Tenth EPRI Superconductivity Conference October 11-13, 2011

Superconducting Fault Current Limiters


Latest developments at Nexans SuperConductors

Mathias Noe Karlsruher Institut fr Technologie & Joachim Bock, Achim Hobl, Judith Schramm Nexans SuperConductors GmbH EPRI 2011 Nexans SuperConductors

Outline Introduction SFCL systems


Function Operation behaviour Commercial Projects
ASL I 12-100 ASL II 12-400 Vattenfall 12-800

Development Projects
ENSYSTROB ECCOFLOW

Latest Project: AmpaCity

Conclusions

EPRI 2011

Nexans SuperConductors

Chemiepark Knapsack in Hrth

Chemiepark Knapsack 10 km South-west of Kln


EPRI 2011

Nexans SuperConductors

Nexans SuperConductors in new premises 2010


Office building and assembly hall

bldg. 2728 Assembly of Fault Current Limiter systems Building height allowing crane hook of 7 m Optimisation of the production
EPRI 2011

Nexans SuperConductors

Materials and conductor types for industrial HTS applications

YBa2Cu3O7-x buffer buffer 2 1 substrate

Bi-2212/ Bi-2223 tape 1st generation

Y-123 cc-tape 2nd generation

Systems realized

Bi-2212 bulk
EPRI 2011

Y-123 bulk
Nexans SuperConductors

Production of HTS-bulk BSCCO-2212 Melt Cast Processing


Highly efficient and very flexible process

Melting

Metal oxides
Mixing Casting
EPRI 2011

Annealing Nexans SuperConductors

Operating behaviour of the FCL


normal operation short-circuit recovery

p
current

ultrafast
reacts in 1-2 milliseconds

w/o FCL

automatic
max r td tr
no external trigger necessary, self-recovering

wear-free
ta
time service only for cooling system

Superconductor Fault Current Limiters are intrinsically safe!

EPRI 2011

Nexans SuperConductors

FCL systems Commercial Projects


12-100 (ASL 1) first commercial system
Field tested for ~8 months

12-800 (Vattenfall) first system in a power station


Field tested Nov. 2009- Dec. 2010

XX-YYY XX: Voltage [kV] YYY: Current [A]

12-400 (ASL 2) second system for UK (bifilar)


Presently under installation
EPRI 2011

Nexans SuperConductors

ASL I 12-100 Realisation

first FCL-System realised by NSC first commercial system worldwide

EPRI 2011

Nexans SuperConductors

ASL I 12-100 Field test


ASL, Newcastle ENW, Bamber Bridge

Live on grid 10-2009 to 06-2010


EPRI 2011

Nexans SuperConductors

ASL II 12-400 Testing

Customer has ordered second system!


Test at IPH

EPRI 2011

Nexans SuperConductors

ASL II 12-400 Installation site

Ainsworth Lane (Scottish Power)

In UK around 270 substations (MV up to 33 kV) are at or above max. rating


EPRI 2011

Nexans SuperConductors

Vattenfall 12-800 Brown Coal Power Plant

Block Q in Boxberg

EPRI 2011

Nexans SuperConductors

Power to the consumer

EPRI 2011

Nexans SuperConductors

Power to the consumer Auxiliary Power

EPRI 2011

Nexans SuperConductors

Auxiliary Power

Not limited short circuit currents

EPRI 2011

Nexans SuperConductors

Auxiliary Power
63.000 Current [A] Investment

800

rating

fault

High Short Circuit Currents high mechanical and thermal forces No fuses on the MV power distribution level equipment and grid must be short-circuit proof high investment for equipment oversizing
EPRI 2011

Nexans SuperConductors

Location in Boxberg power plant

EPRI 2011

Nexans SuperConductors

First FCL worldwide in a power plant


Installation 10/ 2009 Commissioning 02.11.2009 End of field-test 12/ 2010 second field-test starts IV/ 2011

Significant savings for extension and new construction Improved safety for personnel and equipment
EPRI 2011

Nexans SuperConductors

From metal oxide powder to HTS-components


Melt Cast Process Nexans proprietary process

Fault Current Limiter Components

BSCCO-2212 tubes

BiSrCaCuO powder
EPRI 2011

Nexans SuperConductors

Basic design of the FCL


Connection for adaptation Current in parallel Voltage in series

component

module

set-up of a phase

accomodation in a cryostat

Fault Current Limiter connected in series with the grid Current and voltage adjustable by modular construction
EPRI 2011

Nexans SuperConductors

Realisation of the FCL


Nexans is mastering the full chain.

EPRI 2011

Nexans SuperConductors

High voltage and high current testing of complete FCL-system

Testing scheme 75 kV lighting impulse 28 kV withstand voltage (1 min)

Testing scheme 63 kA (peak) maximum 3-phase full loads (4 shots)

EPRI 2011

Nexans SuperConductors

New developments: FCL systems based on cc-tape

12-600 (ENSYSTROB) first MV system with cc-tape


This project has received funding from German government under grant 03KP102A

EPRI 2011

Nexans SuperConductors

New developments: ENSYSTROB

Specification
ENSYSTROB voltage 12 kV normal operating current 800 Arms inrush current (50 ms) 4100 Ap High current inrush(15 currents inrush s) 1800 Arms Small window for limited current prospective current 60 kA first peak limitation < 30 kAp limitation time 120 ms limitation after 100ms 6.6 - 7 kA

