Energy Management at APCW Energy Conservation Projects (02-06) Energy Consumption Trends Benchmarking Recognition Innovative Project of 2005-06 Future plans
Manufacturing Process
LIME STONE
LS CRUSHER
MINES
Manufacturing Process
COAL
KILN CLINKER
BAGS
CEMENT MILL
PACKING PLANT
Development of Policy
Shop floor awareness classes at each dept.
Energy Meter
RS 485 RS 232 Converter
PC RS 232
RS 485
Plant & Asset Care Team Area Effectiveness Team Energy Pillar Team Plant Steering Board
Project Selection
Deployment of Plant Thrust Area
Screening of Projects
Involvement of People
HT Breaker
Fan HT Motor
(After commissioning of HTVFD, able to operate cooler ESP fan up to 50% speed) Damper opening Net saving per annum ((40 Units/hour)) 100 % 3.12 Lac KWh
Annual savings achieved Rs.12 Lacs (40 kW x 24 hrs x 330 days x Rs 3.91/unit) Investment Rs.35 Lacs
Annual Savings Rs.31 Lacs (2x85 KW x 14 hrs x 330 days x Rs 3.91/unit) Investment Rs.12 Lacs
Cement Mill ESP Fan (Z1P50 & Z2P50) 1.3 Kiln shell cooling fans (11,18.5,30KW) 0.87
Dossimate filter fan ZIP15 & Z2P25 (30KW) 0.5 1.2 Raw mill main motors blower (22KW) CF silo JPF (22KW) Roller press dedusting fans Z1P20 & Z2P20 (30KW) Packing plant compressor (90KW) CF silo aeration blower (18.5KW) JPFs in raw mill reject circuit(18.5KW) 0.4 1.0 0.1 0.3 0.3 0.2 0.2 0.9 1.2 2.0 0.8 1.6
0.4 0.3
4.0 2.2
3.02
5.4
3.15
10.6
1.95
6.5
D o w n C o m er
Increasing the kiln down comer duct dia from 2.5 mtr to 2.8 mtr
1.16
52
Fan Optimization
Particulars
Saving in KWh Investment (Lac units /a) (Rs. Lacs)
Modification of Raw Mill Fan 1 & 2 Inlet Suction Box Trimming of raw mill 1& 2 Fan Impeller by 70 mm Widening of speed range of CS fan SPRS from 78% to 75% Introducing energy saving mode of operation for cooler fans
4.6
11.0
7.5
0.3
2.6
0.1
1.0
0.1
0.8
3.8
2.3
0.7
0.1
0.5
1.5
0.3
0.5
0.1
0.1
0.0
0.2
0.0
Voltage Optimisation
Particulars Voltage optimisation Reduction in tap position of transformers at cement mill Reduction in Voltage drop for CM MCC-5.2 Switching off one distribution transformer at raw mill
Saving in KWh Investment (Lac units /a) (Rs. Lacs)
2.15 0.0
1.2
0.0
0.1
0.2
0.4
0.0
Voltage Optimisation
Particulars Voltage drop reduction in RM MCC 3.4 & MCC 3.3 Voltage reduction in PP & RM Transformer Voltage drop reduction for CCR building MCC
Saving in kWh Investment (Lac units /a) (Rs. Lacs)
0.1
0.2
0.3
0.0
0.1
0.2
Electrical Heating
Particulars Provision of Heater in RM gear unit avoid the idle running Switching off electric heat tracing system for HFO separator Removal of Rawmill hydraulic unit heating element
Saving in KWh Investment (Lac units /a) (Rs. Lacs)
1.1
0.3
0.1
0.0
0.1
0.0
Upgradation of Drives
Particulars
Saving in kWh Investment (Lac units /a) (Rs. Lacs)
Water pump from 30 kW to 45 kW to avoid the running of 75 kW pump when only Kiln & one CM is operating Coal belt conveyor motor from 160kW to 200kW resulted in reduction of slag unloading Hours
0.4
0.2
0.4
0.3
Equipment elimination
Particulars
Saving in KWh Investment (Lac units /a) (Rs. Lacs)
Bypass chute for bulk clinker loading reversible belt conveyor [U1U22] Provision of coal crusher bypass chute for slag unloading to avoid running of coal crusher Modification in the ducting for stopping of 2nos 30kw JPF Fans at Packing Plant Bag Diverter (2.2 kW) elimination by providing Spiral Chute
0.1
0.2
0.25 0.1
0.7
0.1
0.1
0.1
Lighting Optimisation
Particulars Installation of energy saving tube Lights 500 Nos. in plant Provision of energy saver for lighting in LS crusher& MRSS section Replacement of 400W SV lamp with MH lamp in colony & CM area Providing transparent fiber sheets for day light Provision of AVR for factory & township lighting
Saving in KWh Investment (Lac units /a) (Rs. Lacs)
Lighting Optimisation
Particulars Lighting optimization at Gypsum, Flyash & Slag yard Providing ON/OFF switch for lighting at WLM, TLM area Replacement of 40w fitting with 11w fitting in colony Lighting optimization in the plant Master switch control (70% of lighting) Provision of LDR & control of lighting thru PLC at raw mill area
Saving in KWh Investment (Lac units /a) (Rs. Lacs)
Others
Particulars Sewage treated water line size increasing Derating of Motors
Saving in KWh Investment (Lac units /a) (Rs. Lacs)
0.12
0.3
1.0
0.4
Changing of Delta to star connection for RBC's P2U05,12,19,20 2.0 Fan less cooling tower at Packing plant Jet cooling tower for DG
0.2
0.4 1.4
0.6 5.5
Others
Particulars
Saving in KWh Investment (Lac units /a) (Rs. Lacs)
Reduction in raw meal reject elevator height by 5 mtr Installation of swing cooler at cooler Conversion of V-Belt to Flat Belt Reduction in rpm of HFO unloading pump Arresting of air infiltration KS & CS fan casing
0.1
0.2
1.7
0.1
Others
Particulars Modification of Nozzle Ring at Raw Mill 2 Reduction in dam ring height from 200mm to 190mm for optimum loading of the Raw mill 1 & 2 main motor Fan less cooling tower at main pump house
Saving in KWh Investment (Lac units /a) (Rs. Lacs)
3.7
0.4
9.5
0.2
1.7
7.2
Others
Particulars Optimization of Cooling Water System in Packing Plant Air Compressor Modification in water distribution line for avoiding 30 kW pumps Reduction in fan inlet pressure drop in cooler fan 5&10 Air cooled condensers for CPP (to reduce water consumption)
Saving in KWh Investment (Lac units /a) (Rs. Lacs)
0.5
0.6
1.9
0.2
0.7 1.2
0.1 6.4
Commissioning of Waste heat recovery system from cooler exhaust Installation of HT Capacitor bank (4.86 MVAR) to improve the PF from 0.94 to 0.99 Energy audit proposals in water Pumps, & roots blowers. Discard poor performing ACs by replacing with new & other audit Proposals of AHU, ACs
250 3000
1.8
14
11
16
2.5
No of Encon Projects
41
22 18 17
26
'03
'04
'05
'06
Year
60.6 60
55
54.2
Year
Year
89
87.41
84
83.6
79
76.6 74.46
76.4
Year
689
kCal / Kg of Clinker
Year
80
Lac units(kWh)
68.2
73.4
Year
Benchmarking
kWh/t Cement
2002 Performance
74.24
kWh/t Cement
160
Benchmarking
Selected Kilns
22.90
Peer Group
18.16
10
80
Benchmarking
Selected Kilns
2864
5396 8331
All Kilns
2757
10000