3.10.3 Soil Investigation..................................................................... 50 3.10.4 Degree of Expansion of Fine Grades Soils .................................... 50 3.11 Road Drainage Studies ................................................................... 55 3.11.1 General .................................................................................. 55 3.11.2 High Flood Level ...................................................................... 55 3.11.3 Depth of Water-Table ............................................................... 56 3.11.4 Ponded Water Level ................................................................. 56 3.11.5 Surface Run-off ....................................................................... 56 3.12 Cross- Drainage Structures ............................................................. 57 4.0 Water Supply Project..................................................................... 57 4.1 Desk Studies .................................................................................. 57 4.2 Pre-design Stage............................................................................. 57 4.2.1 After Field Survey...................................................................... 58 4.3 Design Development Stage............................................................... 60 4.4 Prior Studies & Choice of Location Water Resources.............................. 60 4.5 Route Alignment of Transmission Line ................................................ 61 4.6 Ground Investigation ....................................................................... 61 5.0 Sewerage Project. ................................................................... 62 5.1 Basic Information ............................................................................ 63 5.1 Basic Information ............................................................................ 64 5.1.1 Physical Aspects........................................................................ 64 5.1.2 Developmental Aspects .............................................................. 64 5.2 Project Surveys............................................................................... 65 5.2.1 Preliminary Project Surveys ........................................................ 65 5.2.2 Detailed Project Surveys ............................................................ 65 6.0 Solid Waste Management ................................................................. 66 6.1 Functional Elements of Solid Waste Management ................................. 66 6.2 Composition, Characterization and Quantification of Solid Waste ............ 69 6.3 Field Investigations ......................................................................... 71 6.3.1 Sample Survey ......................................................................... 71 6.3.2 Quantification ........................................................................... 72 6.3.4 Chemical Characterisation .......................................................... 72 6.3.5 Solid Waste Collection Routing .................................................... 76 6.4 Surveys for Identification of Disposal Sites....................................... 78 6.4.1 Preliminary Boreholes and Geophysical Investigation ...................... 79 6.4.2 Site Investigation and Site Characterization .................................. 80 6.4.3 Subsoil Investigation.................................................................. 81 6.4.4 Ground Water/Hydrogeological Investigation ................................. 81 6.4.5 Topographical Investigation ........................................................ 82 6.4.6 Hydrological Investigation........................................................... 82 6.4.7 Geological Investigation and Seismic Investigation ......................... 82
ii
Annex II: Checklist of major operations involved in the Survey and Investigation Annex III: List of Laboratory Test to be Conducted for Road Embankments Annex IV: Seismic Zones of India Annex V: Sample Road Sections Annex VI: Satelitte Data Order Form Annex VII: Sample TOR for Surveying
iii
1.0 Introduction
The process of urbanization has created a huge gap between demand and supply of urban infrastructure services such as roads, water supply, sewerage, sanitation, solid waste management etc. To fulfil the gap between demand and supply, a most important step is probably to get a clear idea about the existing situation. Proper survey and investigation is therefore very important to assess the qualitative and quantitative demand. Lack of adequate, investigations has been one of the major factors in many urban infrastructure project, resulting into inaccurate assessment of costs, necessitating substantial revision during the course of execution. Many times the actual project implementation may get delayed due to inaccurate survey and investigation. Thus the extent and quality of investigations have a strong influence on selection of the most cost-effective alternatives, and execution of the job itself. Survey and investigation not only includes technical surveys but may also include social-economic surveys based on the objective of the project. This Module is therefore structured to discuss the most commonly used survey and investigation methods during planning and project preparation of many of the urban infrastructure projects like, water supply, sewerage, solid waste management of road projects.
As far as population data is concerned, the Indian Census is the largest single source of statistics on the people of India. With a history of more than 125 years, this reliable, time tested exercise has been bringing out a veritable wealth of statistics every 10 years beginning from 1872 when the first census was conducted non-synchronously in different parts of India.
Office of the Registrar General and Census Commissioner, India, New Delhi, is responsible for conducting the decennial population census.
The State Series presents Census statistics, in separate volumes for each state or union territory, at the following administrative levels: State or Union Territory level (for Rural and Urban residences separately) District level (for Rural and Urban residences separately) Tahsil level (for Rural and Urban residences separately) Urban Agglomerations, City or Town level (for Urban residences only)
CEPT, Ahmedabad
F Series: Fertility Tables This series of tables provide data on female age at marriage, number of children ever born and number of children surviving to ever married women and birth to currently married women during the last year. Data on age at marriage have been classified by duration of marriage while all other data are classified by age of the woman. At state level data are also available by religion, educational level and work status of the woman. There are in all 32 Tables in this series.
H Series: Housing and Household Amenities These tables give information on housing and household amenities, viz., the type of material used for construction; tenure status, number of rooms and household size; availability of electricity, drinking water supply (by source) and toilet facilities to the household and type of fuel used for cooking. There are in all 17 Tables in this series. SC ST Series: Tables on Scheduled Castes and Scheduled Tribes These tables give information on the Scheduled Castes and Scheduled Tribes population socioof the level. country. The Most of of the the group tables on are generated at and State/District tables provide population, demographic
cultural
characteristics
individual
Scheduled
CEPT, Ahmedabad
Part IX: Town Directory T - 1: T - 2: All India Town Directory Civic and other amenities in the Notified Slums of Class I & II Towns
Sample Input window and output data sheet of a user-friendly Census CD has been given below.
CEPT, Ahmedabad
CEPT, Ahmedabad
Maps showing different demographic indicators can be prepared very easily Based on the census. Some sample demographic maps prepared from census data has been given below.
CEPT, Ahmedabad
CEPT, Ahmedabad
terrain; and rivers; highways, railways, bridges and other man-made features. Hydrographic surveys map the shorelines of bodies of water; chart the bottom of streams, lakes, harbours and coastal waters; measure the flow of rivers; and assess other factors affecting navigation and water resources. The sounding of depths by radar is involved in this type of survey. Mine surveys determine the position of underground works such as tunnels and shafts, the position of surface structures and the surface boundaries. Aerial surveys use photogrammetry to produce a mosaic of matched vertical photographs, oblique views of landscape and topographic maps drawn from the photographs. Construction surveys fix elevations, horizontal positions and dimensions for construction projects. Control surveys provide basic horizontal and vertical position data. These are called datum. For most surveying work the vertical position of points in terms of height above a curved reference surface is mean sea level. The Australian Geodetic Datum (AGD) is the surface that passes through mean sea level at thirty tide gauges. Heights obtained from the GPS satellite system do not refer to the AGD, but to the mathematical reference surface (the ellipsoid). The difference between these two surfaces is known as the geoid ellipsoid separation.
CEPT, Ahmedabad
Satellite remote sensing for urban and land development can be used to gather strategic planning information pertaining to a district or an entire city. High resolution satellite imagery from satellite sensors such as GeoEye-1, Quick Bird, IKONOS, SPOT-5 aerial photography and LIDAR incorporated into a GIS (Geographic Information Systems) and CAD (Computer Aided Drafting) has gained popularity among Planners, Developers and Engineers for large scale mapping of any region for most urban and land development applications. Information from satellite images or aerial photography when combined with GIS mapping is used for analysis in evaluating construction costs as well as environmental impacts of alternative routes for utility and transport corridors; land cover and land use classification; identifying population groups at risk where human intervention is most needed to limit and prevent hazards during development stages. Satellite image data is highly useful for creating or updating base maps and detecting major changes in urban land cover and land use from imagery such as LANDSAT and ASTER satellite sensors due to their multi-spectral band combinations, which allows for frequent coverage and overlaying of different time sequences to classify soil and vegetation areas for the proposed development area(s). Other applications include: Updating information on road networks and other urban infrastructure Collection and analysis of data on population density, distribution and growth Preparation of housing typologies Analysis of watersheds
Geodetic and mapping experts create two-dimensional interactive mapping projects by overlaying third-party data, such as land cadastre ownership information, census data, and labels of geographic features. Mapping: Image Maps In most areas and of the world, maps mediumsmall-scale
either have not yet been produced, or are outdated and inaccurate. The ability to extract a wide variety of information, control, and to locate an to features at 1:25,000 scale without ground produce inexpensive provides opportunity maps of unprecedented
accurate,
relatively entire
CEPT, Ahmedabad
countries, including areas previously inaccessible due to terrain. Frequent satellite coverage offered by Digital Globe can make such areas easily accessible and inexpensive to update. 60-centimeter panchromatic imagery will provide an alternative for costly updating of inaccurate medium- and small-scale maps. The value of satellite imagery is based on the comparison of map and imagery. Infrastructure changes can be quickly detected and updated on maps. Mapping: Feature Extraction Digital Globe 60-centimeter imagery can be used to identify and locate a variety of features, such as street centrelines, building footprints, parking lots, and elevation contours to within a few meters horizontal and vertical accuracy. 60-centimeter pan-chromatic imagery. with extracted features: lines, red blue lines lines lines indicate delineate buildings, contour yellow
depict transportation boundaries. Mapping: Infrastructure Monitoring City, regional, and national governments, as well as public and private utilities worldwide, can use high spatial to resolution identify, satellite inventory, imagery
monitor, and plan for a wide variety of urban and residential infrastructure projects. Streets, highways, bridges, railroads, canals, buildings of all sizes, and other infrastructure can be accurately identified and located within a few meters of their true horizontal position. 2.4-meter multi-spectral imagery, sharpened with 60-centimeter panchromatic, is an excellent tool for identifying and monitoring various types of infrastructure.
CEPT, Ahmedabad
10
Mapping: Utilities & Boundaries Planning, construction, permitting, and service activities are more efficient when 60-centimeter imagery is combined with vectors and point data to identify parcel boundaries and utility location. 60-centimeter panchromatic imagery, combined with point data, will accurately identify parcel boundaries and utility locations. Environmental: Storm Water Runoff 60-centimetre pan-sharpened multi-spectral imagery can be used to measure impervious surfaces, such as roofs, streets, and parking lots. Pervious surfaces, such as tree- and grass-covered areas can also be measured. Applying runoff coefficients to the area of each surface type can provide the best available estimates for non-point source water pollution. By adding parcel boundaries, it is possible to provide estimates of runoff per parcel in order to assess storm sewer fees.