EPRI 2011

Nexans SuperConductors

New developments: ENSYSTROB - component

U = 433 Vrms I = 850 Arms P = 360 kW

I
2 twins in, 2 twins out sc-length: 8 x 4.30 Central contact
EPRI 2011

Nexans SuperConductors

New developments: ENSYSTROB characterisation (1)

inrush currents
1367 Ap / 50 ms 600 Arms / 15 s

EPRI 2011

Nexans SuperConductors

New developments: ENSYSTROB characterisation (2)

short circuits
partial load I prosp = 2 kAp Erms = 0.05 V/ m
full load I prosp = 32 kAp Erms = 50 V/ m

EPRI 2011

Nexans SuperConductors

New developments: ENSYSTROB system integration

3 x 32 =96 components

EPRI 2011

Nexans SuperConductors

New developments: ENSYSTROB Testing at IPH Berlin

3-Phase short circuit, Iprosp= 63 kA


EPRI 2011

Nexans SuperConductors

New developments: ENSYSTROB Next steps

First system based on cc-tapes was engineered and built in time SFCL device was successfully tested at the certified high power test lab in Berlin in September 2011 SFCL has been installed at the Boxberg power plant

SFCL will go life to the grid in October 2011

EPRI 2011

Nexans SuperConductors

EU-project: ECCOFLOW
cc-tape based FCL 24-1000 15 partners involved 5 utilities coordinated by
Stockholm

Nexans and 13 European partners have reached a

Siegen

Kosice

Barcelona

Mailand

EPRI 2011

First multipurpose system for two sites and applications Nexans SuperConductors

New developments: ECCOFLOW

ECCOFLOW is: A project to prepare commercialisation of SFCL The 3-phase resistive limiter with the highest voltage today Including 15 project partners 5 of which are utilities The first SFCL foreseen for two different applications
EPRI 2011

Nexans SuperConductors

New developments: Project 24-1000 ECCOFLOW

Palma de Mallorca

1st site for installation


High voltage

transformer feeder

FCL

Medium voltage
FCL

busbar coupler

San Juan de Dios


Nexans SuperConductors

EPRI 2011

New developments: Project 24-1000 ECCOFLOW


2nd site for installation

Koice (VSE)

High voltage

VSE grid Koice, Slovakia


transformer feeder
FCL

Medium voltage
FCL

busbar coupler

EPRI 2011

Nexans SuperConductors

New developments: Project 24-1000 ECCOFLOW

Endesa Nominal voltage Nominal current AC withstand voltage Lightning impulse Max. prospective current (peak) Max. limited current (peak) Fault duration HTS limitation time Recovery time 16.5 kV 1000 A 50 kV 125 kV 22 kA 10.8 kA 1s 80 ms < 30 s

VSE 24 kV 1005 A 50 kV 125 kV 26 kA 17 kA 120 ms 80 ms < 30 s

Eccoflow 24 kV 1005 A 50 kV 125 kV 26 kA 10.8 kA 1s 80 ms < 30 s

EPRI 2011

Nexans SuperConductors

New developments: Project 24-1000 ECCOFLOW

limitation time > 120 ms


Module of FCL FCL inside components cryostat

with parallel impedance FCL and circuit breaker Circuit


Breaker

Air Core System Reactor

Black Box

inrush currents > 1.2 kA

EPRI 2011

Nexans SuperConductors

New developments: Project 24-1000 ECCOFLOW Component Design 3 x 2 x 2 conductors, about 8 m each 1 kArms / 800 Vrms no parallel connection of components needed excellent use of volume low voltage for the single component small AC losses due to multifilar geometry short single pieces of superconducting tape with mutual protection.
EPRI 2011

Nexans SuperConductors

New developments: Project 24-1000 ECCOFLOW


Module Design

Stack of 12 components in series Liquid / gaseous nitrogen insulating against cryostat wall

EPRI 2011

Nexans SuperConductors

New developments: Project 24-1000 ECCOFLOW


Cryostat Design 3 nitrogen vessels One common vacuum vessel Boiling nitrogen at 77 K About 100 W thermal losses G-M cryocooler Compact design Design close to series production
EPRI 2011

Nexans SuperConductors

New developments: Project 24-1000 ECCOFLOW


Cryostat Design 3 nitrogen vessels One common vacuum vessel

Loss contribution Max. superconductor AC loss Max. current lead loss Cryostat loss Max. additional loss Max. total loss at 77 K Max. electric power at RT

Loss at 0.1 Ic <1W 180 W 120 W 1W ~ 300 W ~ 6990 W

Loss at 0.5 Ic ~ 10 W ~ 220 W 120 W 15 W ~ 365 W 8504 W

Loss at 1 Ic 150 W 270 W 120 W 60 W 600 W 13980 W

EPRI 2011

Nexans SuperConductors

Latest Project AmpaCity


110-kV-substation (suburban area) 110-kV-substation (suburban area)

40 MVA Conventional 110-kV-Cable

10-kV-HTS cable 40 MVA

10-kV-substation (city center)

10-kV-substation (city center)

Supply of city center by MV HTS cable


EPRI 2011

Nexans SuperConductors

AmpaCity Feasibility Study

Kick-off Oct. 2011 Study showed project is technically feasible economically reasonable
EPRI 2011

Nexans SuperConductors

AmpaCity in the City of Essen

Herkules

Dellbrgge

position of joints
EPRI 2011

Nexans SuperConductors

AmpaCity HTS cable with stand alone FCL

EPRI 2011

Nexans SuperConductors

Conclusions
Full chain mastered from production of HTS material to final FCL system (for bulk)

First commercial FCL systems realized (w/o any public funding)


Successful grid operations also with the first HTS system in a power station worldwide Market entry with bulk already achieved New development projects started first system realised based on cc-tape
multipurpose device new solutions for urban areas
EPRI 2011

Nexans SuperConductors

First FCL worldwide in a power plant

Thank you for listening!