2009WIRB #5 BMP ProgressDecember 31, 2014

Sandy Branch, Goodwater Creek, Hamilton Creek, Chariton River #3, Lower Chariton Creek
Practice Seeding Waterways Terraces Debris Basins Basins Structures IJOBS Terrace Total Grant Obligation $6,000.00 $3,715.00 $212,100.00 $123,705.00 $57,600.00 $51,200.00 $36,900.00 $491,220.00 Obligated-Unspent $0.00 $0.00 $32,468.38 $0.00 $0.00 $13,261.20 $16,485.75 $62,215.33 Expended $0.00 $3,714.30 $129,345.98 $64,420.47 $34,480.53 $34,281.21 $19,662.48 $285,904.97 Available Balance $6,000.00 $0.70 $50,285.64 $59,284.53 $23,119.47 $3,657.59 $751.77 $143,099.70

Watershed Update
Contact Velvet Buckingham at 641.872.1350 or by email at Velvet.Buckingham@ia.nacdnet.net

WIRB and BMP Update


Tables below summarize BMPs installed, load reductions achieved in the 42 targeted sub-watersheds, and a summary of financial support. Iowa Watershed Improvement Review Board funding progress is shown on opposite page.

Table 1: : FY2014 summary of BMPs installed and load reductions achieved in the 42 targeted sub-watersheds
July 1, 2013 Dec. 31, 2013 Units Installed 18,945 ft. 12 no. 5 no. 0 no. 0 ac. 0 ac. 0 ac. 0 0 0 0 0 0 0 Acres Benefited 195 25 196 0 0 0 0 0 Gross Erosion Reduction Tons/ Yr. 430 69 200 0 0 0 0 0 Sediment Delivery Reduction Tons/ yr. 358 50 392 0 0 0 0 0 Phosphorus Delivery Reduction Lbs./Yr. 1,727 218 1,225 0 0 0 0 0

Practice Terraces Water & Sediment Basins Grade Stabilization Structures Sediment Basin Livestock Exclusion Pasture & Hayland Seeding Grassed Waterways CRP buffer / filter strips Fence Heavy Use Protection Areas Pipeline Tanks Brush Management Nutrient Management TOTALS Cumulative (FFY 04 Dec 31,
2013)

2010WIRB #6 BMP ProgressOctober 31, 2014


South Fork Chariton River #1, Upper West Jackson Creek, Upper Jackson Creek, Lost Branch, Chariton River #6
Practice Terraces Debris Basins Total Grant Obligation $100,000.00 $0.00 $100,000.00 Obligated-Unspent $50,009.75 $0.00 $50,009.75 Expended $49,338.69 $0.00 $49,338.69 Available Balance $651.56 $0.00 $651.56

2011 WIRB #7 BMP ProgressFebruary 28, 2017


Upper and Lower Dick Creek, Chariton River #4, Chariton River #8
Practice Terraces Debris Basins Grade Stabilization Structures Water Sediment Basins Priority Land Conversion Grassed waterways Total Grant Obligation $78,750.00 $0.00 $23,000.00 $11,250.00 $3,750.00 $750.00 $117,500.00 Obligated-Unspent $8,657.50 $0.00 $0.00 $0.00 $0.00 $0.00 $8,657.50 Expended Available Balance $40,157.35 $0.00 $0.00 $0.00 $0.00 $0.00 $40,157.35 $29,935.15 $0.00 $23,000.00 $11,250.00 $3,750.00 $750.00 $68,685.15

416 ac.

699 t/y

800 t/y

3,170 lbs/y

Table 2: Cumulative summary of BMPs installed and load reductions achieved in the 42 targeted sub-watersheds

2012 WIRB #8 BMP ProgressFebruary 28, 2016


Chariton River #5, Chariton River #10, Middle Wolf Creek #2
Practice Seeding Terraces Basins Structures Total Grant Obligation $5,000.00 $66,150.00 $9,000.00 $17,640.00 $97,790.00 Obligated-Unspent $0.00 $13,074.00 $0.00 $0.00 $13,074.00 Expended $0.00 $0.00 $0.00 $0.00 $0.00 Available Balance $5,000.00 $53,076.00 $9,000.00 $17,640.00 $84,716.00

Practice Terraces Water & Sediment Basins Grade Stabilization Structures Sediment Basin Livestock Exclusion Pasture & Hayland Seeding Grassed Waterways CRP buffer / filter strips Fence Heavy Use Protection Areas Pipeline Tanks Brush Management Nutrient Management TOTALS

Units Installed 1,298,709 ft. 401 no. 127 no. 12 no. 8 ac. 1,102 ac. 44.8 ac. 20.8 ac. 13,022 ft. 10 no. 3,160 ft. 7 no. 280 ac. 159.7 ac.

Acres Benefited 12,471 1,162 3,970 3,054 8 1,102 626 37.8

Gross Erosion Reduction Tons/ Yr. 21,674 2,197 2,515 851 84 4,606 497 46

Sediment Delivery Reduction Tons/ yr. 22,737 2,449 6,879 7,072 32 1,645 510 23

Phosphorus Delivery Reduction Lbs./Yr. 104,595 9,897 25,964 23,944 158 8,009 2,607 103

Three-State Beef Conference January 14 5:30 to 8:45SW Community College, Creston $20 pre-registration is required by January 10 and includes meal and conference proceedings. Sessions include cover crops for grazing, pasture rental, and dry lotting and cow management. Call 877.596.7243 to pre-register.

2014 Corn Belt Cow Calf Conference January 189:30 amBridge View Center, Ottumwa $15 admission includes lunch and conference proceedings 2014 Heifer Development 2: Maintaining Your Investment Visit www.IowaBeefCenter.org to attend one of the 12 locations throughout the state including Osceola, Albia, Winterset, and Ames. $20 pre-registration includes meal.

22,430 ac.
IDALS-DSC WSPF/IJOBS $1,884,245 $13,686 IDALS-DSC IFIP $72,216 $0

32,470 t/y
EPA Watershed Initiative $460,878 $0

41,347 t/y
IDNR Section 319 $1,238,557 $77,843

175,277 lbs/y

Table 3: Summary of financial support for BMP application in targeted sub-watersheds


Total Cost Cumulative (FFY 04-14) SFY 2014 $12,198,910 $271,045 NRCS EQIP/ AWEP $2,889,074 $26,835 WIRB $1,781,872 $41,974 Landowners $3,872,066 $83,872

OuickBooks for Agriculture and Business $40 Pre-registration required. Instructed by Bryan Ziglar and ISU Crop Advantage January 168 am to 4 pmHoney Creek Resort State Park facilitated by Joe Sellers. Two sessions: time for both 9:00 am3:30 pm Contact Mark Carlton at 641.932.5612 Feb 11, 2014 at Wayne County NRCS Mar 3, 2014, at Lucas County Extension Office