Section II Quality
4. Quality Requirements 4.1 Program Management 4.2 Product Development Plan (Timing Chart) 4.3 The Design Failure Modes Effects Analysis (DFMEA) 4.4 The Production Inspection Standard
Page 2 of 24
The Process FMEA Product Validation Process Flow Chart and Control Plan Process Capability Studies Engineering Change and / or Manufacturing Change Prototype / Pre-production Parts Launch Support and the Supplier Conference Production Process Audit Production Part Approval Process (PPAP)
Section III - Acronyms and Their Meanings Section IV Supplier Quality Forms Section V Revision Record
Page 3 of 24
Section I - Purchasing
1. INTRODUCTION
1.1. Purpose
The purpose of this document is to communicate PPGs Automotive OEM Glass Business Unit, quality management systems requirements to those companies that supply parts and services to PPG. The basis for PPGs Supplier Quality Manual is the Quality System Requirement ISO/TS16949 developed in coordination with the Automotive Industry Action Group (AIAG). This standard is based on ISO 9000 Series Standard. PPG has adopted ISO/TS16949 as the framework for the basic quality systems required for all suppliers of parts and services. The goal of ISO/TS16949 is to develop quality processes that provide for continuous improvement, emphasizing defect prevention, the reduction of variation and waste in the supply chain. It applies to all critical internal and external suppliers of parts and services. Design responsible suppliers must meet all requirements of this document. These requirements support the ISO/TS16949 and ISO 9000 clauses as stated in PPGs purchase order. PPG requires that the supplier: Manage facilities, processes, quality systems and personnel to consistently and cost effectively produce product and furnish services that meet the needs of PPG and its customers. Develop, implement, document and maintain an Advanced Product Quality Planning process to assure that product and service requirements are met. Provide objective evidence that initial sample requirements have been met and that acceptable process capabilities for all key characteristics have been established. Be committed to continuous process improvement by emphasizing reduction of part-topart variation and waste through defect prevention.
1.2.
Supporting Documents
The following publications are available from the Automotive Industry Action Group (AIAG). These documents contain additional reference information for suppliers to PPG Automotive OEM Glass: Quality System Requirements QS9000 or ISO 9001:2000 ISO/TS 16949 Technical Specification Quality System Assessment (QSA) Production Part Approval Process (PPAP)
Page 4 of 24
Advanced Product Quality Planning and Control Plan Reference Manual (APQP) Potential Failure Modes and Effects Analysis Reference Manual (FMEA) Measurement Systems Analysis Reference Manual (MSA) Fundamental Statistical Process Control Reference Manual (SPC) Customer Specified Requirements The latest versions of these documents can be purchased from: Automotive Industry Action Group 26200 Lahser Road, Suite 200 Southfield, Michigan 48034 USA Phone (248) 358-3570 Fax (248) 358-3253 Or www.aiag.org
1.3.
Certification
PPG Industries, Inc., a global and diversified producer of Glass, Coatings and Chemicals, is committed to providing products and services to our customers that fully meet their present and future requirements. PPGs suppliers are a critical strategic resource in meeting this customer commitment. PPG requires suppliers to have an effective Quality System. The basis for PPGs quality system requirements is the Quality System Requirements ISO/TS16949 developed in coordination with the Automotive Industry Action Group (AIAG). This standard is based upon the ISO 9000 series standard. PPG has adopted ISO/TS16949 as the framework for the basic quality systems required for all suppliers of products and services. These requirements are an integral aspect of PPGs purchase order. PPG requires the following: Suppliers to PPGs ISO/TS 16949 registered facilities are encouraged to achieve ISO/TS 16949, but must achieve third party registration to ISO 9001:2000. Suppliers to QS-9000 registered PPG facilities are encouraged to achieve third party registration to QS-9000 but a minimum compliance requirement will be certification to a current version of the ISO 9000 Quality Management series Standard, (by the end of 2002) excluding ISO 9003; plus any requirements specified by the customer. Supplier assessments to QS-9000 and/or ISO/TS 16949 by the OEM Customer, an OEM Customer-approved second party or an accredited third party registrar will be recognized by PPG as supplier quality audits.
