TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

TECHNICAL SPECIFICATIONS FOR 66KV SWITCHYARD FOR 40 MWP SOLAR POWER PROJECT IN G JARAT! INDIA

Doc No. PEF10069-BE-TS-007 Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! 1

%e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

TABLE OF CONTENTS

SECTION
1 " # 4 $ 6 &

DESCRIPTION
GENERAL TECHNICAL SPECIFICATION DETAILED TECHNICAL SPECIFICATION - ELECTRICAL DETAILED TECHNICAL SPECIFICATION - CIVIL TECHNICAL SCHED LE % ALITY ASS RANCE PROGRAM LIST OF MANDATORY SPARE PARTS SINGLE LINE DIAGRAM

NO OF SHEET
4" 114 "$ "1 # # "

Doc No. PEF10069-BE-TS-007 Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! '

%e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

VOLUME II
SECTION I GENERAL TECHNICAL SPECIFICATION

TABLE OF CONTENTS

Doc No. PEF10069-BE-TS-007 Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! (

%e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

CLAUSE NO. 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0

DESCRIPTION

PAGE

INTENT OF SPECIFICATION .......................................................................................5 DESCRIPTION OF SYSTEM: ........................................................................................6 SCOPE OF WORK..........................................................................................................6 TERMINAL POINTS ......................................................................................................12 EXCLUSIONS.................................................................................................................13 TAGGING ......................................................................................................................13 BASIC REFERENCE DRAWINGS.................................................................................13 QUALITY ASSURANCE PROGRAM ............................................................................13 GUARANTEE.................................................................................................................13 TOLERANCE..................................................................................................................14 TIME SCHEDULE...........................................................................................................14 APPROVED SUB VENDORS/MAKES...........................................................................15 FACILITIES TO BE PROVIDED BY THE PURCHASER ..............................................15 DRAWING/DOCUMENTS REQUIRED..........................................................................15 ERECTION TESTING & COMMISSIONING ................................................................ 17 GALVANIZING & PAINTING..........................................................................................37

ANNEXURE A PROJECTINFORMATION...........................................................................................38 ANNEXURE B BILL OF QUANTITY....................................................................................................40

Nearest Railway Line

:Bhuj

Doc No. PEF10069-BE-TS-007 Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! )

%e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

Nearest Sea Port Nearest Airport Access Roads Site Elevation Atmospheric Conditions Seismic data Meteorological data Design Ambient temp for equipment Ambient Air Temperature Maximum dry bulb temperature Minimum dry bulb temperature Rainfall in mm Wind velocity Maximum wind velocity Experienced Wind direction Relative humidity Maximum humidity Electrical Details Electrical Voltage levels HV System

: :Bhuj : : :Dusty & heavily polluted : As per IS 1839-2002

: 50C : : :

: m/s as per IS 875, part 3:1987 : : 21-95% : 95%

66 KV,(+/-)10%, 3 Phase,50HZ,(+)3 % to (-) 3% solid grounded. 11 kV, () 10% volts, 3phase, 50 Hz (+/-) 3%, Ungrounded system. 400 V ()10% volts, 3 phase, 50 Hz (+/-) 3%, solidly grounded system Control Voltage 110 V () 10% volts, 1 phase, 50 Hz. 230 V ()10% volts, 1 phase, 50 Hz 10% (Absolute sum)

MV System

LV System

Auxiliary supply for lighting Combined voltage & frequency Variation DC Voltage UPS Voltage Electric Equipment Voltage Rating

220 (+)10% to (-) 15% volts, ungrounded 230 volts ()10% volts, 1 phase, 50 Hz system

For motors from 0.2 kW to 160kW For motors less than 0.2 kW

: :

400 Volt, 3 phase, 50 Hz Solidly earthed 230 Volt, 1 phase, 50 Hz

Doc No. PEF10069-BE-TS-007 Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! *

%e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

Fault Level 66 kV system 11 kV system 400 volts system : : : 31.5 kA for one second 31.5 kA for three second. 50 kA for one second

