Note: If the sequence of the work plan cant be followed, Stop Work, contact FS Coordinator, FS EHS Department, FS Area

Owner and / or FS System Owner to Revise the work plan.


Thework plan should bealways attached with SI PP.

Job Hazard Analysis
Attach with Site Incident Prevention Plan (SIPP) Permit

Supervisor in Charge: Company: Contact No:
Location: ______________________________________________ Extension From: __________________ to: _____________________
Work Description: __________________________________________________________________________________________________________________________
WORK TO BE ACCOMPLISHED
JOB HAZARD
ANALYSIS

No. Sequential Steps for Completion of Work Potential Hazards
Safety Precaution Required to
Eliminate / Control Hazards
1.


2.


3.


4.


5.

6.

7.

8.


9.

10.


To notify the FS Project coordinator to commence the installation
works

To mobilize the water dispenser from the lorry to the installation
location by use of manual trolley

To conduct tool box briefing to all workers explaining the task to be
done for the day with all safety precaution

To walk with the FS Project coordinator to identify the installation
location

To prepare the necessary materials at the installation area

To tap the water supply from existing water dispenser unit

To drill the cabinets to create opening for the piping works

To install new PVC tube piping connection the new water dispenser
unit

To install the water dispenser unit and testing commissioning.

Housekeeping and remove all unwanted debris.
Communication breakdown work
without approval

Tripping hazard








Tripping Hazard / Physical injuries


Tripping Hazard / Physical injuries
To ensure have valid SI PP for the task

Barricade the work area with proper
signages

To ensure the trolley is in good
condition

To communicate and record the activity
for the day to all workers and ensure
they understand 100%

Look for any potential hazard and
notify to PM to eliminate or remove the
FS material from work area.

To use adequate tools for the task. Pre-
prepare the material required.

To double check on the installation.

To have competent supervisor 100%
monitor the activities

Segregate the debris and remove hourly.


Signature of Supervisor: _____________________________ Name : _________________________ Date : __________________
(I understand and agree that the above proposed work activities will be accomplished in a safe condition with control measures agreed above without compromising the work sequence been stated
here.)

Note: If the sequence of the work plan cant be followed, Stop Work, contact FS Coordinator, FS EHS Department, FS Area Owner and / or FS System Owner to Revise the work plan.
Thework plan should bealways attached with SI PP.

Job Hazard Analysis
Attach with Site Incident Prevention Plan (SIPP) Permit

Supervisor in Charge: Company: Contact No:
Location: ______________________________________________ Extension From: __________________ to: _____________________
Work Description: __________________________________________________________________________________________________________________________
WORK TO BE ACCOMPLISHED
JOB HAZARD
ANALYSIS

No. Sequential Steps for Completion of Work Potential Hazards
Safety Precaution Required to
Eliminate / Control Hazards








Signature of Supervisor: _____________________________ Name : _________________________ Date : __________________