! "$#%
&! &'(
Page 5 of 24
2. PURCHASING REQUIREMENTS
2.1. Supplier Qualification Background Information
PPG requires suppliers to complete the Supplier Qualification Background Information form (QA4.SQM.01.01). In addition to this form, we also require a copy of the Suppliers Quality Policy, Mission Statement, Organization Chart, a typical Control Plan, DFMEA, PFMEA, a quality system procedure and a process work instruction. The information provided by you will be held strictly confidential within PPG.
2.2.
The Quality System Audit consists of a visit to a specific suppliers production site. This is normally completed in one to two days. PPG Supplier Quality System Audit Form (QA4.SQM.01.02) is included in the manual for your review. At the discretion of PPG, all potential suppliers will be subject to an on-site audit by Purchasing and Supplier Development. The supplier audit is intended to help further the suppliers awareness of PPGs quality requirements. It is also intended to verify that the supplier has an adequate quality process and to confirm that it is functioning properly. A formal response and follow-up action for all significant elements identified as needing improvement during the audit is required on a timely basis. In some cases, adherence to a recognized standard such as ISO 9000 or QS 9000 may eliminate the need for all or part of a formal on-site audit by PPG. At PPGs discretion, a full QSA audit may be required. Purchasing will coordinate and lead all initial quality system audits of the supplier.
2.3.
Contact Lists
After the program has been sourced, the PPG Program Manager will complete the PPG Contact List (QA4.SQM.01.20). The Program Manger will also provide the list to the suppliers representative on PPGs Program Management Team. The supplier is required to complete the Supplier Contact List (QA4.SQM.01.21) and to forward the list to PPGs Supplier Development Engineer with a copy to the PPG Purchasing Manager.
2.4.
Launch support is an integral part of any new product introduction. PPG highly recommends that the supplier reviews the risks associated with the new product introduction and plans for support of the product launch. PPG actively supports launch activities at their customer facilities. The supplier is expected to provide launch support at either the PPG facility or the PPG customer facility.
Page 6 of 24
2.5.
Suppliers are expected to be globally competitive and will be benchmarked by PPG Purchasing Managers. PPG expects its suppliers to continually strive for increased efficiency, and cost reductions in their processes in order to meet PPGs customers annual cost reduction initiatives. Refer to Section 3.6 Continuous Improvement - $AVE for more details on submitting your improvement opportunities. Minimum Payment terms are Net 60 days. All invoices, packing slips and correspondence must reference PPGs individual purchase order number, line item number, storeroom part number, and releasers name, (if applicable). Excessive or premium freight charges related to a PPG expediting requirement are to be detailed in a separate line item on the supplier' s invoice and previously approved by PPG personnel. Excessive or premium freight costs related to the suppliers issue and necessary to meet the PPG delivery date will be at the suppliers expense. The supplier will be required to submit a premium freight report covering all excessive or premium costs as requested by PPG. PPG reserves the right to audit supplier' s invoicing against agreed to pricing.
2.6.
On-Time Delivery
All deliveries of requested materials will be made to the facility receiving dock and the packing list will refer to the purchase order number, release number, line item number and storeroom part number (if applicable) and releaser' s name (if applicable). 100% on time full shipment deliveries are required. Supplier is expected to maintain, at his own volition, sufficient stock to achieve and maintain specified delivery. Delivery lead times quoted by the supplier are as important as price to PPG. Deliveries made against releases are to be unloaded only at the PPG' s facility. Requests for deliveries elsewhere are to be approved in writing by purchasing Backorders are not acceptable. Shipping costs on backorders necessary to meet the PPG delivery date will be at the suppliers expense.
2.7.
