Ruddlesden geotechnical ltd 65 Langaton Lane, Pinhoe Exeter EX1 3SP Telephone: 01392 678082 Fax: 01392 678083

Project

TRIAL PIT LOG


TRIAL PIT No

Land off Ebley Road, Stroud, Gloucestershire


Job No Date Ground Level (m) Co-Ordinates ()

TP9
Sheet

08134
Contractor

27-03-08 1 of 1

Legend

STRATA
Depth 0.00-0.40 0.40-1.20 No DESCRIPTION TOPSOIL: Brown silty clay with occasional gravel & frequent rootlets. Firm brown silty CLAY.

SAMPLES & TESTS


Depth No Remarks/Tests

1.20-2.00

1.00 ...stiff. (Medium dense) yellowish brown very slightly clayey sandy sub-rounded GRAVEL.

1.00

VANE

100

1.90 ...occasional cobbles.


AGS3 UK TP 08134 - LAND OFF EBLEY ROAD, STROUD.GPJ AGS 3_1.GDT 23/4/08

Shoring/Support: None. Stability: Stable. Groundwater: Moderate groundwater seepage encountered @ 1.90m.
1.80 A D C All dimensions in metres Scale 1:50 Client: Barratt Homes Method/ Plant Used B 0.70

GENERAL REMARKS
1. Density of granular deposits estimated from visual assessment only. 2. Trial pit terminated due to maximum reach/ difficult excavation with mini digger.

Logged By

3 tonne mini digger.

TN

Ebley Road, Stroud

Ruddlesden geotechnical ltd

SOAKAWAY TEST RESULTS

Ground Investigation & Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR

Ebley Road, Stroud

Ruddlesden geotechnical ltd

Soakaway Test Results In Accordance with BRE 365 "Soakaway Design"


Job Title: Job No.: Client: Date: Land off Ebley Road, Stroud, Gloucestershire 08134 Barratt Homes Apr-08

Test No. TP1 Trial Pit Dimensions Length (m): Width (m): Depth (m): Start Water Level (m): Total Depth of Test Field Results Time (minutes) 0 1 2 3 4 5 66 117 239

1.90 0.70 2.30 0.95 1.35

Water Level (mBGL) 0.95 0.95 0.95 0.95 0.95 0.95 0.91 0.89 0.84

Ground Investigation and Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR

Ebley Road, Stroud

Ruddlesden geotechnical ltd

Soakaway Test Results In Accordance with BRE 365 "Soakaway Design"


Calculations Soil Infiltration Rate (f) Where Vp75-25

(Vp75-25) / (ap50 x tp75-25)

effective storage volume of water in the trial pit between 75% and 25% effective depth 1.90 x 0.89775 m3 internal surface area of the trial pit up to 50% effective depth and including the base area 0.95 + 4.84 m2 2.57 + 1.33 0.70 x 0.68

= = ap50 =

= =

tp75-25

time for the water level to fall from 75% to 25% effective depth 25% effective depth = 1.2875 75% effective depth = 1.9625 0 mins 0 secs (Vp75-25) / (ap50 x tp75-25) 0.89775 #DIV/0! / m/s 4.84 x 0 mins

= = = Soil Infiltration Rate (f) = = =

OTHER NOTES: Test aborted due to rise in water level.

Ground Investigation and Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR

Ebley Road, Stroud

Ruddlesden geotechnical ltd

Soakaway Test Results - TP1


Time (minutes) 0 0.80 50 100 150 200

1.00

1.20 Water Level (mBGL)

1.40

1.60

1.80

2.00

2.20

Ground Investigation and Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR

Ebley Road, Stroud

Ruddlesden geotechnical ltd

Soakaway Test Results In Accordance with BRE 365 "Soakaway Design"


Job Title: Job No.: Client: Date: Land off Ebley Road, Stroud, Gloucestershire 08134 Barratt Homes Apr-08

Test No. TP5 Trial Pit Dimensions Length (m): Width (m): Depth (m): Start Water Level (m): Total Depth of Test Field Results Time (minutes) 0 1 2 3 4 5 33 84 153 214 257 327

