S.No. A. Pump House-A 1 2 3 4 5 6 7 8 Supply , Installation of Vacuum Circuit Breaker including all civil foundations and structures Supply and Installation of Current Transformer Supply and Installation of Voltage Transformer (Gantry Mounted) Earthwire (including supply installation and design) Disconnecting Switch for transformer and incomer bay Lightning Arrester for line and transformers (including civil, structure for 2 set of transformer bays) Earthing Mat to be rectified with necessary electrodes and conductors Transformer maintenance and repair 8.1 1 set transformer not in operation 8.2 2nd Set Transformer currently in operation a. Problem with WTI (to be replaced) b. Problem with OTI (to be replaced) set set set lot set set lot lot lot Description Unit
c. Problem with Buchholz relay to be modified d. Off load Tap changer to be replaced with the new On-Load Tap changer 8.3 Ground clearance to be confirmed Oil replacement with filtering for both the 8.4 transformers 8.5 Painting of both the transformers 9 Switchyard Area to be cleared from all grasses and new crushed rock surfacing required Supply and installation of Cable, along with clearing and repair of Cable trench including the cable trays. Supply and installation of Conductor (dog) Voltage regulation to be maintained with the help of (AVR) that can be done with the help of tap changer control panel including the function of AVR (only 26-29 kV Voltage recorded in place of 33 kV) Repair and maintainence of 3.3/0.44 kV Transformer
10 11
12
13
WTI OTI Buchholz Oil filtering Painting 14 15 Battery and Charger complete set to be replaced Control and Relay Panel Incomer 280 kW 160 kW Transformer 100 kVAR capacitor bank to be replaced AC and DC DB with complete sets of MCB and MCCB as required OPGW between two stations to establish communication and transfering electrical control signals between two stations (12/24 core) mode:Duplex Communciation and annunciation panel with annunciation as required Power Cable to be replaced Switching Stator to be replaced for all motors Control cables to be replaced as required Motor Repairment Illumination of Switchyard, control and other buildings Filter machine to be repaired
16 17
18
km
19 20 21 22 23 24 25 26
Nos
Nos
Gate Lifting mechanism to be supplied and installed Trash Rack to replaced (size of around 4x6 m) 27 Gate and Fencing for switchyard 28 Boundary wall 29 Guard House 30 Water supply system 31 Windows (2.5x2.5 of fibre) 32 Rolling Shutter (3x6 m) 33 B. Switching Station
m m
Nos set
Option 1:- Include Breaker, CT and PT so that dedicated power limit can be established (NEA cannot take extra power; this can be established by over current setting in the relay) Option 2 1 All fuses to be replaced set 2 Gang Operated switch set 3 Lightning Arrester set 4 Switchyard Illumination 5 Boundary wall m 6 Earthing to be designed and modified C. Pump House-B
2 3 4 5 6 7 8
Transformer 2500 kVA to be repaired and painted On load tapchanger WTI OTI Buchholz Oil refiling and filtering Painting of only 1 transformer Voltage Transformer Current Transformer Lightning Arrester Breaker 400 Sq mm Power cable Battery and Charger complete set to be replaced All similar to Pump house A
Nos
ubstation
Quantity
1 3 1 1 3 4 1 1 1
250
9 2 4 2 1 1 1
150 500
40 2
3 3 4