2.7.1. Manufactured Parts - SPC data showing process capability of Key Product Characteristics (KPC) shall be sent per lot, prior to shipment and on request via fax or mail to the attention of the PPG Facility Quality Representative. The minimum acceptable long term CPK value is 1.33. 2.7.1. Chemicals & Compounds - A certificate of analysis or compliance must be sent with each shipment, each lot or upon request to the PPG Facility Quality Representative.
Page 7 of 24
2.8.
PPG or PPG' s customer shall be afforded the right to perform inspection and/or expediting of the materials and the fabrication at the suppliers facility at any reasonable time. All materials or services are subject to final inspection and acceptance by PPG at destination, notwithstanding any prior payment or inspection at seller' s source and inspection shall be made within a reasonable time after delivery or completion of work.
2.9
Tooling
All tooling must be identified with the owners name and other information as required by PPG or its customer. Maintenance and refurbishing of the tooling required to meet requirements defined, shall be the sole financial responsibility of the supplier, without liens being attached for any reason. The supplier is prohibited from using this tooling to make any product for any company except for the owner or its representative without written authorization from its owner or its representative.
2.10.
Packaging
PPG and supplier shall agree upon the packaging plan. All packaging units shall be labeled with PPGs purchase order number, storeroom part number, quantity, and supplier name (minimum requirements). All unique parts must be shipped in separate packaging units and shall not be mixed with other unique parts.
2.11.
Supplier must be in compliance with all federal and state policies as outlined in PPGs Purchase Order General Terms and Conditions as well government regulations in the country of manufacture or sale. PPG encourages registration to ISO 14001.
2.12.
The European Union (EU) introduced regulations, effective in 2003, to control the design and recyclability of automobiles. This Directive, called End of Life Vehicle (ELV) prohibits the use of lead, mercury, cadmium and hexavalent chromium in any component of automobiles placed on the market after 1 July 2003. It applies only to cars and light commercial vehicles (<3.5 tonne gross weight). These regulations apply to any affected product sold in Europe. Further down the supply chain, your product sold to a customer in the USA may become part of an automobile sold in Europe. Then a request could come back up the supply chain for you to confirm that your product does not contain any of the restricted substances. Additionally, similar regulations are proposed in Japan and other parts of the world so you may get various requests related to end-of-life 2.13.
Supplier Quotations
All quotations for new business and proposed changes must be submitted to the PPG Purchasing Manager and include part cost, tooling cost and delivery lead-times (minimum requirements). All supplier quotations must be submitted on PPG forms or through PPGs e-sourcing tool.
Page 8 of 24
2.14.
Contingency Plan
Suppliers shall develop a Disaster Recovery Plan for potential catastrophes/work interruption that would interrupt the supply of their product to PPG. This Disaster Recovery Plan shall include at a minimum: material contingency plan, transportation contingency plan, computer contingency plan and sub-supplier contingency plan. Supplier must immediately notify PPG of the course of action during this period as well as the chain of command contacts.
3. SUPPLIER PERFORMANCE
3.1. Supplier Measurement
Supplier performance measurement is an important function in PPGs quality process. We have implemented a formal method to evaluate suppliers through PPGs Supplier Performance Measurement System. There are four (4) key elements to the Supplier Performance Measurement System, Quality, Delivery, Documentation, and Value. Supplier Non-Conformance Notices (SNN), Supplier Alerts (SA), and Supplier Praise Notices (SPN) are the important factors in the performance monitoring process and become part of the suppliers performance rating. Suppliers will receive a Supplier Performance Evaluation report on a periodic basis or at least once per year. The measurement elements will be used to provide feedback to key suppliers and identify areas of opportunity for PPG and suppliers to continuously improve. These evaluations will also be used in Supplier Selection and Supplier Recognition. Input to this measurement process may include associates from Purchasing, Manufacturing Operations, Quality Assurance, Research, Sales, Receiving, Stores, Accounting, Engineering and Maintenance. Poor performing suppliers will be notified and required to develop a formal corrective action plan with Purchasing. Consistent poor performance can lead to disqualification of the supplier. The elements of PPGs Supplier Measurement System are: Quality - Conformance of products and services to specifications and standards with minimum variability and with all required documentation supporting the conformance. Delivery - PPG requires 100% on time delivery of error free products and services. Documentation - Proper and accurate labeling and shipping documentation. This includes all Safety, Health and Environmental information requested by PPG. Value - $AVE contributions, competitive price, technical support, e-commerce initiatives, inventory programs (CDI, JIT, consignment), and responsiveness to PPGs needs.
