DSS 3A As Per 28 June 2012
DSS 3A As Per 28 June 2012
S
Latest
Document Title
Revision
Status Code
Submission
Date
Preliminary Design
Cumulative %
Cumulative
Earned Value
WEIGHT
FACTOR
77.5168%
0.739%
0.569%
Project Management
Management (Manuals / Procedures / Plans):
Claim Procedure
REVISION 3
REVISION 0
REVISION 2
REVISION A
REVISION 2
REVISION 3
REVISION 0
REVISION 3
REVISION 2
REVISION 1
REVISION F
REVISION 2
REVISION F
REVISION E
REVISION 0
IFC
IFC
IFC
IFR
IFC
IFC
IFC
IFC
IFC
IFC
IFR
IFC
IFR
IFR
IFC
01-Jun-12
31-May-12
11-Jun-12
08-Jun-12
11-Jun-12
23-Apr-12
11-Jun-12
29-May-12
14-Jun-12
20-Apr-12
27-Apr-12
14-Jun-12
23-Apr-12
26-Apr-12
14-Jun-12
0%
100%
100%
100%
75%
100%
100%
100%
100%
100%
100%
75%
100%
75%
75%
100%
0.0000%
0.0085%
0.0085%
0.0085%
0.0064%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0064%
0.0085%
0.0064%
0.0064%
0.0085%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0031R-00-A-MN-005-A4
0031R-00-A-MN-006-A4
REVISION 5
REVISION 5
IFC
IFC
28-May-12
28-May-12
100%
100%
0.0085%
0.0085%
0.0051%
0.0051%
HSE PROCEDURE
0031R-00-N-PR-001-A4
0031R-00-N-PR-002-A4
0031R-00-N-PR-003-A4
Training Programme for Health, Safety and Environmental and Security Requirement
Security Procedure
0031R-00-N-PR-004-A4
0031R-00-O-PR-002-A4
REVISION 4
REVISION 3
REVISION 2
REVISION 2
REVISION 4
IFC
IFC
IFC
IFC
IFC
25-Jun-12
13-Jun-12
13-Feb-12
13-Feb-12
09-Jul-12
100%
100%
100%
100%
100%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0031R-00-A-PR-007-A4
Procedure
0031R-00-Q-PR-001-A4
REVISION 3
IFC
31-May-12
100%
0.0085%
0.0051%
0031R-00-Q-PR-005-A4
0031R-00-Q-PR-006-A4
0031R-00-Q-PR-007-A4
0031R-00-Q-PR-008-A4
0031R-00-Q-PR-009-A4
0031R-00-Q-PR-010-A4
0031R-00-Q-PR-011-A4
0031R-00-Q-PR-012-A4
0031R-00-Q-PR-015-A4
0031R-00-Q-PR-016-A4
0031R-00-Q-PR-018-A4
0031R-00-Q-PR-019-A4
REVISION 0
REVISION B
REVISION 5
REVISION 1
REVISION 1
REVISION 1
REVISION 0
REVISION 2
REVISION 3
REVISION 2
REVISION D
REVISION 2
REVISION 1
06-Feb-12
20-Apr-12
13-Mar-12
06-Feb-12
06-Feb-12
06-Feb-12
06-Feb-12
23-Apr-12
07-Mar-12
29-May-12
26-Apr-12
22-Jun-12
06-Mar-12
0031R-00-Q-PR-020-A4
0031R-00-Q-PR-021-A4
Report
REVISION 1
IFC
IFR
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFR
IFC
IFC
IFC
06-Mar-12
100%
75%
100%
100%
100%
100%
100%
100%
100%
100%
75%
100%
100%
0%
100%
0.0085%
0.0064%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0064%
0.0085%
0.0085%
0.0000%
0.0085%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0031R-00-A-RE-001-A4
0031R-50-Q-RE-001-A4
REVISION A
REVISION 0
IFR
IFC
29-Jun-12
03-Jul-12
75%
100%
0.0000%
0.0085%
0.0000%
0.0051%
REVISION 1
IFC
IFR
IFR
IFC
04-May-12
100%
0%
75%
75%
100%
0.0064%
0.0000%
0.0064%
0.0064%
0.0085%
0.0038%
0.0051%
0.0051%
0.0051%
0.0051%
08-Feb-12
16-Mar-12
15-Feb-12
13-Mar-12
22-Jun-12
29-Jun-12
29-May-12
25-Jun-12
18-Apr-12
REVISION A
REVISION 1
REVISION D
REVISION 3
REVISION 0
REVISION B
REVISION A
REVISION 0
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFR
IFR
IFR
IFR
IFR
IFR
IFR
IFC
IFR
IFC
IFC
IFR
IFR
IFC
20-Mar-12
25-Jun-12
28-Jun-12
22-Jun-12
04-May-12
13-Mar-12
