Dynanet & PDH Update

New EIU Life time extension Pirkko Kajander 20.03.2003


1 NOKIA NBA_VAR_Marketing_Seminar_20-21.03.2003

Dynanet & PDH Update New Ethernet Interface Unit


In previous seminar VARs strongly suggested to develop this unit and we did it! Thank you! Two port EIU was launched in September 2002 and well received on the market Improvement proposal from customers: HUB functionality EIU with HUB is launched in March 2003 Can be ordered using NC Manual is available in NOLS Master units: DM2, DM2+, DB2, DN2, ACM2 V2 & V5.1
21133.01 25442.01
2 NOKIA NBA_VAR_Marketing_Seminar_20-21.03.2003

21133.02 25442.02

EIU and multipoint connection

2 Mbit/s connection
2 S DB d X an 2 B

1 3.0 3 1 21 U T

Transmission network
2 Mbit/s connection
2 S DB d X an 2 B

2 Mbit/s connection
2 S DB d X an 2 B

1 3.0 3 1 21 U T

LAN External HUB

2 3.0 3 1 21 U T

LAN External HUB

NOKIA

NBA_VAR_Marketing_Seminar_20-21.03.2003

Multipoint bridging with EIU


2 Mbit connection

Two integrated hubs: can work separately or can be connected together


10Base-T IF 1A 10Base-T IF 1B

DM2

HUB 1

CrossConnection
10Base-T IF 2A

HUB 1
Multipoint bridging with EIU 21133.02
10Base-T IF 2B

NOKIA

NBA_VAR_Marketing_Seminar_20-21.03.2003

Dynanet & PDH Update Life time extension


Extensive business study done last autumn: Market situation: Market for traditional fixed telecommunication is not going away Key market requirements: High quality and high availability products continue to be well recognized Product structure: True that we have terminated some products during last years but overall only 650 different items out of 1600 was sold during 2002 Implementation: Replacing End Of Life components, buying EOL components to stock, re-design units, modifications, removals Internal requirements: EOL component follow-up, maintenance work, customer support Risks: EOL components, forecasts give no time to react Conclusion was to extend the Dynanet and PDH life cycle No major ramp-down risks foreseen for active products, evaluation done twice per year March and September. In case of ramp-down decision, notification will be given six months before last order date.
5 NOKIA NBA_VAR_Marketing_Seminar_20-21.03.2003

Dynanet & PDH Update Example of life time extension


Long haul 1550 nm DFB lasers are re-designed
DF2-8: DF34: DF140: 21519 21519.01 21539 21539.01 21942 21942.01 Terminal Repeater 2-8 M, 1550 nm DFB is replaced by Terminal Repeater 2-8 M,1550nm Laser DFB Terminal Repeater 34 M, 1550 nm DFB is replaced by Terminal Repeater 34 M, 1550 nm DFB Term. Repeater 140 M, 1550 nm LASER DFB is replaced by Term. Repeater 140M,1150nm LASER DFB

Latest Node Manager versions are supporting Windows 2000 Data Interface Unit 21128 system tested and added to ACM2 V2 system release