Kinetic turbines create energy from flowing water with no head required. The energy output depends on the velocity of the river or canal and does vary with variations in the stream. As the SMART turbine is a nohead turbine infrastructure requirements are reduced to anchoring.
Generation 24 hours a day = baseload energy 2 m/s = 2 kW = 45 kWh per day or 16,294 kWh per year (load factor 93%) Even low velocities allow reliable supply; example rural workshop:
1.25 m/s = 500 watt = 11 kWh per day 11 kWh fridge, electrical saw, radio, fan during 10 hours
Competitive against small diesel generator or small photovoltaic system Complete delivery includes
Turbine Anchor cable Electrical cable Electrical system (minus batteries)
Easy to
Install with local boats in one day Operate by local people Maintain as only regular cleaning is required
System be built in modules up to MW clusters in single canal or river Maximum size depends on injection point and demand
Max 75 to 100 kW low voltage injection at one single point Approx 50 m distance between lines of turbines so flow recovers
Implementation can be realized in phases with generation starting with first turbine in place
100 kW project order to first kWh
5 to 6 month (incl. transport)
Demand Profile: Daytime peak by workshop Minimisation of battery bank compared with PV only system Diesel or grid as back up when batteries low and no generation available System can work with different load profiles or as UPS system (uninterrupted power supply)
7
AC inverter
~ 220 V
AC inverter
Power fed into low voltage grid at traffic light Distributed generation Stabilising the grid Uninterruptible power supply
~ ~ ~
rectifier + dumpload
+ -
AC inverter
~ 220 V
Smart Hydro Power run a simulation on linear grid systems It could be shown that grid losses could be reduced from 18% to 5% by injecting every 500 m along a 20 km low voltage line Each of the injection points could be used for a UPS (uninterrupted power supply) connection
Applications Local businesses (agriculture, fishery) Communication (cell phone towers) Living standard (water treatment, refrigeration) Labor camps
Sabko industries
11
No low pressure in front of diffusor no fish fed in Low spinning of rotor (250 rpm) does not harm river life Low noise does not affect river life Anchor does not impact river environment All components are watersafe, no washing-off and polution
fish
12
Excess energy can be used for ice production Uninterrupted line of freezing guarantees commercial fish: Over night the turbine feeds into ice generation, fishermen take ice, days harvest is taken to the fridge Installation design is project specific: current demand profile and opportunities are analyzed
13
ENERSAC as Smart Hydro Powers acknowledged EPC arm with local partner BNB Engineering & Development Training of local partners
Assembling Installation Electrical wiring service
transportation cost
15
Basic price turbine: Electronics: Transportation: 40 ft container with 9 turbines approx 4,000 U$ EPC: 100 kW project, approx. 2 month for installation, training and commissioning with two engineers and local workforce Prices vary between 2,500 U$ to 3,900 U$ / kW installed Generation costs vary between 0.06 U$ / kWh to 0.40 U$ / kWh depending on project cost and river velocity
16
SMART turbines have high local content Regional clusters with local workshops for assembling and project management Training of local personnel for Assembling Electrical wiring Installation Maintenance / service Future project development for electrical management
17
Selected References
The Company
CEO Dr. Karl Kolmsee Founded in 2010 Based in Feldafing near Munich, Germany Promoted by the Bavarian Ministry for Commerce 2012 winner of German Development Bank KfW new business award Internationally-renowned
Mission: Development, production and commercialization of affordable and environmentally-friendly kinetic micro hydropower systems.
EPC partner
Marco Espinoza ENERSAC LLC - USA Phone: +1 850 559-5739 Skype: marco103195 www.enersac.com
Dr. Karl Reinhard Kolmsee Smart Hydro Power GmbH Alte Traubinger Str. 17 82340 Feldafing / Munich Germany www.smart-hydro.de