Schedle Maintenance Jenbacher

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

HAINIlNANfl 5fhl0ull - IN5IlfII0N 3.

1
KeyWoid: Arreton lane lnd unlt no.: 1 8242 Module no.: 309630 1-3
Module tye: 1H5 616 05-N.l 8ulld: 2000 Lnqlne no.: 309631 1-3
Deslqn: f
veislon: 01
Issued: Checked: Date: Index: Paqe - ho.:
GB L!DJ8llek LLKJMSA 2000-01 - 1J1
InspectIon task Numherj
sectIon
Interval Note
Laily inspection iound I 9000 daily Caiiy out daily visual inspection ol the
unit.
0peiatinq data loq 6.2 daily Loq the opeiatinq data daily.
Intake aii liltei IU 801 A0 daily Il the nanonetei at the pocket liltei
shows neqative piessuie 10 nbai
(1000 Pa), the liltei needs to be
cleaned.
0il levelJ0il piessuie - Pie-
chanbei qas conpiessoi
IU 80 0 weekly Check oil level and check oil piessuie
Condensate diain - Pie.
chanbei qas conpiessoi
IU 80 0 weekly Check opeiation ol lloat condensate
dischaiqe unit.
Check iqnition
voltaqe J spaik pluq
IU 0309 H0 weekly
250 opeiatinq
houis
Ihe iesult ol the iqnition voltaqe check
to be caiiied out weekly, seives as the
indicatoi loi the actual seivice lile ol
the spaik pluq.
Lubiicatinq oil IU 0101 H
IA 1000-0099A
IA 1000-00998
IA 1000-0099C
liist tine altei
150 opeiatinq
houis
Ihe iesults lion the enqine lubiicatinq
oil analyses aie decisive loi the actual
oil chanqe peiiods.
8atteiy IA 1000-0050 once in a nonth Check the acid level.
Check il the pole bindeis aie piopeily
secuied.
Hodule inteilace panel --- once in a nonth Check aii liltei loi pollution.
Il necessaiy, clean oi ieplace.
8atteiy-LIAhL --- eveiy 2 yeai keplace
Iroper maIntenance accordIng to the maIntenance schdule Is a condItIon for honourIng
any claIms under warranty.
Ilease note that properly carrIed out maIntenance work Is to he acknowledged hy fIllIng
In the maIntenance protocol.
After the "0verhaul" 60000 operatIng hours, the maIntenance work to he carrIed out Is
repeated at the same Interval perIods.
HAINIlNANfl 5fhl0ull - kl0ulAk HAINIlNANfl 3.2
KeyWoid: Arreton lane lnd unlt no.: 1 8242 Module no.: 309630 1-3
Module tye: 1H5 616 05-N.l 8ulld: 2000 Lnqlne no.: 309631 1-3
Deslqn: f
veislon: 01
Issued: Checked: Date: Index: Paqe - ho.:
GB L!DJ8llek LLKJMSA 2000-01 - 1J2
Intervall reference numher = 0peratIng hoursj1000 Ik = on the occasIon of cylInderhead InstallatIon
Numher 0peratIng hours HaIntenance task j
InspectIon task
<