Page 9 of 24
complete a five (5) step corrective action process within fifteen (15) days. If you have a corrective action process, you may submit your form (attached to PPGs) as long as it addresses all of the elements contained on the PPG form provided. On occasion, PPGs end customer requires immediate responses to the problem. When this situation exists, PPG will require an immediate initial response with the understanding that a formal corrective action review will be completed in an appropriate time period. The Root Cause section is to include results of the investigation into what specifically caused the non-conforming condition as well as the reasons why the quality system did not prevent the condition from occurring and being detected. Why did it happen and why did it ship? Interim action may include the immediate action steps that have been taken as well as the shortterm fixes that will be used until a permanent solution can be implemented. Preventive action plans that require a delay beyond the specified time limit are to be coordinated between the supplier and the originating PPG location. Permanent corrective action is to be described in sufficient detail to cover the activities taken to prevent recurrence of the problem identified. There should also be an audit performed by the supplier that the preventive action is fully implemented and effective.
3.3.
If the non-conformance does not reach the severity to warrant an SNN, a Supplier Alert (SA) (for information only) may be issued to the supplier. A Supplier Alert (SA) will be issued to suppliers when the non-conformance does not affect the manufacturing process in such a way to warrant a formal corrective action review by the supplier. SAs are to improve communications between PPG manufacturing facilities and suppliers in order to facilitate continuous improvement. If a SA is issued repeatedly to a Supplier for the same reason, the PPG location will issue a SNN, which will require a five (5) step corrective action process.
3.4.
A Supplier Praise Notice (SPN) will be issued by a PPG location to acknowledge the superior performance of a supplier for an individual contribution to that location. The ultimate recognition for a supplier is through the PPG Excellent Supplier Award program, which consists of both Group and Corporate awards.
3.5.
The importance of PPG receiving purchased products which comply with the agreed upon product specifications cannot be stressed strongly enough. Receipt of defective products, incorrect quantities, incorrectly labeled products, etc., can have a significant impact on PPG' s overall performance, and can negatively impact our ability to retain the business of our end customer.
Page 10 of 24
PPG have determined that receipt of defective materials cannot be tolerated. Therefore, and at our discretion, PPG has chosen to initiate a "Parts Certification Process" (PCP). The PCP, can and will be at the discretion of the manufacturing facility impacted by receipt of non-conforming products. The PCP, can and will be an extension of the Supplier NonConformance Notice (SNN) communications tool. At the discretion of the facility impacted, and at the time a SNN is issued, so, too, may the Defective Part Certification Control (DPCC) letter. The DPCC is self-explanatory, but we will highlight the key points here. (It is understood that all costs associated with the defective parts supplied will be captured and presented to the supplier for reimbursement to PPG.) 1. Supplier will immediately dispatch resources to PPG for the purpose of 100% part inspection/certification. 2. Supplier will immediately hold and certify all products in suppliers facility. 3. All further shipments will be certified for a period of 20 working days, or until corrective actions are initiated and confirmed effective. 4. Re-occurrence of the same defect within 6 months will require supplier to secure a Third Party company to sort and certify all further shipments to PPG, until such time as PPG Supplier Quality Group confirms effectiveness of the counter measures implemented. 5. Label errors immediately require Third Party certification.