4.4.16.12

The energy accounting and audit meters shall have the facility to measure, record and display one or more of the following parameters depending upon the energy accounting and audit requirement. All parameters excluding instantaneous electrical parameters shall also be stored in memory. Apparent power Phase wise kilowatt at peak KVA Phase wise KVA (reactive) at peak KVA Phase wise voltage at peak KVA Power down time Average power factor Line currents Phase voltages Date and time Tamper events (a) Two ports for Remote Control Centre

Doc No. PEF10069-BE-TS-007 Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! 6

%e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

(b)

Two ports for Regional System Coordination Centre (RSCC)

conductors of the safety earthing system above ground level. 4.5 4.6 Down conductors shall be cleated on the structures at 2000 mm interval. Connection between each down conductor and rod electrodes shall be made via test joint (pad type compression clamp) located approximately 1500 mm above ground level. The rod electrode shall be further joined with the main earthmat. Lightning conductors shall not pass through or run inside G.I. conduits For Switchyard control building, Lightning protection system shall comprise air terminations down conductors, test links, earth terminations & earth electrodes. Galvanized Steel is used as the material for lightning protection conductor as per contract technical specification. Dimensions of conductors for lightning protection system shall be as follows: o 50 x 6 mm Galvanized steel strip for Horizontal Air termination & Down Conductors o 20 mm dia 1000 mm long Galvanized steel rod for Vertical air termination o 40 mm dia 3 m long Mild Steel rod for Earth termination Air termination network consist of vertical or horizontal conductors or combination of both shall be provided for the buildings requiring lightning protection according to IS: 2309. Down conductors should follow the most direct path possible between the air terminal network and the earth termination network. Where more than one down conductor is used, the conductors should be arranged as evenly as practicable around the outside walls of the structure. Each down conductor shall be provided with a test link for testing. An earth electrode shall be connected to each down conductor. GALVANISING Thickness of galvanizing shall be atleast 910gm/sq.m for all galvanized steel conductors. The galvanized surfaces shall consist of a continuous and uniformly thick coating of zinc, firmly adhering to the surfaces of steel. The finished surface shall be clean and smooth and shall be free from defects like discolored patches, bare spots, unevenness of coating, spelter which is loosely attached to the steel globules, spiky deposits, blistered surfaces, flaking or peeling off etc 5.0 TESTS Materials offered shall be of type tested and proven type. Type test certificates for test conducted earlier on similar rating shall be furnished. Routine tests, Acceptance tests shall be carried out for as per applicable standards. The galvanized steel shall be subjected to four one minute dips in copper sulphate solution as per IS : 2633.

4.7 4.8

4.9

4.10

4.0

1.0

Design and Engineering Aries Engineering Consultant Page! 7 %e& '

Doc No. PEF10069-BE-TS-007 Vol- ! Tec"nical S#eci$ication

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

2.0 3.0 4.0

Manufacture Transport & Delivery at Site Erection, Testing & o!!issioning

SIGNATURE OF BIDDER NAME DESIGNATION

___________________________

___________________________ ___________________________

COMPANY SEAL

DATE

___________________________

Doc No. PEF10069-BE-TS-007 Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! +

%e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

SECTION ' 4()* RE% IREMENTS OF THE CONTRACTOR AT SITE

1. "and #e$uire!ents 1 2. &or stores 1 3. &or site office 1 4. onstruction 2 #e$uire!ent Duration -. onstruction 3 #e$uire!ent Duration

%nit

#e$uire!ent

S$.M

S$.M

'o(er )*+ Mont,s .ater u.!/d ay Mont,s

SIGNATURE OF BIDDER NAME DESIGNATION

___________________________

___________________________ ___________________________

COMPANY SEAL

DATE

___________________________

Doc No. PEF10069-BE-TS-007 Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! 9

%e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

S BSECTION ' 4(+* CONTRACTOR,S RESO RCE DEPLOYMENT SCHED LE

A)