26-Mar-12
28-Jun-12
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
100%
0%
100%
75%
75%
75%
75%
75%
75%
0%
75%
100%
75%
100%
100%
75%
75%
100%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0000%
0.0085%
0.0000%
0.0085%
0.0064%
0.0064%
0.0064%
0.0064%
0.0064%
0.0064%
0.0000%
0.0064%
0.0085%
0.0064%
0.0085%
0.0085%
0.0064%
0.0064%
0.0000%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0000%
REVISION 0
REVISION 1
REVISION 0
REVISION 0
REVISION 0
REVISION 0
IFC
IFC
IFC
IFC
IFC
IFC
26-Jun-12
09-Jul-12
26-Jun-12
26-Jun-12
28-Jun-12
26-Jun-12
100%
100%
100%
100%
100%
100%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0%
0%
0.0000%
0.0000%
0.0000%
0.0000%
0031-00-A-MN-001-A4
0031R-00-A-PR-001-A4
0031R-00-A-PR-002-A4
0031R-00-A-PR-003-A4
0031R-00-A-PR-005-A4
0031R-00-A-PR-009-A4
0031R-00-A-PR-010-A4
0031R-00-A-PR-012-A4
0031R-00-A-PR-014-A4
Correspondence Procedure
Permit To Work Procedure
0031R-00-A-PR-015-A4
0031R-00-G-PR-010-A4
0031R-00-B-PR-002-A4
0031R-00-U-PR-005-A4
0031R-00-U-PR-001-A4
0031R-00-A-PR-008-A4
0031R-00-A-PR-016-A4
HSE
HSE MANUAL
QA / QC
Plan & ITP
0031-00-A-SC-013-A4
0031-00-N-RE-002-A4
REVISION B
REVISION E
REVISION 2
08-Jun-12
24-Apr-12
28-May-12
Procurement
Manuals / Procedures / Plans
Request For Quotation (RFQ)
Bid Evaluation
Un-price Purchase Order
List
Construction (Manual/Procedure/Plan)
REVISION 1
REVISION 6
REVISION 7
REVISION 5
REVISION 2
REVISION 6
REVISION 5
REVISION 5
REVISION 3
0031R-50-C-PR-002-A4
0031R-50-C-PR-003-A4
0031R-50-C-PR-004-A4
0031R-50-C-PR-005-A4
0031R-50-C-PR-006-A4
0031R-50-C-PR-007-A4
0031R-50-C-PR-008-A4
0031R-50-C-PR-009-A4
0031R-50-C-PR-011-A4
0031-50-C-PR-012-A4
0031-50-C-PR-013-A4
0031-50-C-PR-014-A4
0031R-50-C-PR-015-A4
Painting Procedure
Pipeline Swabbing, Drying and Purging Procedure
Pipeline Drying and Nitrogen Purging Procedure
0031R-50-C-PR-017-A4
0031R-50-C-PR-018-A4
0031R-50-C-PR-019-A4
0031R-50-C-PR-020-A4
0031R-50-C-PR-021-A4
0031R-50-C-PR-022-A4
0031-50-C-PR-023-A4
0031R-50-C-PR-025-A4
Handling, Transportation and Storage Procedure for Employer's Free-Issue Materials for WPS & WPQT
Internal and External Coating Procedure for Hot Bend Pipe
0031R-50-C-PR-027-A4
0031R-50-C-PR-028-A4
0031-50-C-PR-032-A4
0031R-50-C-PR-033-A4
0031R-50-C-PR-034-A4
0031R-50-C-PR-035-A4
0031R-50-C-PR-036-A4
REVISION 0
REVISION 0
REVISION B
REVISION A
REVISION A
REVISION A
REVISION A
REVISION A
Commissioning
Pre-Commissioning:
Commissioning:
0031R-00-A-MN-003-A4
0031R-50-C-MN-030-A4
0031R-50-C-MN-037-A4
0031R-50-D-MN-006-A4
0031R-50-D-PR-002-A4
Commissioning Manual
Commissioning Procedure
0031R-50-D-PR-003-A4
Report
0031-50-D-RE-001-A4
0031-50-D-RE-002-A4
Spare Parts (List)
Pre-Commissioning Report
Commissioning Report
Page 1 of 5
24-Apr-12
28-Jun-12
14-Jun-12
26-Apr-12
01-May-12
26-Apr-12
01-May-12
01-May-12
B
U
P
lI
L
a
T
80% ###
n
IDV
Plan
A
S
Latest
Document Title
Cumulative %
Cumulative
Earned Value
WEIGHT
FACTOR
Revision
Status Code
Submission
Date
REVISION 0
IFC
29-May-12
100%
0.0085%
0.0051%
Specification
0031-50-L-SP-015-A4
REVISION 1
0031-50-L-SP-020-A4
0031-50-L-SP-021-A4