Parcel boundaries 2.4-metre multispectral imagery, sharpened with 60-centimetre panchromatic imagery, will clearly illustrate different surface types.
CEPT, Ahmedabad
11
Source: wikimapia.com
Source: wikimapia.com
CEPT, Ahmedabad
12
These images are useful to get an idea about the existing land use of any study area, however these images should not be used for preparing detailed project report or detail designing as many times accuracy of the images are questionable. Some such images has been given below which gives a clear idea of exiting land use.
Small Format Aerial Photography (SFAP) In case of large projects with mapping as one of the main objectives conventional aerial photography in traditional format (23 cm X 23 cm) may also be useful. There are at least three known agencies in India for such aerial photography, namely, the National Remote Sensing Agency (NRSA), Hyderabad, Air Survey Company, Calcutta and the Indian Air Force All aerial photography work requires clearance from the Ministry of Defence. The major advantages of SFAP are Very large scale true colour photo enlargements can be done in scales upto 1:1,000 to 1:2,000 (upto scales of 1:10,000). Acquisition plans along side roads can be suitably made in scale 1:4,000
Monitoring of urban areas, villages and environment along the corridor are possible at comparatively lower cost than ground surveys.
CEPT, Ahmedabad
13
disadvantages (GPS - poor accuracy in the vertical axis and lower accuracy without long occupation periods; Total Station - requires line of sight observations and must be setup over a known point or within line of sight of 2 or more known points). Measurement of distance is accomplished with a modulated microwave or infrared carrier signal, generated by a small solid-state emitter within the instrument's optical path, and bounced off of the object to be measured. The modulation pattern in the returning signal is read and interpreted by the onboard computer in the total station, and the speed-of-light lag between the outbound and return signal is translated into distance. Most total stations use a purpose-built glass prism as the reflector for the EDM signal, and can measure distances out to a few kilometres, but some instruments are "reflectorless", and can measure distances to any object that is reasonably light in colour, out to a few hundred meters. The typical Total Station EDM can measure distances accurate to about 0.1 millimetre or 1/1000-foot, but most land surveying applications only take distance measurements to 1.0 mm or 1/100-foot.
Box Sample Terms and condition for tender for Total Station Survey 1. Chief Engineer, _______Corporation invites sealed quotation from appropriate and eligible Firms/Consultancy Firm dealing with surveying work for the following project: (i) XYZ Land .measuring approximately 18 hects. (ii) Camping land at , at .measuring approximately 15 hects. 1.1 Time allowed for completion - 10 Days from the date of issue of work order for .Project & 15 days for Project. 2. Description of work The work involves 2.1 Surveying of .. land at .. measuring approximately 18 hects. and Camping resort land at , at . measuring approximately 15 hects. Using total station incorporating all existing features. 2.2 Establishment of bench mark (Horizontal control points) on the ground at Strategic locations to carry our details surveys in future if required. 2.3 Supplying of Site Plan to proper scale with proper Horizontal control points duly existing features with dimensions and offsets. The Boundary shall be properly established with proper dimensions / angles etc. in order to facilitate of features with ease. 2.4 Supplying of Contour Maps with Contour interval of 1mtr drawn to a proper scale. 2.5 Supplying of sectional details along strategic points. 2.6 All drawing shall be generated through computers with appropriate software 2.7 Original tracing shall be handed over to the corporation which shall be the property of XYZ corporation
CEPT, Ahmedabad
14
2.8 An overall site plan to a scale of 1:500 or to a suitable scale in single sheet shall be submitted. 2.9 Detailed Sheets to 1:200 scales or to any convenient scale with all internal details shall be submitted. 2.10 Indicating 50 meters, 200 mtrs. and 500 mtrs. line from HTL. 2.11 Indicating location of naturally grown trees, Creek, wells, electric transmission lines, telephone lines, pipelines, nallah, adjoining roads etc. 3. Eligibility criteria: Only those firms /consultants which fulfill the following the following minimum criteria are eligible to tenders. 3.1 The tenderer should have satisfactorily completed at least one similar nature of work. Proof of having executed similar works shall be enclosed. 3.2 The firm should have well-qualified and experienced Surveyors associated with them. They shall submit proof of qualifications/ experience of the persons associated with the project. 3.3 The firms shall possess modern survey instruments viz. Total Station and appropriate Computer Software and facilities for plotting etc. 4. Final decision making authority The ..corporation reserves the right to accept or reject any application and to annul the qualification process and reject all applications at any time, without there by incurring any liability to the affected applicants or specifying the grounds for the . action. Rate & Payment The rate includes for the following items of work per Ha. of land area. 5.1 All field works related with the Survey 5.2 Supplying of Drawing as mentioned in Para-4 of Press Notice (8 copies each) 5.3 Supplying of original tracing to the Department 5.4 Payment towards all service charges, tax if any. 5.5 All unforeseen works required for completing the work. 5.6 Expenditure to visit the site from Chennai including air fare and ship fare. 5.7 The payment shall be made after successful completion of work to the satisfaction of the Engineer- In-charge and handing over of the drawing to .corporation. 5.8 ..corporation shall arrange accommodation for the staff visiting for the survey. 5.9 The payment will be made in the single bill on first and final bill and no part payment will be made during execution of the work.
CEPT, Ahmedabad
15
6. Other Conditions 6.1 EMD amounting to Rs. 12500/- in the form of call deposit from any scheduled bank issued in favor payable at ..should be enclosed. The tender document without EMD will be rejected. 6.2 The last date for submission of tender is 3.00 pm on 25th June 2007 at . and it will be opened at 3.30 pm on the same day.
Output of Total Station Survey The major outputs of a total station survey are listed below. Site Plan to proper scale with proper Horizontal control points duly existing features with dimensions and offsets. Site Contour Maps with Contour interval of 1mtr, 5mtr etc. Sectional details along strategic points Drawing generated through computers with appropriate software An overall site plan to a scale of 1:500 or to a suitable scale Detailed Sheets to 1:200 scales or to any convenient scale with all internal details indicating 50 meters, 200 mtrs. and 500 mtrs. line from HTL, and indicating location of naturally grown trees, Creek, wells, electric transmission lines, telephone lines, pipelines, nallah, adjoining roads and some output maps of total station survey is given below.
CEPT, Ahmedabad
16
CEPT, Ahmedabad
17
2.2.4 Codes and Manuals and Guidelines for Survey & Investigation
The development of various infrastructures in the urban need to carry out different activities of survey and investigation as follows:
List of IRC & IS Codes 1. IRC: SP: 13 2004 Guidelines for Design for Small Bridges and Culverts 2. IRC: SP: 19 2001 Manual for Survey, Investigation & Preparation of Road Project (1st Revision) 3. IRC: SP: 42 1994 Guidelines for Drainage 4. IRC: 69 1977 Space Standards for Roads in Urban Areas 5. IRC: 70 1977 Guidelines on regulation and Control of Mixed Traffic in Urban Areas 6. IRC: SP: 50 1999 Guidelines for Urban Drainage 7. IRC: 52 1981 Recommendations about alignment Survey & Geometric Design of Hill Roads 8. IRC: SP: 48 1998 Hill Road Manual 9. IRC: 102 1988 Traffic Studies for Planning Bypasses around Towns 10. IS:7537- 1974 Road Traffic Signals 11. IRC: 106 1990 Guidelines for capacity of Urban Road in Plain Areas 12. IS:1498 -1970 Classification & Identification of Soil for General Engineering Purpose (Reaffirmed 1997) 13. IS: 1892 1979 Code of Practice for Sub-surface Investigation for Foundation (Reaffirmed 1997) 14. IS:2132 1986 Code of Practice for Thin Wall Rube Sampling of Soil (Second Revision) (Reaffirmed 1997) 15. IS: 2720 Part 1 to Part 41 Method of Test for Soil 16. IS: 6403 1981 Code of Practice foe Determination of Breezing Capacity of Shallow Foundation 17. IS:8763 1978 Guide for undisturbed Sampling of Sand and Sandy Soil (Reaffirmed 1997) 18. IS:9640 1980 Split Spoon Sampler (Amendment 2) (Reaffirmed 1997) 19. IS:10042 1981 Code of Practice for Site Investigation for Foundation in Gravel Boundary Deposit (Reaffirmed 1997)
CEPT, Ahmedabad
18
List of Manuals of Central Pubic Health and Environmental Engineering Organization (CPHEEO) 1. CPHEEO Manual on Water Supply & Treatment, May 1999 2. CPHEEO Manual on Sewerage & Sewage Treatment, Dec 1993 3. CPHEEO Manual on Solid Waste Management, 2000
Survey Activities to be performed for Infrastructure Development Project 1. Study of topographical survey sheets 2. Study of agricultural soil 3. Study of Geological & meteorology cal maps 4. Aerial Reconnaissance 5. Ground Reconnaissance with Compass, abney level, Alti-meter, Pedometer etc. instruments 6. Locality map 7. Longitudinal sections/cross section 8. Establishment of Bench Mark 9. Soil information 10. Construction material information 11. Locating Physical features such as buildings, burial grounds, cremation grounds, places of worship 12. Crossing of pipelines, railway, stream/river 13. Map preparation 14. Environmental Impact Study 15. Viable, technical soundness, alternative final selection 16. Socio-economic profile 17. Traffic survey 18. Soil investigation in detail for Foundation Soil, Borrow area etc. 19. Drainage studies 20. HFL & ponded water level 21. Depth of subsoil water table 22. Surface runoff 23. Site Selection for Cross drainage structure 24. Collection of hydraulic and foundation data 25. Detailed maps preparation
CEPT, Ahmedabad
19
Sr. No.