) * *+,+,+-((
.* /0
& *12
* '&
! (. (
Page 11 of 24
Section II Quality
4. Quality Requirements
4.1. Program Management Team
PPG utilizes a team approach for the management of Advanced Product Quality Planning (APQP). The Program Management Team (PMT) is a cross-functional team responsible for assuring that the new product being launched satisfies the customer. The PMT follows a structured method of defining the customer requirements and establishing the steps necessary to provide a quality product on time and at the lowest cost to the customer. The typical crossfunctional PMT includes representatives from sales, engineering, manufacturing, quality, purchasing, packaging and suppliers as appropriate. Depending on the complexity of the new product launch, the supplier may be asked to participate on the PPG PMT. Irrespective of this participation, the supplier also has an obligation to establish a cross-functional team that coordinates their APQP activity. The outputs of the PMT activity are: Select the disciplines and individuals required to address the scope of the APQP activity Define the roles and responsibilities for each area represented Identify the customers, both internal and external Define the customer requirements Understand the customer expectations Assess the feasibility of the proposed product design Identify the costs, timing and constraints of the processes that will be used Determine what customer assistance will be required Complete all the APQP requirements required by PPG (see QS-9000 Advanced Product Quality Planning and Control Plan manual)
Documentation of the PMT process is essential to assure that all parties are aware of the program requirements and that all deliverables are completed. The PMT activity may be documented using the following: PMT Charter defines team membership, program scope, key timing milestones and key deliverables Product Development Plan defines all program milestones (typically in Gantt format) Statement of Work defines program scope and provides a of review product specifications Open Issues list A document to track open issues from inception to completion/resolution. This is a living document that the team reviews usually weekly to keep a pulse on the progress of the team.
Page 12 of 24
List all major steps from the design through trial parts fabrication to PPAP. List planned and actual completion dates for each step of the process. The PDP and Tool Progress Report must be kept up-to-date and submitted monthly per the request of the Purchasing Agent or Supplier Quality Development Engineer. * At the discretion of the Supplier Development Engineer.
Page 13 of 24
from all the affected areas. These areas should include, but are not limited to: assembly, manufacturing, materials, quality, service and suppliers, as well as the design area responsible for the next assembly. The DFMEA should be a catalyst to stimulate the interchange of ideas between the functions affected and thus promotes a team approach. The DFMEA is a living document and should be initiated before or at the design concept finalization, be continually updated as changes occur or additional information is obtained throughout the phases of product development, and be fundamentally completed before the production drawings are released for tooling. The DFMEA addresses the design intent and assumes the design will be manufactured/assembled to this intent. Potential failure modes and/or causes that can occur during the manufacturing process need not, but may be included in a DFMEA, when the Process FMEA covers their identification, effect and control. The DFMEA does not rely on process controls to overcome potential weaknesses in the design, but it does take the technical limits of a manufacturing process into consideration, e.g.: Necessary mold drafts Limited surface finish Assembly space/access for tooling Limited hardenability of steels Process capability/performance
The process begins by developing a listing of what the design is expected to do, and what it expected not to do, i.e., the design intent. Customer wants and needs should be incorporated. The better the definition of the desired characteristics, the easier it is to identify potential failure modes for corrective action. For information about Design FMEAs, see the AIAG Advanced Product Quality Planning and Control Plan (APQP) Reference Manual and the AIAG Potential Failure Mode and Effects Analysis (FMEA) Reference Manual, latest editions.
Page 14 of 24
Updates or changes to the Product Inspection Standard can be requested for the following reasons: Change or update due to Engineering Change A correction to the Product Inspection Standard (must be approved by both Supplier and PPG) An addition or correction based on process capability studies in production A change to improve the PPG part or PPG Customer build condition (must be approved by all parties)
The Product Inspection Standard form (QA4.SQM.01.06) shows a suggested format for the Product Inspection Standard.