S-./ E0/1.-23 E45-67/3. T8/ 9-::/0 ;8<== -3:-1<./ .8/ ;18/:5=/ 2> S-./ E0/1.-23 /45-67/3. 8/ 60262;/; .2 :/6=2? <. .8/ ;-./ >20 /@/15.-3A .8/ B20C;( S.No Site Erection Equip ent

B)

R/;2501/ D/6=2?7/3. S18/:5=/ T!e "i##er $!%&& in#ic%te t!e $c!e#u&e o' %t t!e $ite 'or e*ecutin+ t!e (or,$. S.No. T)pe o' Re$ource$ %npo(er re$ource$ !e propo$e$ to #ep&o)

Mont!$ ' (

SIGNATURE OF BIDDER NAME DESIGNATION

___________________________ ___________________________ ___________________________

COMPANY SEAL

DATE

___________________________

Doc No. PEF10069-BE-TS-007 Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! 10

%e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

S BSECTION ' 4(10* SCHED LE OF TEST AND INSPECTION

A-

SC.EDULE OF PLACES

T"e Bi,,er s"all in,icate t"e ite- o$ E.ui#-ent to /e su##lie,0 na-e o$ t"e 1anu$acturer or Su/Ven,or an, #lace o$ test an, ins#ection as s"o2n /elo2! Ite o' Equip ent M%nu'%cturer/Su" 0en#or P&%ce o' te$t %n# In$pection

B-

SC.EDULE OF TESTS

T"e Bi,,er s"all in,icate t"e Sc"e,ule o$ tests #ro#ose, to /e carrie, out at 1anu$acturer or Su/Ven,or3 4or5s! Ite o' Equip ent N% e o' Te$t P&%ce o' te$t %n# In$pection

SIGNATURE OF BIDDER NAME DESIGNATION

___________________________ ___________________________ ___________________________

COMPANY SEAL

DATE

___________________________

Doc No. PEF10069-BE-TS-007 Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! 11

%e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

SECTION - 4(11* SCHED LE OF TYPE TESTS

T"e Bi,,er s"all in,icate t"e list o$ t6#e tests alrea,6 carrie, out on si-ilar e.ui#-ent an, rating along 2it" co#6 o$ test certi$icates. N% e o' t!e Te$t R%tin+ o' equip ent Ye%r o' Te$tin+ Te$t P%r% eter $ P&%ce o' te$t 1 Te$tin+ A+enc)

SIGNATURE OF BIDDER NAME DESIGNATION

___________________________ ___________________________ ___________________________

COMPANY SEAL

DATE

_______________________

Doc No. PEF10069-BE-TS-007 Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! 1'

%e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

SECTION - 5 QUALITY ASSURANCE PROGRAM

Doc No. PEF10069-BE-TS-007 -0'-1009160 %e&-' Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! '0* %e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

TABLE OF CONTENTS CLAUSE. No DESCRIPTION PAGE No.

1.0.0 2.0.0 3.0.0 4.0.0

QUALITY ASSURANCE PROGRAMME....................................................... 207 GENERAL REQUIREMENT .......................................................................... 207 QA & I CO ORDINATION PROCEDURE...................................................... 210 INSPECTION AND TESTING........................................................................ 210

Doc No. PEF10069-BE-TS-007 -0'-1009160 %e&-' Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! '06 %e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

