Soil Stack 1: Calculation Sheet

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 10

Client: Project : Subject:

Engineering Consultant :

Ref No.

Calculated:

Checked:

Approved:

Location :

DATE: 15/02/2012

NG2406/VMP 4

GTA

KOL

AM

CALCULATION SHEET
LOCATION: FIXTURE UNIT WC WHB URNAL SOIL STACK 1 DISCRIPTION WATER CLOSET WASH BASIN URINAL FIXTURE UNIT (l/s) WC WHB URINAL TOTAL FIXTURE UNITS Ratio of appliance discharge time to interval between use, P = No. of appliances on a stack, n = Appliances discharging simultaneously, m = Simultaneous demand factor, m/n = Allowable simultaneous demand, Q = Diameter of Discharge Stack, D = Recommended diameter of Pipe, D (mm) = 2.3 0.6 0.15 NUMBER 0 24 24 48 FIXTURE DISCHARGE Units 0.6 l/s 0.15 l/s 2.3 l/s TOTAL FIXTURE UNIT 0 14.4 3.6 18 0.017 48 3.095866101 0.06449721 1.160949788 51.27123715 75

Client: Project : Subject:

Engineering Consultant :

Ref No.

Calculated:

Checked:

Approved:

Location :

DATE: 15/02/2011

NG2406/VMP 3

GTA

KOL

AM

CALCULATION SHEET
LOCATION: FIXTURE UNIT WC WHB URNAL SOIL STACK 1 DISCRIPTION WATER CLOSET WASH BASIN URINAL FIXTURE UNIT (l/s) WC WHB URINAL TOTAL FIXTURE UNITS Ratio of appliance discharge time to interval between use, P = No. of appliances on a stack, n = Appliances discharging simultaneously, m = Simultaneous demand factor, m/n = Allowable simultaneous demand, Q = Diameter of Discharge Stack, D = Recommended diameter of Pipe, D (mm) = 2.3 0.6 0.15 NUMBER 60 24 0 84 FIXTURE DISCHARGE Units 0.6 l/s 0.15 l/s 2.3 l/s TOTAL FIXTURE UNIT 138 14.4 0 152.4 0.017 84 4.443979363 0.052904516 8.062648273 106.0468813 150

Client: Project : Subject:

Engineering Consultant :

Ref No.

Calculated:

Checked:

Approved:

Location :

DATE: 15/02/2012

NG2406/VMP 3

GTA

KOL

AM

CALCULATION SHEET
LOCATION: STORM DRAIN: Lower roof floor. 150 286.5 11.9375 2.92 4.088184932 9 Rain fall Intensity (mm/hr) is = Area to be drained =

Run off Flow rate of water, Q = Flow rate for a 100mm pipe @ 5% slope= Number of outlet =

Recommended number of outlet =

LOCATION: STORM DRAIN: Upper roof floor. Rain fall Intensity (mm/hr) is = Area to be drained =

150 100.2 4.175 2.92 1.429794521 4

Run off Flow rate of water, Q = Flow rate for a 100mm pipe @ 5% slope= Number of outlet =

Recommended number of outlet =

Client: Project : Subject:

Engineering Consultant :

Ref No.

Calculated:

Checked:

Approved:

Location :

DATE: 15/02/2012

NG2406/VMP 4

GTA

KOL

AM

CALCULATION SHEET
LOCATION: FIXTURE UNIT WC URNAL SOIL STACK A DISCRIPTION WATER CLOSET URINAL FIXTURE UNIT (l/s) WC URINAL TOTAL FIXTURE UNITS No. of appliances on a stack, n = Water consumption by each appliances = Frequency of use = Probability of Discharge Factor = From Probability Graph , only 3 will be used at a point in time Nos of Floors (n) = 8 Frequent use factor (K) = 0.5 Sum of Discharge Unit as per the Number of Floors ( DU) = Total Flow Rate (Qtotal) = k ( DU) = 5.44 From Plumbing Design Guide, Diameter of Discharge Stack, D = 11 30 Secs 20 mins (1,200 Secs) 0.025 1.7 0.4 NUMBER 8 3 11 FIXTURE DISCHARGE Units 1.7 l/s 0.4 l/s TOTAL FIXTURE UNIT 13.6 1.2 14.8

118.4

100mm dia

Client: Project : Subject:

Engineering Consultant :

Ref No.

Calculated:

Checked:

Approved:

Location :

DATE: 15/02/2012

NG2406/VMP 4

GTA

KOL

AM

CALCULATION SHEET
LOCATION: FIXTURE UNIT WC WHB URNAL SOIL STACK B DISCRIPTION WATER CLOSET WASH BASIN URINAL FIXTURE UNIT (l/s) WC TOTAL FIXTURE UNITS No. of appliances on a stack, n = Water consumption by each appliances = Frequency of use = Probability of Discharge Factor = From Probability Graph , only 3 will be used at a point in time Nos of Floors (n) = 8 Frequent use factor (K) = 0.5 Sum of Discharge Unit as per the Number of Floors ( DU) = Total Flow Rate (Qtotal) = k ( DU) = 3.19 From Plumbing Design Guide, Diameter of Discharge Stack, D = 3 30 Secs 20 mins (1,200 Secs) 0.025 1.7 NUMBER 3 3 FIXTURE DISCHARGE Units 1.7 l/s 0.3 l/s 0.4 l/s TOTAL FIXTURE UNIT 5.1 5.1

40.8

100mm dia

Client: Project : Subject:

Engineering Consultant :

Ref No.