Development Projects Stone paving in Local Streets Road up-gradation in local streets Cement concrete work in local & collector streets Asphalt road resurfacing work in collector. Sub arterial & Arterial road New construction of road in local, collector & arterial streets. New Road construction work for rapid transmission work. Integrated Street development in urban area Water supply & Sewerage related Infrastructure Development Projects: 1 Enhancing the existing water 20,21 1,58,10,12,13,2022,26 2 3 4 Rehabilitation Construction & of reinstatement new of the 20,21 12-19 20,21 1,58,10,12,13,20-22 1 - 25 1 - 25 existing water supply/ Sewerage systems water/sewerage treatment plant Development of water supply / sewerage system in new township New laying of in 5 streets New laying of in 6 7 8 streets New construction work of ESR/UGR in local area of the city Retrofitting & strengthening work of ESR & UGR Augmentation of supply network in the new merged area of the urban sprawl in existing limit Solid Works 1 Development of new land fill site in the urban area 22 1-6,9,11-16,1822,24,25 Waste Management related 20,21 1 25 except 2 & 17 20,21 20,21 1 25 except 2 & 17 6,9,10,18-22,26 water/sewerage pipelines and arterial 20,21 1,5-8,10-13,2023,26 collector, sub arterial water/sewerage pipelines and arterial collector, sub arterial supply/sewerage systems
CEPT, Ahmedabad
20
Sr. No. 2
IS/IRC/CPHEEO Types of Project Vol. (As per clause 1.2.1) Procurement of new trucks, tractors, 22
hand Lorries, tricycles for augmentation of transportation work 3 4 5 Procurement of containers & dustbins in the urban area Construction of new solid waste 22 22 1,3-6,9-15,1822,25 Nil composting plant in the urban area Procurement of mechanical equipments for segregation of SW Housing related Works: 1 2 3 4 5 Integrated Housing Development Scheme in Urban area Slum development project in the urban Rehabilitation of slums within the urban area Construction of low-cost sanitation in the slum area within the urban Construction of community center, health centers in urban area -do1-25 except 17,23,24 1-25 except 17,23,24 1-25 except 17,23,24 -do22 Nil
Measures of Length
12 inches 3 feet 5.5 yards 220 yards 8 furlongs 5000 feet = = = = = = 1 foot 1 yard 1 rod, pole or perch 1 furlong 1 mile=1760yards 1 canal mile
CEPT, Ahmedabad
21
The metre is used in ordinary measurements, the centimetre or millimetre in reckoning very small distances or measurements, and the kilometre for roads or great distances. Conversion Factors
1/25 inch 1 inch 1 foot 1 yard 1 rod 1 furlong 1 mile 1 millimetres 1 centimetre 1 decimeter 1 metre 1 decametre 1 hectometre 1 kilometre = = = = = = = = = = = = = = = = = = = = 1 millimetre 25.4 millimetre or 2.54 cm 30.48 cm or 0.3048 metres 0.9144 metres or 91.44 cm 5.029 metres 0.201 km or 201.168 metres 1.609 km or 1609 metres 0.03937 inch 0.3937 or 2/5 inch 3.937 inches 0.328 feet 39.37 inches 3.281 feet 32.81 feet 1.094 yards 328 ft 1 in. 3280 ft 10 ins. 1093.63 yards 4.97 furlongs 5/8 or 0.621 mile
An acre is the area of a square whose side is 208.71 ft. long Metrix Units
1 sq. kilometre (km2) 1 sq. hectometre 1 sq. dekametre 1 sq. metre (m2) 1 sq. decimeter (dm2) 1 sq. centimetre (cm2) are= sq. Dekametre = = = = = = 1,000,000 sq. metres 10,000 sq. metres 100 sq. metres 1 sq. metres 1/100 sq. metres 1/10,000 sq. metres = = = = = = 100 ha 100 ares = 1 ha 1 ares 100 sq. dm 100 sq. cm 100 sq. mm
CEPT, Ahmedabad
22
The sq. metre is the primary unit of ordinary surfaces or small areas. The are or sq. dekametre, hectare or sq. hectometer are the units of land measures. Conversion Factors
1 sq. inch 1 sq. foot 1 sq. yard 1 acre = = = = = = = = = 1 sq. mile = = = 1 sq. millimetre 1 sq. centimetre 1 sq. decimetre 1 sq. metre or a centare 1 sq. dekametre or 1 are 1 sq. hectometer or 1 hectare 1 sq. kilometre = = = = = = = 6.45 sq. centimetre 645.2 sq. millimetre 929.0 sq. centimetre 0.093 sq. metres 0.836 sq. metres 0.836 centares 4046.86 sq. metres 40.47 ares 0.4047 hectare 2.590 sq. kms 259 hectares 640 acres 0.00155 sq. ins. 0.155 sq. ins. 15.50 sq. ins. 10.76 sq. ft. or 1.196 sq. yards 11,959.85 sq. yards = 2.471 acres 247.10 acres 0.3861 sq. miles
CEPT, Ahmedabad
23
Adequate funds should be earmarked for the work of survey, investigation and project preparation. Estimation of realistic fund and time requirement needed for project preparation will go a long way in making the project preparation a success. It will be found that in the long run, such investment pays more than for itself in the form of well prepared and cost effective projects, orderly schedule of work and timely completion. Systematic presentation of project details is no less important. The project document is the very basis of technical, administrative and financial sanction of a project. It is also crucial for accurate execution of work in the field. The project should, therefore, be comprehensive enough for proper appreciation of the proposals as well as easy understanding of the details. This Manual lays down guidelines both for survey and investigations and presentations of the project details. Surveying methods and instruments used at the beginning of the twentieth century new light weight metals and more advanced calibration techniques resulted in development of lighter and more accurate instruments needed for the precise layout requirements of high speed railroads and roads. Use of aerial photography for mapping began in the 1920s, and advanced rapidly during the following decades. By 1950 photogrammetric methods had revolutionized survey procedures, especially in route surveying and site selection.
3.2 Scope
It should be understood clearly that the extent of operations involved in surveys and investigations including the detailing of the individual aspects, would depend very much on the size and scope of each project. Depending on needs of the situation, one or more phases of investigations might be curtailed, telescoped or made more extensive than prescribed in the manual. The order in which various surveys are discussed in the manual should not be taken to mean that such work must strictly follow the same pattern or sequence. Some of the surveys could easily be initiated in advance and carried out simultaneously overlapping each other. For example, some results of soil and materials survey and study of cross-drainage structures would be needed as an essential input to the Feasibility Report. But more detailed investigations on these aspects may be continued in the detailed engineering phase. It should be upto the Engineer-in-charge to exercise his discretion and adopt a flexible approach. The requirements of the funding agencies or the authority according administrative approval may also result in rescheduling the sequence of work and in redefining the extent of coverage of each work.
CEPT, Ahmedabad
24
Planning
Reconnaissance Survey: Map Study, Aerial Reco., Ground Reco., General Soil Study
Feasibility Study
1. Primary Survey: Traffic Survey, Establishment of BMS, Topographical survey with instruments, Socio-economic, H/H Survey 2. Secondary Survey: Land Acquisition, Revenue map/ City Map, Census data, Facility accommodation survey, Geo-tech. i.e. Soil Investigation
Detail Study
Final Route: Centre line marking, Existing properties, Long/Cross section, Detailed Drainage Study, HFL and ponded level, CD Works, EIA
Pavement Design
Sub grade base course Bituminous: Soil Investigation & Material Survey
CEPT, Ahmedabad
25
CEPT, Ahmedabad
26
CEPT, Ahmedabad
27
CEPT, Ahmedabad
28
Plan and profile Sight distance/visibility in horizontal as well as vertical plan Curve implements Carriageway, shoulder and roadway width Cross-drainage structures Road side drainage provisions as well as area drainage considerations Safety features
Any disregard of these aspects may well lead to unnecessary expenditure, since at a later date the alignment may again have to be improved at considerable extra cost. It is, therefore, imperative that the final centre line of the road with respect to which, the improvements are designed and are to be carried out is fixed with great care in the light of ultimate geometric requirements and economy. The other important point is removal of structural deficiencies with an eye on future needs with respect to pavement, culverts, road and area drainage requirements, etc. Proper location and orientations of cross-drainage structures is an important factor in the selection of the road alignment. Their importance increases with their length and cost. In general for bridges having length between 60 to 300 m, siting of the bridges as well as alignment of the approaches will have equal priority and should be well co-ordinated. For bridges of length more than 300 m, siting for the bridges will be primary guiding factor in route selection. Apart from engineering factors, like social and environmental impact of the proposal should be fully kept in view in terms of such aspects as air pollution, damage to life systems, soil erosion, drainage pattern, landscaping, disruption of local communities, etc.
g) Accident Records
In urban area traffic volume surveys must include bicycle traffic as one of traffic category. If need require separate bicycle tracked may be planed.
