Multilevel debris ow barrier holds back 2,000 m3 of debris following exceptionally heavy rain On October 10, 2011, heavy rainfall triggered a shallow landslide containing a total of 2,000 m3 of Alenienschiefer (schist) in the drainage area of the Milibach river. 80 mm of rain had fallen in the space of 12 hours on top of a 70 cm layer of snow from the previous day. The Swiss Federal Ofce for the Environment (FOEN) rated these heavy rainfalls as a once-in-a-century occurrence. As recently as August 22, 2005, a storm in the Weiler Reuti and in Meiringen caused serious debris coverage and severe damage. A cascade comprising 13 exible debris ow barriers and with a retention volume of up to 10,000 m3 was installed to protect the two settlements. For details, please turn to page 4. This multilevel debris ow barrier system successfully held back the latest event of October 10, 2011, stopping an estimated 2,000 m3 of debris before the shallow landslide had had chance to build up signicant erosive force, as happened in 2005. The event lled barrier no. 2 completely and barrier no. 5 partially. Barrier 1, which was situated above where the shallow landslide was triggered, remained unaffected, while barriers 3 and 4 were not lled up as they have a higher basal opening. Stopping the 2,000 m3 of debris in good time helped prevent the shallow landslide further eroding the unstable banks of the Milibach river and forestalled an even greater shallow landslide that could have caused damage to the settlements further downstream. After an in-depth investigation during an on-site inspection, the customer decided to leave barrier no. 2 lled to protect the riverbanks. The debris held by barrier no. 5 is also to be left and should be carried away over time as the water drains naturally.
Satellite image of the storm that moved across the northern Swiss Alps on October 10 (source: SF Meteo website)
Marking off
Drilling in progress
Anchor foundation
Rockfall barriers Rockfall drapes Slope stabilization systems Debris ow barriers Avalanche prevention structures Open pit rockfall barriers Special applications
Geobrugg protects people and infrastructures from the forces of nature It is the task of our engineers and partners to analyze the problem together with you in detail and then, together with local consultants, to present solutions. Painstaking planning is not the only thing you can expect from us, however; since we have our own production plants on three continents, we can offer not only short delivery paths and times, but also optimal local customer service. With a view towards a trouble-free execution, we deliver preassembled and clearly identied system components right to the construction site. There we provide support, if desired, including technical support from installation right on up until acceptance of the structure.
1.203.03.EN.0809
Geobrugg AG Geohazard Solutions Aachstrasse 11 CH-8590 Romanshorn Phone +41 71 466 81 55 Fax +41 71 466 81 50 www.geobrugg.com info@geobrugg.com