SECTION 5 QUALITY ASSURANCE PROGRAM 1.0 QUALITY ASSURANCE PROGRAMME The contractor shall adopt suitable quality assurance programme to ensure that the equipment and services under the scope of contract whether manufactured or performed within the contractors works or at his sub-contractors premises or at the Owners site or at any other place of work are in accordance with the specification. Such programme shall be outlined by the contractor and shall be finally accepted by the Owner / authorized representative after discussion. The QA programme shall be generally in line with ISO9001. 2.0.0 2.1.0 GENERAL REQUIREMENT All materials, components and equipments covered under this specification shall be procured, manufactured, erected, commissioned, and tested at all stages, as per a comprehensive Quality Assurance Programme. It is the contractors responsibility to draw up and implement such programme duly approved by the Owner. The detailed Quality Plans for manufacturing (MQP) and field activities (FQP) shall be drawn up by the Bidder and will be finalized as per enclosed Annexures 1&2. Manufacturing Quality Plan (MQP) will detail out for all the components and equipments, various test/inspection, to be carried out as per the requirements of this specification and standard mentioned therein and quality practices and procedures followed by Contractors/sub-contractors Quality Control Organization, the relevant reference documents and standards, acceptance norms etc. during all stages of manufacturing including raw material procurement, in-process manufacturing, assembly, and final testing/performance testing. The Quality Plans shall be submitted to Owner in soft form for review and Comment. Hard copies of Final Quality Plans shall be submitted for stamping and approval in addition to soft copies. Field Quality Plans (FQP) will detail out for all the equipments, the quality practices and procedures etc. to be followed by the contractors site Quality Control Organization, during various stages of site activities starting from receipt of materials/equipment at site. The Bidder shall also furnish copies of the reference documents/plant. Standards/acceptance norm/test and inspection procedures etc. as referred in Quality Plans along with Manufacturing and Field Quality Plans. These Quality Plans will be subject to Owners approval without which manufacturer and erector shall not proceed with the manufacturing and erection activities. These approved documents shall form a part of the Contract. In these approved Manufacturing and Field Quality Plans, Owner shall identify Customer Hold Points (CHP), e.g. test/checks which shall be carried out in presence of the Owners representative or its nominated outside inspection agency and beyond which the work will not proceed without consent of Owners representative or its nominated outside inspection agency in writing. All deviations to this specification, approved quality plans and applicable standards must be documented and referred to Owner along with technical justification for approval and dispositioning. The contractor shall submit to the Owner Field Welding Schedule for field welding activities Critical item .The field welding schedule shall be submitted to the Owner along with all

2.2.0

2.3.0

2.4.0

2.5.0

Doc No. PEF10069-BE-TS-007 -0'-1009160 %e&-' Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! '07 %e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

2.6.0

supporting documents like welding procedures, heat treatment procedure, NDT procedures, etc. at least 90 (Ninety) days before start of erection work at Site. The contractor shall have suitable Field Quality Organization with adequate manpower at Owners site, to implement the Field Quality Plans (FQP) and Field Quality Management System for site activities .The contractor shall submit the details of the proposed FQA set up (organizational structure and manpower) for Owners approval. The FQA set up shall be in place at least one month before the start of site activities. No material shall be dispatched from the manufacturers works before the same is accepted, subsequent to pre-dispatch and final inspection including verification of records of all previous tests/inspection by Owners representative or their authorized outside inspection agency and authorized for dispatch by issuance of Material Despatch Clearance Certificate (MDCC). All materials used for equipment manufacture including casting and forging etc. shall be of tested quality as per relevant codes/standards . Details of results of the test conducted to determine the mechanical properties, Chemical properties, details of Heat Treatment procedure recommended and actually followed (H T Chart), results of NDT tests conducted shall be recorded on the test certificate. All tests shall be carried out as per applicable material specification, code requirement and as specified in this specification.

2.7.0

2.8.0

2.9.0

2.10.0 All welding and brazing shall be carried out as per procedure drawn and qualified in accordance with requirement of ASME Section IX or any other equivalent International Standard acceptable to the Owner. All welding and brazing procedures shall be submitted to the Owner or its authorized outside inspection agency for approval prior to carrying out the welding/brazing. 2.11.0 All welders, brazers, and welding operators employed on any part of the contract either at the Contractors/ sub- contractors works or at site or elsewhere shall be qualified as per ASME Section IX or any other equivalent International Standards acceptable to the Owner. Welding procedure qualification, welders qualification, Brazing procedure qualification and brazers qualification test results shall be furnished to the Owner or its authorized outside inspection agency for approval. However, where required by the Owner, tests shall be conducted in presence of Owners representative or its authorized outside Inspection agency. 2.12.0 All statutory and safety requirements for the equipments/systems shall also be complied with. 2.13.0 Unless otherwise proven and specifically agreed with the Owner, Welding of dissimilar materials and high alloy materials shall be carried out at shop only. No welding shall be carried out on cast iron components for repair and up gradation of casting. 2.14.0 All the heat treatment results shall be recorded on time temperature Chart and verified with recommended regimes. 2.15.0 All non-destructive examination shall be performed in accordance with written procedures as per International Standards. The NDT operators shall be qualified as per American