CEPT, Ahmedabad
29
Table 3.1: Proforma 1: Classified Traffic Volume Count Survey (IRC: SP:19-2001) Road Name: Section: From ____________to_____________ Location Km.: Direction Towards: Road No.: Station No.: Date & Day: Hour: Additional Information: Weather:
Fast Moving Vehicles Three Time Two Wheeler Wheeler/ Auto Rickshaw 00-15 15-30 30-45 45-60 Total Source: IRC: SP 19, 2001 Car/ Jeep/ Van/ Taxi Mini Full 2Axle Multi Axle Artic/ semi Artic With Trailer Without Trailer cycle Cycle Rickshaw Bullock Cart Hoarse Bus Truck Agri. Tractor Others (Pl. Specify Drawn) Slow Moving Vehicles
Name & Signature of Enumerators: ________________________ Name & Signature of Supervisor: __________________________
CEPT, Ahmedabad
30
Table 3.2: Proforma 2(a): Origin & Destination (O-D) Survey (Freight Traffic). (IRC: SP:19-2001) Name of Road: Road No.: Location at Km: Weather: Towards: Date: Day: Time:
Sr. No. Particulars Registration No. Vehicles Particulars Type of Vehicles & Axle Configuration Make & Model RLW/ULW Commodity Type Commodity/ O-D Particulars Quantity (Tonnes/Litre) Origin (Name of place & District/State/Country) Destination (Name of place & District/State/Country) Trip Length (km) Vehicle Utilization Number of Trips Average km driven/day no. of hours per day no. of working days per month Route Particulars
Source: IRC: SP 19, 2001
Name & Signature of Enumerators: ________________________ Name & Signature of Supervisor: __________________________
CEPT, Ahmedabad
31
Table 3.3: Proforma 2(b): Origin & Destination (O-D) Survey (Car/Bus). (IRC: SP:19-2001) Name of Road: Road No.: Location at Km: Weather: Towards: Date: Day: Time:
Sr. No. Particulars Registration No. Type of Vehicles No. of Passengers Vehicles Particulars Origin (Name of Place & District/State/Country) Destination (Name of place & District/State/Country) Quantity (Tonnes/Litre) Origin (Name of place & District/State/Country) Destination (Name of place & District/State/Country) Trip Length (km) Vehicle Utilization Number of Trips Average km driven/day no. of hours per day no. of working days per month Route Particulars
Source: IRC: SP 19, 2001
Name & Signature of Enumerators: ________________________ Name & Signature of Supervisor: __________________________
CEPT, Ahmedabad
32
CEPT, Ahmedabad
33
CEPT, Ahmedabad
34
Earthquake possibility should also be studied from earthquake maps & relevant IS. Type and design of structure should be planned accordingly. Also, maps prepared by National Bureau of Soil Survey and Land Use Planning (NBSS & LUP) indicating information on Soil, Wasteland, etc. and Geological Survey of India Maps (on scale 1:250,000 or smaller) with information on geology, geomorphology and changes in drainage, river courses, etc. are available for many areas. These maps are fruitfully used when considered necessary. After study of the topographical features on the maps, a number of alignments feasible in a general way are selected. The present status of Aerial Photography (AP) in India is that AP on scale 1:50,000 is available for the whole of India. Depending on their quality the negatives of these photographs, when necessary, can be enlarged easily by about five times without losing clarity and thus obtain AP enlargements on scale of 1:5,000 to 1:20,000.
CEPT, Ahmedabad
35
possible to prepare rough cost estimates within reasonably close limits for obtaining administrative approval, if not already accorded and for planning further detailed survey and investigations. In particular, information may be collected regarding: (i) The highest sub-soil and floor water levels, the variation between the maximum and minimum and the nature and extent of inundation, if any, gathered from local enquires or other records. These should be correlated to data about the maximum and minimum rainfall and its duration and spacing, etc. by appropriate hydrological analysis. (ii) The character of embankment foundations including the presence of any unstable strata likes micaceous schists, poor drainage or marshy areas; etc. this is particularly necessary in areas having deep cuts to achieve the grade. (iii) Any particular construction problem of the area, like, sub-terranean flow, high level water storage resulting in steep hydraulic gradient across the alignment canal crossings and their closure periods. Information regarding earlier failures in the area of slides or settlements of slopes, embankments and foundations, together with causes thereto may also be gathered from records and enquiry where feasible.
(iv)
In cut sections, the nature of rock i.e. hard, soft etc. should be determined by trial pits or boreholes. This is essential to make realistic cost estimates.
CEPT, Ahmedabad
36
interval (ranging from 500 m to 2 kms) to have control on accuracy. It also helps in repeating the survey, if required, within the control pillars. 3. Distances along the traverse line should be measured with EDM or total station. An accuracy of at least 1 in 10000 should be aimed at in all distance measurement. 4. No hard and fast rule can be laid down as regards distance between two consecutive transit stations. In practice, the interval will be dictated by directional changes in the alignment, terrain conditions and visibility. The transit stations should be marked by means of stakes and numbered in sequence. These should be protected and preserved till the final location survey. 5. Physical features, such as buildings, monuments, burial grounds, cremation grounds, places of worship, posts, pipelines, existing roads and railway lines, stream/river/canal crossings, cross-drainage structures, etc. that are likely to affect the project proposals should be located by means of offsets measured from the traverse line. Where the survey is for improving or upgrading an existing road, measurements should also be made for existing carriageway, roadway and location and radii of horizontal curves. In case of roads in rolling and hilly terrain the nature and extent of grades, ridges and valleys and vertical curves should necessarily be covered. The width of land to be surveyed will depend on the category of road, purpose of the project, terrain and other related factors. Generally, the survey should cover the entire right-of-way of the road, with adequate allowance for possible shifting of the centre line from the traverse line. 6. Levelling work during a preliminary survey is usually kept to the minimum. Generally, fly levels are taken along the traverse line at 50 metre intervals and at all intermediate breaks in ground. To draw contours of the strip of land surveyed, cross-sections should be taken at suitable intervals, generally 100 to 250 m in plain terrain, upto 50 m in rolling terrain, and upto 20 m in hilly terrain. To facilitate the levelling work, bench marks, either temporary or permanent, should be established at intervals of 250 to 500 metres. The levels should be connected to GTS datum. 7. Field notes of the survey should be clear and concise, yet comprehensive enough for easy and accurate plotting. 8. Apart from traverse survey, general information about traffic, soil, drainage should be collected while the traverse is being run, as mentioned in Para 7.1. 9. Check list on preliminary survey is available in Appendix 2.
CEPT, Ahmedabad
37
CEPT, Ahmedabad
38
stadia rod is in proportion to the distance from the equipment to the rod. A simple demonstration of the stadia method of measuring distance is included in the Practical activities section of this topic - the activity is called In the distance. This method was demonstrated by Bob Christopherson as a very effective means of helping students understand the principles of measurement with surveying equipment, in particular the dumpy level. Electronic Distance Measuring (EDM): EDM equipment is of various types relying on the reflection of electromagnetic radiation such as microwaves, infrared, and laser radiation waves from a reflector at the distant station. Chain: Chaining is an older means of measuring distances. The chain is made of metal and has 100 links. Each link is 7.92 inches long, and each chain is 66 feet long 7.92 100 = 792 inches 792 12 = 66 feet. The Surveyors Museum located in the Land Centre at Woolloongabba has examples of these chains that were used in early surveying work in Queensland. I believe only a few remain although many were in existence. Trundle wheel or perambulator: For early surveying work the perambulator was used to measure distances. It was pushed along and the number of revolutions of the wheel counted either manually (room for lots of error) or by an odometer attached to the frame. Depending on the radius of the wheel distance could then be determined by calculating circumference number of revolutions. A perambulator is on display at the Surveyor's Museum located in the Land Centre at Woolloongabba. Trundle wheels, which work in the same manner, should be available in schools. They measure a standard one metre per revolution. Compass: Measurement of Horizontal Angel
CEPT, Ahmedabad
39
Theodolite
CEPT, Ahmedabad
40
Optical Theodolite
Optical Theodolite: An optical theodolite being used on Montserrat in 1996 to measure the growth of the lava dome (in distance, partially covered in meteoric and ash clouds). A theodolite measures horizontal and vertical angles extremely accurately, and is a common surveying tool. By siting on points on the dome from at least two locations, they can be accurately located in 3 dimensions. Repeated measurements then can define the movement of the dome. Distometer Broad range of measurement (from 0.2m to 200m) easy to use accurate measurements that are simple to read Made of lightweight materials, making it easy to manipulate. 5 second readout instrument. This instrument is ideal for small building companies.
CEPT, Ahmedabad
41
Tracheometer The electronic tacheometer 4Ta5 is designed for measuring of slant distances, horizontal and vertical angles and elevations in topographic and geodetic works, tacheometric surveys, as well as for solution of application geodetic tasks. The measurement results can be recorded into the internal memory and transferred to a personal computer via RS-232C interface.
Global Positioning System The Global Positioning System (GPS) is an important unequalled technology, accuracy which and provides of flexibility
positioning during movement, surveying and GIS data capture. The GPS is a satellite-based positioning navigation, timing are and 24 system. There
satellites, known as GPS satellites that orbit at 11,000 nautical miles above the Earth. They are continuously monitored by ground stations located worldwide. The satellites transmit signals that can be
CEPT, Ahmedabad
42
detected by anyone with a GPS receiver. GPS satellites circle the earth twice a day and transmit signal information to earth. GPS receivers take this information and calculate the user's exact location. The GPS provides continuous three-dimensional positioning 24 hrs a day throughout the world. The basic GPS service provides commercial users with an accuracy of 10-15 meters, 95% of the time anywhere on the earth. The GPS technology has tremendous amount of applications in GIS data collection, surveying, and mapping.
Advantages of GPS 1. More time efficient than using the toposheets and recording information by hand 2. Very accurate 3. Easy to use 4. GPS works in any weather conditions, anywhere in the world 5. There are no subscription fees or setup charges to use GPS
CEPT, Ahmedabad
43
Limitations of GPS 1. Since a GPS can able to provide information based on the number of satellites, it becomes mandatory that it must not be used in a closed surrounding such as: inside a building, shadowed by tall trees or blocked by high mountains etc. However it can be used inside a building or from inside a vehicle provided that the GPS is connected with a cable to external antennae to receive the signals.
2. Good handheld GPS receivers are expensive, ranging from few thousands
to even sometimes fifty thousands rupees.
The Feasibility Report may include discussion on different alternative alignments, alternative pavement design for deciding the one most suitable as final option.
CEPT, Ahmedabad
44
A brief outline of the organizational structure of establishing its adequacy in handling the project and giving details of any augmentation support system proposed.
The report should give a brief description of the scope of the project, its need, sources of funding, budget and plan provision, selection or route alignment, cross-sectional elements, drainage facilities and construction technology.
The methodology adopted for the various studies must be described. These include traffic surveys: soils, materials and sub-soil investigation; hydrological and drainage studies.
The design standards and methodology adopted must be explained. The report must contain a reasonably accurate estimate of costs, giving the basis for adopted rates. Any provision for escalation of costs must be explained.