During the initial PFMEA process, the responsible engineer is expected to directly and actively involve representatives from all affected areas. The PFMEA should be a catalyst to stimulate the interchange of ideas between the functions affected and thus promote a team approach. The PFMEA is a living document and should be initiated before or at the feasibility stage, prior to tooling for production, and take into account all manufacturing operations. Early review and analysis of new or revised process is promoted to anticipate, resolve or monitor potential process concerns during the manufacturing planning stages of a new model or component program. The PFMEA assumes the product as designed will meet the design intent. Potential failures which can occur because of a design failure, which can occur because of a design weakness, need not, but may be included in a PFMEA. Their effect and avoidance is covered by the Design FMEA.
Page 15 of 24
For information about Process FMEAs, see the AIAG Advanced Product Quality Planning and Control Plan (APQP) Reference Manual and the AIAG Potential Failure Mode and Effects Analysis (FMEA) Reference Manual, latest editions.
Reliability of the product is paramount to the success of the overall program. PPG will review and approve the Product Validation Test Plan for appropriateness of the planned reliability tests and the successful completion of the tests during the Production Process Audit. The suggested format is shown on the Product Validation Test Plan form (QA4.SQM.01.09). .Other forms can be used to document product validation.
Subsequently, it guides manufacturing in how to control the process and ensure product quality. Ultimately, the Control Plan remains a living document, reflecting the current methods of control and measurement systems used. The Control Plan is updated as measurement systems and control methods re evaluated and improved. For process control and improvement to be effective, a basic understanding of the process must be obtained. A cross functional team should be established to develop the Control Plan by utilizing all the available information to gain a better understanding of the process, such as: Process Flow Diagram Design Failure Mode and Effects Analysis Process Failure Mode and Effects Analysis Special Characteristics Lessons Learned from Similar Parts Teams knowledge of the process Design Reviews Optimization Methods
For information about Control Plans, see the AIAG Advanced Product Quality Planning and Control Plan (APQP) Reference Manual, latest edition.
Provide Correction Action 100% inspection contact SDE Provide Corrective Action
PPG will review the proposed change and request samples for evaluation. Depending on the extent of the manufacturing change, PPG may also request: DFMEA and/or PFMEA Product Validation Test Plan Capability analysis PPAP submission
In all cases, the supplier is not to ship production quantities of the product produced under the manufacturing change conditions until PPG has validated that the product does not adversely affect overall product performance.
Page 18 of 24
Reviewing the checklist items will help assure that the APQP requirements have been completed to the satisfaction of both the supplier and PPG. PPG recommends that the format of the quality planning documents follow the AIAG standards shown in the QS-9000 manuals. However, a welldocumented system created by the supplier can be used if found acceptable by the PPG team.
PPG and Supplier will be evaluated and documented on the three certification parts. PPG prefers that the three certified parts be taken from throughout the production run, i.e. beginning, middle and end. Even if the supplier provides multiple submissions from a single fabrication run, PPG expects each separate shipment will be documented in compliance with this procedure. The three (3) certified parts will be packaged separately from the remaining parts provided. Included within the certified part package will be a copy of the PPPCF form. The three parts will be clearly marked with either an alphabetic or numeric designation (at the suppliers discretion) and these designations will carry over to the certification form. These parts will not be utilized for PPG part submission, but will be maintained for future review should questions arise regarding their compliance to design. This will aid in any discussion or review that may be necessary with the supplier. Note: If parts are produced in a multi-cavity operation, three (3) samples from each cavity must be measured, documented and submitted to PPG. Example: Part XYZ produced in a four (4)cavity mold. Therefore, 12 parts (3/cavity) are to be measured.
Ticketing Requirement: All Prototype and Pre-Production packages must utilize BLUE color-coded tickets, as these will be clearly definable when compared to mass production parts. PPG will not define a specific blue color standard. Each supplier may choose from materials available to them.