1
0
0
2
0
0
0
4
0
0
0
6
0
0
0
8
0
0
0
1
0
0
0
0
1
2
0
0
0
1
4
0
0
0
1
6
0
0
0
1
8
0
0
0
2
0
0
0
0
2
2
0
0
0
2
4
0
0
0
2
6
0
0
0
2
8
0
0
0
3
0
0
0
0
-
Haintenance altei liist
stait-up
U 1001 n
2 Inspection I 0103 n n n n n n n n n n n n n n n
2 kequlatinq iods U 0200 H n n n n n n n n n n n n n n n
2 Valve play U 000 H n n n n n n n n n n n n n n n
2 Iqnition systen U 0303 H0 n n n n n n n n n n n n n n n
10 Iuibochaiqei U 8023 H0 n n n
10 Lnqine coolant punp U 0202 H n n n
10 0il liltei inseit U 8038 H n n n
10 0as nixei U 0700 H n n n
20 Staitei U 8032 H0 n
20 Hixtuie bypass valve U 0801 H n
20 Jenbachei-switch cabinets U 8031 A0 n
20 Ciankcase vent U 0503 H
n
20 Lnqine oil punp U 80 H n
20 Ioision vibiation danpei U 001 H0 n
20 Ihiottle valveJActuatoi U 8055 H n
30 PistonJPiston coolinq U 807 H0 n
30 Con iodJCon iod beaiinq U 808 H0 n
30 Cylindei lineiJSciapei iinq U 809 H0 n
30 Ciankshalt nain beaiinq U 8050 H n
30
Ik
Canshalt J Contiol paits U 8052 H0 n
60
Iuibochaiqei altei-
lubiication punp
U 805 H0
60 0veihaul U 2100 H0
60 Plate-type heat exchanqei U 803 A0
Ik
Lxhaust qas naniloldJ
isolation
U 8051 H0
- Cylindei head ieplacenent U 8053 H If requIred
- 0as tiain U 805 A0 n n n n n n n n n n n n n n n
- 0eneiatoi U 8030 A0 n n n n n n n n n
-
Piechanbei J
Piechanbei qas valve
U 0501 H n n n n n n n n
- Llastonei paits U 803 n n n n n n n n
Hodule 1
Hodule 2
InspectIonjmaIntenance
carrIed out
Hodule 3
HAINIlNANfl 5fhl0ull - kl0ulAk HAINIlNANfl 3.2
KeyWoid: Arreton lane lnd unlt no.: 1 8242 Module no.: 309630 1-3
Module tye: 1H5 616 05-N.l 8ulld: 2000 Lnqlne no.: 309631 1-3
Deslqn: f
veislon: 01
Issued: Checked: Date: Index: Paqe - ho.:
GB L!DJ8llek LLKJMSA 2000-01 - 2J2
Intervall reference numher = 0peratIng hoursj1000 Ik = on the occasIon of cylInderhead InstallatIon
Numher 0peratIng hours HaIntenance task j
InspectIon task
3
2
0
0
0
3
4
0
0
0
3
6
0
0
0
3
8
0
0
0
4
0
0
0
0
4
2
0
0
0
4
4
0
0
0
4
6
0
0
0
4
8
0
0
0
5
0
0
0
0
5
2
0
0
0
5
4
0
0
0
5
6
0
0
0
5
8
0
0
0
6
0
0
0
0
2 Inspection I 0103 n n n n n n n n n n n n n n n
2 kequlatinq iods U 0200 H n n n n n n n n n n n n n n n
2 Valve play U 000 H n n n n n n n n n n n n n n n
2 Iqnition systen U 0303 H0 n n n n n n n n n n n n n n n
10 Iuibochaiqei U 8023 H0 n n n
10 Lnqine coolant punp U 0202 H n n n
10 0il liltei inseit U 8038 H n n n
10 0as nixei U 0700 H n n n
20 Staitei U 8032 H0 n n
20 Hixtuie bypass valve U 0801 H n n
20 Jenbachei-switch cabinets U 8031 A0 n n
20 Ciankcase vent U 0503 H
n n
20 Lnqine oil punp U 80 H n n
20 Ioision vibiation danpei U 001 H0 n n
20 Ihiottle valveJActuatoi U 8055 H n n
30 PistonJPiston coolinq U 807 H0 n
30 Con iodJCon iod beaiinq U 808 H0 n
30 Cylindei lineiJSciapei iinq U 809 H0 n
30 Ciankshalt nain beaiinq U 8050 H n
Ik
30
Canshalt J Contiol paits U 8052 H0 n
60
Iuibochaiqei altei-
lubiication punp
U 805 H0 n
60 0veihaul U 2100 H0 n
60 Plate-type heat exchanqei U 803 A0 n
Ik Lxhaust qas naniloldJ
isolation
U 8051 H0
- Cylindei head ieplacenent U 8053 H If requIred
- 0as tiain U 805 A0 n n n n n n n n n n n n n n n
- 0eneiatoi U 8030 A0 n n n n n n n n n
-
PiechanbeiJ
Piechanbei qas valve
U 0501 H n n n n n n n
- Llastonei paits U 803 n n n n n n n
Hodule 1
Hodule 2
InspectIonjmaIntenance
carrIed out
Hodule 3

You might also like