The
implementation
programme
involving
prequalification,
bidding,
construction supervision and contract management must be drawn up and presented in the form of bar chart. The feasibility report must be accompanied by the following drawings: 1. Locality map 2. Plans showing various alternative alignments considered and the selected alignment 3. Typical cross-sections showing pavement details 4. Drawings for cross-drainage and other structures 5. Road junction drawings 6. Strip plan 7. Preliminary land acquisition plans The feasibility study shall have following broad coverage: 1. Executive summary 2. Regional/state socio-economic profile 3. Socio-economic profile of the project influence area 4. Methodology adopted for the studies 5. Traffic surveys and analysis 6. Engineering survey investigations and analysis 7. Project road description and or improvement proposals 8. Environmental impact assessment 9. Resettlement and rehabilitation action plan 10. Project cost estimates including L.A. cost 11. Economic analysis and evaluation including sensitivity 12. Conclusions and recommendations 13. Project road inventory 14. Engineering survey and investigation data 15. Design standards and specifications
CEPT, Ahmedabad
45
Centre line profile should normally be continued at least 200 metres beyond the limits of the project. This is intended to ensure proper connecting grades at both ends. With the same objective, profile along all intersecting roads should be measured upto a distance of about 150 metres. Further, at railways level crossings, the level of the top of the rails, and in the case of subways, the level of the roof should be noted. On existing roads, levels should be taken at all points of intersection in order to help the fixation of profile.
CEPT, Ahmedabad
46
CEPT, Ahmedabad
47
CEPT, Ahmedabad
48
amount of sand, silt, and clay sample. particle soil distribution determines field or
texture,
which can be assessed in the particle-size analysis in the laboratory. A field analysis is carried out in the following way: a small soil sample is taken, water is added to the sample, it is kneaded between the fingers and thumb until the aggregates are broken down. The guidelines to determine the particle class are as following: Sand: Sand particles are large enough to grate against each other and they can be detected by sight. Sand shows no stickiness or plasticity when wet. Silt: Grains cannot be detected by feel, but their presence makes the soil feel smooth and soapy and only very slightly sticky. Clay: A characteristic of clay is the stickiness. If the soil sample can be rolled easily and the sample is sticky and plastic when wet (or hard and cloddy when dry) it indicates a high clay content. Note that a high organic matter content tend to smoothen the soil and can influence the feeling for clay. A variety of systems are used to define the size ranges of particles, where the ranges of sand, silt, and clay that define a particle class. The classification of particle sizes are the following (units: mm): Clay: < 0.002 Silt: 0.002 - 0.05 Fine sand: 0.05 - 0.1 Medium sand: 0.1 - 0.5 Coarse sand: 0.5 - 1.0 Very coarse sand: 1.0 - 2.0 x Gravel: 2.0 - 762.0 Cobbles: > 762.0
CEPT, Ahmedabad
49
Soil texture in the field is determined using a texture triangle (Figure below). For example, a particle size distribution of 33 % clay, 33 % silt, and 33 % sand would result in the soil texture class 'clay loam'.
CEPT, Ahmedabad
50
CEPT, Ahmedabad
51
CEPT, Ahmedabad
52
CEPT, Ahmedabad
53
CEPT, Ahmedabad
54
Drainage studies have the following principal objectives 1. fixing the grade line of the road 2. design of pavement and 3. design of the surface/sub-surface drainage system
Main components of drainage investigation are determination of HFL and ponded water level, depth of water table, range of tidal levels and amount of surface runoff. Besides this, for cut sections in rolling and hilly areas, it would be necessary to carry out special investigations for sub-terrain flows and seepage of irrigation water from fields situated above the road.
Extent of studies and the data to be collected will depend on the type and scope of the project. Usually good deal of information could be collected through site inspection, simple measurements and local enquiry. Most appropriate time for such enquiries is during the stage of preliminary survey so that the information gathered can be of use in fixing the alignment and finalizing the broad strategy for improving the drainage. Detailed investigations could continue till the final location survey when any adjustment in the light of further data could still be made before the projects in finally ready. In the case of cut sections, investigations for seepage and sub-terrain flows may generally have to be done again at the stage of formation cut when new features may come to light warranting modifications in design or the need for special measures.
CEPT, Ahmedabad
55
Construction of a road embankment may sometime block the natural drainage paths and cause a heading up on the water on upstream side. In finalizing the HFL, due allowance for the possible afflux in such circumstances must be made. Adequate number of openings shall be provided.
In areas where the climate is arid and the water-table is known to be at least one metres below the general ground level, depth of water table need not be measured.
CEPT, Ahmedabad
56
CEPT, Ahmedabad
57
is necessary. The planning exercise would draw up a time frame for all the activities to be completed. Following main activities are to be planned to be undertaken for the Survey: PRINTING OF SURVEY FORMAT PARTICIPANTS IN THE SURVEY The actual survey may be conducted by field level officers of the nodal Department assisted by field officers of other Departments/ Organisations and public enlisted specially for this TRAINING Since this survey involved understanding of technical terms, a very comprehensive training on all aspects of the Survey and the data to be collected for all those involved in the training is essential REPORTING SYSTEM It is suggested that this may be done within a week of compilation of the survey.
CEPT, Ahmedabad
58
Chart 4.1 The main surveys required for Water Supply project
Water Demand
Residential/Commercial/Indus trial/Institutional: HH Survey, Ward Wise Map, Census etc.
Source/Availability
Ground Water /Surface Water: Well, Canal, Tubewell, River, Reservoir etc. Toposheets, Geohydrological Maps,
Treatment Plant
Site Selection, Size, etc: Toposheet, Location maps, Landuse Plan, Found Soil Investigation, Material Survey, Detail of Sub Soil Water, Seismic Zone Map, Construction Material & Quantity Survey, EIA
Storage
ESR/GSR: Toposheet, Location maps, Landuse Plan, Found Soil Investigation, Material Survey, Detail of Sub Soil Water, Seismic Zone Map
Distribution
1. Procuring of pipe: Market Rate & BIS Standard 2. Laying Pipeline: Trial Pits, Alignment Survey, Geometric Survey, L/S& Cross section survey, Investigation of foundation soil, Ground Water Table, Existing under ground utility services,
CEPT, Ahmedabad
59
Site reconnaissance determines the site conceptual hydrogeology model and location for the best places for a geophysical survey. The geophysical survey should be involved several kilometres of resistivity and seismic lines to find conductive fracture zones. The pilot drilling program drilled three core wells, of which, only suitable can be confirmed as a good target for installing a largecapacity tube well.
CEPT, Ahmedabad
60
CEPT, Ahmedabad
61
Phase 1: Desk study walk-over survey- preliminary conceptual ground model preliminary risk assessment Phase 2: Intrusive investigation insitu testing laboratory testing monitoring - evaluation reporting revised risk assessment revised conceptual ground model. Further investigation if required quantitative risk assessment.
CEPT, Ahmedabad
62
Conveyance
1. Procuring of Pipes: Market survey, BIS standard 2. Laying Of Pipe: Trial pits, Fixing of alignment, Geometric Survey (L/S & C/S), Investigation of foundation soil, Subsoil water data, Existing underground utility services 3. Land Acquisition: Land record maps / City Maps, Site Selection, Size, etc:
Pumping Station
1. Providing Pumps: BIS Standard Market Survey & 2. Land Acquisition: Land Revenue Map, Toposheets, Foundation soil in detail, sub soil water table detail, EIA Study, Construction material Study
CEPT, Ahmedabad
63
e)
CEPT, Ahmedabad
64
Possible sources of information are census records, town and metropolitan master plans, regional planning records, land use plan, flow gauging stream flow records, meteorological data and Pollution Control Boards.
CEPT, Ahmedabad
65
Waste Handling, Sorting, Storage, and Processing at the Source: The second of the six functional elements in the solid waste management system is waste handling, sorting, storage, and processing at the source. Waste handling and sorting involves the activities associated with management of wastes until they are placed in storage containers for collection.
CEPT, Ahmedabad
66
Collection
Population/HH: Census Quantity: Sample Survey
Transportation
Quantity: Container Survey Route : Road Map
Storage
Dust Bin : Location Map etc. Container : Equipment Capacity
Final Transportation
Quantity: Machinery, Trucks,Trippers
Treatment
Selection: Recyclable, Non biodegradable
Disposal
Location of Landfill Site: Topo Sheets Study Ground Water Table Land Use Map Location of Landfill Hydrology Map
CEPT, Ahmedabad
67
Handling also encompasses the movement of loaded containers to the point of collection. Sorting of waste components is an important step in the handling and storage of solid waste at the source. For example, the best place to separate waste materials for reuse and recycling is at the source of generation. Households are becoming more aware of the importance of separating newspaper and cardboard, bottles/glass, kitchen wastes and ferrous and non-ferrous materials. On-site storage is of primary importance because of public health concerns and aesthetic consideration. Unsightly makeshift containers and even open ground storage, both of which are undesirable, are often seen at many residential and commercial sites. The cost of providing storage for solid wastes at the source is normally borne by the household in the case of individuals, or by the management of commercial and industrial properties. Processing at the source involves activities such as backyard waste composting. Collection: The functional element of collection, includes not only the gathering of solid wastes and recyclable materials, but also the transport of these materials, after collection, to the location where the collection vehicle is emptied. This location may be a materials processing facility, a transfer station, or a landfill disposal site. Sorting, Processing and Transformation of Solid Waste: The sorting, processing and transformation of solid waste materials is the fourth of the functional elements. The recovery of sorted materials, processing of solid waste and transformation of solid waste that occurs primarily in locations away from the source of waste generation are encompassed by this functional element. Sorting of commingled (mixed) wastes usually occurs at a materials recovery facility, transfer stations, combustion facilities, and disposal sites. Sorting often includes the separation of bulky items, separation of waste components by size using screens, manual separation of waste components, and separation of ferrous and non-ferrous metals. Transfer and Transport: The functional element of transfer and transport involves two steps: (i) the transfer of wastes from the smaller collection vehicle to the larger transport equipment and (ii) the subsequent transport of the wastes, usually over long distances, to a processing or disposal site. The transfer usually takes place at a transfer station. Disposal: The final functional element in the solid waste management system is disposal. Today the disposal of wastes by landfilling or uncontrolled dumping is the ultimate fate of all solid wastes, whether they are residential wastes collected and transported directly to a landfill site, residual materials from Materials Recovery Facilities (MRFs), residue from the combustion of solid waste, rejects of composting, or other substances from various solid waste-processing facilities. A
CEPT, Ahmedabad
68
municipal solid waste landfill plant is an engineered facility used for disposing of solid wastes on land or within the earths mantle without creating nuisance or hazard to public health or safety, such as breeding of rodents and insects and contamination of groundwater.