0031-50-L-SP-022-A4
Calculation
0031-50-L-CA-004-A4
REVISION 1
IFC
IFC
01-May-12
0031-50-L-SP-016-A4
0031-50-L-SP-017-A4
100%
0%
0%
0%
0%
100%
0.0085%
0.0000%
0.0000%
0.0000%
0.0000%
0.0085%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0031-50-L-CA-005-A4
0031-50-L-CA-012-A4
REVISION 1
REVISION 1
REVISION 3
15-May-12
09-Jul-12
05-Mar-12
0031-50-L-CA-013-A4
0031-50-L-CA-014-A4
REVISION C
IFC
IFC
IFC
IFR
100%
100%
100%
0%
75%
0.0085%
0.0085%
0.0085%
0.0000%
0.0064%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
Data Sheet
0031-50-L-DS-007-A4
100%
0.0085%
0.0051%
Process
Calculation
Report
0031-50-P-RE-001-A4
Data Sheet
Drawing
Pipeline / Piping
09-Jul-12
09-Jul-12
Drawing
Piping Drawing
0031-50-L-DG-210-A3
River Crossing Drawing
0%
0.0000%
0.0038%
REVISION 3
IFC
04-May-12
100%
0.0064%
0.0038%
REVISION D
REVISION C
REVISION C
REVISION 2
REVISION 2
REVISION 1
IFR
IFR
IFR
IFC
IFC
IFC
-
09-Jul-12
09-Jul-12
09-Jul-12
09-Jul-12
09-Jul-12
09-Jul-12
75%
75%
75%
100%
100%
100%
0%
0.0064%
0.0064%
0.0064%
0.0085%
0.0085%
0.0085%
0.0000%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0031-50-L-DG-002-A3
Typical Drawing for Roads and Railway Crossings
Detailed Over Pass / Under Pass Crossing in MMS - Toll Road Area
Sectional PGN's Pipeline Within MMS - Toll Road Area
Material Take Off (MTO)
0031-50-L-MT-003-A4
MTO for Flange and Blind Flange
0031-50-L-MT-004-A4
0031-50-L-MT-005-A4
0031-50-L-MT-012-A4
0031-50-L-MT-015-A4
0031-50-L-MT-016-A4
0031-50-L-MT-017-A4
Instrument
Data Sheet
Drawing
Material Take Off (MTO)
Electrical
Report
Procedure
0031-50-E-PR-001-A4
Calculation
REVISION 4
IFC
09-Jul-12
100%
0.0085%
0.0051%
0031R-50-E-CA-001-A4
0031R-50-E-CA-002-A4
0031R-50-E-CA-003-A4
Specification
REVISION 5
REVISION 6
REVISION C
IFC
IFC
IFR
12-Apr-12
10-May-12
23-Apr-12
100%
100%
75%
0.0000%
0.0000%
0.0064%
0.0000%
0.0000%
0.0051%
REVISION 0
REVISION 0
IFC
IFC
23-Apr-12
23-Apr-12
100%
100%
0.0064%
0.0064%
0.0038%
0.0038%
0%
0.0000%
0.0038%
Data Sheet
Drawing
0031R-50-E-DG-202-A3
0031-50-E-DG-207-A3
Material Take Off (MTO)
0031-50-E-MT-001-A4
Civil
Specification
0031-50-S-SP-001-A4
REVISION 2
REVISION D
IFC
IFR
04-May-12
04-May-12
100%
75%
0.0085%
0.0064%
0.0051%
0.0051%
REVISION E
REVISION 0
REVISION F
REVISION F
REVISION A
REVISION A
IFR
IFC
IFR
IFR
IFR
IFR
04-May-12
10-May-12
03-Apr-12
26-Mar-12
03-Jul-12
10-Jul-12
75%
100%
75%
75%
75%
75%
0.0064%
0.0085%
0.0064%
0.0064%
0.0000%
0.0000%
0.0051%
0.0051%
0.0051%
0.0051%
0.0000%
0.0000%
REVISION A
IFR
26-Apr-12
0%
0%
75%
0.0000%
0.0000%
0.0048%
0.0038%
0.0038%
0.0038%
0031R-50-S-DG-202-A3
REVISION A
IFR
26-Apr-12
75%
0.0048%
0.0038%
0031-50-S-DG-203-A3
0031-50-S-DG-204-A3
0031-50-S-DG-205-A3
0031R-50-S-DG-210-A3
0031R-50-S-DG-210-A3
0031-50-S-DG-025-A3
0031-50-S-DG-026-A3
0%
0%
0%
100%
100%
0%
100%
0.0000%
0.0000%
0.0000%
0.0064%
0.0000%
0.0000%
0.0064%
0.0038%
0.0038%
0.0038%
0.0038%
0.0000%
0.0038%
0.0038%
0031-50-S-DG-026-A3
0031-50-S-SP-002-A4
Calculation
0031R-50-S-CA-001-A4
0031R-50-S-CA-002-A4
0031R-50-S-CA-003-A4
0031R-50-S-CA-004-A4
0031R-50-S-CA-005-A4
0031R-50-S-CA-006-A4
