Corporate Overview
3
LANCO Group, All Rights Reserved
Corporate Overview
One of Indias Leading Integrated Infrastructure Company
Member of
4
LANCO Group, All Rights Reserved
Corporate Overview
EPC
Leading Private Sector IPP 4410 MW in operation Integrated strategy in conventional power across development, EPC, resources
Power
Solar
Business Verticals
Resources Infrastructure
5
LANCO Group, All Rights Reserved
Contents
1. Assessing the Current Status of O&M of Solar Projects Globally.
2. Introduction to O&M Practices for Solar Projects. 3. Warranties and Post-Warranty Risks of O&M of Solar Projects.
6
LANCO Group, All Rights Reserved
*Potential (MW)
45,000 16,000 15,000 3,500 2,700 Unlimited
Today, Solar power is merely 0.22% of RE power But potential of Solar power in India is far more than other RE sources
Rank
Country
Solar Index
Solar PV
Solar CSP
USA
72
71
74
2
3 4 5
India
China Spain Italy
64
61 58 58
69
66 56 64
53
47 63 65
India emerged as the 2nd most attractive country on overall solar index
8
LANCO Group, All Rights Reserved
30
25
23.2 44.8
50 40 30
20
15.6
15
10
13.1
5
20 10 0
2.7
2011-12
2017-18
2020-21
2021-22
Key Drivers Strong Government support Decreasing cost of Solar power Huge Off grid requirement of Rooftop/Rural segment
9
LANCO Group, All Rights Reserved
68.0
10
LANCO Group, All Rights Reserved
11
LANCO Group, All Rights Reserved
ISO 9001:2008
ISO 14001:2004
OHSAS 18001:2007
13
LANCO Group, All Rights Reserved
14
15
Maintenance Strategy
Time Based Maintenance (TBM):- Monthly, Quarterly, Half Yearly and Annually. Corrective Maintenance:- 24x7 team available for restoration of Breakdowns. Predictive Maintenance:- Predictive maintenance methodology like thermal Imaging and walkthrough routine checks. Improvement and up-gradation Maintenance :- Maintenance for enhancement of performance of equipments and plant in Quality, Safety and Productivity domains.
16
LANCO Group, All Rights Reserved
Liaoning With State Utility ( EB) For JMR & Billing Support To Customers
Coordination with State Utility- EB for JMR and billing support to customer for timely payments. .
Other Scope
Legal compliances / Periodical Inspections by Electrical Inspector Security management. Customer Interface. CDM Validation and Audit. 17
LANCO Group, All Rights Reserved
Thermography Test Report:- By Thermal Imaging we are providing rectification before failure,
Identification of hot spot in Inverter, Electrical panels, Modules under predictive maintenance.
18
LANCO Group, All Rights Reserved
19
LANCO Group, All Rights Reserved
20
LANCO Group, All Rights Reserved
Optimising Auxiliary Consumption based on design and execution during EPC ( 1-1.5%), Availability of Inverter spare parts at site. Inverter suppliers are not considering to train & Develop service Engineer as certified Service Engineer for fault rectification rather insisting on CALL Basic Restricted Data Transfer protocol by Inverter suppliers to SCADA system developed by Owner. Inverter suppliers Insisting Developers to enter in AMC post warranty which is highly expensive with no option left.
22
LANCO Group, All Rights Reserved
23
LANCO Group, All Rights Reserved
Indigenous Equipments
Electrical Switchyard Equipments Transformers Inverter Shelters Electrical Drives and Pumps Water Treatment Facilities Module Cleaning systems / Capital test Equipments Miscellaneous items like cooling towers, boilers, auxiliaries
24
LANCO Group, All Rights Reserved
Lack of Expertise knowledge on Inverter specially on Control Cards/ Sensors, Lack of Indigenous Vendor Availability, Non availability of spare parts in open market inventory levels for cost optimization, Monopolistic approach of Inverter and module manufacturer, Warranty and extended warranties are must to keep plant fully operational
How to Achieve?
Ensure extended performance warranty with manufacturer / supplier for life of product in terms of annual availability with spares supply. Response and Resolution time in case of failure of equipment To ensure optimized plant availability to safe guard investment and returns.
25
LANCO Group, All Rights Reserved
Sustainable Performance of plant, Infrastructure created to meet requirement Lack of Independent Solar O&M expertise, Indigenous Vendor development, Availability of Spares for imported equipments, Technological Change / Up gradation, Degradation of equipments efficiency Availability of Imported spares when required
26
LANCO Group, All Rights Reserved
Experience in operating Solar Plants in India with track record Technical Expertise with Back end support Quality of manpower deployed with industry knowledge Indigenous Vendor development for services, Working Experience with different suppliers/ developers to understand different technology, Monitoring and Reporting performance data as agreed on Daily/ Monthly Basis methodology Infrastructure availability for PM, BM, Predictive Maintenance Selection of Module Cleaning / Capital equipments technology Legal compliances to ensure no deviation from any Govt. Rule. Reputation & Brand image in Solar Industry to give confidence in plant operation Services Quality are complied / certified for EHS & Quality as per ISO Standards. 27
LANCO Group, All Rights Reserved
28
LANCO Group, All Rights Reserved
Revenue Generation High with long term sustainability Low Revenue short term sustainability Legal Compliances 100% partial to cut cost EHS and quality as per ISO Standard fully compliance Partial Frequency of Breakdown Low High Soiling Losses ( Revenue Losses) low High Housekeeping / Up keep of plant High level Medium/ low level CDM audits / Insurance Assistance 24 x 7 need to arrange on case to case basis Identifying module degradation at string level & Take actions Yes No Man Power supply Site Over All Management / Reporting
Skilled Fully trained for Solar plant highly skilled in charge Semi Skilled Manpower with some exposure to Solar
O&M Cost / MW
LANCO Group, All Rights Reserved
Rs 10-12 Lacs / MW Rs 8-10 Lacs / MW ( Long Terms Revenue Gain) ( Short 29 Term Revenue Gain )