1.90 0.70 2.30 0.88 1.42

Water Level (mBGL) 0.88 0.89 0.90 0.91 0.91 0.92 1.02 1.16 1.30 1.40 1.46 1.58

Ground Investigation and Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR

Ebley Road, Stroud

Ruddlesden geotechnical ltd

Soakaway Test Results In Accordance with BRE 365 "Soakaway Design"


Calculations Soil Infiltration Rate (f) Where Vp75-25

(Vp75-25) / (ap50 x tp75-25)

effective storage volume of water in the trial pit between 75% and 25% effective depth 1.90 x 0.9443 m3 internal surface area of the trial pit up to 50% effective depth and including the base area 0.99 + 5.022 m2 2.70 + 1.33 0.70 x 0.71

= = ap50 =

= =

tp75-25

time for the water level to fall from 75% to 25% effective depth 25% effective depth = 1.235 75% effective depth = 1.945 550 130 mins

= = = Soil Infiltration Rate (f) = = =


OTHER NOTES:

420 mins 25200 secs (Vp75-25) / (ap50 x tp75-25) 0.9443 / 5.02 x 25200

7.46E-06 m/s

Ground Investigation and Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR

Ebley Road, Stroud

Ruddlesden geotechnical ltd

Soakaway Test Results - TP5


Time (minutes) 0 0.80 100 200 300 400 500 600

1.00

1.20 Water Level (mBGL)

1.40

1.60

1.80

2.00

2.20

Ground Investigation and Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR

Ebley Road, Stroud

Ruddlesden geotechnical ltd

Soakaway Test Results In Accordance with BRE 365 "Soakaway Design"


Job Title: Job No.: Client: Date: Land off Ebley Road, Stroud, Gloucestershire 08134 Barratt Homes Apr-08

Test No. TP9 Repeat Trial Pit Dimensions Length (m): Width (m): Depth (m): Start Water Level (m): Total Depth of Test Field Results Time (minutes) 0 1 2 3 4 5 16 54 65 122 148

1.80 0.70 2.00 1.04 0.96

Water Level (mBGL) 1.04 1.09 1.12 1.14 1.16 1.17 1.30 1.56 1.60 1.74 1.80

Ground Investigation and Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR

Ebley Road, Stroud

Ruddlesden geotechnical ltd

Soakaway Test Results In Accordance with BRE 365 "Soakaway Design"


Calculations Soil Infiltration Rate (f) Where Vp75-25

(Vp75-25) / (ap50 x tp75-25)

effective storage volume of water in the trial pit between 75% and 25% effective depth 1.80 x 0.6048 m3 internal surface area of the trial pit up to 50% effective depth and including the base area 0.67 + 3.66 m2 1.73 + 1.26 0.70 x 0.48

= = ap50 =

= =

tp75-25

time for the water level to fall from 75% to 25% effective depth 25% effective depth = 1.28 75% effective depth = 1.76 131 14 mins

= = = Soil Infiltration Rate (f) = = =


OTHER NOTES:

117 mins 7020 secs (Vp75-25) / (ap50 x tp75-25) 0.6048 / 3.66 x 7020

2.35E-05 m/s

Ground Investigation and Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR

Ebley Road, Stroud

Ruddlesden geotechnical ltd

Soakaway Test Results - TP9 Repeat


Time (minutes) 0 1.00 20 40 60 80 100 120 140

1.20

Water Level (mBGL)

1.40

1.60

1.80

2.00

Ground Investigation and Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR

Ebley Road, Stroud

Ruddlesden geotechnical ltd

Soakaway Test Results In Accordance with BRE 365 "Soakaway Design"


Job Title: Job No.: Client: Date: Land off Ebley Road, Stroud, Gloucestershire 08134 Barratt Homes Apr-08

Test No. TP9 Trial Pit Dimensions Length (m): Width (m): Depth (m): Start Water Level (m): Total Depth of Test Field Results Time (minutes) 0 1 2 3 4 5 35 55 87 124 161