Drawing
0031-50-S-DG-200-A3
0031-50-S-DG-006-A3
0031R-50-S-DG-202-A3
REVISION 0
REVISION 0
IFC
IFC
-
29-May-12
29-May-12
100%
0.0064%
0.0038%
67.5595%
0.8336%
0.540%
15-May-12
100%
0.0044%
0.002%
04-May-12
04-May-12
04-May-12
0%
0%
0%
0%
100%
100%
100%
0.0000%
0.0000%
0.0000%
0.0000%
0.0044%
0.0044%
0.0044%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0.0059%
0.0059%
0.0059%
0.0059%
0.0059%
0.0059%
0.0059%
0.0059%
0.0000%
0.0000%
0.0000%
0.0000%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0031-50-P-DG-100-A1
0031-50-P-DG-001-A1
0031-50-P-DG-001-A1
0031-50-P-DG-001-A1
0031R-52-P-DG-001-A1
0031R-53-P-DG-001-A1
0031R-56-P-DG-001-A1
Pipeline / Piping
Specification
0031R-50-L-SP-002-A4
0031R-50-L-SP-003-A4
0031R-50-L-SP-004-A4
0031R-50-L-SP-005-A4
0031R-50-L-SP-006-A4
0031R-50-L-SP-007-A4
0031R-50-L-SP-009-A4
0031R-50-L-SP-010-A4
0031R-50-L-SP-011-A4
0031R-50-L-SP-013-A4
0031-50-L-SP-015-A4
0031-50-L-SP-016-A4
REVISION 1
IFC
REVISION 5
REVISION 5
REVISION 5
IFC
IFC
IFC
REVISION 5
REVISION 4
REVISION 1
REVISION 2
REVISION 1
REVISION 1
REVISION 2
REVISION 2
Page 2 of 5
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
-
29-May-12
01-Jun-12
01-May-12
27-Apr-12
01-May-12
01-May-12
29-May-12
01-May-12
B
U
P
lI
L
a
T
80% ###
n
IDV
Plan
A
S
Latest
Document Title
0031-50-L-SP-017-A4
0031-50-L-SP-020-A4
0031-50-L-SP-021-A4
0031-50-L-SP-022-A4
MTO
0031-50-L-MT-012-A4
Data Sheet
0031-50-L-DS-001-A4
0031-50-L-DS-002-A4
0031-50-L-DS-004-A4
0031-50-L-DS-005-A4
0031-50-L-DS-006-A4
Piping Drawing
0031R-50-L-DG-211-A3
0031R-50-L-DG-211-A3
0031R-50-L-DG-212-A3
0031R-50-L-DG-213-A3
0031R-50-L-DG-214-A3
0031R-50-L-DG-214-A3
0031R-50-L-DG-214-A3
0031R-50-L-DG-214-A3
0031R-50-L-DG-215-A3
0031R-50-L-DG-215-A3
0031R-50-L-DG-216-A3
Piping Plan Isometric Drawing Tie-In Isolation Valve at Cikande Station KP.32+764 sheet 2 of 2
Piping Plan and Isometric Drawing Future Conection at Cikande Station KP 32+777 Sheet 1 of 2
0031R-50-L-DG-216-A3
0031R-50-L-DG-217-A3
Piping Plan and Isometric Drawing Future Conection at Cikande Station KP 32+777 Sheet 2 of 2
Piping Isometric Drawing Typical Portable Vent Stack Sectional Valve KP.08+002, KP.16+575, KP.29+914
(sheet Isometric
1 of 2)
Piping
Drawing Typical Portable Vent Stack Sectional Valve KP.23+536 (sheet 2 of 2)
0031R-50-L-DG-217-A3
0031R-50-L-DG-218-A3
Piping Plan and Isometric Drawing Portable Vent Stack Future Connection Cikande Station KP.32+777
Piping Isometric Drawing Typical Drain Pipe Section Valve Box KP.08+002
Piping Isometric Drawing Typical Drain Pipe Section Valve Box KP.16+575
Piping Isometric Drawing Typical Drain Pipe Section Valve Box KP.23+536
0031R-50-L-DG-219-A3
0031R-50-L-DG-220-A3
Piping Isometric Drawing Typical Drain Pipe Section Valve Box KP.29+914
0031R-50-L-DG-221-A3
0031R-50-L-DG-222-A3
0031R-50-L-DG-223-A3
0031-50-L-DG-201-A3
0031-50-L-DG-231-A3
0031-50-L-DG-233-A3
0031-50-L-DG-233-A3
0031-50-L-DG-234-A3
0031-50-L-DG-235-A3
Pipe Crossing at Main Irrigation River Pamarayan Barat Location KP 07+690 Serang (Sheet 2 of 2)
Pipe Crossing at Kali Banten River Location KP 12+525 Serang