Because of the heterogeneous nature of solid wastes, no single method of classification is entirely satisfactory. In some cases it is more important for the solid waste specialist to know the source of waste, so that classifying wastes as domestic, institutional or commercial, for example, is particularly useful. For other
CEPT, Ahmedabad
69
situations, the types of waste, garbage, rubbish, ashes, street waste is of greater significance because it gives a better indication of the physical and chemical characteristics of the waste. The principal classification is given in Table 6.1 below.
Table 6.1: Classification of Solid Wastes Types of Solid Waste Description Food waste (garbage) Wastes from the preparation, cooking, and serving of food. Market refuse, waste from the
Sources
handling, storage, and sale of produce and meats and vegetable Rubbish Combustible (primary organic) paper, cardboard, cartons wood, boxes, plastics, rags, rubber, trimmings Noncombustible (primary inorganic) metals, tin cans, metal foils dirt, stones, bricks, ceramics, crockery, Ashes and Residues glass bottles, other mineral refuse Residue from fires used for cooking and for heating buildings, cinders, clinkers, thermal power plants. Bulky waste Large auto parts, tyres, stoves refrigerators, others large appliances, furniture, large crates, trees, branches, palm fronts, stumps, flotage Street waste Street sweepings, Dirt, leaves, Streets, sidewalks, alleys, vacant lots, etc. catch basin dirt, animal droppings, contents of litter receptacles dead animals Dead animals Small animals: cats, dogs, poultry etc. Large animals: horses, cows etc. Construction molition waste & de Lumber, roofing, and sheathing scraps, crop residues, rubble, broken concrete, plaster, conduit pipe, wire, insulation etc. Industrial sludges waste & Solid wastes resulting from industry processes and manufacturing operations, such as food processing wastes, boiler Construction demolition remodeling, sites Factories, power plants, treatment plants, etc. and sites, repairing cloth, bedding, leaves, leather, yard grass, Households, institutions and commercial such as hotels, restaurants, etc. stores, markets,
CEPT, Ahmedabad
70
Description house cinders, wood, plastic and metal scraps and shaving, etc. Effluent treatment plant sludge of industries and sewage treatment plant sludges, coarse screening, grit & septic tank
Sources
Hazardous wastes
Hazardous waste,
wastes:
industry, etc.
explosives,
material, toxic waste etc. Horticulture Wastes Tree-trimmings, leaves, Parks, gardens, roadside trees, etc. from parks and gardens, etc.
Source: Solid Waste Management in Developing Countries by Bhide & Sunderasan, INSDOC April, 1983
CEPT, Ahmedabad
71
is one. Similarly number of samples can be calculated for Phosphorus, Potassium and other chemical parameters.
6.3.2 Quantification
The information regarding waste quantity and density coupled with waste generation rate (by weight), is important while assessing the payload capacity of the collection equipment. It is possible to estimate the number of vehicles required for the collection and transportation of waste each day. While per capita waste generation is a statistic, which is necessary for indicating trends in consumption and production, the total weight and volume of wastes generated by the community served by the management system are of greater importance in planning and design. As in all other aspects of data collection for the planning and design phases, data on waste generation, weight and volume should be collected by each authority for application in its own area of operation. For this purpose ward wise population data and income level of residents need to be collected for proper quantification. Quantity of Municipal Solid waste generation in Indian urban centres is given below in table 6.2. Table 6.2: Quantity of Municipal Solid waste generation in Indian urban centers
Population Range (in million) <0.1 0.1 0.5 0.5 1.0 1.0 2.0 2.0 5.0 > 5.0 Number of Urban Centers (samples) 328 255 31 14 6 3 68.3 56.914 21.729 17.184 20.597 26.306 0.21 0.21 0.25 0.27 0.35 0.50* 14343.00 11952.00 5432.00 4640.00 7209.00 13153.00 Total population (in million) Average per capital value (kg/capital/day) Quantity (tones/day)
0.6 kg/capita/day generation of MSW observed in metro cities Source: Background material for Manual on SWM, NEERI, 1996
CEPT, Ahmedabad
72
Toxic: Toxicity characteristics include heavy metals, pesticides, insecticides, Toxicity test for Leachates (TCLP), etc. After proper quantification of generation of solid waste it is important to identify community level as well as cluster level storage facilities and strategic location. A detail household survey is useful to quantify as well as identify location of storage bins. A sample household survey questionnaire is presented in table 6.3. Table 6.3: Sample Household Survey Questionnaire for SWM
Sr. no. 1 2 Questions Registration code for QA Full name of house occupant 3 Postal address of the house 4 Housing type Bungalow Apartment (Flat) Row house Other Answers
HIG
MIG
LIG
JJ Cluster
House _____________M / f 1 2 3
2 2
Occupation of occupant
Service
Business
Other
Adults
10
Plastic containers
Metal containers
Plastic bag
No dustbin
11
Twice a day
Once a day
occasional
Festive occasions
CEPT, Ahmedabad
73
Sr. no. 12
Answers No
13
Wet
Dry
Organics
Hazardous
14
MCD
NGO
Self
Others
15
Dumping at Dhalao
16
MCD
Private
17
Daily
Alternate days
Specific
18
Per month
Specific
No payments
19
Weekly
Monthly
Occasional
Specific2
20
Doorstep
Charity
21
How often do you dispose your recyclables News papers Other paper, packing materials Glass Plastic bags Plastic Metal ferrous, utensils Garden waste/ vegetable matter Cloths, textiles
Weekly
Monthly
Occasional
Specific
CEPT, Ahmedabad
74
Sr. no.
Answers
22
What is the quantity of recycles generated in kg/number News papers Other materials Glass Plastic bags Plastic Metal ferrous, utensils Garden matter Cloths, textiles Miscellaneous/ other waste/ vegetable paper, packing
Kg.
Numbers
23
Weekly
Monthly
Occasional
Specific
24
25
Yes
NO
26
27
Yes
No
28
Rs. / month
29
30
Are you willing to pay for biodegradable plastic bags for used and waste disposal
Yes
No
CEPT, Ahmedabad
75
Sr. no. 31
Questions
Answers
Positive
Negative
32
Positive
Negative
CEPT, Ahmedabad
76
2.5 Km
2.5 Km
Figure 6.2 :Sample map showing waste collection routing for four clusters
CEPT, Ahmedabad
77
CEPT, Ahmedabad
78
drinking water supply line(s), water intake wells located on surface water bodies, and open wells. (f) Flood Prone Maps: These maps are used to delineate areas that are within a 100 year flood plain. Landfill siting must be avoided within the flood plains of major rivers. (g) Geologic Maps: These maps will indicate geologic features and bedrock levels. A general idea about soil type can be developed from a geologic map. Such maps can be procured from Geological Survey of India. They may be used to identify predominantly sandy or clayey areas. (h) Aerial Photographs/Satellite Imagery: Aerial photographs or satellite imageries may not exist for the entire search area. However such information may prove to be extremely helpful. Surface features such as small lakes, intermittent stream beds, and current land use, which may not have been identified in earlier map searches, can be easily identified using aerial photographs. (i) Ground Water Maps: Ground water contour maps are available in various regions, which indicate the depth to ground water below the land surface as well as regional ground water flow patterns. Such maps should be collected from Ground Water Boards or Minor Irrigation Tube well Corporations. (j) Rainfall Data: The monthly rainfall data for the region should be collected from the Indian Meteorological Department. (k) Wind Map: The predominant wind direction and velocities should be collected from the Indian Meteorological Department. (l) Seismic Data: The seismic activity of a region is an important input in the design of landfills Seismic coefficients are earmarked for various seismic zones and these can be obtained from the relevant BIS code or from the Indian Meteorological Department.
CEPT, Ahmedabad
79
including
suggested
minimum
requirements
of
such
gradient (b) Observations of g.w. level fluctuations and ground water flow (c) Collection of groundwater samples (monthly/bi-monthly) for g.w. quality testing for 1 year prior to landfill construction. Topographical Investigation Hydrological Investigation Surveying of landfill area and preparation of a topographical map with 0.3m contour interval. (a) Collection of detailed topographical maps of surrounding area from Survey of India. (b) Collection of hydrometeorological data from India Meteorogical Department (c) Performance of flood routing analysis for one in 100 year flood (d) Collection of surface water samples (monthly/bimonthly) for water quality testing one year prior to landfill construction
Geological Investigations
&
Seismic
(a) Geophysical survey -seismic refraction or microgravity for bedrock profiling (b) Joint mapping of exposed rock outcrop/quarry face. (c) Collection of seismic data
Environmental basis
Investigation
(a) Collection of samples on monthly/bimonthly surface water samples ground water samples, and air samples (b) Transportation to certified testing laboratory and testing for regulatory parameters (c) Vegetation/ecology mapping survey
CEPT, Ahmedabad
80
Suggested Scope of Work (a) Collection of data on existing traffic - daily traffic volume and peak hour traffic volume -for six months (b) Road condition survey for existing road with suggestions for strengthening/widening.
Waste
&
Leachate
(a) Waste characterisation of fresh waste collected from bins (b) Waste characterization of old waste collected from different depths in existing waste dumps or sanitary landfills. (c) Collection and laboratory testing of at least 6samples of leachate from just beneath existing waste dumps or sanitary landfills. (d) Estimate of leachate quality from laboratory testing.
Investigation
The suggested minimum investigation is listed in Table 17.1. A detailed investigation plan may be drawn up in consultation with a ground water specialist/water resources engineer or a hydro-geologist. The output from such an investigation should yield the following: Depth to groundwater table and its seasonal variations Ground water flow direction Baseline ground water quality parameters all drinking water quality parameters
CEPT, Ahmedabad
81
CEPT, Ahmedabad
82
Dust: PM 10 (Particle size less than 10 Microns) monitoring on a monthly basis, specifically at noon, during hot, dry, windy days. Odour: Monthly analysis at the site and at 200m intervals from the landfill boundary to the nearest inhabited zone. Noise: Peak noise analysis at the site and nearby inhabited zone on a monthly basis. Vegetative Cover: Vegetative mapping on a seasonal basis.
