This document outlines the job hazard analysis for installing a new water dispenser unit. It contains:
1) 10 sequential steps for the work including mobilizing equipment, conducting safety briefings, identifying installation locations, and commissioning the new unit.
2) Potential hazards associated with each step such as tripping hazards and physical injuries.
3) Required safety precautions to eliminate or control hazards such as barricading work areas, using proper tools, and having competent supervision of the work.
The supervisor signs to agree the work will be done safely according to the plan without compromising the sequence of steps. Any changes require revising the plan with coordinators.
This document outlines the job hazard analysis for installing a new water dispenser unit. It contains:
1) 10 sequential steps for the work including mobilizing equipment, conducting safety briefings, identifying installation locations, and commissioning the new unit.
2) Potential hazards associated with each step such as tripping hazards and physical injuries.
3) Required safety precautions to eliminate or control hazards such as barricading work areas, using proper tools, and having competent supervision of the work.
The supervisor signs to agree the work will be done safely according to the plan without compromising the sequence of steps. Any changes require revising the plan with coordinators.
This document outlines the job hazard analysis for installing a new water dispenser unit. It contains:
1) 10 sequential steps for the work including mobilizing equipment, conducting safety briefings, identifying installation locations, and commissioning the new unit.
2) Potential hazards associated with each step such as tripping hazards and physical injuries.
3) Required safety precautions to eliminate or control hazards such as barricading work areas, using proper tools, and having competent supervision of the work.
The supervisor signs to agree the work will be done safely according to the plan without compromising the sequence of steps. Any changes require revising the plan with coordinators.
Note: If the sequence of the work plan cant be followed, Stop Work, contact FS Coordinator, FS EHS Department, FS Area
Owner and / or FS System Owner to Revise the work plan.
Thework plan should bealways attached with SI PP.
Job Hazard Analysis Attach with Site Incident Prevention Plan (SIPP) Permit
Supervisor in Charge: Company: Contact No: Location: ______________________________________________ Extension From: __________________ to: _____________________ Work Description: __________________________________________________________________________________________________________________________ WORK TO BE ACCOMPLISHED JOB HAZARD ANALYSIS
No. Sequential Steps for Completion of Work Potential Hazards Safety Precaution Required to Eliminate / Control Hazards 1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
To notify the FS Project coordinator to commence the installation works
To mobilize the water dispenser from the lorry to the installation location by use of manual trolley
To conduct tool box briefing to all workers explaining the task to be done for the day with all safety precaution
To walk with the FS Project coordinator to identify the installation location
To prepare the necessary materials at the installation area
To tap the water supply from existing water dispenser unit
To drill the cabinets to create opening for the piping works
To install new PVC tube piping connection the new water dispenser unit
To install the water dispenser unit and testing commissioning.
Housekeeping and remove all unwanted debris. Communication breakdown work without approval
Tripping hazard
Tripping Hazard / Physical injuries
Tripping Hazard / Physical injuries To ensure have valid SI PP for the task
Barricade the work area with proper signages
To ensure the trolley is in good condition
To communicate and record the activity for the day to all workers and ensure they understand 100%
Look for any potential hazard and notify to PM to eliminate or remove the FS material from work area.
To use adequate tools for the task. Pre- prepare the material required.
To double check on the installation.
To have competent supervisor 100% monitor the activities
Segregate the debris and remove hourly.
Signature of Supervisor: _____________________________ Name : _________________________ Date : __________________ (I understand and agree that the above proposed work activities will be accomplished in a safe condition with control measures agreed above without compromising the work sequence been stated here.)
Note: If the sequence of the work plan cant be followed, Stop Work, contact FS Coordinator, FS EHS Department, FS Area Owner and / or FS System Owner to Revise the work plan. Thework plan should bealways attached with SI PP.
Job Hazard Analysis Attach with Site Incident Prevention Plan (SIPP) Permit
Supervisor in Charge: Company: Contact No: Location: ______________________________________________ Extension From: __________________ to: _____________________ Work Description: __________________________________________________________________________________________________________________________ WORK TO BE ACCOMPLISHED JOB HAZARD ANALYSIS
No. Sequential Steps for Completion of Work Potential Hazards Safety Precaution Required to Eliminate / Control Hazards
Signature of Supervisor: _____________________________ Name : _________________________ Date : __________________