Pipe Crossing at Main Irrigation River Ciujung Location KP 29+300 Serang
0031R-50-L-DG-252-A3
0031R-50-L-DG-252-A3
0031R-50-L-DG-253-A3
0031R-50-L-DG-253-A3
Detailed Over Pass / Under Pass Crossing in MMS - Toll Road Area
0031R-50-L-DG-270-A3
Major Road Crossing Details (sheet 1 of 4)
WEIGHT
FACTOR
Status Code
REVISION 3
REVISION 2
IFC
IFC
-
29-May-12
29-May-12
0%
100%
100%
0%
0.0000%
0.0059%
0.0059%
0.0000%
0.003%
0.003%
0.003%
0.003%
0%
0.0000%
0.003%
REVISION 3
REVISION 5
REVISION 2
REVISION 2
REVISION 5
IFC
IFC
IFC
IFC
IFC
01-May-12
01-Jun-12
01-May-12
01-Jun-12
29-May-12
100%
100%
100%
100%
100%
0.0059%
0.0059%
0.0059%
0.0059%
0.0059%
0.003%
0.003%
0.003%
0.003%
0.003%
REVISION 7
REVISION 6
REVISION 5
REVISION 4
REVISION 7
REVISION 7
REVISION 7
REVISION 7
REVISION 5
REVISION 4
REVISION 4
REVISION 4
REVISION 0
REVISION 0
REVISION 1
REVISION 1
REVISION 1
REVISION 1
REVISION 1
REVISION 0
REVISION 0
REVISION 1
REVISION A
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFR
-
29-May-12
26-Apr-12
19-Jun-12
25-Jun-12
25-Jun-12
25-Jun-12
25-Jun-12
25-Jun-12
25-Jun-12
19-Jun-12
04-May-12
04-May-12
19-Jun-12
19-Jun-12
25-Jun-12
25-Jun-12
25-Jun-12
25-Jun-12
25-Jun-12
19-Jun-12
19-Jun-12
25-Jun-12
26-Apr-12
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
75%
0%
0.0044%
0.0000%
0.0044%
0.0044%
0.0044%
0.0000%
0.0000%
0.0000%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0000%
0.0000%
0.0000%
0.0044%
0.0044%
0.0044%
0.0033%
0.0000%
0.002%
0.000%
0.002%
0.002%
0.002%
0.000%
0.000%
0.000%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.000%
0.000%
0.000%
0.002%
0.002%
0.002%
0.002%
0.002%
REVISION 0
IFC
-
26-Apr-12
100%
0%
0%
0%
0%
0%
0%
0.0044%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.0000%
0.0000%
0.0000%
0.0000%
0.0044%
0.002%
0.002%
0.002%
0.002%
0.002%
0031-50-L-DG-236-A3
Pipe Crossing at Ciujung River Location KP 32+520 Serang
Detailed Railways Crossing Drawing
0031-50-L-DG-250-A3
0031-50-L-DG-251-A3
Cumulative
Earned Value
Revision
0031R-50-L-DG-219-A3
0031R-50-L-DG-219-A3
0031R-50-L-DG-219-A3
Cumulative %
Submission
Date
REVISION 2
IFC
30-Mar-12
0%
0%
0%
0%
100%
REVISION 2
IFC
30-Mar-12
100%
0.0044%
0.002%
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
29-Jun-12
29-Jun-12
24-Apr-12
24-Apr-12
29-Jun-12
29-Jun-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0031R-50-L-DG-270-A3
0031R-50-L-DG-270-A3
0031R-50-L-DG-270-A3
0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3
0031R-50-L-DG-272-A3
0031R-50-L-DG-272-A3
0031-50-L-DG-273-A3
0031-50-L-DG-273-A3
0031R-50-L-DG-274-A3
0031R-50-L-DG-274-A3
0031R-50-L-DG-275-A3
0031R-50-L-DG-275-A3
0031R-50-L-DG-276-A3
0031R-50-L-DG-276-A3
0031R-50-L-DG-277-A3
0031R-50-L-DG-277-A3
REVISION 0
REVISION 0
REVISION 0
REVISION 0
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 0
REVISION 0
REVISION 2
REVISION 2
REVISION 0
REVISION 0
REVISION 0
REVISION 0
REVISION 0
REVISION 0
0031R-50-L-DG-278-A3
REVISION 0
IFC
24-Apr-12
100%
0.0044%
0.002%
0031R-50-L-DG-278-A3
REVISION 0
IFC
24-Apr-12
100%
0.0044%
0.002%
0031R-50-L-DG-279-A3
REVISION 0
IFC
24-Apr-12