Traffic investigations must be conducted to identify peak traffic volume as well as the quality of existing roads near the landfill. The influence of increased heavy vehicle traffic due to landfilling should be analysed with a view to widening the existing road.
CEPT, Ahmedabad
83
References
Indian Practical Civil Engineers Handbook by Khanna, P. N. Publisher: New Delhi-Engineers Publisher, 1993 Highway Engineering by Khanna S.K. & Jasto C.E.G. Publisher: Roorkee Nemchand & Brothers, 1998 Soil Mechanics & Foundations. Rev. by Ashok Kumar Jain By Punmai B.C. Publisher: New Delhi: Lakshmi Pvt. Ltd. 1991 Text Book of Building Construction by Punmia B. C. Publisher: New DelhiLakshmi Pub., 1987 Project Planning & Control with PERT & CPM by Punmia B. C. & Khandelwala K.K. Publisher: New Delhi- Lakshmi Pub.,1992 Soil Mechanics & Foundations by Punmia B. C. Publisher: New Delhi- Lakshmi Pub., 1991 Engineering Survey Manual by American Society of Civil Engineers (ASCE) Publisher: ASCE, 1985 Engineering Survey Technology by Kennie T. J. M.Ed. & Petrie; G. Ed. Publisher: London: Blackie & Sons Ltd. 1990 Surveying and Leveling by S.C.Rangwala, Publisher: Anand-Charotar Book Stall, 1979 Surveying and Leveling by Kanetkar T.P., Publisher: Pune: Pune Vidyarthi Griha Prakashan, 1989 Surveying for Construction by Irvine Willian H. Publisher: New Delhi: MacGraw Hill Pub, 1995 Surveying Vol. 2 by S.K. Duggal Publisher: New Delhi: Tata MacGraw Hill Pub. Co. Ltd. 1996 Hand Book on Road Construction Machinery by India, Ministry of Shipping and Transport Publisher: New Delhi: IRC, 1985 Road & Bridge Construction Handbook by Lapinski Michael, Publisher: New York: Ban Nostrand Reinhold, 1978 Surveying for Civil Engineers by Philip Kissan Publisher: MacGraw Hill Book Company Water Supply Engineering by Garg, Santosh Kumar Publisher: Delhi Kanna Pub, 1996
CEPT, Ahmedabad
84
Electronic References
www.sunsurveysystems.com www.dehilster.info www.jupiterimages.com www.globalsecutiry.org www.gps.gov www.triginstruments.co.nz www.smartstart-toys.co.uk www.stanleylondon.com www.epa.gov www.faxswitch.com www.starfireusa.com www.airshow.ru www.grunwald.ifas.ufl.edu www.soils.usda.gov www.thehindubusinessline.com/2007/01/11/stories/2007011105861000.htm Source: www.satimagingcorp.com/svc/urban_and_land_development.html Source: www.satimagingcorp.com/svc/urban_and_land_development.html
CEPT, Ahmedabad
85
Annex I:
Guiding Principles Covering Route Selection
General The location should result in minimum interference to agriculture and industry. The location should, as far as possible, facilitate easy grades and curvature. The location should steer clear of obstruction, such as cemeteries, burning ghats, places of worship, archaeological and historical monuments, and as far as possible, from public facilities like, hospitals, schools, play grounds, etc. Where the proposed location interferes with utility, services, like, overhead transmission lines. Water supply lines, etc., decision between changing the road alignment or shifting the utility services should be based on study of the relative economics and feasibility. As far as possible, frequent crossing and re-crossing of a railway line should be avoided. For design requirements in such cases, reference may be made to IRC: 39 Standards for Road-Rail Level Crossings An important obligatory point in the selection of the route is the location of river crossings. While crossings of major rivers (waterway exceeding 200 m.) may have to be as normal to the river flow if possible, with road alignment sub-ordinated to considerations of the bridge sitting. Crossings of medium/minor streams should be generally governed by the requirements of the road proper. If necessary, such structures could be made skew/located on curves. The location should be such that the road is fully integrated with the surrounding landscape of the area. In this connection, it would be necessary to study the environmental impact of the road and ensure that the adverse effects of it are kept to the minimum. The road should, as far as possible, be located along edges of properties rather than through their middle so as to cause least interference to cultivation and other activities and to avoid the need for frequent crossing of the road by the local people. The location should be, such as to avoid unnecessary and expensive destruction of wooded areas. Where intrusion into such areas is unavoidable the road should be aligned on a curve if possible so as to preserve an unbroken background. The location should, as far as possible, be close to sources of embankment and pavement materials so that haulage of these over long distances is avoided and the cost minimized. A preferred location is one which passes through areas having better type of soil and permits a balancing of the cost of cut and fill for the formation.
CEPT, Ahmedabad
86
Marshy and low-lying land, and areas having poor drainage and very poor embankment material should be avoided, as far as possible. Also, areas susceptible to subsidence due to mining operations should be by-passed.
Areas liable to flooding should be avoided, as far as possible. As far as possible, area likely to be unstable due to toe-erosion by rivers, shall be avoided. During fixing of alignment by the side of a river, the direction of flow of the river and HFL records for past 50 years shall be kept in view. In spite of all conscious effort to avoid running through forest area many times roads are required to be aligned passing through the forest land. With increase in traffic roads require to be widened often leading to cutting of trees on one or both sides of the road. All these unavoidable feeling need to be made good by provision of compensatory aforestation in equal or additional areas at suitable locations. Project preparation needs to keep this aspect in view and make necessary provisions for compensatory aforestation where the same is warranted.
If prior to project preparation it is known that a facility under construction is to be widened to additional lanes, the project should be prepared by locating the first embankment and pavement in an eccentric position with respect to the total land available and also freeze the total land required for the entire envisaged facility right in the beginning. The subsequent construction may then be undertaken symmetrically with respect to the centre line of the land.
If provision of additional lanes has to be made to an old road, it can be done either by addition of half the requirements symmetrically on each side on the entire new addition on one side only. The points to be considered in such a case are: 1. The availability of land and convenience of additional acquisition in view of presence of buildings and existing constructions on each side 2. Felling of trees that may be involved on either side 3. The width of new construction and facility of compaction equipment to operate and 4. Technical convenience for construction of additional structures and necessary protection works for the same in the vicinity of the existing structures 5. Technical convenience for locations of additional two lane carriage way preferably on up stream side of the flow of water, providing better protection to the existing facility.
CEPT, Ahmedabad
87
Special Problems of Locating Hilly Areas Steep terrain and other inaccessible area should be avoided, as far as possible. Unstable hilly features, areas having frequent landslide or settlement problems and up slope benched agricultural field with potential for standing water may be avoided as far as possible. The alignment should involve least number of hair-pin bends. Where unavoidable, the bends should be located on stable and gentle hill slopes In crossing mountain ridges, the location should be such that the road preferably crosses the ridge at their lowest elevation Areas liable to snow drift should be avoided. As far as possible, needless rise and fall must be avoided, specially where the general purpose of the route is to gain elevation from a lower point to a higher point.
Areas of valuable natural resource and wild live sanctuaries shall be avoided.
Special Considerations in Expansive Soils Suitable forms of stabilization, especially mixing of lime in pulverized soil may be necessary to achieve desired gain in strength. Special Considerations of Road in Saline Soils Locations where large salt deposits occur should be bypassed In locating the road in medium and highly saline soil precautions for diversion of water away from road bed should be taken. On wet saline soils, road embankment should be constructed of good imported soil free from salts. Special Considerations in Marine Clay In case the marine clay site is under the influence of tide rise and fall of water, the sub grade should be 1.0 meter above the highest tidal water level.
Marine clay are soft and compressible. Therefore, stability of fill and the magnitude and time rate of settlement needs to be evaluated and considered. If these factors are not within the acceptable limit ground improvements methods may be adopted.
Special Considerations in Water Logged Areas Embankment height should be adequately above level of standing water Provision of capillary cut-off or blanket drainage facility below pavement may be necessary
CEPT, Ahmedabad
88
Points of Guidance of Prevention of Soil Erosion needing attention in the Construction of Road in Hilly Areas The road construction project estimates should provide for not only the requisite scale of investigation but also the necessary measures against soil erosion so that these can be built into the project with adequate financial provision. Before finalizing the alignment erosion potential of each alternative should be carefully examined and the one involving least disturbance to the natural ground should be preferred. Roads should not be located in geological by unstable strata, if this can be avoided. Study of the geological maps of the area and consultation with the local Geological Department will be helpful in this regard. It will be advisable, at least for important roads, to have consultation with officers of Forest Department at the stages of route alignment selection, surveys and investigations, etc., so as to ensure that the selected alignment has minimum potential for soil erosion and that the project designs and estimates provide for the necessary soils erosion control measures. On hill slopes half cut and half fill type of cross-sections which involves least disturbance to the natural ground, should be adopted subject to consideration of economy and road stability being satisfied. The cut slope should be made stable for the type of strata in the initial construction stage itself by resorting to stable cut slopes with benches, etc. including the use of slope stabilizing structures, like, breast walls, pitching, etc. Area for clearing and grubbing should be kept minimum subject to technical requirements of the road. The clearing area should be properly demarcated to save desirable trees and shrubs and to prevent over clearing. Location and alignment of culverts should be so chosen as to avoid adverse erosion at outlets and siltation at inlets. The crossing-drainage structures should discharge safely on the valley side and in this connection all necessary precautions/safe guards should be taken to ensure that the discharging water does not cause erosion even when they flow for long period. Drainage of water from the roadside must be given top attention and necessary system of drains will be received to deal the run-off to natural water courses.