1.80 0.70 2.00 0.99 1.01

Water Level (mBGL) 0.99 1.06 1.12 1.16 1.20 1.22 1.52 1.62 1.71 1.76 1.79

Ground Investigation and Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR

Ebley Road, Stroud

Ruddlesden geotechnical ltd

Soakaway Test Results In Accordance with BRE 365 "Soakaway Design"


Calculations Soil Infiltration Rate (f) Where Vp75-25

(Vp75-25) / (ap50 x tp75-25)

effective storage volume of water in the trial pit between 75% and 25% effective depth 1.80 x 0.6363 m3 internal surface area of the trial pit up to 50% effective depth and including the base area 0.71 + 3.785 m2 1.82 + 1.26 0.70 x 0.51

= = ap50 =

= =

tp75-25

time for the water level to fall from 75% to 25% effective depth 25% effective depth = 1.2425 75% effective depth = 1.7475 108 7.5 mins

= = = Soil Infiltration Rate (f) = = =


OTHER NOTES:

100.5 mins 6030 secs (Vp75-25) / (ap50 x tp75-25) 0.6363 / 3.79 x 6030

2.79E-05 m/s

Ground Investigation and Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR

Ebley Road, Stroud

Ruddlesden geotechnical ltd

Soakaway Test Results - TP9


Time (minutes) 0 0.85 20 40 60 80 100 120 140 160

1.05

Water Level (mBGL)

1.25

1.45

1.65

1.85

Ground Investigation and Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR

Ebley Road, Stroud

Ruddlesden geotechnical ltd

IN-SITU CBR (TRL DCP METHOD) TEST RESULTS

Ground Investigation & Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR

UK DCP V3.1

DCP Layer Strength Analysis Report


Project Name: 08134 - Land off Ebley Road, Stroud DCP1

Chainage (km): Direction: Location/Offset: Cone Angle: Zero Error (mm): Test Date:

0.000 Carriageway 60 degrees 0 27/03/2008

Surface Type: Thickness (mm): Base Type: Thickness (mm): Surface Moisture: Moisture adjustment factor:

Unpaved 0

Moderate Not adjusted

Layer Boundaries Chart Layer Properties


No. Penetration Rate 1 2 3 (mm/blow) 246.33 75.67 34.86 CBR (%) 1 3 7 Thickness (mm) 467 340 133 Depth to layer bottom (mm) 467 807 940 Subgrade Subgrade Subgrade Position

CBR Chart

Strength Coefficient ----

SN

SNC

SNP

----

----

----

Pavement Strength
Layer Surface Base Sub-Base Subgrade Pavement Strength SN Layer Contribution SNC SNP ----------0.00 0.00 -0.00 0.00

CBR Relationship:
TRL equation: log10(CBR) = 2.48 - 1.057 x log10(Strength)

Report produced by ...................................................................

Report Date: 23-Apr-2008

Page 1 of 1

UK DCP V3.1

DCP Layer Strength Analysis Report


Project Name: 08134 - Land off Ebley Road, Stroud DCP2

Chainage (km): Direction: Location/Offset: Cone Angle: Zero Error (mm): Test Date:

0.000 Carriageway 60 degrees 0 27/03/2008

Surface Type: Thickness (mm): Base Type: Thickness (mm): Surface Moisture: Moisture adjustment factor:

Unpaved 0

Moderate Not adjusted

Layer Boundaries Chart Layer Properties


No. Penetration Rate 1 (mm/blow) 51.96 CBR (%) 5 Thickness (mm) 940 Depth to layer bottom (mm) 940 Subgrade Position

CBR Chart

Strength Coefficient --

SN

SNC

SNP

--

--

--

Pavement Strength
Layer Surface Base Sub-Base Subgrade Pavement Strength SN Layer Contribution SNC SNP ----------0.53 0.53 -0.53 0.53

CBR Relationship:
TRL equation: log10(CBR) = 2.48 - 1.057 x log10(Strength)

Report produced by ...................................................................