100%
0.0044%
0.002%
0031R-50-L-DG-279-A3
REVISION 0
IFC
24-Apr-12
100%
0.0044%
0.002%
0031R-50-L-DG-280-A3
REVISION 0
IFC
24-Apr-12
100%
0.0044%
0.002%
0031R-50-L-DG-280-A3
0031R-50-L-DG-281-A3
0031R-50-L-DG-281-A3
0031-50-L-DG-282-A3
0031-50-L-DG-282-A3
0031-50-L-DG-283-A3
0031-50-L-DG-283-A3
0031-50-L-DG-284-A3
0031-50-L-DG-284-A3
0031-50-L-DG-285-A3
REVISION 0
REVISION 0
REVISION 0
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 0
REVISION 0
24-Apr-12
24-Apr-12
24-Apr-12
29-Jun-12
29-Jun-12
29-Jun-12
29-Jun-12
24-Apr-12
24-Apr-12
0031-50-L-DG-285-A3
0031R-50-L-DG-285-A3
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
100%
0.0044%
0.0044%
0.0044%
0.0044%
0.0000%
0.0044%
0.0000%
0.0044%
0.0000%
0.0000%
0.0000%
0.0044%
0.002%
0.002%
0.002%
0.002%
0.000%
0.002%
0.000%
0.002%
0.000%
0.002%
0.002%
0.002%
REVISION 3
Page 3 of 5
24-Apr-12
B
U
P
lI
L
a
T
80% ###
n
IDV
Plan
A
S
Latest
Document Title
Revision
Status Code
Submission
Date
0031-50-L-DG-285-A3
Details RC /RIC KP 07+950 Bojonegara - Cikande Pipeline (Sheet 2 of 2)
0031-50-L-DG-285-A3
Details RC /RIC KP 07+950 Bojonegara - Cikande Pipeline (Sheet 2 of 2)
Sectional PGN's Pipeline Within MMS - Toll Road Area
Cumulative %
Cumulative
Earned Value
WEIGHT
FACTOR
0%
0%
0.0000%
0.0000%
0.002%
0.002%
0031-50-L-DG-290-A3
Sectional PGN's Pipeline within Toll Road Area KM Toll 76+926 - KM 76+661.36 Bojonegara - Cikande
Pipeline
REVISION 0
IFC
19-Jun-12
100%
0.0044%
0.002%
0031-50-L-DG-291-A3
Sectional PGN's Pipeline within Toll Road Area KM Toll 60+336 - KM 60+238 Bojonegara - Cikande Pipeline
REVISION 1
IFC
19-Jun-12
100%
0.0044%
0.002%
0031-50-L-DG-292-A3
Sectional PGN's Pipeline within Toll Road Area KM Toll 60+084 - KM 59+918 Bojonegara - Cikande Pipeline
REVISION 2
IFC
19-Jun-12
100%
0.0044%
0.002%
0031-50-L-DG-293-A3
Sectional PGN's Pipeline within Toll Road Area KM Toll 59+048 - KM 58+800 Bojonegara - Cikande Pipeline
REVISION 2
IFC
19-Jun-12
100%
0.0044%
0.002%
REVISION 0
REVISION 0
REVISION 0
REVISION 1
REVISION 1
REVISION 1
REVISION 1
IFC
IFC
IFC
IFC
IFC
IFC
IFC
24-Apr-12
24-Apr-12
24-Apr-12
29-Jun-12
29-Jun-12
29-Jun-12
29-Jun-12
100%
100%
100%
100%
100%
100%
100%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0031R-50-L-DG-303-A3
0031R-50-L-DG-303-A3
0031R-50-L-DG-303-A3
0031R-50-L-DG-303-A3
Instrument
Data Sheet
Data Sheet for Pressure Gauge
0%
0.0000%
0.003%
0%
0.0000%
0.003%
0%
0.0000%
0.003%
0031-50-E-CA-001-A4
0031-50-E-CA-002-A4
0031-50-E-CA-003-A4
Specification
0%
0%
0%
0.0000%
0.0000%
0.0000%
0.003%
0.003%
0.003%
0031-50-I-DS-001-A4
Drawing
0031-50-I-DG-201-A3
Material Take Off (MTO)
0031-50-I-MT-001-A4
Electrical
Calculation
Data Sheet
0031-50-E-DS-001-A4
0031-50-E-PR-001-A4
0031-50-E-PR-002-A4
0031-50-E-PR-003-A4
0031R-50-E-PR-018-A4
0031R-50-E-PR-020-A4
Drawing
0031-50-E-DG-200-A3
0031-50-E-DG-201-A3
0031-50-E-DG-202-A3
0031-50-E-DG-203-A3
0031-50-E-DG-204-A3
0031-50-E-DG-205-A3
0031-50-E-DG-206-A3
0031-50-E-DG-207-A3
Material Take Off (MTO)
REVISION 3
REVISION 6
REVISION 5
REVISION A
REVISION A
IFC
IFC
IFC
IFR
IFR
05-Mar-12
01-May-12
08-Jun-12
26-Apr-12