Calculated:

Checked:

Approved:

Location :

DATE: 15/02/2012

NG2406/VMP 4

GTA

KOL

AM

CALCULATION SHEET
LOCATION: FIXTURE UNIT WC WHB URNAL SOIL STACK C DISCRIPTION WATER CLOSET WASH BASIN URINAL FIXTURE UNIT (l/s) WC TOTAL FIXTURE UNITS No. of appliances on a stack, n = Water consumption by each appliances = Frequency of use = Probability of Discharge Factor = From Probability Graph , only 3 will be used at a point in time Nos of Floors (n) = 8 Frequent use factor (K) = 0.5 Sum of Discharge Unit as per the Number of Floors ( DU) = Total Flow Rate (Qtotal) = k ( DU) = 4.88 From Plumbing Design Guide, Diameter of Discharge Stack, D = 7 30 Secs 20 mins (1,200 Secs) 0.025 1.7 NUMBER 7 7 FIXTURE DISCHARGE Units 1.7 l/s 0.3 l/s 0.4 l/s TOTAL FIXTURE UNIT 11.9 11.9

95.2

100mm dia

Client: Project : Subject:

Engineering Consultant :

Ref No.

Calculated:

Checked:

Approved:

Location :

DATE: 15/02/2012

NG2406/VMP 4

GTA

KOL

AM

CALCULATION SHEET
LOCATION: FIXTURE UNIT WC WHB URNAL SOIL STACK D DISCRIPTION WATER CLOSET WASH BASIN URINAL FIXTURE UNIT (l/s) WC TOTAL FIXTURE UNITS No. of appliances on a stack, n = Water consumption by each appliances = Frequency of use = Probability of Discharge Factor = From Probability Graph , only 3 will be used at a point in time Nos of Floors (n) = 8 Frequent use factor (K) = 0.5 Sum of Discharge Unit as per the Number of Floors ( DU) = Total Flow Rate (Qtotal) = k ( DU) = 3.69 From Plumbing Design Guide, Diameter of Discharge Stack, D = 4 30 Secs 20 mins (1,200 Secs) 0.025 1.7 NUMBER 4 4 FIXTURE DISCHARGE Units 1.7 l/s 0.3 l/s 0.4 l/s TOTAL FIXTURE UNIT 6.8 6.8

54.4

100mm dia

Client: Project : Subject:

Engineering Consultant :

Ref No.

Calculated:

Checked:

Location :

DATE: 15/02/2012

NG2406/VMP 4

GTA

KOL

CALCULATION SHEET
LOCATION: FIXTURE UNIT WC WHB URNAL SOIL STACK E DISCRIPTION WATER CLOSET WASH BASIN URINAL FIXTURE UNIT (l/s) WC TOTAL FIXTURE UNITS No. of appliances on a stack, n = Water consumption by each appliances = Frequency of use = Probability of Discharge Factor = From Probability Graph , only 3 will be used at a point in time Nos of Floors (n) = 8 Frequent use factor (K) = 0.5 Sum of Discharge Unit as per the Number of Floors ( DU) = Total Flow Rate (Qtotal) = k ( DU) = 3.69 From Plumbing Design Guide, Diameter of Discharge Stack, D = 4 30 Secs 20 mins (1,200 Secs) 0.025 1.7 NUMBER 4 4 FIXTURE DISCHARGE Units 1.7 l/s 0.3 l/s 0.4 l/s TOTAL FIXTURE UNIT 6.8 6.8

54.4

100mm dia

Approved:

AM

Client: Project : Subject:

Engineering Consultant :

Ref No.

Calculated:

Checked:

Approved:

Location :

DATE: 15/02/2012

NG2406/VMP 4

GTA

KOL

AM

CALCULATION SHEET
LOCATION: FIXTURE UNIT WC WHB URNAL SOIL STACK F DISCRIPTION WATER CLOSET WASH BASIN URINAL FIXTURE UNIT (l/s) WC TOTAL FIXTURE UNITS No. of appliances on a stack, n = Water consumption by each appliances = Frequency of use = Probability of Discharge Factor = From Probability Graph , only 3 will be used at a point in time Nos of Floors (n) = 8 Frequent use factor (K) = 0.5 Sum of Discharge Unit as per the Number of Floors ( DU) = Total Flow Rate (Qtotal) = k ( DU) = 4.12 From Plumbing Design Guide, Diameter of Discharge Stack, D = 5 30 Secs 20 mins (1,200 Secs) 0.025 1.7 NUMBER 5 5 FIXTURE DISCHARGE Units 1.7 l/s 0.3 l/s 0.4 l/s TOTAL FIXTURE UNIT 8.5 8.5

68

100mm dia

You might also like