Doc No. PEF10069-BE-TS-007 -0'-1009160 %e&-' Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! '0+ %e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

Society of Non- Destructive Testing or any other International Standard acceptable to Owner. The result of NDT shall be recorded in a report, which includes details of methods and equipment used, job identification no. job detail, identification of personnel performing the test, result of evaluation and correlation of the test report with the job. 2.16.0 All bar stock/forging of diameter equal to or greater than 50 mm shall be ultrasonically tested. In general all plates of thickness 40 mm and above used for non pressure application and plates of thickness 25 mm and above used for pressure parts shall be ultrasonically tested unless otherwise specified in respective specification. 2.17.0 The contractor shall list out all major items/equipments/components to be manufactured in house as well as to be procured from their suppliers and sub-suppliers. All suppliers and their sub-suppliers proposed by the contractor for procurement of major items including casting, forging, semi-finished and finished items /equipments etc. list of which shall be drawn up by the contractor and shall be subject to Owners approval. 2.18.0 The contractor shall submit their proposal for approval of suppliers and their sub-suppliers prior to placement of orders which will include details of manufacturing facilities established at the respective works, their Quality Management System followed, and experience list in manufacturing and supply of items for which proposal has been submitted for approval along with their own technical evaluation of proposed manufacturer with in the period agreed at the time of pre-awards discussion. 2.19.0 The contractor should have their own QA and Inspection organization for carrying out inspection at manufacturers works and at site as per approved Quality Plan. In case , the contractor proposes to engage third party Inspection Agency for carrying out inspection on his behalf, the same shall be done only after obtaining due approval from the Owner/ Purchaser well in advance. 2.20.0 Owner reserves the right to carry out quality audit and quality surveillance of the system and procedures of the contractor and their sub-contractors Quality Management and control activities. The contractor shall provide all necessary assistance to enable the Owner carry audit and surveillance. 2.21.0 The contractor shall carry out an inspection and testing of component and equipment during manufacture at his work and at his sub-suppliers work and at site to ensure to ensure the compliance with the drawing, quality, conformance to functional and performance requirements of the parts and equipments. 2.22.0 Contractor shall carry out all tests/inspection required to establish that the items/equipments conform to the requirements of the specification and relevant codes/standards specified in the specification , in addition to carrying out tests as per the approved Quality Plans. Quality audit/ surveillance/approval of the test results, inspection and acceptance of material will not, however, prejudice the right of the Owner to reject the equipment if it does not comply with the Specification when erected or does not give complete satisfaction in service and the above shall in no way limit the liabilities and responsibilities of the Contractor in ensuring complete conformance of the materials/equipments supplied to relevant specification, standard, data sheet, drawing etc. For all spares and replacement items, the quality requirements as agreed for the supply of main equipments shall be applicable. 2.23.0 Repair/rectification procedures to be adopted to make the job acceptable shall be subject

Doc No. PEF10069-BE-TS-007 -0'-1009160 %e&-' Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! '09 %e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

to the approval of the Owner/ authorized Inspection Agency. .00 QA ! I CO ORDINATION PROCEDURE It will be discussed between owner and bidder and finalized during Pre- award discussion. 4.0 4.1 INSPECTION AND TESTING The word Inspector shall mean Owners or Purchasers authorized representative or nominated Outside Inspection Agency representative acting on behalf of the Owner/ Purchaser to inspect and examine the materials and workmanship of the equipment during its manufacture or erection. The Owner or his authorized representative and /or nominated outside inspection agency acting on behalf of the Owner/Purchaser shall have access at all reasonable times to inspect and examine the materials and workmanship of the equipments during its manufacturing and erection and if part of the work is being manufactured or assembled on other premises or works, the Contractor shall obtain for Owner/Purchaser and for his duly authorized representative or nominated outside inspection agency necessary permission to inspect as if the materials/parts/equipments were manufactured or assembled on the Contractors own premises or works.