Appropriate
mitigating
measures,
like,
ground
cover
planting
and
CEPT, Ahmedabad
89
Annex II:
Checklist of major operations involved in the Survey and Investigation
1. Reconnaissance Survey 1. Map Study 2. Aerial reconnaissance
3. Ground reconnaissance
2. Preliminary Survey 1. Collection of general information about traffic, soil, subsoil and surface drainage, etc. 2. Establishment of reference bench marks 3. Traverse survey 4. Fly levels and cross-sections
5. Map preparation
3. Determination of final Center-Line in the Design Office 4. Final location Survey 1. Staking of final centre line 2. Referencing Horizontal Intersection Points (HIP)s, Points of Transit (POTs) etc. 3. Establishment of permanent bench marks
CEPT, Ahmedabad
90
4. Surface run-off
9. Cross-drainage Structures 1. Site selection
CEPT, Ahmedabad
91
Annex III:
List of Laboratory Test to be conducted for Road Embankments A BOREHOLE SAMPLES
1. Test on Undisturbed Samples Undisturbed samples are those collected in 100 mm dia. thin walled tubes conforming to IS: 2132-1972. These should be tested in the laboratory for the determination of the following soil properties: 1. Grain size analysis (as per IS: 2720 part IV-1975) 2. Natural moisture content (as per IS: 2720 Part II-1973) and dry density 3. LL & PL (as per IS: 2720 Part V 1970) (for soils suspected to be organic in nature, by virtue of colour, odour, texture, etc. LL on fresh as well as on oven-dry specimens may be separately found out) 4. CS, CV, and PC (pre consolidation pressure) from consolidation test (according to IS: 2720 PartXV-1965) 5. C & from unconsolidated, un-drained (UU) triaxial test (according to IS: 2720 Part XI-1971). Bulk density, void ratio and moisture content before/after UU test should also be determined.
2. Natural moisture content (as per IS: 2720 Part II-1973) and dry density
3. LL & PL (as per IS: 2720 Part V 1970) (for soils suspected to be organic in nature, by virtue of colour, odour, texture, etc. LL on fresh as well as on oven-dry specimens may be separately found out)
CEPT, Ahmedabad
92
4. For any of the types of strength tests mentioned above, the actual
bulk density, void ratio and moisture content of the specimens before/after the test should be found out and recorded.
CEPT, Ahmedabad
93
Annex IV:
Seismic Zones of India
Seismic zoning map of a country is a guide to the seismic status of a region and its susceptibility to earthquakes. India has been divided into five zones with respect to severity of earthquakes. Of these, Zone V is seismically the most active where earthquakes of magnitude 8 or more could occur. Recent strong motion observations around the world have revolutionized thinking on the design of engineering structures, placing emphasis also on the characteristics of the structures themselves.
Section 1.01
Zone 5: Zone 5 is the worst prone zone in the country. It covers the area with the highest risk zone that suffers earthquakes of intensity.. The IS code assigns zone factor of 0.36 for Zone-5. Structural designer uses this factor for earthquake
CEPT, Ahmedabad
94
resistant design of structure in zone-5. The zone factor of 0.36 is indicative of effective (zero period) peak horizontal ground accelerations of 0.36 g (36 % of gravity) that may be generated during MCE level earthquake in this zone. It is referred to as the Very High Damage Risk Zone. The state of Kashmir, the western and central Himalayas, the North-East Indian region and the Rann of Kutch fall in this zone
Section 1.02
Zone 4: This zone is called the High Damage Risk Zone. The IS code assigns zone factor of 0.24 for Zone-4. The Indo-Gangetic basin and the Rajasthan region fall in Zone 4.
Section 1.03
Zone 3: The Andaman and Nicobar Islands, parts of Kashmir, Western Himalayas and Punjab fall under this zone. This zone is classified as Moderate Damage Risk Zone. The IS code assigns zone factor of 0.16 for Zone-3.
Section 1.04
Zone 2: This region is classified as the Low Damage Risk Zone. The IS code assigns zone factor of 0.10 (maximum horizontal acceleration that can be experienced by a structure in this zone is 10 % of gravitational acceleration) for Zone-2.
CEPT, Ahmedabad
95
Annex V:
Sample Road Sections
CEPT, Ahmedabad
96
CEPT, Ahmedabad
97
Annex VI:
SATELITTE DATA ORDER FORM NRSA DATA CENTER, SATELLITE DATA REQUEST FORM
(IRS, LANDSAT, SPOT, ERS & NOAA) Please remember incomplete forms will not be processed & will be returned
1.
Designation
Country: Fax:
Contact Person :
(List your address including PIN/ZIP code clearly. Listing of Telephone, Telex/Fax number or Cable/Telegraphic address will help NDC contact you faster in times of need.)
2. 3.
Your reference : SHIPPING ADDRESS (if different from above) Name : Mr./Ms./Dr. Address : City Phone : : : Central Govt. State Govt. Academic Inst. Industrial Individual Foreign Pin/Zip : Telex : Designation Country: Fax:
4.
(Tick the category to which your organization belongs.) (b) Funding organization if different from User Organisation: 5. 6. (a) NDC Account no : (Ex: 6-8888)
(a) In case of non-availability of good quality data for the requested date one can specify the alternative dates (either a period or a specific date). Please be sure to refer item 8 of guide lines and check column 8 on the next page (a) Have you checked the browse print(s) Yes (b) If no, tick the acceptable cloud cover : Note: Cloud cover % mentioned in accession Catalogue is only approximate Enhancement required: Common specific) (Only for photographic products) No Approx. 0-10% Approx. 11-25% Irrespective of cloud cover (Default option is Scene
7.
8.
Scene specific
CEPT, Ahmedabad
98
Data Request Details Please read all of the following guidelines before filling the table and use a separate row for each product, dont club several products in one row. Guidelines Specify the satellite: (IRS, LANDSAT, SPOT, NOAA, etc.) Specify the sensor: (MSS, Tmfor LANDSAT, MLA, PLA for SPOT, LISS-I, LISS-II for IRS) or the subscene in case of IRS (LISS-I), for eg. LII-A1, L-II-A2, LII-B1, LII-B2 Specify the Path or Orbit (Orbit in case of NOAA) Specify the Row or Sector (Sector in case of NOAA) Specify the Topp sheet No. or Quadrant No. (Quadrant No. in case of TM Standard CCT/Cartridge or Toposheet No. in case of geocoded product). To order floppy products specify lat-long values and segement size(A-512x512, Bfor 1024x1024) do Specify the date of pass required. Alternative dates can be mentioned incase of non availability of
Sensor/ Subscene 2 Path/ Orbit 3 Row/ Sector 4 Topo Sheet/ Quadrant 5 Latitude From To 6 Longitude From To Segme nt Size A or B 7 Date of Pass 8 Product Code 9 Bands/Band Combination B&W BGR 10a 10b Unit Price Rs. 11 Value Rs. 13
Good quality data for the requested date. Indicate the alternative dates (period or specific date) in paranthesis just below the date of pass requested initially 9. Specify the product code as per the current price list. 10. (a) Specify one band number for Black & White paper print OR 1k x 1k segment floopy and 4 band numbers in case of 512x512 segment floppy (b)Specify the band combination for False Color Composite 11. Specify the Unit price 12. Specify the Quantity 13. Specify the Value of the products ordered by multiplying columns 11 and 12
Satellite 1
Quantity 12
TOTAL
CEPT, Ahmedabad
99
CONDITIONS OF SALE All products are sold for the sole use of purchasers and shall not be loaned, copied or exported without express permission of and only in accordance with terms and conditions if any, agreed with the NRSA data Centre, National Remote Sensing Agency, Dept. of Space, Govt. of India.
CEPT, Ahmedabad
100
Compliants and inspection : No compliant related to the quality and/or quantity of the products will be entertained unless the complaint is lodged at NDC within 30 days from the date of despatch. On acceptance of the compliant, product can be returned after confirmation by NDC. If the rejections are accepted by NDC, all attempts will be made to provide similar/equivalent data products.
The purchaser is responsible for any use of the data products purchased from NDC, which has no liability and responsibility for the fitness of the products for any particular use. Consequently, the purchaser waives all claims against NDC.
In general, all the data products will be despatched by registered insured post/air parcel. products can be despatched by courier service/speed post on specific request and at NDC's discretion.
Supply of data products on the price list are governed by these general terms. No contrary terms or conditions of the purchaser are binding on the NRSA Data Centre. The undersigned has verified the correctness of the order and accepted the General Terms and Conditions of supply listed above. Signature:___________________ Name:______________________ Date:_______________________
Completed
order
form
and
payment
may
be
mailed
to:
Head, NRSA Data Centre National Remote Sensing Agency Balanagar, Hyderabad-500 037, INIDA Phone : 040-23878560, 040-23879572 Ext. 2318 Telex : 0425-8080, 0425-8039 Fax : 040-23878664, 23878158
CEPT, Ahmedabad
101
For NDC use only 1. Received at NDC on______________________ 2. 3. Special instructions (if any) :
CEPT, Ahmedabad
102
Annex VII:
Sample TOR for Surveying
Subject: HUDA-Jawaharnagar Township-Preparation of Detailed Base Map by carrying out Topographical and Detailed Survey Work. Ref: Your Quotation on Dated:________________________________________ Your quotation for the work mentioned in the subject is hereby accepted. Your are requested to take up the above works as per the following specifications, terms and conditions Sr. No. Falling in to
Description of Work Preparation of Detailed Base Map of the Land Various are about of Survey (total 1475 s ha) Nos. in of the area the Jawaharnagar extending amount
covering
following components: Preparation marking of detailed topographical various other survey plan of the area along with the boundary drains, covering and Structures, trees,
plantations and any other developments existing on ground. Carrying out contour survey by taking levels at 10 m X 10 m interval and preparation of 1 m contour interval map. Marking of visible physical features like buildings, trees, utilities etc. Marking of private properties boundaries Boundary survey of water bodies (including fixing of the FTL) Levels provided will be connected to the MSL (Mean Sea LEVEL)/GTS. GPS markings for 5 points at the site Provision of Terrain Modeling including slope analysis Ruppes Seven Lakhs Eight Thousand Four Hundreds only Terms and Conditions: 1. 2. 3. 4. 5. 6. The above rates are inclusive of all taxes, duties etc. The above should be completed with in 25 days from the date of receipt of this order. The out put/deliverables should be provided in the format of which three (3) sets of hard copies and one (1) soft copy. Payment will be made after satisfactory completion of work and after deliverable are made. Bills in triplicate shall be submitted to the VC, HUDA for arranging payment. Payment will be made to the actual extent surveyed.
CEPT, Ahmedabad