYDBSC19

Project Category: Rollout


S No. 1 2 3 4 5 Site ID-Site Name 2386 3417 Current Configuration S000_444 BSC HYDBS15 E1 requirement met No Yes On site caller/Subcon Arshad (Highrise)

Project Category: Swap


S No. Site ID-Site Name Current Configuration BSC E1 requirement met On site caller/Subcon

TOP Issues & Risks


No. Top1 Top2 Top3 Issue/Risk Description

2 7

Daily Report_Day
On site caller/Subcon Caller no. Expansion DoneHard/Soft No No Yes / Hard Remarks/Expansion not done due to

Khurram (Netkom) Ayaz (EES)

03346261303 03332542143

E1 not available / Link capacity issue E1 not available Site expanded to S000-660

Raheel/Syed (Netkom) 03349444009

Caller no.

Integration Remarks Done E1 not available No Site integrated in HYDBSC15 today. Site is in halted mode Yes

Caller no.

Cutover Completed

Remarks

Issue Owner

Current Handler

Target resolution date

Issue Status

3 7

CMPak OMCR Daily Report_Day


Project Category:
S No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Site ID/Site Name 1608 1593 2386 1898,0253 0949 0949 1055 0811 1125 0257,1057 3418 1417 1124 All BSCs 1034 1124 Multiple Sites 0074 1514 1608 2,042 Multiple Sites

Auxillary
Caller Name/Dept-Company Waqar Abro (Huawei) Dilshad (CMPAK) Arshad (Highrise) Shafeeq (CMPAK) Shakoor (Interses) Asif Hameed (Huawei) Raheel/Syed (Netkom) Shafeequrehman (CMPAK) Zia (CMPAK) Shafeequrehman (CMPAK) Safeel (Huawei) Aziz (Netkom) Waqar Abro (Huawei) Alizee (Huawei) Rizwan (CMPAK) Abdullah (EES) Abdus Sami (CMPAK) Shafiq-ur-Rehman (CMPAK) Najam (Netkom) Wakeel Kamran/Mujtaba (Huawei) Atif/Majid (Ericsson)

Pak OMCR Daily Report_Day


Reason for call Alarms verification Alarms verification E1 verification Alarms verification / Change polarity of alarms Alarms verification Alarms verification E1 verification Alarms verification Change polarity of alarms Alarms verification Site status verification E1 verification Site status verification Query CFG exports and License Usage Site status verification Site status verification WO for software expansion of 33 cells Alarms verification E1 verification Alarms verification Alarms verification E1 verification