Doc No. PEF10069-BE-TS-007 -0'-1009160 %e&-' Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! '10 %e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

SECTION " MANDATORY SPARE PARTS

Doc No. PEF10069-BE-TS-007 -0'-1009160 %e&-' Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! '11 %e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

ELECTRICAL MANDATORY SPARES FOR "" #V EQUIPMENTS


S(N2 I./7 ELECTRICAL WORKS 1 66 CV SF6 C-015-. B0/<C/0 0ne pole co!plete (it, colu!n and interrupter (it, M1 and operating a !ec,anis! and (it,out support structure 3 S&4 5as c Trip coils (it, resistor d losing coils (it, resistors e Ter!inal pad & connectors Molecular filter for S&4 ircuit for 1 pole of f 1 Density /'ressure Monitor for S&4 ircuit g for 1 pole of 1 , orona rings of eac, type &i9ed !oving and arcing contacts including insulating no::les for one pole of i 1 #elays (it, 'DS relay, 'o(er contactors, s(itc, fuse units, "i!it s(itc,es ,pus, ; 3uttons, ti!ers &M 1 etc ) losing coil +sse!3ly l Trip coil +sse!3ly ! Set of ontrol *alves <of eac, type= n 'ressure s(itc,es < &or one 1 = 'ressure gauges & oupling device of o eac, type p +u9 contact asse!3ly $ 0peration counter r Micro &ilter set s Micro s(itc,es for au9 contact asse!3ly t +ll types of coupling for S&4 gas u 'ipe lengt, < opper & Steel= #u33er gas)ets > 0? rings and seals for v S&4 circuit ( Spring 0perated closing !ec,anis! 9 S&4 refilling unit S&4 lea)age Tester/identification device y <porta3le type= 1rea)er ,andling & lifting : device/apparatus aa o!plete 0perating Mec,anis! 2 66 CV S-3A=/DD259=/ B0/<C I;2=<.20 0ne co!plete pole including support insulators .it, one eart, s(itc, (it, operating !ec,anis! for !ain isolator a and eart, s(itc, e9cluding structures 3 opper contact fingers for fe!ale and 3-. %5<3.-.?

2o 6g 2os

1 407 of Total 8 4 2

Set Set Set 2o. 2o. Set Set Set 2o. 2os. Set Set Set Set Set Set Set Set Set 2o.

1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1

Set 2os.

2 2

Doc No. PEF10069-BE-TS-007 -0'-1009160 %e&-' Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! '1' %e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

c d e f g , i ; ) 3 4 a 3 4 a 3 c d e f g , i ; ) l B

!ale contacts #elays 'o(er contactors, M 1s, s(itc, fuses 'us, 3uttons and resistors for electrical control ircuits Ter!inal pad & connectors Ti!ers, 6ey interloc), 'us, 3utton s(itc,, "i!it s(itc,, +u9 s(itc,es Motor 3earing asse!3ly "i!it s(itc, and au9iliary contact <co!plete for 0ne Mec,anis! 3o9 of isolator= #otor @ousing 3earing +sse!3ly Motor (it, gear and level gear asse!3ly orona s,ielding ring of eac, type Anterloc)ing coils )ey interloc) of eac, type 66 CV C500/3. T0<3;>207/0 "ine T 66 CV P2./3.-<= T0<3;>207/0 "ine 'T 60 CV S50A/ A00/;./0 Surge +rrester co!plete (it, insulating 3ase and ter!inal connectors Surge Monitor (it, counter 66 CV R/=<? P<3/=; (E<18) 1rea)er failure relay Trip ircuit supervision relay Self reset trip relay @and reset trip relay Ti!er relay +u9iliary relays &lag relays D supervision relay 'ole discrepancy relay Main 1 nu!erical distance relay Main 2 nu!erical distance relay 2u!erical !ultifunction relay for 'o(er Transfor!er feeder protection ""0 V B<../0-/; Dry and unc,arged cells Ter!inal lugs &loat level indicators *ent plugs Anter cell connectors Anter ro( connectors 1attery stand insulators ell insulators 2uts, 3olts & (as,ers Spare dry cell ""0 V B<../0? C8<0A/0 Set of control cards <+ll ' 1 cards= Set of relays Set of contactor