4.12. Launch Support and the Supplier Conference
Launch support is an integral part of any new product introduction. PPG highly recommends that the supplier reviews the risks associated with the new product introduction and plans for support of the product launch. PPG actively supports launch activities at their customer facilities. The supplier is expected to provide launch support at either the PPG facility utilizing their product and at the PPG customer facility utilizing the PPG product. To assure a full understanding of how PPG will utilize purchased components, the PPG Supplier Development Engineer (SDE) will schedule and facilitate a Supplier Conference (SC). The Supplier Conference will be at the discretion of PPG SDE and PPG Purchasing, and will be based upon the complexity of the program or unique product being purchased. The SC will be held at the PPG assembly site utilizing the purchased component(s). The goal is to complete this SC 90 days prior to the program SOP (start of production). Engineering and Production representatives from the component supplier are required to attend. The Supplier Conference will be inclusive of all tier 2 suppliers for the given program. During the SC, PPG will provide information on assembly methods, incoming material requirements, quality expectations, launch support expectations, and a review of any open issues.
Page 20 of 24
Part Submission Warrant (AIAG CFG 1001) Design Records, e.g. part print. Engineering Change documents, if any Customer Engineering Approval, if required DFMEA, if applicable Process Flow Diagram PFMEA Control Plan Dimensional Results Material Test Results, if applicable Performance Test Results, if applicable Initial Process Study Measurement System Analysis Studies Qualified Laboratory Documentation Appearance Approval Report, if applicable Sample product Master Sample Checking Aids Component part warrant documents
PPAP submission requirements are dictated by the PPG SDE and can be changed to meet particular requirements of a program. A run at rate trial may be required to be completed at the suppliers part process. This run at rate trial is a check to see if the production process can make enough good parts to satisfy both PPGs required peak demand and also a demand equal to 20% greater than peak demand. The Run at Rate Blank Form can be used to document the trial.
Page 21 of 24
Document Name Control Plan Checklist Control Plan Form Design FMEA Checklist Design FMEA Form Design Information Checklist Engineering Change Log Form
Revision Level Dec. 21, 1999 Dec. 21, 1999 Dec. 21, 1999 Dec. 21, 1999 Dec. 21, 1999 Dec. 21, 1999
Page 22 of 24
Document No. QA4.SQM.01.12 QA4.SQM.01.14 QA4.SQM.01.06 CFG-1001 QA4.SQM.01.20 QA4.SQM.01.23 QA4.SQM.01.08 QA4.SQM.01.07 QA4.SQM.01.18 QA4.SQM.01.16 QA4.SQM.01.09 QA4.SQM.01.19 QA4.SQM.01.24 QA4.SQM.01.13 SA 0100 QA4.SQM.01.21
Document Name Manufacturing Change Notification Form Measurement Result Sheet Form Product Inspection Standard Form PPAP Warrant PPG Contact List PPG Prototype/Pre-Production Part Certification Form (PPPCF) Process FMEA Checklist Process FMEA Form Product/Process Quality Checklist Product Validation Plan Checklist Product Validation Test Plan for Suppliers Form Production Process Audit Checklist Run at Rate Blank Form Sample Submission Checklist Supplier Alert (Issued by PPG) Supplier Contact List
Revision Level Dec. 21, 1999 Dec. 21, 1999 Dec. 21, 1999 July 1999 Dec. 21, 1999
Dec. 21, 1999 Dec. 21, 1999 Dec. 21, 1999 Dec. 21, 1999 Dec. 21, 1999 Sept. 23, 2002
Page 23 of 24
Document Name Supplier Contact List Supplier Nonconformance Notice (SNN) (Issued by PPG) Supplier Qualification Background Information Form Supplier Quality System Audit Worksheet Tool Progress Report
Revision Level Dec. 21, 1999 Dec. 1, 2005 May 1, 2004 July 19, 2005 Dec. 21, 1999
C. LaRocque
A. Eckstein C.Siess