Technical Specifications.: No Descriptions Required Offered
Technical Specifications.: No Descriptions Required Offered
Please indicate in the box Offered if requested switches meet the requirements.
No 1 2
3 4 5
60 hz 2500 amperes 40 KA
460
Kv
to
min/50Hz Kv 1.2/50
10
Maximum interruption
time
50
milliseconds
11
12
Maximum connection
time
of 70 milliseconds
13
Time of investment
60
milliseconds
(contract 60
milliseconds
reversing time)
14
Insulating
and
way
of SF6
SF6
extinction of the arch 15 Sequence of operation O-0.3 s-CO-3 min. CO/CO- O-0.3 15 s-CO s-CO-3
16
300 m.s.n.m.
17
Distance of escape
18 19
Type of switch
Three-phase
Three-phase Single-pole
20
Type of mechanisms
spring
21 22 23
110v DC 208v AC
seismic 0.3g
classification 24 Auxiliary connections 6889 mm (25*245=6125 31*245=7595) 25 Auxiliary contacts 10 NO y 10 NC (Minimum) 10 NO y 10 NC (Minimum) 26 Capacity contacts 27 28 Voltage of heating office Bobbins of shot 208v AC Double of auxiliary 10 amperes minimum 10 minimum 208v AC Double amperes
29 30
Bobbin of closing
One
One contact of
Monitoring pressure of the With contact of alarm and With SF6 block
31
of the gas 32 33 anti-pumping relay Quality of the included gas IEC 376 included IEC 376
according to norm
No 1 2
Acceleration, 0.5 g Acceleration, 0.5 g horizontal, vertical 0,5 g horizontal, vertical 50 C 0,5 g
Maximum
long 50 C
temperature of the day 4 Maximum humidity 5 installation height 300 msnm 300 msnm relative 100% 100%
No 1
Requirements The technical rating plates must be in Spanish language, made of steel Stainless with inscriptions of low relief for outdoor and of easy reading.
Offered Yes
The switches must bring own structure of material resistant to the environment galvanized in warmly, according to procedure EN-ISO 1461, CASH 50976 or ASTM A153 and with capacity of static load and suitable dynamics
Yes
The stature of every switch will Yes have to be adapted to the current base of the concrete one
The structure of every switch must Yes have his point of connection of earthing
necessary and adapted for the installation of the equipment 6 The height of every switch must Yes be similar to nowadays installed in such a way that there are not modified in risky form the
distances and current heights of the installation 7 Every switch must rely on Yes
sufficient auxiliary contacts that they allow to connect all the circuits of control that allow the
current operation of the switches in sure form and that are fulfilled by the scheme of current
qualified and independent from the quality of the materials used in the switches and the quality of the smelting of the fixed parts and mobiles of the switch 9 Must be submitted to international Yes standards both mechanical and electrical applied in the
manufacture of equipment and components, if they use their own rules of the country of origin must be comparable or better than most current international standards 10 In the assembly of the equipment Yes the use of adjustments is not allowed in the structure that alters the quality of the equipment 11 It is necessary to deliver the full Yes equipment of SF6 with all the accessories 12 It is necessary to deliver a lot of minimal supplies, attend to any damage that is generated in the first operations, this lot must include: - 3 relays monitoring SF6 gas Yes pressure.
- 3 engines of tightened of spring, - 6 bobbins of closing. - 6 bobbins of opening. - Relays of control. - Switchboards. - Switches you die of career.
Bobbins signaling to attend a NA switch 13 Densimeter of SF6 per pole to Yes floor height for easy viewing, indicating scale shall have
temperature compensated pressure. so it must be Equipped with lowstage press indication, the first one as alarm and the second for blockade. 14 The protections of the elements of Yes the switch must effect by means of thermomagnetic switch. They
were not accepted protections by means of fuses 15 It must possess a counter of Yes operations of the type that does not adjust
4. Testing.
All switches must bring manufactures testing protocol prior to delivery and receipt of the same.
packing
measurements
during the tests. Important information for his storage and managing during the assembly. B) Manuals of operation and maintenance, where it Yes
includes measurements and calibrations and parameters of functioning, in Spanish language C) Fault identification manual, indicating the most likely failures and maintenance program to prevent Yes
6. Warranty.
The contractor must deliver the original certificate of guarantee of the manufacturer, whose term must be equal or bigger than 18 months, from the definitive receipt of the supply and service. Reply:confirm. 7. Delivery time.
With a maximum of 24 months, counted from the day of the notification to the beneficiary of the letter of credit. In the same term the contractor has 20 days calendar for every field of switches, from the notification in writing of the from date of the works for the supervisor of the contract or the chief of plant. Reply:confirm.