Report Date: 23-Apr-2008

Page 1 of 1

UK DCP V3.1

DCP Layer Strength Analysis Report


Project Name: 08134 - Land off Ebley Road, Stroud DCP3

Chainage (km): Direction: Location/Offset: Cone Angle: Zero Error (mm): Test Date:

0.000 Carriageway 60 degrees 0 27/03/2008

Surface Type: Thickness (mm): Base Type: Thickness (mm): Surface Moisture: Moisture adjustment factor:

Unpaved 0

Moderate Not adjusted

Layer Boundaries Chart Layer Properties


No. Penetration Rate 1 2 3 (mm/blow) 205.83 58.77 40.16 CBR (%) 1 4 6 Thickness (mm) 276 358 326 Depth to layer bottom (mm) 276 634 960 Subgrade Subgrade Subgrade Position

CBR Chart

Strength Coefficient ----

SN

SNC

SNP

----

----

----

Pavement Strength
Layer Surface Base Sub-Base Subgrade Pavement Strength SN Layer Contribution SNC SNP ----------0.00 0.00 -0.00 0.00

CBR Relationship:
TRL equation: log10(CBR) = 2.48 - 1.057 x log10(Strength)

Report produced by ...................................................................

Report Date: 23-Apr-2008

Page 1 of 1

UK DCP V3.1

DCP Layer Strength Analysis Report


Project Name: 08134 - Land off Ebley Road, Stroud DCP4

Chainage (km): Direction: Location/Offset: Cone Angle: Zero Error (mm): Test Date:

0.000 Carriageway 60 degrees 0 27/03/2008

Surface Type: Thickness (mm): Base Type: Thickness (mm): Surface Moisture: Moisture adjustment factor:

Unpaved 0

Moderate Not adjusted

Layer Boundaries Chart Layer Properties


No. Penetration Rate 1 2 (mm/blow) 200.72 47.03 CBR (%) 1 5 Thickness (mm) 302 648 Depth to layer bottom (mm) 302 950 Subgrade Subgrade Position

CBR Chart

Strength Coefficient ---

SN

SNC

SNP

---

---

---

Pavement Strength
Layer Surface Base Sub-Base Subgrade Pavement Strength SN Layer Contribution SNC SNP ----------0.00 0.00 -0.00 0.00

CBR Relationship:
TRL equation: log10(CBR) = 2.48 - 1.057 x log10(Strength)

Report produced by ...................................................................

Report Date: 23-Apr-2008

Page 1 of 1

Ebley Road, Stroud

Ruddlesden geotechnical ltd

APPENDIX B PHOTOGRAPHS

Ground Investigation & Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR

Ebley Road, Stroud

Ruddlesden geotechnical ltd

PLATE 1 The southwest of the site, viewed from the northeast.

PLATE 2 The south of the site, viewed from the north.

Ground Investigation and Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR

Ebley Road, Stroud

Ruddlesden geotechnical ltd

PLATE 3 The southeast of the site, viewed from the northwest.

PLATE 4 The northeast of the site, viewed from the southwest.

Ground Investigation and Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR

Ebley Road, Stroud

Ruddlesden geotechnical ltd

PLATE 5 The northwest of the site, viewed from the southeast.

PLATE 6 The southeast of the site, viewed from the northeast (note waterlogged topsoil in the foreground).

Ground Investigation and Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR

Ebley Road, Stroud

Ruddlesden geotechnical ltd

PLATE 7 Ground conditions encountered in TP2, typical of the ground conditions encountered in the north of the site.

PLATE 8 Ground conditions encountered in TP5, typical of the ground conditions encountered in the south of the site.

Ground Investigation and Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR

Ebley Road, Stroud

Ruddlesden geotechnical ltd

APPENDIX C LABORATORY TESTING RESULTS

Ground Investigation & Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR

Ebley Road, Stroud

Ruddlesden geotechnical ltd

GEOTECHNICAL LABORATORY TESTING

Ground Investigation & Environmental Assessment Report Report Ref: SR/TN/DT/08134/GIEAR