Set 2os. Set Set Set Set Set Set Set 2os 2os 2o 2o 2o 2o 2o 2o 2o 2o 2o 2o 2o 2o 2o 2o 2os. 2os. 2os. 10 2os. 10 2os. 10 2os. 2 2os. 2 2os. 2 Sets 10 2os. 10 Set 1 Set 1 Set 1

1 2 1 1 1 1 1 1 1 1 1 3 3 1 3 1 1 3 3 1 1 1 1 1 1 20

Doc No. PEF10069-BE-TS-007 -0'-1009160 %e&-' Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! '1( %e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

10

11

12 13 14 114 1B 18

&ilter capacitor T,ree p,ase full (ave 3ridge rectifier Set of (ound resistor Set of S(itc,es 'otentio!eter &uses of T,yristor (it, indicator 400 V PDB! LDB! E7/0A/31? DB AIR CIRC IT BREAKER S'#A25 @+#5A25 M0T0# &i9ed contact of eac, rating Moving ontact of eac, type +rcing contact of eac, type ,arging spring of eac, type 0ver load #elays ontactor & +u9. 'o(er ontactors PS Set of control cards <+ll ' 1 cards= Set of relays Set of contactor &ilter capacitor T,yristors Set of S(itc,es 'otentio!eter Set of fuses -==57-3<.-23 ;?;./7 Eac, type & rating of la!p Eac, type & rating of 1allast Eac, type & rating of Starter Eac, type & rating of Agniter Eac, type & rating of apacitor I3;5=<.20; E 8<0:B<0/ ACSR 123:51.20 A=57-3-57 T595=<0 123:51.20(;.<3:<0: =/3A.8) C=<76; E C233/1.20; 66 CV T<0->> 7/./0-3A P<3/=; <5@-=-<0? /45-67/3. (E<18 .?6/) S?318023-F-3A 0/=<? 6<3/= <5@-=-<0? /45-67/3. (E<18 .?6/) SAS ;?;./7 6<3/=; A5@-=-<0? (E<18 .?6/)

2os. 1 2os. 1 Set 1 Set 1 2os. 1 2os. 4 1 no 1 set

1 no of eac, rating 1 no of eac, rating Set 1 Set 1 Set 1 Set 1 Set 1 Set 1 Set 1 Set 1 2os. 2os. 2os. 2os. 2os. 107 of installed Duantity 107 of installed Duantity 107 of installed Duantity 107 of installed Duantity 1 nos 1nos 1 Set/2os

Doc No. PEF10069-BE-TS-007 -0'-1009160 %e&-' Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! '1) %e& '

TECHNICAL SPECIFICATION FOR 66KV SWITCHYARD

ADANI RENEWEABLE ENERGY LLP SOLAR POWER PROJECT 40MW (1X40MW PHASE-1)

SECTION $ SINGLE LINE DIAGRAM

Doc No. PEF10069-BE-TS-007 -0'-1009160 %e&-' Vol- ! Tec"nical S#eci$ication

Aries Engineering Consultant Page! '1* %e& '

SINGLE LINE DIAGRAM FOR GENERAL SWITCHYARD DRG( NO( PEF 1006+BE-EL- NI-00$-0#! REV( 0" AS PER SEPARATELY ENCLOSED (