26-Apr-12
100%
100%
100%
75%
75%
0.0059%
0.0059%
0.0059%
0.0000%
0.0000%
0.003%
0.003%
0.003%
0.003%
0.000%
0.000%
REVISION 2
REVISION 2
REVISION 0
REVISION 4
REVISION 5
REVISION 5
REVISION 3
REVISION 0
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
01-May-12
01-May-12
23-Apr-12
01-May-12
01-May-12
01-May-12
01-May-12
23-Apr-12
100%
100%
100%
100%
100%
100%
100%
100%
0.0059%
0.0059%
0.0059%
0.0059%
0.0059%
0.0059%
0.0059%
0.0059%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.0000%
0.0000%
0.0044%
0.0044%
0.0044%
0.0044%
0.0000%
0.0044%
0.0044%
0.0044%
0.0044%
0.0000%
0.0000%
0.0044%
0.0044%
0.0000%
0.0044%
0.0044%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
0%
0%
100%
100%
100%
100%
0%
100%
100%
100%
100%
0%
0%
100%
100%
0%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
100%
100%
100%
100%
Civil
Drawing
0031-50-S-DG-400-A3
0031-50-S-DG-401-A3
0031R-50-S-DG-402-A3
0031R-50-S-DG-402-A3
0031R-50-S-DG-402-A3
Typical Sign Board and Marker Detail Marker Post for Crossing (sheet 2 of 4)
Typical Sign Board and Marker Detail Tiang Marker Post Details (sheet 3 of 4)
0031R-50-S-DG-402-A3
0031-50-S-DG-403-A3
Typical Sign Board and Marker Detail Patok Gas Details (sheet 4 of 4)
Soil Erosion Control Measures - Details Ditch Breaker at KP 09+940 to KP 09+990, KP 10+010 to KP 10+145
0031R-50-S-DG-404-A3
0031R-50-S-DG-405-A3
0031R-50-S-DG-406-A3
0031R-50-S-DG-407-A3
0031-50-S-DG-408-A3
0031-50-S-DG-409-A3
0031R-50-S-DG-410-A3
0031R-50-S-DG-410-A3
0031-50-S-DG-411-A3
Sectional Valve Pit & Fencing Detail for KP.08+000, KP.16+575, KP.29+914 (sheet 1 of 2)
Sectional Valve Pit & Fencing Detail for KP.08+000, KP.16+575, KP.29+914 (sheet 2 of 2)
Sectional Valve Pit & Fencing Detail for KP 15+600 Future Connection
REVISION 0
REVISION 0
0031R-50-S-DG-412-A3
0031R-50-S-DG-412-A3
Typical Sectional Valve Box at KP 08+002, KP 16+575, KP 23+536 and KP 29+914 (sheet 1 of 3)
Typical Sectional Valve Box at KP.23+535 (sheet 2 of 3)
0031R-50-S-DG-412-A3
0031-50-S-DG-413-A3
Typical Sectional Valve Box at KP 08+002, KP 16+575, KP 23+536 and KP 29+914 (sheet 3 of 3)
Sectional Valve Box at KP 15+600 Future Connection
REVISION 1
REVISION 1
REVISION 1
0031-50-S-DG-414-A3
0031-50-S-DG-415-A3
0031-50-S-DG-416-A3
0031-50-S-DG-417-A3
0031R-50-S-DG-418-A3
0031R-50-S-DG-419-A3
0031R-50-S-DG-420-A3
0031R-50-S-DG-421-A3
0031R-50-S-DG-422-A3
0031-50-S-DG-025-A3
0031R-50-S-DG-026-A3
0031R-50-S-DG-026-A3
0031R-50-S-DG-026-A3
0031R-50-S-DG-026-A3
Material Take Off (MTO)
0031R-50-L-DG-102-A1
0031R-50-L-DG-103-A1
0031R-50-L-DG-104-A1
0031R-50-L-DG-105-A1
0031R-50-L-DG-106-A1
0031R-50-L-DG-107-A1
0031R-50-L-DG-108-A1
0031R-50-L-DG-109-A1
0031R-50-L-DG-110-A1
0031R-50-L-DG-111-A1
0031R-50-L-DG-112-A1
0031R-50-L-DG-113-A1
0031R-50-L-DG-114-A1
0031R-50-L-DG-115-A1
0031R-50-L-DG-116-A1
0031R-50-L-DG-117-A1
0031R-50-L-DG-118-A1
0031R-50-L-DG-119-A1
0031R-50-L-DG-120-A1
0031R-50-L-DG-121-A1
REVISION B
IFR
27-Apr-12
75%
0.0044%
0.003%
Revision 10
Revision 10
Revision 10
Revision 10
Revision 10
Revision 10
Revision 9
Revision 9
Revision 9
Revision 9
Revision 9
Revision 9
Revision 9
Revision 9
Revision 9
Revision 9
Revision 9
Revision 9
Revision 9
Revision 9
REVISION 6
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0044%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
REVISION 4
REVISION 3
REVISION 3
REVISION 2
REVISION 0
REVISION 0
REVISION 0
REVISION 0
0031-50-S-MT-001-A4
MTO for Civil Work
Topography and Alignment Sheet
0031-50-L-DG-100-A1
0031R-50-L-DG-101-A1
REVISION A
REVISION A
REVISION A
REVISION A
REVISION A
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
Page 4 of 5
08-Jun-12
29-May-12
29-May-12
29-May-12
19-Jun-12
19-Jun-12
19-Jun-12
19-Jun-12
19-Jun-12
19-Jun-12
06-Jul-12
06-Jul-12
0.002%
0.000%
0.000%
0.000%
0.000%
0.000%
0.002%
0.002%
0.002%
0.002%
0.002%
B
U
P
lI
L
a
T
80% ###
n
IDV
Plan
A
S
Latest
Document Title
0031R-50-L-DG-122-A1
0031R-50-L-DG-123-A1
0031R-50-L-DG-124-A1
0031R-50-L-DG-125-A1
0031R-50-L-DG-126-A1
0031R-50-L-DG-127-A1
0031R-50-L-DG-128-A1
0031R-50-L-DG-129-A1
0031R-50-L-DG-130-A1
0031R-50-L-DG-131-A1
0031R-50-L-DG-132-A1
0031R-50-L-DG-133-A1
0031R-50-L-DG-134-A1
0031R-50-L-DG-135-A1
0031R-50-L-DG-136-A1
0031R-50-L-DG-137-A1
0031R-50-L-DG-138-A1
0031R-50-L-DG-139-A1
0031R-50-L-DG-140-A1
0031R-50-L-DG-141-A1
0031R-50-L-DG-142-A1
0031R-50-L-DG-143-A1
0031R-50-L-DG-144-A1
0031R-50-L-DG-145-A1
0031R-50-L-DG-146-A1
0031R-50-L-DG-147-A1
0031R-50-L-DG-148-A1
0031R-50-L-DG-149-A1
0031R-50-L-DG-150-A1
0031R-50-L-DG-151-A1
0031R-50-L-DG-152-A1
0031R-50-L-DG-153-A1
0031R-50-L-DG-154-A1
0031R-50-L-DG-155-A1
0031R-50-L-DG-156-A1
0031R-50-L-DG-157-A1
0031R-50-L-DG-158-A1
0031R-50-L-DG-159-A1
0031R-50-L-DG-160-A1
0031R-50-L-DG-161-A1
0031R-50-L-DG-162-A1
0031R-50-L-DG-163-A1
0031R-50-L-DG-164-A1
0031R-50-L-DG-165-A1
0031R-50-L-DG-166-A1
Vendor Document
Cumulative
Earned Value
WEIGHT
FACTOR
Revision
Status Code
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 8
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 8
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 7
REVISION 6
Revision 9
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
25-Jun-12
75%
0%
0%
100%
0.0044%
0.0000%
0.0000%
0.0059%
0.003%
0.003%
0.003%
0.003%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0%
0%
0%
0.0000%
0.0000%
0.0000%
Ball Valve
Coating Pipe
Acceptance Design
0031R-50-C-PR-030-A4
0031-50-C-PR-031-A4
0031-50-C-RE-032-A4
Commissioning Design
Mechanical Completion Dossier (Draft)
REVISION B
REVISION 1
0031-50-G-RE-005-A4
Pre-Construction Survey Report
Final Documentation and As-Built:
0031-50-L-DG-210-A3
0031-50-P-DG-102-A1
0031-50-P-DG-104-A1
0031-50-P-DG-105-A1
0031-50-C-PR-032-A4
Material Balance Table Base Case for South Sumatra - West Java Gas Distribution Pipeline
Material Balance Table Step-1 Initial Case for South Sumatra - West Java Gas Distribution Pipeline
Mechanical Completion Dossier
REVISION 1
REVISION 1
REVISION 1
0031-50-G-RE-003-A4
Cumulative %
Submission
Date
REVISION 0
IFR
IFC
IFC
IFC
IFC
IFC
15-May-12
0.002%
04-May-12
04-May-12
04-May-12
26-Jun-12
Page 5 of 5
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.000%
B
U
P
lI
L
a
T
80% ###
n
IDV
Plan